SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
Process Mapping with Flowcharts
A flowchart is an outline or schematic drawing of the process your team is trying to measure or improve. It can also be a
picture of an ideal process that you would like to use. Process mapping with flowcharts can help people:
     Agree on the steps of a process and the order in which they occur
     See some of the duplicated effort and other non-value-added steps that might be lurking in a process
     Clarify working relationships between people and organizations
     Target specific steps in the process for improvement.
Process mapping is especially useful in the measure and analyze phases of Lean Six Sigma methodology.

Top-down flowchart
There are several kinds of flowcharts. The simplest is the top-down flowchart.

What can it do for you?
       Tell what the major clusters of activity are—the ones that are essential to the total process.
       Show what the process would look like without the steps that have accumulated over time to shore up an
        inefficient or faulty process.

How do you make one?
1. List the most basic steps of the process. Limit these to no more than five or six major steps.
2. Write the major steps across the top of a board, flipchart or piece of paper in the order that they occur in the process.
3. Under each major step, list the sub-steps that make up that element of the process. List them in the order that they occur.
Again, limit yourself to no more than five or six sub-steps for each major step.
Now what?
The picture you have created will show only the useful work that goes into the process.
    Compare this to the way things are actually done. Ask: “What can be done to eliminate unnecessary work?”
    Talk to your customers. Ask: “How can we improve the process to better please the people who receive our work?”
    Look at the essential process. Ask: “How can we change the process to make fewer errors and increase our speed
        of delivery?”
                  Product Spt.        Design            Model                      The top-down flowchart can be used
 Customer                                                             Others       for planning new processes as well as
                  Engineering Engineering Engineering                              examining existing ones. It helps keep
    Events              Data                                                       people focused on the whole process
   Reported           received                                                     instead of getting lost in details.
                                                                                   Details can be worked out by the team
                                                                                   members responsible for that part of
                                                                                   the process.
                Y       Isolated
                        Problem
                            ?                                                        Deployment flowchart
                                                                                     Another flowchart is the deployment
                        N                                                            chart. While the top-down flowchart
                                                                                     tells what, the deployment chart
                            Form Teams, Establish Priority                           shows both what and who.

                                                                                     What can it do for you?
                                N        Action                                           Show how the people
                                        Required                                     involved fit together.
                                           ?                                              Keep track of what each
                                    Y                                                person or organization is supposed to
                                                                                     do.
                            Action Plan
                                                                                     How do you make one?
                            Control Plan                                             1. List the major steps of the process
                                                                                     in the order in which they occur. This
                                                                                     might be the output of your work with
                    Preliminary Investigation
                                                                                     a top-down flowchart or you might
                                                                                     use some other technique to create this
                                                                                     list.
                    Y                                                                2. Across the top of your board,
                        More Data
                                                Investigation Plan                   flipchart or paper write the names of
                            ?
                                    N                                                the people or organizations involved
                                                                                     in the process.
                                                                                     3. Under the name of the person or
                              Establish priority and funding                         organization responsible for the first
                                                                                     step in the process, draw a box and
                                                                                     write that step in the box. If more than
     Deployment Flowchart                          Analysis and Improvement          one person or group is responsible for
                                                                                     a step, extend the box so it is also
under the name of that person or group.
4. If any of the other people or groups help or advise the ones with primary responsibility for that step, draw an oval under
the names of those people or groups.
5. Connect the ovals to the box with the process step in it.
6. After the first step is complete, put the second step under the people responsible for it.
7. Connect the first step to the second step, and then add ovals for any helpers or advisors in the second process step. Keep
going this way with all the steps in the process.
Now what?
The completed chart tells not only how the process operates at each step, but who is involved and what responsibility they
each have.

Ask:
       “Are the right people involved at the right time in the process?”
       “Are there too many people involved or too many hand-offs?”
       “Are there barriers between people who must work together to make the process work?”

The deployment chart can be as simple (just major steps) or as involved (sub-steps and sub-sub-steps) as you need to
make it.

