SlideShare une entreprise Scribd logo
1  sur  6
PROJ430 Advanced Program Management Entire Class
Add to Wallet from here:
http://hwminute.com/downloads/proj430-advanced-program-management-entire-class/
PROJ-430Advanced Project Management – All 7 Weeks Discussions, A+ Material (PROJ430 PROJ430 PROJ/430)
PROJ430Week 1 DQ1 Project& Functional Manager Differences
PROJ430Week 1 DQ2 Projects and Organizational Structures
PROJ430Week 2 DQ1 The Project Kick-Off
PROJ430Week 2 DQ2 ProjectPlanningDocuments
PROJ430Week 3 DQ1 Scheduling Techniques
PROJ430Week 3 DQ2 Adjustingthe ProjectSchedule
PROJ430Week 4 DQ1 Quality Management
PROJ430Week 4 DQ2 ProjectStaffing
PROJ430Week 5 DQ1 ProjectRisks
PROJ430Week 5 DQ2 Procurement
PROJ430Week 6 DQ1 ProjectConflict
PROJ430Week 6 DQ2 Variance
PROJ430Week 7 DQ1 Managing ProjectTrade-Offs
PROJ430Week 7 DQ2 Change Management
ALL Weeks Checkpoints
PROJ430Week 1 CheckpointSolution (Jones and ShephardAccountants (Chapter 3, pp 138 – 140)
1. Provide a synopsis ofthe Jones and Shephard case.
2. Highlight threeenterprise management causes/considerations and threeproject management causes/considerations for the situation.
Include what seemedto be missing.
3. Consider thatyou are the systems managerwhois now responsible for redesigning theorganizational structure.What areas needto be
addressed for the transition and how will theybenefitthe company?How will you interactwith the upper managers in the company?
How do you make this a transition with the least impact on the employees and the customers?
4. How should the transition to a new project managementoperation be accomplished? Consider whatthe enterprise should need to
know about project managementand the new structure. How much time doyou recommend for the transition tothe matrix
organizations?Be sure toinclude your rationale.
5. Whatother organizational changes should be made? How do you work with the manager ofoperations to gain his/her supportfor
your organizational changes?
PROJ430Week 2 CheckpointThe Trophy Project(Chapter 5,pp 264– 266) 100%CorrectAnswers
1. Provide a synopsis ofthe TrophyProjectcase study. Highlightyour observations about the project.
2. Did the projectappear to be plannedcorrectly?Whyor whynot?Relate your answers to the expected documents forproperproject
planning.
3. Citingevidence from the case,do you think functional management teams were committed to theproject?Whatevidence do you have
from the case study tosubstantiate your views?
4. Citingevidence from the case,do you think senior managementmanagers were supportive and committed?What evidence do you
have from thecase study tosubstantiate your views?
5. Whatwould you have done differently?
PROJ430Week 3 CheckpointHabitat for Humanity– Simulation
1. When the projectfirst started, you were asked toorderthe tasks to build the WBS. How did you decide theorder tasks should appear
in for the WBS? In a typical project, how do you think a WBS should be created, andwhat stakeholders or team members shouldbe
involved?
2. Whatchallenges did you face duringthe simulation,and whatsolutions did you propose?Indicate any research thatyou did In order
to gain your own knowledge about remodelinga bathroom and howit helped you.
3. When faced with the challenges, what information did you useto make your decision, and what tradeoffs did you contemplate?
4. How did your decisions impactthe project’s critical path? Howwas the critical path impacted as you tried different options?
5. Based on the simulation and on whatwe discussed this week in class,whatadditional information orresources would have helped you
make better projectdecisions?
PROJ430Week 4 CheckpointThe Reluctant Workers (Chapter 6,Page 294)100%Correct Answers
Tim Aston had a normal expectation tobe the “bestprojectmanager” in his new assignment.Whatseems tohave caused him to change
his outlook?What approaches would you take toimprove communications between Tim and theteam members?Ifyou were in Tim’s
position and were listeningtohis manager, Phil Davies,refer more than one time tothe average age ofthe staff, what would be your
reaction? How would you use this information to improve your workingrelationships with the staff?Tim seems positioned to respectthe
customer’s wishes to attend a test. How would you (as his manager) counsel himabouthonoringor rejectingthatrequest?Support your
answer with examples of managingcustomer relations.Phil Davies said,“…people think that theycomefirst and that the project is
second.”What message is he reallyconveying? What does Tim seem to be missingin his next statement or reply?
PROJ430Week 5 CheckpointCrosbyManufacturing Corporation (Chapter 12, pp. 552 – 554) 100%CorrectAnswers
Livingston made some mistakes initially. Describe at least twoof them and provide how you would handle the situations.Howdo you
think the functional employees feel? Support howyou might feel if you were in their position by citing points from the case study?Are
there anyother alternatives?Explain atleast three alternatives. Explain your thoughts about the appointment ofTim Emaryas project
manager. Consider whatis expected ofa projectmanagerand senior managers’support for projects. How longdo you thinkit should
take todevelop a detailed project schedule and why?Is a completion date in as shortas 18 months realistic?Whyor whynot? Analyze
this question using the information from Exhibit 12-2 (Typical schedule in months).Explain what other areas maysufferas time
constraints increase.
PROJ430Week 6 CheckpointThe Bathtub Period(Chapter 15, pp. 708 – 709) 100%CorrectAnswers
Should Jerry gotothe General Manager?Whyor whynot?Think back to what is expected of a project manager and the project
charter.Should the key people be supported on overhead?Whyor whynot?If this were a cost-plus program, would you consider
approaching thecustomer with your problem in hopes ofrelief? Whyor why not? If you were the customerof this cost-plus program,
what would your responsebe for additional funds for thebathtub period,assuming costoverrun? Whyor why not? Would your
previous answerchange ifthe program had the money availableas a resultof beingunderbudget? Whyor why not?How do you prevent
this situation from recurring on all yearly follow-on contracts?
PROJ430Week 7 Checkpoint100%Correct Answers
Will project managementwork in all companies?Why orwhynot?Provide examples ofcompanies or industries tosupportyouranswer.
