By Matar S. Al-Mehairi (Member IAM) and Sharif M. Al-Batayneh (Member IEEE)
Asset Management Department, Dubai Electricity & Water Authority (DEWA)
assetmanagement.iirme.com ■ +971 4 407 2526 ■ register@iirme.com
Best Practices of Distribution Networks Asset
Management in view of PAS55 Framework
Al-Batayneh, Sharif M. (Member IEEE), and Al-Mehairi, Matar S. (Member IAM)
Dubai Electricity & Water Authority (DEWA), Asset Management Department
1
Abstract--“In the race for excellence there is no finish line [1]”, and from the Utilities Operators/Managers view point the race for
excellence is solely a race for an optimum Asset Life-Cycle Management. Especially for Distribution network operators/managers,
having an intensive portfolio of assets, with all the related costs, risks & performance involved in the whole life cycle management
process. Nowadays, Asset Management teams are facing an uphill challenge, with continual (on daily basis) increase in an already
huge asset portfolio, and with the recent economic crisis adding yet another stone to hurdle the efforts of the Asset Management
approach adopted by many utilities worldwide. Challenges, led by the ageing infrastructure and the increase in their failures, are two
of the most arguable and debatable topics. Theft of copper is yet a new risk which is to be either controlled or eliminated as per the
organizations strategy, and this is another task for the Asset Management team. Invisible assets, such as cables are a critical part of
the infrastructure which needs to be addressed & condition monitored under the RCM philosophy. Asset Management is to optimize
the three pillars of the whole life cycle activities of assets: risk, cost & performance, and this can be done within the guidelines of the
PAS 55. This paper will highlight the best practice model of the Distribution Power Asset Management under the Dubai Electricity &
Water Authority in view of PAS 55.
Index Terms-- Asset Management, Condition Monitoring, Crisis Management, Failure Investigation, Life-Cycle, Publically Available
Specification (PAS), Risk Management.
I. INTRODUCTION
ISTRIBUTION Network operators/managers worldwide
face a continuous challenge for the sake of achieving the
optimum balance of the whole-life-cycle of their assets, and
here we mean physical assets. As per PAS 55, “Physical assets
represent only one of the five broad categories of asset types
[2]”. All the asset types should be managed intrinsically to
achieve the total business objectives, however, the focus of
our discussion and as well the scope of PAS 55 is focused
objectively on the physical assets. Figure-1 highlights the
correlation of physical assets to other asset types as defined in
the PAS 55 [2].
Fig. 1. Critical interdependencies between assets [2]
In any utility, Assets might have two extremely opposing
impacts on the business, either drive business (i.e. not
manageable) or serve business (i.e. managed to serve business
goals). Any Asset Owner/Manager would like to have the
latter case; wherein they can manage their assets optimally to
deliver the planned business goals.
Distribution Asset Management in DEWA was established
in 2009 upon an extensive urge for the assignment of an
independent body under the Distribution Power Division to
take-over the responsibility of managing the existing portfolio
of physical assets and regularizes the practices of Operations
& Maintenance to be in-line with internationally adopted best-
practices. The assets of Distribution Network of DEWA are
outlined in table-1 & 2 below:
TABLE 1
Distribution substations & capacities as on 2011
Voltage
level
Sub level
No. Of
Substations
Capacity
In MVA
132kV*
132kV 2 -
132/33kV 17 3,795
132/11kV 147 22,770
33kV
33kV 3 -
33/11kV 37 1,235
33/6.6kV 95 3,035
11-6.6kV - 25,656 34,228.75
Within a quick look on the above table, one understands
the sum of Assets/Asset systems underlying these figures; of
which requires systematic & well-coordinated practices to
optimally manage them.
TABLE 2
Length of Distribution Cable & OHL network
Voltage level Type Length (km)
11-6.6kV
OHL 721
Underground 23,978
33kV
OHL 113
Underground 1,985
D
________________________________
* Distribution ownership of assets under the 132/33kV & 132/11kV
substations is only for 33kV & 11kV switchgears, respectively.
2
Fig. 2. Growth of 11-6.6kV Cable system in DEWA
As seen in Fig. 2 above, the MV cable network (for 11-
6.6kV) have seen a vast growth in between 2005 and 2011.
The rate of expansion seen was approximately 150%.
The results of an optimized life-cycle Asset Management
can be outlined by the below:
 Increased customer satisfaction.
 Better occupational, health & safety practices.
 Increased ROI.
 Achieving sustainability.
 Improved risk management.
 Controlled & systematic processes.
 Staff empowerment.
II. ASSET MANAGEMENT & PAS 55
Asset Management in its essence is not simply a
department or section that is established in any utility, but
rather is an organization culture. A culture which is adopted at
all levels of the organization ensuring the buy-in from all
concerned stakeholders for the successful adoption of Asset
Management. Figure 3 highlights the different levels of assets
& their management [2].
Fig. 3. Levels of Assets and their management [2]
At each level we can outline the requirements as below:
 “Managing Assets” level (operational level): Optimize
life-cycle activities, such as; acquisition, utilization,
maintenance & disposal of assets.
 “Managing Asset Systems” level: In this level our
concern is to ensure the performance is sustained and the
cost/risk are optimized.
 “Managing Asset Portfolio” level: CAPEX optimization
and planning for sustainability.
 “Corporate/Organization Management” level:
Organizational Strategic Planning level, which is beyond
the boundary of PAS55 framework.
When looking at ageing infrastructure, we take normally
replacement decisions (at expected end of life of equipment-
refer figure 4 below) and while taking that decision we might
fall under two extremes, either:
 We replace too early; thus, incurring extra costs on the
non-utilized life of replaced equipment; or
 We replace too late; upon encountering too many failures,
again incurring extra costs on repairs, spare parts, or loss
of revenue due to shutdowns, etc.
Fig. 4. Asset expected-life curve
There is a threshold point on the curve (named “P”) upon
which many decisions can be taken; this point is to be defined
by Asset Managers for each of their assets. This potential to
failure point, if properly defined, can extend the life cycle of
equipments and thus improve on asset utilization. It is a
challenge to any Asset Manager, but the outcomes are
rewarding.
To decide on this point it is essential to have an established
and reliable data for the utilization of the assets, namely,
Maintenance records, failures records, condition history, or
other relevant data depending on the business of the
organization.
A correlation of all the above data will be necessary to
analyze any trends, probabilities, or repeated failures and the
scope of works that can anticipate for them in order to get an
approximation of the above point (“P”).
In another perspective, there are many factors to manage
assets of which can be outlined by the followings:
 Benefits/goals outreached: short term vs. Long term.
 Cost savings: expenditures vs. Performance levels.
 Availability: Planned vs. Unplanned.
 Financial: Capital costs vs. Operating expenditures.
3
 Asset Levels: Discrete equipment vs. Complex functional
systems (e.g. utility networks).
All the above factors to be embedded in the framework of
the PAS55, which defines for each level of the organization
hierarchy the requirement of that level (refer Figure 3 above).
Accordingly, a proper SWOT analysis is recommended to be
able to decide on the factors upon which Asset Managers will
manage their assets. As many of the decisions will dictate how
well the business would perform (Strengths & Weaknesses),
and what challenges (Threats) it will encounter as well what
opportunities will open up for exploring.
Asset Management drivers comes from the criticality of the
assets/asset systems to its business core purpose. These drivers
might be one or a combination of the follows:
 Sustainability: From three perspectives; i.e. economy
(expansions, seeking alternatives, etc.), society (consumer
satisfaction, awareness, etc.) or environment (reducing
pollution, seeking environmental friendly solutions, etc.).
 Reliability & Safety (consistent with performance & risk).
 Accountability (or “do what you say”).
 Privatization: From the perspectives of achieving
appropriate service levels within a cost saving boundaries.
 Regulation.
Asset Management can be sub-divided into two main
disciplines:
A. Asset oriented: concerned with age, condition and
performance of the physical assets. Here we apply the
Life-Cycle concepts.
B. Service oriented: concerned with the stability of the
services, its cost benefit and expenditures involved (seen
from the two perspectives of CAPEX and OPEX).