Detailed flowchart
Generally top-down and deployment charts are enough to examine a process, but sometimes teams need more detail to see
where problems are occurring.

What can it do for you?
       Show what actually happens at each step in the process in detail
       Show what happens when non-standard events occur
       Graphically display processes so you can easily see redundancies and other wasted effort.

How do you do it?
To construct a detailed flowchart, various symbols can be used to represent process steps.
1. Draw the first symbol, and then write a description of the process step inside the symbol.
2. Draw the second symbol. Write the description. Connect the two symbols with an arrow showing the direction of flow.
3. Continue this way until you have completed the process or the part of the process you wanted to examine.

Each symbol should represent only one action or one yes-no decision. This is what gives the detailed flowchart its detail.
It is also what makes the creation of detailed flowcharts so time consuming.




                                                                                             Each symbol should
                                                                                          represent only one action
                                                                                           or one yes-no decision.
                                                                                            This is what gives the
                                                                                            detailed flowchart its
                                                                                            detail. It is also what
                                                                                            makes the creation of
                                                                                            detailed flowcharts so
                                                                                               time consuming.
Now what?
                                   Look at the completed flowchart.

                                   Ask:
                                           Where are there redundancies that could be eliminated?
                                           Where are there steps that seem out of order?
                                           What steps are missing that could improve the process?
                                           Where is time lost waiting or sending things back and
                                   forth?
                                           What steps add no value to the customer?

                                   A detailed flowchart can be a powerful tool for examining a
                                   process that has built up needless complexity, but be warned.
                                   Creating all this detail is time-consuming.

                                   Before you begin, ask:
                                        Is all this detail necessary?
                                        Can the detailed flowchart be limited to only a small
                                   part of the total process?




Steven Bonacorsi is the President of the International Standard for Lean Six Sigma
(ISLSS) and Certified Lean Six Sigma Master Black Belt instructor and coach. Steven
Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and
Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for
Lean Six Sigma process improvement methodologies.
                             Author for the Process Excellence Network (PEX Network /
                             IQPC).
                             FREE Lean Six Sigma and BPM content

International Standard for Lean Six Sigma
Steven Bonacorsi, President and Lean Six Sigma Master Black Belt
47 Seasons Lane, Londonderry, NH 03053, USA
Phone: + (1) 603-401-7047
Steven Bonacorsi e-mail
Steven Bonacorsi LinkedIn
Steven Bonacorsi Twitter
Lean Six Sigma Group

Contenu connexe

Tendances

Business process mapping
Business process mappingBusiness process mapping
Business process mappingDAVIS THOMAS
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen EventsStephen Depoe
 
PROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMS
PROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMSPROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMS
PROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMSHriday Bora
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean ProjectsAnand Subramaniam
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 
Process improvement
Process improvementProcess improvement
Process improvementaolrac
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Process Mapping Checklist
Process Mapping ChecklistProcess Mapping Checklist
Process Mapping ChecklistJanet McGreevy
 

Tendances (20)

Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Process Mapping
Process MappingProcess Mapping
Process Mapping
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
Business Process Mapping
Business Process MappingBusiness Process Mapping
Business Process Mapping
 
Process mapping overview
Process mapping overviewProcess mapping overview
Process mapping overview
 
Quality Tools
Quality ToolsQuality Tools
Quality Tools
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
PROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMS
PROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMSPROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMS
PROCESS MAPPING AND PROCESS RECONSTRUCTIONS & DIAGRAMS
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 
Process improvement
Process improvementProcess improvement
Process improvement
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Process Mapping Checklist
Process Mapping ChecklistProcess Mapping Checklist
Process Mapping Checklist
 

En vedette

Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)083805154
 
1.2 workflow and_process_redesign
1.2 workflow and_process_redesign1.2 workflow and_process_redesign
1.2 workflow and_process_redesignTCT
 
Workflow and Clinical Informatics Assessment (CIA)
Workflow and Clinical Informatics Assessment (CIA)Workflow and Clinical Informatics Assessment (CIA)
Workflow and Clinical Informatics Assessment (CIA)Edward Stern
 
HH Centralized Maintenance-Work Order Processing Cross Functional Workflow
HH Centralized Maintenance-Work Order Processing Cross Functional WorkflowHH Centralized Maintenance-Work Order Processing Cross Functional Workflow
HH Centralized Maintenance-Work Order Processing Cross Functional WorkflowTimothy L. Butler, H.C.C.P.
 