Consider a project in which all projectplanningis performed bya group. After all planningis completed, includingthe program plan
and schedule, a project manager is selected. Is there anythingwrong with this arrangement?The director ofproject management calls
you intohis office and informs you that oneof your fellow projectmanagers had a severe heartattack midwaythrough a project. You
will be taking overhis project, which is well behind schedule and overrunningcosts. The directorof projectmanagement then “orders”
you to complete the project within timeand cost.Howdo you proposeto do it?Where do you start? Should you shut down the projectto
re-plan it? Docost overruns justhappen,or are theycaused? Once the functional manager and project manager agree on a project
schedule, whois responsiblefor gettingthe work performed? Whois accountablefor getting the work performed? Whythe difference, if
any?
3. PROJ430 All Weeks Course Project on Customer Care Website Implementation
Course Project: Final Report
Objective
Each student in AdvancedProjectManagement (PROJ430) will choose a project that will be used to develop various documents that are
developed and used throughoutthe projectlifecycle.The projectdocuments will be completed and submitted in eightparts due in each
week throughoutthe course.
Guidelines
The topic you select should be a projectthatwill take between sixmonths to twoyears to complete. Choose a business orcommunity
related projecttopicin which you are interested, and have knowledge, tomake iteasier for you to complete these assignments.
The intentof the Course Project is that theproject will be sufficientlycomplexto require consideration of a number ofproject
management issues. In completingthe sample project documents for this course,considerthe full breadth of the project work required,
but rememberthat you will develop the details toa lesser depth than would be required in reality.
As a reminder, your projecttopicMUST be a business orcommunity-related projecttopic.This will allowyou tocomplete all sections of
the project. Try to find a project atyourworkplace orcommunity organization that you can use as a basis for completingthese
assignments.
You should keep in mind that your projectmustmeet all ofthe characteristics of a project:
A specific and definedobjective A defined life span with a definitive start and a definitive endInvolvingmultiple departmental
organizations and professional staffmembers Doingsomethingunique, not havingbeen done before Defined and specific schedule,
budget, and quality/performance requirements
Deliverable Schedule
Week
ProjectLifecycle Area(s)
Information and Activities
Deliverable Directions
1 Initiate, Define, and OrganizeYour Project
Establish the projectorganization, DefineProjectParameters,and Plan the ProjectOffice and Framework
This week, you are definingand organizing your project. This is the first step in analyzing your conceptby gatheringinformation needed
for all theproject documents that are created duringthe Project Managementprocess.Often an organization will require months to
complete this work.For this course project, you will be creatingsample documents thatgive you an ideaor example ofthe type of
information needed to create similar types of projectdeliverables.
Download the Course_Project_Week_1.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_1.docx template
contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project.
You will submitthis deliverable tothe Week 1 Course Project Dropbox.
2 Continue to Define and Organize Your Project,and Startthe Planning
Define How the ProjectTeam Will Work Together, and Define MajorDeliverables and Milestones
This week, you are continuing todefine and organizeyourproject.Your focus will be on the project team (members and team
organizational structure), and howthe team will function. You will alsodefine and describe the major project deliverables (and sub-
deliverables)and milestones.
Download the Course_Project_Week_2.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_2.docx template
contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project.
You will submitthis deliverable tothe Week 2 Course Project Dropbox.
3 Define WBS and Work Packages
Develop the WBS with Schedule, Resources, and Costs usingMicrosoftProject
This week, you will be usingMicrosoft Projectto develop the Work Breakdown Structure (WBS)and work packages for your course
project.You will also be developingthe project schedule and project budget. You can access Microsoft Projectfrom theiLab under
Course Home.
You will submityourMicrosoftProjectfile to the Week 3 Course Project Dropbox.
4 Plan your Project by AnalyzingResources
Analyze Resources and OptimizeTrade-offs
This week, your focus is on resource planning.This includes work resources (people) and material resources.Beingthorough and
complete is veryimportant, and you need to analyze if you identified all the resources you need and the workloads foreach. You will use
your MicrosoftProjectfile to perform the analysis and complete this week’s assignment. You can access Microsoft Projectfrom
the iLabunder Course Home.
Download the Course_Project_Week_4.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_4.docx template
contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project.
You will submitthis deliverable tothe Week 4 Course Project Dropbox.
5 Plan your Project by AnalyzingProjectRisks
Develop a Risk Management Plan
This week, you will develop a risk management plan for your course project. This portion of the planning process includes analyzing
potential risks that could impact the project,determiningwhois responsible tomanage the risk,and whatactions should be taken to
minimize the risk.
Download the Course_Project_Week_5.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_5.docx template
contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project.
You will submitthis deliverable tothe Week 5 Course Project Dropbox.
6 Plan your Project by Defininghow to Track, Manage, and ReportProjectStatus
Collect Status Information and Plan howto Take Corrective Actions
This week’s focus is on project information. As a project manager,you will need tokeepyourfingeron the pulse ofthe project. You need
to identify theinformation that you are monitoring, collecting,analyzing, andreporting. Based on the information, you and others will
need to makedecisions regarding the project.