The first discipline concentrates on the network items and
their maintenance policies or condition monitoring practices.
This is covered by following the manufacturer’s
recommendations, the experience gained from operating them
and a sound engineering judgement [3]. Eventually,
maintenance cycles are produced for all equipments, and
periodicity of equipment condition assessments are agreed to
have an optimum life-cycle planning.
Nowadays, attention and importance is given to the
discipline of Services, primarily to address questions of
quality, such as customer interruptions, restoration times and
power quality (avoidance of voltage sags, harmonics, etc.).
Furthermore, the running costs of the network have also come
under the spotlight [3].
III. ASSET MANAGEMENT SYSTEM STRUCTURE
From the top of the hierarchy, emphasized by the
Organization Strategy down to the individual assets and their
day-to-day activities, PAS 55 gives clear alignment between
the Organizations’ vision/aspirations and the assets/asset
systems’ capabilities as depicted in figure-5 below [2].
Fig. 5. Planning & implementation elements of asset management system [2]
At the core business of Asset Management, PAS 55
outlines what to do, but not how to do it. It is more like a
check-sheet! The key elements for the preparation of the Asset
Management Policy, Strategy, Objectives, and Plans are
outlined as below:
For Asset Management Policy:
 Stipulates principles & mandated requirements for control
of asset management.
 Derived from & consistent with Organizational Strategic
Plan (OSP).
 Consistent with other Organizational Policies & Risk
Management framework.
 Complies with stakeholder requirements.
 Committed to continual improvement.
 Provides framework for:
 Development & implementation of Asset
Management Strategy.
 Setting Asset Management Objectives.
 Documented, implemented, maintained & communicated
to all stakeholders.
 Reviewed periodically.
From the content perspective, Asset Management Policy
might be produced in two parts:
 Internal:
 Detailed,
 Contains confidential parts.
 External (for stakeholders):
 Summarized,
4
 Contains non-confidential parts.
As per Figure-5 above, life cycle activities contains a term
called functional policies, which unlike the normal policy,
contains specific processes/activities and provides direction
and control. Likewise, there can be functional strategy &
functional objectives.
For Asset Management Strategy:
 Long term optimized approach, with time horizon
equivalent to OSP.
 Derived from & consistent with:
 Asset Management Policy.
 OSP.
 Considers life-cycle management requirements of assets.
 Accountable for:
 Asset related risks,
 Asset systems criticalities.
 Identify current & future function, performance &
condition of critical assets.
 Communicated & reviewed.
For Asset Management Objectives:
 Specific & measurable outcome from:
 Asset systems to implement Asset Management
Policy & Strategy.
 Asset Management Systems.
 Derived from & consistent with AM Strategy.
 Detailed & measurable level of performance of the assets.
 Considers legal, regulatory & statutory requirements.
 Accountable for:
 Stakeholder & financial expectations,
 Operational & business requirements,
 Risks.
 Improves on Asset Management practices, tools &
technologies.
 Communicated & reviewed.
For Asset Management Plans:
 A document(s) which specifies:
 Activities & Responsibilities,
 Resources & Timescales; required to implement
Asset Management Strategy & deliver Asset
Management Objectives.
 Applied on each phase of Asset life cycle planning, i.e.:
 Acquisition (construction, procurement,
modification, designing or commissioning).
 Utilization.
 Maintenance (inspection, Condition Monitoring,
testing, repairing, refurbishment and life extension).
 Disposal.
 Documented & maintained.
Asset Management enablers is yet another key terminology
utilized in PAS 55, of which can be any one of the below:
 Supportive systems,
 Procedures,
 Processes,
 Activities,
 Resources.
Asset Management enablers and controls ensures the
viability of Asset Management Policy & Strategy and their
consistency with the Organizational Strategic Plan. Further it
ensures that the Asset risks are identified, assessed &
controlled. Like other Asset Management documents, this
should also be communicated & maintained.
An effective, step by step, implementation of the PAS 55 is
depicted in Figure-6 below [2], in which it follows the PDCA
management framework (Plan-Do-Check-Act). This
framework was adopted by DEWA under the Integrated
Management Systems (IMS).
Fig. 6. Structure of PAS 55-1:2008 [2]
IV. CHANGE MANAGEMENT APPROACH
The approach of Change Management in any organization
is a challenging yet rewarding practice, as it will improve on
many aspects related to operational & managerial levels. From
the perspective of PAS 55, change management assesses &
considers the below [2]:
 Revising the organization holistically, including:
 Structure,
 Roles,
 Responsibilities.
 Revising the Asset Management, including:
 Policy,
 Strategy,
 Objectives,
 Plans,
 Processes/Procedures.
 Introducing:
 New Assets & Asset Systems,
 New Technology,
 New contractors & suppliers.
As mentioned above introducing new technologies are part
of change management, yet, introducing new technologies for
the sake of mentioning that one is using technology is not
sufficient to provide justification for change management.
Careful and planned integration of technology with business
5
processes and activities help drive performance improvement
[4], thus, leading to proper change management practices.
Change management cycle is elaborated in the below
figure (figure-7) in which adoption should start from the
senior management as to adopt the Asset Management
practice [5] or to transform their existing practices to be in line
with PAS55.
Fig. 7. Change Management – A major enabler [5]
V. PERFORMANCE & CONDITION MONITORING
Asset Management is concerned primarily with Monitoring
of performance related parameters & condition related
parameters, of which they apply separately for:
a) Performance Monitoring relates to the Asset
Management Systems (i.e. to highlight non-
conformities), while;
b) Condition Monitoring relates to physical Assets (i.e.
to highlight defects, deterioration, failures).
Improvement feedbacks on Condition Monitoring practices
will come from failure/defect investigations (refer Section VII
below), to concentrate on the parameters or the
equipments/part of equipments that are vulnerable to failure.
Accordingly, several diagnostic methodologies are adopted for
this purpose, in order to evaluate the healthiness of assets,
like:
 Partial Discharge detection,
 Off-line Partial Discharge & tan delta (for Cables),
 Ultra-Sonic Discharge detection,
 Temperature/Thermal trending,
The above might be incorporated for early detection of
deterioration/defect, and trending the parameters obtained to
analyze the existence of any abnormal patterns that indicates
failure, thus preventing/reducing their chances. Trending
studies and building a consistent criterion for condition
assessment is a vital task for Asset Managers.
Condition Monitoring practices once adopted can improve
on the clearance of most critical defects and can assist in the
avoidance of critical asset failures. Seeking new technologies
in this aspect will help many Asset Managers in the positive
improvement of Asset condition & performance. The figure
below (figure-8) highlights one of the Condition Monitoring
practices done through thermal imaging.
(a)
(b)
Fig. 8. (a) Normal image of 11kV Oil type Distribution Transformer, (b)
Infrared Thermal image of the same
To monitor any parameter we have to have KPIs (Key
Performance Indicators), and these might be:
 Leading Performance Indicators (+): Wherein it can give
us early alarm for non-compliance of monitored
parameter.
 Lagging Performance Indicators (-): Wherein it indicates
the actual achievement (i.e. number of incidents/failures-
AIR, number of consumers affected, duration to restore
supply-CML, duration of repair work-MTTR, etc.).
Leading Performance Indicators assist us in taking
proactive measures (preventive in nature), and Lagging
Performance Indicators assist us in taking reactive measures
(corrective in nature). It is thus of great importance to measure
these KPIs, and record them to measure actual performance
against plan [6]. This is required for future analysis and to be
able to follow-up all corrective and preventive measures
which eventually serves for the continual improvement
initiatives.
VI. RISK MANAGEMENT
For any organization it is essential to identify the risks and
assess them according to their core business objectives. After
this they should establish a proper risk management
framework in which it will outline the methodology to tackle
them.
At the identification/assessment stage we shall be able to
6
identify risks related to:
 Physical Assets failures (i.e. functional failures, ageing,
damage, terrorism acts, etc.),
 Operational related risks (i.e. level of control, human