En vedette (6)

Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)
 
MGCP4LCSS Workflow
MGCP4LCSS WorkflowMGCP4LCSS Workflow
MGCP4LCSS Workflow
 
1.2 workflow and_process_redesign
1.2 workflow and_process_redesign1.2 workflow and_process_redesign
1.2 workflow and_process_redesign
 
Workflow and Clinical Informatics Assessment (CIA)
Workflow and Clinical Informatics Assessment (CIA)Workflow and Clinical Informatics Assessment (CIA)
Workflow and Clinical Informatics Assessment (CIA)
 
Cerebrum
CerebrumCerebrum
Cerebrum
 
HH Centralized Maintenance-Work Order Processing Cross Functional Workflow
HH Centralized Maintenance-Work Order Processing Cross Functional WorkflowHH Centralized Maintenance-Work Order Processing Cross Functional Workflow
HH Centralized Maintenance-Work Order Processing Cross Functional Workflow
 

Similaire à Process mapping with flowcharts

Process & Value Stream Mapping
Process & Value Stream MappingProcess & Value Stream Mapping
Process & Value Stream MappingKenHeitritter
 
Problem solving use a fishbone diagram
Problem solving use a fishbone diagramProblem solving use a fishbone diagram
Problem solving use a fishbone diagramJohnRicoPanjaitan
 
How Process Mapping Can Streamline Your Business Tips and Best Practices
How Process Mapping Can Streamline Your Business Tips and Best PracticesHow Process Mapping Can Streamline Your Business Tips and Best Practices
How Process Mapping Can Streamline Your Business Tips and Best PracticesKashish Trivedi
 
how-to-do-raci-charting-and-analysis.pdf
how-to-do-raci-charting-and-analysis.pdfhow-to-do-raci-charting-and-analysis.pdf
how-to-do-raci-charting-and-analysis.pdfAnanSithivanchai1
 
Nasscom volunteer organization v2
Nasscom volunteer organization v2Nasscom volunteer organization v2
Nasscom volunteer organization v2Manjula Sridhar
 
Project quality management system
Project quality management systemProject quality management system
Project quality management systemselinasimpson351
 
Week 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docx
Week 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docxWeek 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docx
Week 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docxmelbruce90096
 
Five Steps to Excellence
Five Steps to ExcellenceFive Steps to Excellence
Five Steps to ExcellencePMHaas
 
Flow Chart Guide PPT
Flow Chart Guide PPTFlow Chart Guide PPT
Flow Chart Guide PPT丹 丹
 
Problem Solving1.pptx
Problem Solving1.pptxProblem Solving1.pptx
Problem Solving1.pptxsuresh667793
 
Stream Analysis in Organizational Development.pptx
Stream Analysis in Organizational Development.pptxStream Analysis in Organizational Development.pptx
Stream Analysis in Organizational Development.pptxAnonymousFQTgjf
 
7QC Tools By: Prem
7QC Tools By: Prem7QC Tools By: Prem
7QC Tools By: PremPrem Anand
 
A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...
A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...
A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...Connie White
 
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.pptCAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.pptbayanrihawi95
 
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.pptCAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.pptObyDulla1
 

Similaire à Process mapping with flowcharts (20)

Process & Value Stream Mapping
Process & Value Stream MappingProcess & Value Stream Mapping
Process & Value Stream Mapping
 