Download the Course_Project_Week_6.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_6.docx template
contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project.
You will submitthis deliverable tothe Week 6 Course Project Dropbox.
7 Close the Project
Close outthe Projectand Archive Project Documents
This week’s focus is projectclosure, with the assumption that your project will go through execution as planned and will be formally
closed. Whilethe project has been the project manager’s focus since projectinitialization,itis also veryimportantfor the project
managerto help transition team members back totheir functional organizations as well as assure thatall projectdocumentation is
archived.A significant final deliverableof the project is a Lessons Learned document and meeting.
Download the Course_Project_Week_7.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_7.docx template
contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project.
You will submitthis deliverable tothe Week 7 Course Project Dropbox.
8 Course ProjectReport
Formal Reportthat is a Compilation ofAll PlanningDocuments from Weeks 1-7plus Change Management
The Final Report for your CourseProjectwill be a formal reportthatyou will presentto the ProjectSponsor(your Professor). You will
be using the information that you have been preparingeach week ofthe course. You will prepare the reportusingexcellent report
writingskills and with contentthatwould be read byan executive of an enterprise.Now is the time to organizeand present the
information in a waythatis understandable and meaningful to your ProjectSponsor.
Write the reportas though the Project Sponsor is readingthe planningdetails for the firsttime. You have prepared information each
week during the course,and thatinformation will form the foundation for this report.For the Final Report,you shouldaugment that
information with further explanations to facilitate the comprehension of what you are presenting. You will need to demonstrate in your
report thatyou have thought through all that is required to manage your projectsuccessfully. Continued fundingand resource
assignments will depend on how well you have planned,estimated, and communicated all aspects of your project. You will submit your
final reportto the Week 8 Course Project Dropbox.See thecourse Syllabus for Due Date requirements.
Submityour Assignments to the Dropboxlocated on the silver tab at thetop of this page.For instructions on how touse the Dropbox,
read these Step-by-Step Instructions orwatch this Dropbox Tutorial.
Grading Rubrics
Section/Category
Points
Description
Executive Summary
10
Concise,nomore than a halfto threequarters of a page.
Integration Management
10
The information foreach ofthese sections comes from whathas been developed in Weeks 1 – 7 plus Change Management. It needs to be
organized according tothe course textbooks and the PMBOKKnowledge Areas.
Report contains more contentthan the Weeks 1 – 7 submissions. It reflects further explanation todemonstrate your communication
skills.
Scope Management
10
Time/Schedule Management
10
Cost Management
10
QualityManagement
10
Human Resource Management
10
Communications Management
10
Risk Management
10
Procurement Management
10
Conclusion and Recommendations
10
Concise,nomore than a halfto threequarters of a page.
Format and writingquality:Title Page, Page Numbers, Headers, Font Type and Size,Length,and APA Compliance
15
Report is formatted usingthis Rubric as a guide for content and sections.Tone addresses the ProjectSponsordirectlyand professionally.
Table of Contents shows each section with atleasttwo outline levels. Each section is clearlylabeledin the bodyof the report.
Core reportlength 1,500-2,000 words (no limits on appendices,charts,graphs, supporting documentation). Reportis APA-compliant
with accurate in-textcitations supportingfull citations on the reference page.
Report contains no spelling, grammar,typographical,or formattingerrors; all links functional; graphics and charts are clear and
legible.Writingquality is excellent – clear, organized,and professional.
Total
125
A qualitypaper will meet orexceed all of the above requirements.
ProjectTutorials
Tutorials
Project-2010-quick-reference-guide
Getting-started-Microsoft-Project-basics
Getting-started-with-Project-2010
Best Practices
The following are bestpractices in preparing this paper.
Cover Page: Include who you prepared the paper for, who prepared it,and the date. Table ofContents:Listthe main ideas andsections
of the paper and the pages where they are located.Illustrations should be included separately. Executive Summary:Use a header on
your paper.This willindicate thatyou are introducingthe paper.
1. Introduce the subject and whythe subject is important;
2. Previewthe main ideas and the order in which they will be covered; and
3. Establish the tone ofthe document.
Include in the executive summary a reason for the audience toread thepaper. Also, include an overviewof whatyou will cover and the
importance of the material.(This should include orintroduce the questions you are asked toanswer in each assignment.)
Body of the Report:Use a header with thename of theproject.An exampleis, “The Developmentof Hotel X: A World Class Resort.”
Proceed tobreak outthe main ideas:State the main ideas, the major points of each idea,and provide evidence.Show some type of
division,such as separate, labeled sections; separate groups of paragraphs; orheaders.Include the information you found during your
research and investigation.Summaryand Conclusion:Summarizing is similar to paraphrasingbut presents the gistof the material in
fewerwords than the original.An effective summaryidentifies the main ideas and themajor supportpoints from the bodyof the report;
minor details are leftout.Summarize the benefits of the ideas and how theyeffect the subject.Work Cited:Use the citation format
specified in the Syllabus.
Additional hints on preparingthe best possible projectfollow.
Apply a threestep process towriting: plan,write,and complete.Prepare an outline ofthe research paperbefore going forward.
Complete a firstdraftand then goback toedit, evaluate,and make anychanges required. Use visual communication tofurther clarify
and supportthe written partof the report.Examples include graphs, diagrams, photographs, flowcharts,maps, drawings,animation,
video clips,pictograms, tables, and Gantt charts.