actions, performance monitoring, safety, etc.),
 Environmental related risks (i.e. wind storm, earthquake,
flood, etc.)
 Scarcity of external supplies/services (e.g. spare parts.
 Stakeholder requirements (e.g. regulatory).
 Life-Cycle related risks (e.g. maintenance vs. replacement
decisions).
At the methodology stage, we shall consider the below in
the formulation of the framework:
 To be proportionate with the risks identified.
 Be defined (i.e. scope, nature, criticality, timing), and thus
allow for proactive measures rather than reactive ones.
 Assessed properly for identifying any changes or
cascading of the risk.
 Risks to be classified in such way that we identify which
risks we need to, either; control, eliminate or avoid in the
first place.
 Risks handled should be up to the level of our
capabilities.
 The methodology should be monitored for its three key
elements: implementation, effectiveness, and timeliness.
An outcome of proper application of Risk Management is a
contingency plan, wherein an organization will identify the
risks and come up with most applicable scenarios of crisis that
they might encounter and put an equivalent contingency plan
to mitigate them, and control the consequences as much as
possible. For that, any organization should have:
 An established plan/procedure to be implemented in case
of crisis.
 Segregation between Assets related risks from activities
related risks.
 Segregation between actions related to mitigation of crisis
to those related to response to crisis.
 Competent & trained personnel in contingency planning
& crisis management.
 List of stakeholders affected or required for response on
crisis.
 Contacts of relevant personnel, services, external
agencies, etc. required for action.
 Resources location & availability.
 Communication hierarchy.
 A recording/reporting team.
VII. INVESTIGATION
Any Asset is vulnerable to failure during the utilization
period of the life cycle or at its expected end-of-life, and thus
comes the importance of having an investigation process or
procedure in place to take proactive actions to mitigate any
failure or incident or non-conformity. Root-Cause Analysis
(RCA) is essential to tackle the above situations, in which it
will highlight all preventive measures that will be taken and
consider the recommendations that are most relevant to
control & improve Asset conditions and the Asset
Management Systems in practice.
In an asset intensive organizations, such as electrical
utilities, RCA is required to provide on-time and credible
remedial & preventive measures that will serve the decision
making / improvements in favor of providing reliable and
uninterrupted supply of electricity through proper asset life
cycle management.
RCA is done based on good judgment of the facts collected
from site of failure, system sequence of events, protection
data, etc. If confidence is high on the RCA results, then most
of the preventive & corrective measures produced from these
studies will be beneficial in reduction of failures or non-
conformities. System performance and KPIs will indicate the
improvements seen in the above as a measure. The figure
below highlights one of the consequences of cable termination
related failures where an extensive damage is seen in the cable
compartment and total shutdown of the whole bus bar was a
cascading-effect, leading to an interruption of 300 consumers.
Fig. 9. Failure of 11kV Cable termination
Investigation findings should be communicated to all
relevant stakeholders with the findings and the preventive &
Corrective actions taken/to-be-taken. Most importantly is the
feedback cycle of the investigation findings towards the
improvement of the Condition Monitoring tasks (refer Section
“V” above). As it will serve to highlight the failure root-cause,
thus assisting the Condition Monitoring groups to focus or
improve on the detection of such causes (or parts of the
equipment).
Based on failure investigations, many opt-to-fail assets
were safeguarded and proactive measures were taken to avoid
the extensive damages that might be incurred if failure took
place. Figure-10 below highlights one case of 11kV cable
termination in which it was Condition Monitored at an earlier
stage and shutdown was taken for only one panel for
rectifying the defect observed. Unless this was done, a
possible failure would have taken place, and the consequences
or cascading effects might be more devastating.
7
Fig. 10. Early detected cable termination abnormality
VIII. CONCLUSION
Imagine a case of an Asset which fails at a certain point of
time, at which you as an Asset Owner/Manager/Operator
discover that it was missed from your asset register, or was
never Condition Monitored! This implies that Asset
Management is an essential component of the structure of any
organization. PAS 55 is a check-sheet for the optimum Asset
Management practices, giving organizations guidelines on
balancing Asset Life cycle in view of cost, performance &
risk. Figure-11 below depicts the urging need for having an
optimized life cycle planning for our assets in an equiangular
triangle, in case we will have a sharp edge (acute angle)
towards any one of the ends (whether cost, risk or
performance) then we will be either:
1. Over-spending on maintaining or replacing our assets
(cost pillar), or
2. Over-stressing our assets with overloads, failures, and
risking in OH&S (risk pillar), or
3. Exceeding performance expectations to satisfy
stakeholders blindly (performance pillar).
Fig. 11. Optimization of cost, risk and performance to get a balanced life-
cycle
ISO 55,000 is an upcoming standard, which is being out-
looked now for the optimized Asset Management which is
planned for publication by February 2014. This shall be a
continuation to the PAS55 with a highlight on how to get
things done in view of Asset Management best practices.
I. ACKNOWLEDGMENT
The authors gratefully acknowledge the contributions and
efforts of the Asset Management team which assisted in
enlightening the way forward in the preparation of this paper.
Further would like to extend the appreciation to higher
management represented by our leader and role model Mr.
Saeed Al-Tayer (MD&CEO) and Mr. Mohammed Al-Suwaidi
(Vice President of Distribution Maintenance).
The above work wouldn’t have been accomplished without
blessings from Allah the most graceful and the support of our
families and their patience on the delayed working hours and
missing many weekends from being attached to them.
II. REFERENCES
[1] His Highness Sheikh Mohammed Bin Rashid Al-Maktoum, My Vision -
Challenges in the Race for Excellence, Dubai: Motivate Publishing,
2006.
[2] PAS 55-1: Asset Management, Part 1: Specification for the optimized
management of physical assets: British Standards Institution, 2008.
[3] R.P Hoskins, A.T. Brint, and G. Strbac, "A structured approach to Asset
Management within the electricity industry," Nov. 1998.
[4] S. Scott, “Asset Management: Measuring Best Practices, Performance,”
Electric Light and Power; Jul/Aug 2009; 87, 4; ProQuest.
[5] Amit Anand, “Enterprise wide Asset Management transformation in the
Middle East,” presented at the 1st
Government Asset Management
Conference. Dubai, UAE, 2012.
[6] Martin Osborn, "Practical Application of PAS55 in the water sector and
lessons for other sectors," presented at the 1st
Government Asset
Management Conference. Dubai, UAE, 2012.
III. BIOGRAPHIES
Matar Al-Mehairi, a member of IAM, UK. He is
holding a Higher Diploma in Mechanical Eng. from
HCT-Dubai, Bachelor of Engineering Management
from HCT-Dubai, Master in Public Administration
from DSG-Dubai in cooperation with Harvard
Kennedy School, Gov. Leader of Sheikh
Mohammad Bin Rashed Leadership Program and
currently pursuing EMBA from HCT-Dubai.
His employment experience includes Distribution
Operation & Maintenance fields in Electric utility
(Dubai Electricity & Water Authority), joined DEWA in 1999 and presently
working as a Sr. Manager Asset Management Department under Distribution
Power Division with wide range of experience in the Electrical & Mechanical
fields as well as Management & Leadership Skills. His skills include Strategic
Thinking & Analysis, Knowledge Management, etc. He already initiated to
bring all DM Department activities in compliance with PAS55, then entire
Distribution Power Division. (Email: matar.almehairi@dewa.gov.ae).
Sharif Al-Batayneh, a member of the Institute of
Electrical and Electronics Engineers (IEEE). He is
holding a B.Sc. in Electrical & Electronics Engineering
from the American University of Sharjah (Fall 2003).
His employment experience included Distribution
Operation & Maintenance fields in Electric utility
(Dubai Electricity & Water Authority) as he joined first
in 2004 as an Engineer in Distribution Operation
Planning, then moved to Distribution Operation Studies
in 2006 as a Senior Engineer. Since 2009 he was
appointed as an Assistant Manager in Asset Management Department under
Distribution Power Division and looking mainly after the failures of the
Distribution Network Assets. (Email: sharif.albatayneh@dewa.gov.ae).