Brainstorming
BrainstormingBrainstorming
Brainstorming
 
Problem solving use a fishbone diagram
Problem solving use a fishbone diagramProblem solving use a fishbone diagram
Problem solving use a fishbone diagram
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
How Process Mapping Can Streamline Your Business Tips and Best Practices
How Process Mapping Can Streamline Your Business Tips and Best PracticesHow Process Mapping Can Streamline Your Business Tips and Best Practices
How Process Mapping Can Streamline Your Business Tips and Best Practices
 
Iaq paper
Iaq paperIaq paper
Iaq paper
 
how-to-do-raci-charting-and-analysis.pdf
how-to-do-raci-charting-and-analysis.pdfhow-to-do-raci-charting-and-analysis.pdf
how-to-do-raci-charting-and-analysis.pdf
 
FOCUS PDCA
FOCUS PDCAFOCUS PDCA
FOCUS PDCA
 
Nasscom volunteer organization v2
Nasscom volunteer organization v2Nasscom volunteer organization v2
Nasscom volunteer organization v2
 
Project quality management system
Project quality management systemProject quality management system
Project quality management system
 
Week 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docx
Week 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docxWeek 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docx
Week 1BSA 310 Material Week 1.docxSystem InventoryBSA310 V.docx
 
Five Steps to Excellence
Five Steps to ExcellenceFive Steps to Excellence
Five Steps to Excellence
 
Flow Chart Guide PPT
Flow Chart Guide PPTFlow Chart Guide PPT
Flow Chart Guide PPT
 
2 flow charts
2 flow charts2 flow charts
2 flow charts
 
Problem Solving1.pptx
Problem Solving1.pptxProblem Solving1.pptx
Problem Solving1.pptx
 
Stream Analysis in Organizational Development.pptx
Stream Analysis in Organizational Development.pptxStream Analysis in Organizational Development.pptx
Stream Analysis in Organizational Development.pptx
 
7QC Tools By: Prem
7QC Tools By: Prem7QC Tools By: Prem
7QC Tools By: Prem
 
A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...
A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...
A Real Time Online Delphi Decision System, V 2.0: Crisis Management Support d...
 
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.pptCAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
 
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.pptCAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
CAPA,_Root_Cause_Analysis_and_Risk_Management-1.ppt
 

Plus de Steven Bonacorsi

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlySteven Bonacorsi
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellenceSteven Bonacorsi
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitSteven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Steven Bonacorsi
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanSteven Bonacorsi
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement StrategicSteven Bonacorsi
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance NewsSteven Bonacorsi
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelSteven Bonacorsi
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignSteven Bonacorsi
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorSteven Bonacorsi
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalSteven Bonacorsi
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your StrategySteven Bonacorsi
 

Plus de Steven Bonacorsi (20)

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos Only
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Dernier

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Dernier (20)

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Process mapping with flowcharts