Contenu connexe

Tendances

Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
PMI_IREP_TP
 
Rick Barron: User Experience Testing Methods
Rick Barron: User Experience Testing MethodsRick Barron: User Experience Testing Methods
Rick Barron: User Experience Testing Methods
Rick Barron
 
21 Steering Group
21 Steering Group21 Steering Group
21 Steering Group
PAVO
 

Tendances (13)

Planning a project-Gerair M Blair
Planning a project-Gerair M BlairPlanning a project-Gerair M Blair
Planning a project-Gerair M Blair
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
 
Tips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery ProjectTips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery Project
 
PMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperPMI ACP Classroom Question Paper
PMI ACP Classroom Question Paper
 
Close the Loop - Simplifying A3 Thinking for Team Retrospectives
Close the Loop - Simplifying A3 Thinking for Team RetrospectivesClose the Loop - Simplifying A3 Thinking for Team Retrospectives
Close the Loop - Simplifying A3 Thinking for Team Retrospectives
 
PMP® Sample Questions
PMP® Sample QuestionsPMP® Sample Questions
PMP® Sample Questions
 
Rick Barron: User Experience Testing Methods
Rick Barron: User Experience Testing MethodsRick Barron: User Experience Testing Methods
Rick Barron: User Experience Testing Methods
 
21 Steering Group
21 Steering Group21 Steering Group
21 Steering Group
 
Team Building F Lussier V1.3 Eng
Team Building F Lussier V1.3 EngTeam Building F Lussier V1.3 Eng
Team Building F Lussier V1.3 Eng
 
How to ace your summer internship
How to ace your summer internshipHow to ace your summer internship
How to ace your summer internship
 
IDBM x Slush – Service Leadership Minor Handbook
IDBM x Slush – Service Leadership Minor HandbookIDBM x Slush – Service Leadership Minor Handbook
IDBM x Slush – Service Leadership Minor Handbook
 
Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)
 
PMI ACP Classroom Question Paper with Answers
PMI ACP Classroom Question Paper with AnswersPMI ACP Classroom Question Paper with Answers
PMI ACP Classroom Question Paper with Answers
 

En vedette

2 b la aritmetica la geometria y la estadistica para preescolar y primaria
2 b la aritmetica la geometria y la estadistica para preescolar y primaria2 b la aritmetica la geometria y la estadistica para preescolar y primaria
2 b la aritmetica la geometria y la estadistica para preescolar y primaria
Paulo César Salgado Díaz
 
Caso clinico3 artrosis
Caso clinico3 artrosisCaso clinico3 artrosis
Caso clinico3 artrosis
Ändrÿ F
 
Eduardo P ABELLAR RESUME NEW
Eduardo P ABELLAR RESUME NEWEduardo P ABELLAR RESUME NEW
Eduardo P ABELLAR RESUME NEW
EDUARDO ABELLAR
 
Implantação sesc osasco
Implantação sesc osascoImplantação sesc osasco
Implantação sesc osasco
Daielly Giovana
 

En vedette (15)

Cuadro comparativo de los medios de comunicacion en la educacion
Cuadro comparativo de los medios de comunicacion en la educacionCuadro comparativo de los medios de comunicacion en la educacion
Cuadro comparativo de los medios de comunicacion en la educacion
 
Radiacion solar
Radiacion solarRadiacion solar
Radiacion solar
 
KVU Grünerløkka prosjektplan - 03.03.16
KVU Grünerløkka prosjektplan - 03.03.16KVU Grünerløkka prosjektplan - 03.03.16
KVU Grünerløkka prosjektplan - 03.03.16
 