Contenu connexe

En vedette

En vedette (8)

Good Distribution Practices For Medical Devices
Good Distribution Practices For Medical DevicesGood Distribution Practices For Medical Devices
Good Distribution Practices For Medical Devices
 
How to perform an efficient Cold Chain Compliance and Gap Analysis
How to perform an efficient Cold Chain Compliance and Gap Analysis How to perform an efficient Cold Chain Compliance and Gap Analysis
How to perform an efficient Cold Chain Compliance and Gap Analysis
 
Challenges of Cold Chain Supply
Challenges of Cold Chain SupplyChallenges of Cold Chain Supply
Challenges of Cold Chain Supply
 
Transportation management
Transportation managementTransportation management
Transportation management
 
Guidelines gdp
Guidelines gdpGuidelines gdp
Guidelines gdp
 
Who good distributionpracticesforpharmaceuticalproducts
Who good distributionpracticesforpharmaceuticalproductsWho good distributionpracticesforpharmaceuticalproducts
Who good distributionpracticesforpharmaceuticalproducts
 
Good distribution practices for API's
Good distribution practices for API'sGood distribution practices for API's
Good distribution practices for API's
 
Good Laboratory Practice
Good Laboratory PracticeGood Laboratory Practice
Good Laboratory Practice
 

Plus de Ali Zeeshan

Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation Ali Zeeshan
 
Your Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment WebinarYour Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment WebinarAli Zeeshan
 
Webinar: KPI Best Practices
Webinar: KPI Best Practices Webinar: KPI Best Practices
Webinar: KPI Best Practices Ali Zeeshan
 
Webinar: Strategy + Innovation
Webinar: Strategy + InnovationWebinar: Strategy + Innovation
Webinar: Strategy + InnovationAli Zeeshan
 
Time Management: Productivity and Time Stealers
Time Management: Productivity and Time StealersTime Management: Productivity and Time Stealers
Time Management: Productivity and Time StealersAli Zeeshan
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case StudyAli Zeeshan
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case StudyAli Zeeshan
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case StudyAli Zeeshan
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case StudyAli Zeeshan
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsAli Zeeshan
 
Developing Contracts That Fit Your Needs: The Commercial Framework
Developing Contracts That Fit Your Needs: The Commercial FrameworkDeveloping Contracts That Fit Your Needs: The Commercial Framework
Developing Contracts That Fit Your Needs: The Commercial FrameworkAli Zeeshan
 
Webinar: Business Benefits Realisation
Webinar: Business Benefits RealisationWebinar: Business Benefits Realisation
Webinar: Business Benefits RealisationAli Zeeshan
 
Webinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or FalseWebinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or FalseAli Zeeshan
 
Webinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement ItWebinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement ItAli Zeeshan
 
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...Ali Zeeshan
 
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' ReactionsWebinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' ReactionsAli Zeeshan
 
Webinar: Leading Project Managers
Webinar: Leading Project ManagersWebinar: Leading Project Managers
Webinar: Leading Project ManagersAli Zeeshan
 
Webinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the OrganisationWebinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the OrganisationAli Zeeshan
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesAli Zeeshan
 
Internal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarInternal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarAli Zeeshan
 

Plus de Ali Zeeshan (20)

Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation Webinar: Measuring And Monetizing Strategic Innovation
Webinar: Measuring And Monetizing Strategic Innovation
 
Your Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment WebinarYour Brain And Learning Needs Assessment Webinar
Your Brain And Learning Needs Assessment Webinar
 
Webinar: KPI Best Practices
Webinar: KPI Best Practices Webinar: KPI Best Practices
Webinar: KPI Best Practices
 
Webinar: Strategy + Innovation
Webinar: Strategy + InnovationWebinar: Strategy + Innovation
Webinar: Strategy + Innovation
 
Time Management: Productivity and Time Stealers
Time Management: Productivity and Time StealersTime Management: Productivity and Time Stealers
Time Management: Productivity and Time Stealers
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case Study
 
Exponential Informa Case Study
Exponential Informa Case StudyExponential Informa Case Study
Exponential Informa Case Study
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case Study
 
Informa_LinkedIn_Case Study
Informa_LinkedIn_Case StudyInforma_LinkedIn_Case Study
Informa_LinkedIn_Case Study
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For Results
 
Developing Contracts That Fit Your Needs: The Commercial Framework
Developing Contracts That Fit Your Needs: The Commercial FrameworkDeveloping Contracts That Fit Your Needs: The Commercial Framework
Developing Contracts That Fit Your Needs: The Commercial Framework
 
Webinar: Business Benefits Realisation
Webinar: Business Benefits RealisationWebinar: Business Benefits Realisation
Webinar: Business Benefits Realisation
 
Webinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or FalseWebinar: It Is Good To Be First To Market - True or False
Webinar: It Is Good To Be First To Market - True or False
 
Webinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement ItWebinar: The Balanced Scorecard What Does It Mean And How To Implement It
Webinar: The Balanced Scorecard What Does It Mean And How To Implement It
 
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
Webinar: Private Higher Education in MENA - Lesson and Considerations for Ope...
 
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' ReactionsWebinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
Webinar: Rigorous Strategic Thinking: Avoiding 'Knee Jerk' Reactions
 
Webinar: Leading Project Managers
Webinar: Leading Project ManagersWebinar: Leading Project Managers
Webinar: Leading Project Managers
 
Webinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the OrganisationWebinar: Aligning the Employee to the Strategy of the Organisation
Webinar: Aligning the Employee to the Strategy of the Organisation
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slides
 
Internal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarInternal financial control - how ready are you - Webinar
Internal financial control - how ready are you - Webinar
 

Dernier

The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 

Dernier (20)

The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 

Best Practices of Distribution Networks Asset Management in view of PAS55 Framework