2 b la aritmetica la geometria y la estadistica para preescolar y primaria
2 b la aritmetica la geometria y la estadistica para preescolar y primaria2 b la aritmetica la geometria y la estadistica para preescolar y primaria
2 b la aritmetica la geometria y la estadistica para preescolar y primaria
 
Usage of social media in higher education
Usage of social media in higher educationUsage of social media in higher education
Usage of social media in higher education
 
Exodus 39 commentary
Exodus 39 commentaryExodus 39 commentary
Exodus 39 commentary
 
Kundalini and-the-paranormal proceed-with-caution-by-paul-pond
Kundalini and-the-paranormal proceed-with-caution-by-paul-pondKundalini and-the-paranormal proceed-with-caution-by-paul-pond
Kundalini and-the-paranormal proceed-with-caution-by-paul-pond
 
Acct 504 final exam solution
Acct 504 final exam solutionAcct 504 final exam solution
Acct 504 final exam solution
 
Types of Employment Discrimination: A Guide fo Conshohoken, PA Employers and ...
Types of Employment Discrimination: A Guide fo Conshohoken, PA Employers and ...Types of Employment Discrimination: A Guide fo Conshohoken, PA Employers and ...
Types of Employment Discrimination: A Guide fo Conshohoken, PA Employers and ...
 
Caso clinico3 artrosis
Caso clinico3 artrosisCaso clinico3 artrosis
Caso clinico3 artrosis
 
Eduardo P ABELLAR RESUME NEW
Eduardo P ABELLAR RESUME NEWEduardo P ABELLAR RESUME NEW
Eduardo P ABELLAR RESUME NEW
 
I.p.n
I.p.nI.p.n
I.p.n
 
SAP ECC EHP7 BW 7.4 Remote Access
SAP ECC EHP7 BW 7.4 Remote AccessSAP ECC EHP7 BW 7.4 Remote Access
SAP ECC EHP7 BW 7.4 Remote Access
 
Pcn história
Pcn históriaPcn história
Pcn história
 
Implantação sesc osasco
Implantação sesc osascoImplantação sesc osasco
Implantação sesc osasco
 

Similaire à Proj430 advanced program management entire class

Managing your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environmentManaging your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environment
Stephen Hightower
 
Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...
ssuser52fa40
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
cford1973
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...
Abdul Naqashbandi
 
Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docxProject Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
briancrawford30935
 
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
gilbertkpeters11344
 

Similaire à Proj430 advanced program management entire class (20)

Com 140 check point different kinds of messages
Com 140 check point different kinds of messagesCom 140 check point different kinds of messages
Com 140 check point different kinds of messages
 
Managing your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environmentManaging your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environment
 
Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Ben Mkt 347 Week 4
Ben Mkt 347 Week 4Ben Mkt 347 Week 4
Ben Mkt 347 Week 4
 
A presentation on Agile Methodology for Project Managers
A presentation on Agile Methodology for Project ManagersA presentation on Agile Methodology for Project Managers
A presentation on Agile Methodology for Project Managers
 
about start up for you 12
about start up for you 12about start up for you 12
about start up for you 12
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Systematic Innovation
Systematic InnovationSystematic Innovation
Systematic Innovation
 
11 Reasons Oracle E-Business Suite projects fail and how to fix them
11 Reasons Oracle E-Business Suite projects fail and how to fix them11 Reasons Oracle E-Business Suite projects fail and how to fix them
11 Reasons Oracle E-Business Suite projects fail and how to fix them
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...
 
Project Management: Your Guide in Acing the Project
Project Management: Your Guide in Acing the ProjectProject Management: Your Guide in Acing the Project
Project Management: Your Guide in Acing the Project
 
Project management
Project managementProject management
Project management
 
Top PMP Interview Questions and Answers
Top PMP Interview Questions and AnswersTop PMP Interview Questions and Answers
Top PMP Interview Questions and Answers
 
Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docxProject Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
 
Understand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionUnderstand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases Introduction
 

Dernier

VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
nirzagarg
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
mriyagarg453
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
Terna SpA
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
MollyBrown86
 

Dernier (20)

Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 

Proj430 advanced program management entire class

  • 1. PROJ430 Advanced Program Management Entire Class Add to Wallet from here: http://hwminute.com/downloads/proj430-advanced-program-management-entire-class/ PROJ-430Advanced Project Management – All 7 Weeks Discussions, A+ Material (PROJ430 PROJ430 PROJ/430) PROJ430Week 1 DQ1 Project& Functional Manager Differences PROJ430Week 1 DQ2 Projects and Organizational Structures PROJ430Week 2 DQ1 The Project Kick-Off PROJ430Week 2 DQ2 ProjectPlanningDocuments PROJ430Week 3 DQ1 Scheduling Techniques PROJ430Week 3 DQ2 Adjustingthe ProjectSchedule PROJ430Week 4 DQ1 Quality Management PROJ430Week 4 DQ2 ProjectStaffing PROJ430Week 5 DQ1 ProjectRisks PROJ430Week 5 DQ2 Procurement PROJ430Week 6 DQ1 ProjectConflict PROJ430Week 6 DQ2 Variance PROJ430Week 7 DQ1 Managing ProjectTrade-Offs PROJ430Week 7 DQ2 Change Management ALL Weeks Checkpoints PROJ430Week 1 CheckpointSolution (Jones and ShephardAccountants (Chapter 3, pp 138 – 140) 1. Provide a synopsis ofthe Jones and Shephard case. 2. Highlight threeenterprise management causes/considerations and threeproject management causes/considerations for the situation. Include what seemedto be missing. 3. Consider thatyou are the systems managerwhois now responsible for redesigning theorganizational structure.What areas needto be addressed for the transition and how will theybenefitthe company?How will you interactwith the upper managers in the company? How do you make this a transition with the least impact on the employees and the customers? 4. How should the transition to a new project managementoperation be accomplished? Consider whatthe enterprise should need to know about project managementand the new structure. How much time doyou recommend for the transition tothe matrix organizations?Be sure toinclude your rationale. 5. Whatother organizational changes should be made? How do you work with the manager ofoperations to gain his/her supportfor your organizational changes? PROJ430Week 2 CheckpointThe Trophy Project(Chapter 5,pp 264– 266) 100%CorrectAnswers 1. Provide a synopsis ofthe TrophyProjectcase study. Highlightyour observations about the project. 2. Did the projectappear to be plannedcorrectly?Whyor whynot?Relate your answers to the expected documents forproperproject planning. 3. Citingevidence from the case,do you think functional management teams were committed to theproject?Whatevidence do you have from the case study tosubstantiate your views? 4. Citingevidence from the case,do you think senior managementmanagers were supportive and committed?What evidence do you have from thecase study tosubstantiate your views? 5. Whatwould you have done differently? PROJ430Week 3 CheckpointHabitat for Humanity– Simulation
  • 2. 1. When the projectfirst started, you were asked toorderthe tasks to build the WBS. How did you decide theorder tasks should appear in for the WBS? In a typical project, how do you think a WBS should be created, andwhat stakeholders or team members shouldbe involved? 2. Whatchallenges did you face duringthe simulation,and whatsolutions did you propose?Indicate any research thatyou did In order to gain your own knowledge about remodelinga bathroom and howit helped you. 3. When faced with the challenges, what information did you useto make your decision, and what tradeoffs did you contemplate? 4. How did your decisions impactthe project’s critical path? Howwas the critical path impacted as you tried different options? 5. Based on the simulation and on whatwe discussed this week in class,whatadditional information orresources would have helped you make better projectdecisions? PROJ430Week 4 CheckpointThe Reluctant Workers (Chapter 6,Page 294)100%Correct Answers Tim Aston had a normal expectation tobe the “bestprojectmanager” in his new assignment.Whatseems tohave caused him to change his outlook?What approaches would you take toimprove communications between Tim and theteam members?Ifyou were in Tim’s position and were listeningtohis manager, Phil Davies,refer more than one time tothe average age ofthe staff, what would be your reaction? How would you use this information to improve your workingrelationships with the staff?Tim seems positioned to respectthe customer’s wishes to attend a test. How would you (as his manager) counsel himabouthonoringor rejectingthatrequest?Support your answer with examples of managingcustomer relations.Phil Davies said,“…people think that theycomefirst and that the project is second.”What message is he reallyconveying? What does Tim seem to be missingin his next statement or reply? PROJ430Week 5 CheckpointCrosbyManufacturing Corporation (Chapter 12, pp. 552 – 554) 100%CorrectAnswers Livingston made some mistakes initially. Describe at least twoof them and provide how you would handle the situations.Howdo you think the functional employees feel? Support howyou might feel if you were in their position by citing points from the case study?Are there anyother alternatives?Explain atleast three alternatives. Explain your thoughts about the appointment ofTim Emaryas project manager. Consider whatis expected ofa projectmanagerand senior managers’support for projects. How longdo you thinkit should take todevelop a detailed project schedule and why?Is a completion date in as shortas 18 months realistic?Whyor whynot? Analyze this question using the information from Exhibit 12-2 (Typical schedule in months).Explain what other areas maysufferas time constraints increase. PROJ430Week 6 CheckpointThe Bathtub Period(Chapter 15, pp. 708 – 709) 100%CorrectAnswers Should Jerry gotothe General Manager?Whyor whynot?Think back to what is expected of a project manager and the project charter.Should the key people be supported on overhead?Whyor whynot?If this were a cost-plus program, would you consider approaching thecustomer with your problem in hopes ofrelief? Whyor why not? If you were the customerof this cost-plus program, what would your responsebe for additional funds for thebathtub period,assuming costoverrun? Whyor why not? Would your previous answerchange ifthe program had the money availableas a resultof beingunderbudget? Whyor why not?How do you prevent this situation from recurring on all yearly follow-on contracts? PROJ430Week 7 Checkpoint100%Correct Answers Will project managementwork in all companies?Why orwhynot?Provide examples ofcompanies or industries tosupportyouranswer. Consider