  • 1. Best Practices of Distribution Networks Asset Management in view of PAS55 Framework By Matar S. Al-Mehairi (Member IAM) and Sharif M. Al-Batayneh (Member IEEE) Asset Management Department, Dubai Electricity & Water Authority (DEWA) assetmanagement.iirme.com ■ +971 4 407 2526 ■ register@iirme.com
  • 2. Best Practices of Distribution Networks Asset Management in view of PAS55 Framework Al-Batayneh, Sharif M. (Member IEEE), and Al-Mehairi, Matar S. (Member IAM) Dubai Electricity & Water Authority (DEWA), Asset Management Department 1 Abstract--“In the race for excellence there is no finish line [1]”, and from the Utilities Operators/Managers view point the race for excellence is solely a race for an optimum Asset Life-Cycle Management. Especially for Distribution network operators/managers, having an intensive portfolio of assets, with all the related costs, risks & performance involved in the whole life cycle management process. Nowadays, Asset Management teams are facing an uphill challenge, with continual (on daily basis) increase in an already huge asset portfolio, and with the recent economic crisis adding yet another stone to hurdle the efforts of the Asset Management approach adopted by many utilities worldwide. Challenges, led by the ageing infrastructure and the increase in their failures, are two of the most arguable and debatable topics. Theft of copper is yet a new risk which is to be either controlled or eliminated as per the organizations strategy, and this is another task for the Asset Management team. Invisible assets, such as cables are a critical part of the infrastructure which needs to be addressed & condition monitored under the RCM philosophy. Asset Management is to optimize the three pillars of the whole life cycle activities of assets: risk, cost & performance, and this can be done within the guidelines of the PAS 55. This paper will highlight the best practice model of the Distribution Power Asset Management under the Dubai Electricity & Water Authority in view of PAS 55. Index Terms-- Asset Management, Condition Monitoring, Crisis Management, Failure Investigation, Life-Cycle, Publically Available Specification (PAS), Risk Management. I. INTRODUCTION ISTRIBUTION Network operators/managers worldwide face a continuous challenge for the sake of achieving the optimum balance of the whole-life-cycle of their assets, and here we mean physical assets. As per PAS 55, “Physical assets represent only one of the five broad categories of asset types [2]”. All the asset types should be managed intrinsically to achieve the total business objectives, however, the focus of our discussion and as well the scope of PAS 55 is focused objectively on the physical assets. Figure-1 highlights the correlation of physical assets to other asset types as defined in the PAS 55 [2]. Fig. 1. Critical interdependencies between assets [2] In any utility, Assets might have two extremely opposing impacts on the business, either drive business (i.e. not manageable) or serve business (i.e. managed to serve business goals). Any Asset Owner/Manager would like to have the latter case; wherein they can manage their assets optimally to deliver the planned business goals. Distribution Asset Management in DEWA was established in 2009 upon an extensive urge for the assignment of an independent body under the Distribution Power Division to take-over the responsibility of managing the existing portfolio of physical assets and regularizes the practices of Operations & Maintenance to be in-line with internationally adopted best- practices. The assets of Distribution Network of DEWA are outlined in table-1 & 2 below: TABLE 1 Distribution substations & capacities as on 2011 Voltage level Sub level No. Of Substations Capacity In MVA 132kV* 132kV 2 - 132/33kV 17 3,795 132/11kV 147 22,770 33kV 33kV 3 - 33/11kV 37 1,235 33/6.6kV 95 3,035 11-6.6kV - 25,656 34,228.75 Within a quick look on the above table, one understands the sum of Assets/Asset systems underlying these figures; of which requires systematic & well-coordinated practices to optimally manage them. TABLE 2 Length of Distribution Cable & OHL network Voltage level Type Length (km) 11-6.6kV OHL 721 Underground 23,978 33kV OHL 113 Underground 1,985 D ________________________________ * Distribution ownership of assets under the 132/33kV & 132/11kV substations is only for 33kV & 11kV switchgears, respectively.
  • 3. 2 Fig. 2. Growth of 11-6.6kV Cable system in DEWA As seen in Fig. 2 above, the MV cable network (for 11- 6.6kV) have seen a vast growth in between 2005 and 2011. The rate of expansion seen was approximately 150%. The results of an optimized life-cycle Asset Management can be outlined by the below:  Increased customer satisfaction.  Better occupational, health & safety practices.  Increased ROI.  Achieving sustainability.  Improved risk management.  Controlled & systematic processes.  Staff empowerment. II. ASSET MANAGEMENT & PAS 55 Asset Management in its essence is not simply a department or section that is established in any utility, but rather is an organization culture. A culture which is adopted at all levels of the organization ensuring the buy-in from all concerned stakeholders for the successful adoption of Asset Management. Figure 3 highlights the different levels of assets & their management [2]. Fig. 3. Levels of Assets and their management [2] At each level we can outline the requirements as below:  “Managing Assets” level (operational level): Optimize life-cycle activities, such as; acquisition, utilization, maintenance & disposal of assets.  “Managing Asset Systems” level: In this level our concern is to ensure the performance is sustained and the cost/risk are optimized.  “Managing Asset Portfolio” level: CAPEX optimization and planning for sustainability.  “Corporate/Organization Management” level: Organizational Strategic Planning level, which is beyond the boundary of PAS55 framework. When looking at ageing infrastructure, we take normally replacement decisions (at expected end of life of equipment- refer figure 4 below) and while taking that decision we might fall under two extremes, either:  We replace too early; thus, incurring extra costs on the non-utilized life of replaced equipment; or  We replace too late; upon encountering too many failures, again incurring extra costs on repairs, spare parts, or loss of revenue due to shutdowns, etc. Fig. 4. Asset expected-life curve There is a threshold point on the curve (named “P”) upon which many decisions can be taken; this point is to be defined by Asset Managers for each of their assets. This potential to failure point, if properly defined, can extend the life cycle of equipments and thus improve on asset utilization. It is a challenge to any Asset Manager, but the outcomes are rewarding. To decide on this point it is essential to have an established and reliable data for the utilization of the assets, namely, Maintenance records, failures records, condition history, or other relevant data depending on the business of the organization. A correlation of all the above data will be necessary to analyze any trends, probabilities, or repeated failures and the scope of works that can anticipate for them in order to get an approximation of the above point (“P”). In another perspective, there are many factors to manage assets of which can be outlined by the followings:  Benefits/goals outreached: short term vs. Long term.  Cost savings: expenditures vs. Performance levels.  Availability: Planned vs. Unplanned.  Financial: Capital costs vs. Operating expenditures.
  • 4. 3  Asset Levels: Discrete equipment vs. Complex functional systems (e.g. utility networks). All the above factors to be embedded in the framework of the PAS55, which defines for each level of the organization hierarchy the requirement of that level (refer Figure 3 above). Accordingly, a proper SWOT analysis is recommended to be able to decide on the factors upon which Asset Managers will manage their assets. As many of the decisions will dictate how well the business would perform (Strengths & Weaknesses), and what challenges (Threats) it will encounter as well what opportunities will open up for exploring. Asset Management drivers comes from the criticality of the assets/asset systems to its business core purpose. These drivers might be one or a combination of the follows:  Sustainability: From three perspectives; i.e. economy (expansions, seeking alternatives, etc.), society (consumer satisfaction, awareness, etc.) or environment (reducing pollution, seeking environmental friendly solutions, etc.).  Reliability & Safety (consistent with performance & risk).  Accountability (or “do what you say”).  Privatization: From the perspectives of achieving appropriate service levels within a cost saving boundaries.  Regulation. Asset Management can be sub-divided into two main disciplines: A. Asset oriented: concerned with age, condition and performance of the physical assets. Here we apply the Life-Cycle concepts. B. Service oriented: concerned with the stability of the services, its cost benefit and expenditures involved (seen from the two perspectives of CAPEX and OPEX). The first discipline concentrates on the network items and their maintenance policies or condition monitoring practices. This is covered by following the manufacturer’s recommendations, the experience gained from operating them and a sound engineering judgement [3]. Eventually, maintenance cycles are produced for all equipments, and periodicity of equipment condition assessments are agreed to have an optimum life-cycle planning. Nowadays, attention and importance is given to the discipline of Services, primarily to address questions of quality, such as customer interruptions, restoration times and power quality (avoidance of voltage sags, harmonics, etc.). Furthermore, the running costs of the network have also come under the spotlight [3]. III. ASSET MANAGEMENT SYSTEM STRUCTURE From the top of the hierarchy, emphasized by the Organization Strategy down to the individual assets and their day-to-day activities, PAS 55 gives clear alignment between the Organizations’ vision/aspirations and the assets/asset systems’ capabilities as depicted in figure-5 below [2]. Fig. 5. Planning & implementation elements of asset management system [2] At the core business of Asset Management, PAS 55 outlines what to do, but not how to do it. It is more like a check-sheet! The key elements for the preparation of the Asset Management Policy, Strategy, Objectives, and Plans are outlined as below: For Asset Management Policy:  Stipulates principles & mandated requirements for control of asset management.  Derived from & consistent with Organizational Strategic Plan (OSP).  Consistent with other Organizational Policies & Risk Management framework.  Complies with stakeholder requirements.  Committed to continual improvement.  Provides framework for:  Development & implementation of Asset Management Strategy.  Setting Asset Management Objectives.  Documented, implemented, maintained & communicated to all stakeholders.  Reviewed periodically. From the content perspective, Asset Management Policy might be produced in two parts:  Internal:  Detailed,  Contains confidential parts.  External (for stakeholders):  Summarized,
  • 5. 4  Contains non-confidential parts. As per Figure-5 above, life cycle activities contains a term called functional policies, which unlike the normal policy, contains specific processes/activities and provides direction and control. Likewise, there can be functional strategy & functional objectives. For Asset Management Strategy:  Long term optimized approach, with time horizon equivalent to OSP.  Derived from & consistent with:  Asset Management Policy.  OSP.  Considers life-cycle management requirements of assets.  Accountable for:  Asset related risks,  Asset systems criticalities.  Identify current & future function, performance & condition of critical assets.  Communicated & reviewed. For Asset Management Objectives:  Specific & measurable outcome from:  Asset systems to implement Asset Management Policy & Strategy.  Asset Management Systems.  Derived from & consistent with AM Strategy.  Detailed & measurable level of performance of the assets.  Considers legal, regulatory & statutory requirements.  Accountable for:  Stakeholder & financial expectations,  Operational & business requirements,  Risks.  Improves on Asset Management practices, tools & technologies.  Communicated & reviewed. For Asset Management Plans:  A document(s) which specifies:  Activities & Responsibilities,  Resources & Timescales; required to implement Asset Management Strategy & deliver Asset Management Objectives.  Applied on each phase of Asset life cycle planning, i.e.:  Acquisition (construction, procurement, modification, designing or commissioning).  Utilization.  Maintenance (inspection, Condition Monitoring, testing, repairing, refurbishment and life extension).  Disposal.  Documented & maintained. Asset Management enablers is yet another key terminology utilized in PAS 55, of which can be any one of the below:  Supportive systems,  Procedures,  Processes,  Activities,  Resources. Asset Management enablers and controls ensures the viability of Asset Management Policy & Strategy and their consistency with the Organizational Strategic Plan. Further it ensures that the Asset risks are identified, assessed & controlled. Like other Asset Management documents, this should also be communicated & maintained. An effective, step by step, implementation of the PAS 55 is depicted in Figure-6 below [2], in which it follows the PDCA management framework (Plan-Do-Check-Act). This framework was adopted by DEWA under the Integrated Management Systems (IMS). Fig. 6. Structure of PAS 55-1:2008 [2] IV. CHANGE MANAGEMENT APPROACH The approach of Change Management in any organization is a challenging yet rewarding practice, as it will improve on many aspects related to operational & managerial levels. From the perspective of PAS 55, change management assesses & considers the below [2]:  Revising the organization holistically, including:  Structure,  Roles,  Responsibilities.  Revising the Asset Management, including:  Policy,  Strategy,  Objectives,  Plans,  Processes/Procedures.  Introducing:  New Assets & Asset Systems,  New Technology,  New contractors & suppliers. As mentioned above introducing new technologies are part of change management, yet, introducing new technologies for the sake of mentioning that one is using technology is not sufficient to provide justification for change management. Careful and planned integration of technology with business
  • 6. 5 processes and activities help drive performance improvement [4], thus, leading to proper change management practices. Change management cycle is elaborated in the below figure (figure-7) in which adoption should start from the senior management as to adopt the Asset Management practice [5] or to transform their existing practices to be in line with PAS55. Fig. 7. Change Management – A major enabler [5] V. PERFORMANCE & CONDITION MONITORING Asset Management is concerned primarily with Monitoring of performance related parameters & condition related parameters, of which they apply separately for: a) Performance Monitoring relates to the Asset Management Systems (i.e. to highlight non- conformities), while; b) Condition Monitoring relates to physical Assets (i.e. to highlight defects, deterioration, failures). Improvement feedbacks on Condition Monitoring practices will come from failure/defect investigations (refer Section VII below), to concentrate on the parameters or the equipments/part of equipments that are vulnerable to failure. Accordingly, several diagnostic methodologies are adopted for this purpose, in order to evaluate the healthiness of assets, like:  Partial Discharge detection,  Off-line Partial Discharge & tan delta (for Cables),  Ultra-Sonic Discharge detection,  Temperature/Thermal trending, The above might be incorporated for early detection of deterioration/defect, and trending the parameters obtained to analyze the existence of any abnormal patterns that indicates failure, thus preventing/reducing their chances. Trending studies and building a consistent criterion for condition assessment is a vital task for Asset Managers. Condition Monitoring practices once adopted can improve on the clearance of most critical defects and can assist in the avoidance of critical asset failures. Seeking new technologies in this aspect will help many Asset Managers in the positive improvement of Asset condition & performance. The figure below (figure-8) highlights one of the Condition Monitoring practices done through thermal imaging. (a) (b) Fig. 8. (a) Normal image of 11kV Oil type Distribution Transformer, (b) Infrared Thermal image of the same To monitor any parameter we have to have KPIs (Key Performance Indicators), and these might be:  Leading Performance Indicators (+): Wherein it can give us early alarm for non-compliance of monitored parameter.  Lagging Performance Indicators (-): Wherein it indicates the actual achievement (i.e. number of incidents/failures- AIR, number of consumers affected, duration to restore supply-CML, duration of repair work-MTTR, etc.). Leading Performance Indicators assist us in taking proactive measures (preventive in nature), and Lagging Performance Indicators assist us in taking reactive measures (corrective in nature). It is thus of great importance to measure these KPIs, and record them to measure actual performance against plan [6]. This is required for future analysis and to be able to follow-up all corrective and preventive measures which eventually serves for the continual improvement initiatives. VI. RISK MANAGEMENT For any organization it is essential to identify the risks and assess them according to their core business objectives. After this they should establish a proper risk management framework in which it will outline the methodology to tackle them. At the identification/assessment stage we shall be able to