a project in which all projectplanningis performed bya group. After all planningis completed, includingthe program plan and schedule, a project manager is selected. Is there anythingwrong with this arrangement?The director ofproject management calls you intohis office and informs you that oneof your fellow projectmanagers had a severe heartattack midwaythrough a project. You will be taking overhis project, which is well behind schedule and overrunningcosts. The directorof projectmanagement then “orders” you to complete the project within timeand cost.Howdo you proposeto do it?Where do you start? Should you shut down the projectto re-plan it? Docost overruns justhappen,or are theycaused? Once the functional manager and project manager agree on a project schedule, whois responsiblefor gettingthe work performed? Whois accountablefor getting the work performed? Whythe difference, if any? 3. PROJ430 All Weeks Course Project on Customer Care Website Implementation
  • 3. Course Project: Final Report Objective Each student in AdvancedProjectManagement (PROJ430) will choose a project that will be used to develop various documents that are developed and used throughoutthe projectlifecycle.The projectdocuments will be completed and submitted in eightparts due in each week throughoutthe course. Guidelines The topic you select should be a projectthatwill take between sixmonths to twoyears to complete. Choose a business orcommunity related projecttopicin which you are interested, and have knowledge, tomake iteasier for you to complete these assignments. The intentof the Course Project is that theproject will be sufficientlycomplexto require consideration of a number ofproject management issues. In completingthe sample project documents for this course,considerthe full breadth of the project work required, but rememberthat you will develop the details toa lesser depth than would be required in reality. As a reminder, your projecttopicMUST be a business orcommunity-related projecttopic.This will allowyou tocomplete all sections of the project. Try to find a project atyourworkplace orcommunity organization that you can use as a basis for completingthese assignments. You should keep in mind that your projectmustmeet all ofthe characteristics of a project: A specific and definedobjective A defined life span with a definitive start and a definitive endInvolvingmultiple departmental organizations and professional staffmembers Doingsomethingunique, not havingbeen done before Defined and specific schedule, budget, and quality/performance requirements Deliverable Schedule Week ProjectLifecycle Area(s) Information and Activities Deliverable Directions 1 Initiate, Define, and OrganizeYour Project Establish the projectorganization, DefineProjectParameters,and Plan the ProjectOffice and Framework This week, you are definingand organizing your project. This is the first step in analyzing your conceptby gatheringinformation needed for all theproject documents that are created duringthe Project Managementprocess.Often an organization will require months to complete this work.For this course project, you will be creatingsample documents thatgive you an ideaor example ofthe type of information needed to create similar types of projectdeliverables. Download the Course_Project_Week_1.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_1.docx template contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project. You will submitthis deliverable tothe Week 1 Course Project Dropbox. 2 Continue to Define and Organize Your Project,and Startthe Planning Define How the ProjectTeam Will Work Together, and Define MajorDeliverables and Milestones This week, you are continuing todefine and organizeyourproject.Your focus will be on the project team (members and team organizational structure), and howthe team will function. You will alsodefine and describe the major project deliverables (and sub- deliverables)and milestones. Download the Course_Project_Week_2.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_2.docx template contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project. You will submitthis deliverable tothe Week 2 Course Project Dropbox. 3 Define WBS and Work Packages Develop the WBS with Schedule, Resources, and Costs usingMicrosoftProject This week, you will be usingMicrosoft Projectto develop the Work Breakdown Structure (WBS)and work packages for your course project.You will also be developingthe project schedule and project budget. You can access Microsoft Projectfrom theiLab under Course Home. You will submityourMicrosoftProjectfile to the Week 3 Course Project Dropbox. 4 Plan your Project by AnalyzingResources Analyze Resources and OptimizeTrade-offs This week, your focus is on resource planning.This includes work resources (people) and material resources.Beingthorough and complete is veryimportant, and you need to analyze if you identified all the resources you need and the workloads foreach. You will use your MicrosoftProjectfile to perform the analysis and complete this week’s assignment. You can access Microsoft Projectfrom the iLabunder Course Home.
  • 4. Download the Course_Project_Week_4.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_4.docx template contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project. You will submitthis deliverable tothe Week 4 Course Project Dropbox. 5 Plan your Project by AnalyzingProjectRisks Develop a Risk Management Plan This week, you will develop a risk management plan for your course project. This portion of the planning process includes analyzing potential risks that could impact the project,determiningwhois responsible tomanage the risk,and whatactions should be taken to minimize the risk. Download the Course_Project_Week_5.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_5.docx template contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project. You will submitthis deliverable tothe Week 5 Course Project Dropbox. 6 Plan your Project by Defininghow to Track, Manage, and ReportProjectStatus Collect Status Information and Plan howto Take Corrective Actions This week’s focus is on project information. As a project manager,you will need tokeepyourfingeron the pulse ofthe project. You need to identify theinformation that you are monitoring, collecting,analyzing, andreporting. Based on the information, you and others will need to makedecisions regarding the project. Download the Course_Project_Week_6.