  • 7. 6 identify risks related to:  Physical Assets failures (i.e. functional failures, ageing, damage, terrorism acts, etc.),  Operational related risks (i.e. level of control, human actions, performance monitoring, safety, etc.),  Environmental related risks (i.e. wind storm, earthquake, flood, etc.)  Scarcity of external supplies/services (e.g. spare parts.  Stakeholder requirements (e.g. regulatory).  Life-Cycle related risks (e.g. maintenance vs. replacement decisions). At the methodology stage, we shall consider the below in the formulation of the framework:  To be proportionate with the risks identified.  Be defined (i.e. scope, nature, criticality, timing), and thus allow for proactive measures rather than reactive ones.  Assessed properly for identifying any changes or cascading of the risk.  Risks to be classified in such way that we identify which risks we need to, either; control, eliminate or avoid in the first place.  Risks handled should be up to the level of our capabilities.  The methodology should be monitored for its three key elements: implementation, effectiveness, and timeliness. An outcome of proper application of Risk Management is a contingency plan, wherein an organization will identify the risks and come up with most applicable scenarios of crisis that they might encounter and put an equivalent contingency plan to mitigate them, and control the consequences as much as possible. For that, any organization should have:  An established plan/procedure to be implemented in case of crisis.  Segregation between Assets related risks from activities related risks.  Segregation between actions related to mitigation of crisis to those related to response to crisis.  Competent & trained personnel in contingency planning & crisis management.  List of stakeholders affected or required for response on crisis.  Contacts of relevant personnel, services, external agencies, etc. required for action.  Resources location & availability.  Communication hierarchy.  A recording/reporting team. VII. INVESTIGATION Any Asset is vulnerable to failure during the utilization period of the life cycle or at its expected end-of-life, and thus comes the importance of having an investigation process or procedure in place to take proactive actions to mitigate any failure or incident or non-conformity. Root-Cause Analysis (RCA) is essential to tackle the above situations, in which it will highlight all preventive measures that will be taken and consider the recommendations that are most relevant to control & improve Asset conditions and the Asset Management Systems in practice. In an asset intensive organizations, such as electrical utilities, RCA is required to provide on-time and credible remedial & preventive measures that will serve the decision making / improvements in favor of providing reliable and uninterrupted supply of electricity through proper asset life cycle management. RCA is done based on good judgment of the facts collected from site of failure, system sequence of events, protection data, etc. If confidence is high on the RCA results, then most of the preventive & corrective measures produced from these studies will be beneficial in reduction of failures or non- conformities. System performance and KPIs will indicate the improvements seen in the above as a measure. The figure below highlights one of the consequences of cable termination related failures where an extensive damage is seen in the cable compartment and total shutdown of the whole bus bar was a cascading-effect, leading to an interruption of 300 consumers. Fig. 9. Failure of 11kV Cable termination Investigation findings should be communicated to all relevant stakeholders with the findings and the preventive & Corrective actions taken/to-be-taken. Most importantly is the feedback cycle of the investigation findings towards the improvement of the Condition Monitoring tasks (refer Section “V” above). As it will serve to highlight the failure root-cause, thus assisting the Condition Monitoring groups to focus or improve on the detection of such causes (or parts of the equipment). Based on failure investigations, many opt-to-fail assets were safeguarded and proactive measures were taken to avoid the extensive damages that might be incurred if failure took place. Figure-10 below highlights one case of 11kV cable termination in which it was Condition Monitored at an earlier stage and shutdown was taken for only one panel for rectifying the defect observed. Unless this was done, a possible failure would have taken place, and the consequences or cascading effects might be more devastating.
  • 8. 7 Fig. 10. Early detected cable termination abnormality VIII. CONCLUSION Imagine a case of an Asset which fails at a certain point of time, at which you as an Asset Owner/Manager/Operator discover that it was missed from your asset register, or was never Condition Monitored! This implies that Asset Management is an essential component of the structure of any organization. PAS 55 is a check-sheet for the optimum Asset Management practices, giving organizations guidelines on balancing Asset Life cycle in view of cost, performance & risk. Figure-11 below depicts the urging need for having an optimized life cycle planning for our assets in an equiangular triangle, in case we will have a sharp edge (acute angle) towards any one of the ends (whether cost, risk or performance) then we will be either: 1. Over-spending on maintaining or replacing our assets (cost pillar), or 2. Over-stressing our assets with overloads, failures, and risking in OH&S (risk pillar), or 3. Exceeding performance expectations to satisfy stakeholders blindly (performance pillar). Fig. 11. Optimization of cost, risk and performance to get a balanced life- cycle ISO 55,000 is an upcoming standard, which is being out- looked now for the optimized Asset Management which is planned for publication by February 2014. This shall be a continuation to the PAS55 with a highlight on how to get things done in view of Asset Management best practices. I. ACKNOWLEDGMENT The authors gratefully acknowledge the contributions and efforts of the Asset Management team which assisted in enlightening the way forward in the preparation of this paper. Further would like to extend the appreciation to higher management represented by our leader and role model Mr. Saeed Al-Tayer (MD&CEO) and Mr. Mohammed Al-Suwaidi (Vice President of Distribution Maintenance). The above work wouldn’t have been accomplished without blessings from Allah the most graceful and the support of our families and their patience on the delayed working hours and missing many weekends from being attached to them. II. REFERENCES [1] His Highness Sheikh Mohammed Bin Rashid Al-Maktoum, My Vision - Challenges in the Race for Excellence, Dubai: Motivate Publishing, 2006. [2] PAS 55-1: Asset Management, Part 1: Specification for the optimized management of physical assets: British Standards Institution, 2008. [3] R.P Hoskins, A.T. Brint, and G. Strbac, "A structured approach to Asset Management within the electricity industry," Nov. 1998. [4] S. Scott, “Asset Management: Measuring Best Practices, Performance,” Electric Light and Power; Jul/Aug 2009; 87, 4; ProQuest. [5] Amit Anand, “Enterprise wide Asset Management transformation in the Middle East,” presented at the 1st Government Asset Management Conference. Dubai, UAE, 2012. [6] Martin Osborn, "Practical Application of PAS55 in the water sector and lessons for other sectors," presented at the 1st Government Asset Management Conference. Dubai, UAE, 2012. III. BIOGRAPHIES Matar Al-Mehairi, a member of IAM, UK. He is holding a Higher Diploma in Mechanical Eng. from HCT-Dubai, Bachelor of Engineering Management from HCT-Dubai, Master in Public Administration from DSG-Dubai in cooperation with Harvard Kennedy School, Gov. Leader of Sheikh Mohammad Bin Rashed Leadership Program and currently pursuing EMBA from HCT-Dubai. His employment experience includes Distribution Operation & Maintenance fields in Electric utility (Dubai Electricity & Water Authority), joined DEWA in 1999 and presently working as a Sr. Manager Asset Management Department under Distribution Power Division with wide range of experience in the Electrical & Mechanical fields as well as Management & Leadership Skills. His skills include Strategic Thinking & Analysis, Knowledge Management, etc. He already initiated to bring all DM Department activities in compliance with PAS55, then entire Distribution Power Division. (Email: matar.almehairi@dewa.gov.ae). Sharif Al-Batayneh, a member of the Institute of Electrical and Electronics Engineers (IEEE). He is holding a B.Sc. in Electrical & Electronics Engineering from the American University of Sharjah (Fall 2003). His employment experience included Distribution Operation & Maintenance fields in Electric utility (Dubai Electricity & Water Authority) as he joined first in 2004 as an Engineer in Distribution Operation Planning, then moved to Distribution Operation Studies in 2006 as a Senior Engineer. Since 2009 he was appointed as an Assistant Manager in Asset Management Department under Distribution Power Division and looking mainly after the failures of the Distribution Network Assets. (Email: sharif.albatayneh@dewa.gov.ae).