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_6.docx template contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project. You will submitthis deliverable tothe Week 6 Course Project Dropbox. 7 Close the Project Close outthe Projectand Archive Project Documents This week’s focus is projectclosure, with the assumption that your project will go through execution as planned and will be formally closed. Whilethe project has been the project manager’s focus since projectinitialization,itis also veryimportantfor the project managerto help transition team members back totheir functional organizations as well as assure thatall projectdocumentation is archived.A significant final deliverableof the project is a Lessons Learned document and meeting. Download the Course_Project_Week_7.docx from Doc Sharing tostartthis assignment. The Course_Project_Week_7.docx template contains all the sections thatyou will need tocomplete,including instructions to help you work through this part ofthe course project. You will submitthis deliverable tothe Week 7 Course Project Dropbox. 8 Course ProjectReport Formal Reportthat is a Compilation ofAll PlanningDocuments from Weeks 1-7plus Change Management The Final Report for your CourseProjectwill be a formal reportthatyou will presentto the ProjectSponsor(your Professor). You will be using the information that you have been preparingeach week ofthe course. You will prepare the reportusingexcellent report writingskills and with contentthatwould be read byan executive of an enterprise.Now is the time to organizeand present the information in a waythatis understandable and meaningful to your ProjectSponsor. Write the reportas though the Project Sponsor is readingthe planningdetails for the firsttime. You have prepared information each week during the course,and thatinformation will form the foundation for this report.For the Final Report,you shouldaugment that information with further explanations to facilitate the comprehension of what you are presenting. You will need to demonstrate in your report thatyou have thought through all that is required to manage your projectsuccessfully. Continued fundingand resource assignments will depend on how well you have planned,estimated, and communicated all aspects of your project. You will submit your final reportto the Week 8 Course Project Dropbox.See thecourse Syllabus for Due Date requirements. Submityour Assignments to the Dropboxlocated on the silver tab at thetop of this page.For instructions on how touse the Dropbox, read these Step-by-Step Instructions orwatch this Dropbox Tutorial. Grading Rubrics Section/Category Points Description Executive Summary 10 Concise,nomore than a halfto threequarters of a page. Integration Management 10
  • 5. The information foreach ofthese sections comes from whathas been developed in Weeks 1 – 7 plus Change Management. It needs to be organized according tothe course textbooks and the PMBOKKnowledge Areas. Report contains more contentthan the Weeks 1 – 7 submissions. It reflects further explanation todemonstrate your communication skills. Scope Management 10 Time/Schedule Management 10 Cost Management 10 QualityManagement 10 Human Resource Management 10 Communications Management 10 Risk Management 10 Procurement Management 10 Conclusion and Recommendations 10 Concise,nomore than a halfto threequarters of a page. Format and writingquality:Title Page, Page Numbers, Headers, Font Type and Size,Length,and APA Compliance 15 Report is formatted usingthis Rubric as a guide for content and sections.Tone addresses the ProjectSponsordirectlyand professionally. Table of Contents shows each section with atleasttwo outline levels. Each section is clearlylabeledin the bodyof the report. Core reportlength 1,500-2,000 words (no limits on appendices,charts,graphs, supporting documentation). Reportis APA-compliant with accurate in-textcitations supportingfull citations on the reference page. Report contains no spelling, grammar,typographical,or formattingerrors; all links functional; graphics and charts are clear and legible.Writingquality is excellent – clear, organized,and professional. Total 125 A qualitypaper will meet orexceed all of the above requirements. ProjectTutorials Tutorials Project-2010-quick-reference-guide Getting-started-Microsoft-Project-basics Getting-started-with-Project-2010 Best Practices The following are bestpractices in preparing this paper. Cover Page: Include who you prepared the paper for, who prepared it,and the date. Table ofContents:Listthe main ideas andsections of the paper and the pages where they are located.Illustrations should be included separately. Executive Summary:Use a header on your paper.This willindicate thatyou are introducingthe paper. 1. Introduce the subject and whythe subject is important; 2. Previewthe main ideas and the order in which they will be covered; and 3. Establish the tone ofthe document. Include in the executive summary a reason for the audience toread thepaper. Also, include an overviewof whatyou will cover and the importance of the material.(This should include orintroduce the questions you are asked toanswer in each assignment.) Body of the Report:Use a header with thename of theproject.An exampleis, “The Developmentof Hotel X: A World Class Resort.” Proceed tobreak outthe main ideas:State the main ideas, the major points of each idea,and provide evidence.Show some type of division,such as separate, labeled sections; separate groups of paragraphs; orheaders.Include the information you found during your
  • 6. research and investigation.Summaryand Conclusion:Summarizing is similar to paraphrasingbut presents the gistof the material in fewerwords than the original.An effective summaryidentifies the main ideas and themajor supportpoints from the bodyof the report; minor details are leftout.Summarize the benefits of the ideas and how theyeffect the subject.Work Cited:Use the citation format specified in the Syllabus. Additional hints on preparingthe best possible projectfollow. Apply a threestep process towriting: plan,write,and complete.Prepare an outline ofthe research paperbefore going forward. Complete a firstdraftand then goback toedit, evaluate,and make anychanges required. Use visual communication tofurther clarify and supportthe written partof the report.Examples include graphs, diagrams, photographs, flowcharts,maps, drawings,animation, video clips,pictograms, tables, and Gantt charts.