  • 1. Process Mapping with Flowcharts A flowchart is an outline or schematic drawing of the process your team is trying to measure or improve. It can also be a picture of an ideal process that you would like to use. Process mapping with flowcharts can help people:  Agree on the steps of a process and the order in which they occur  See some of the duplicated effort and other non-value-added steps that might be lurking in a process  Clarify working relationships between people and organizations  Target specific steps in the process for improvement. Process mapping is especially useful in the measure and analyze phases of Lean Six Sigma methodology. Top-down flowchart There are several kinds of flowcharts. The simplest is the top-down flowchart. What can it do for you?  Tell what the major clusters of activity are—the ones that are essential to the total process.  Show what the process would look like without the steps that have accumulated over time to shore up an inefficient or faulty process. How do you make one? 1. List the most basic steps of the process. Limit these to no more than five or six major steps. 2. Write the major steps across the top of a board, flipchart or piece of paper in the order that they occur in the process. 3. Under each major step, list the sub-steps that make up that element of the process. List them in the order that they occur. Again, limit yourself to no more than five or six sub-steps for each major step.
  • 2. Now what? The picture you have created will show only the useful work that goes into the process.  Compare this to the way things are actually done. Ask: “What can be done to eliminate unnecessary work?”  Talk to your customers. Ask: “How can we improve the process to better please the people who receive our work?”  Look at the essential process. Ask: “How can we change the process to make fewer errors and increase our speed of delivery?” Product Spt. Design Model The top-down flowchart can be used Customer Others for planning new processes as well as Engineering Engineering Engineering examining existing ones. It helps keep Events Data people focused on the whole process Reported received instead of getting lost in details. Details can be worked out by the team members responsible for that part of the process. Y Isolated Problem ? Deployment flowchart Another flowchart is the deployment N chart. While the top-down flowchart tells what, the deployment chart Form Teams, Establish Priority shows both what and who. What can it do for you? N Action  Show how the people Required involved fit together. ?  Keep track of what each Y person or organization is supposed to do. Action Plan How do you make one? Control Plan 1. List the major steps of the process in the order in which they occur. This might be the output of your work with Preliminary Investigation a top-down flowchart or you might use some other technique to create this list. Y 2. Across the top of your board, More Data Investigation Plan flipchart or paper write the names of ? N the people or organizations involved in the process. 3. Under the name of the person or Establish priority and funding organization responsible for the first step in the process, draw a box and write that step in the box. If more than Deployment Flowchart Analysis and Improvement one person or group is responsible for a step, extend the box so it is also under the name of that person or group. 4. If any of the other people or groups help or advise the ones with primary responsibility for that step, draw an oval under the names of those people or groups. 5. Connect the ovals to the box with the process step in it. 6. After the first step is complete, put the second step under the people responsible for it. 7. Connect the first step to the second step, and then add ovals for any helpers or advisors in the second process step. Keep going this way with all the steps in the process.
  • 3. Now what? The completed chart tells not only how the process operates at each step, but who is involved and what responsibility they each have. Ask:  “Are the right people involved at the right time in the process?”  “Are there too many people involved or too many hand-offs?”  “Are there barriers between people who must work together to make the process work?” The deployment chart can be as simple (just major steps) or as involved (sub-steps and sub-sub-steps) as you need to make it. Detailed flowchart Generally top-down and deployment charts are enough to examine a process, but sometimes teams need more detail to see where problems are occurring. What can it do for you?  Show what actually happens at each step in the process in detail  Show what happens when non-standard events occur  Graphically display processes so you can easily see redundancies and other wasted effort. How do you do it? To construct a detailed flowchart, various symbols can be used to represent process steps. 1. Draw the first symbol, and then write a description of the process step inside the symbol. 2. Draw the second symbol. Write the description. Connect the two symbols with an arrow showing the direction of flow. 3. Continue this way until you have completed the process or the part of the process you wanted to examine. Each symbol should represent only one action or one yes-no decision. This is what gives the detailed flowchart its detail. It is also what makes the creation of detailed flowcharts so time consuming. Each symbol should represent only one action or one yes-no decision. This is what gives the detailed flowchart its detail. It is also what makes the creation of detailed flowcharts so time consuming.
  • 4. Now what? Look at the completed flowchart. Ask:  Where are there redundancies that could be eliminated?  Where are there steps that seem out of order?  What steps are missing that could improve the process?  Where is time lost waiting or sending things back and forth?  What steps add no value to the customer? A detailed flowchart can be a powerful tool for examining a process that has built up needless complexity, but be warned. Creating all this detail is time-consuming. Before you begin, ask:  Is all this detail necessary?  Can the detailed flowchart be limited to only a small part of the total process? Steven Bonacorsi is the President of the International Standard for Lean Six Sigma (ISLSS) and Certified Lean Six Sigma Master Black Belt instructor and coach. Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies. Author for the Process Excellence Network (PEX Network / IQPC). FREE Lean Six Sigma and BPM content International Standard for Lean Six Sigma Steven Bonacorsi, President and Lean Six Sigma Master Black Belt 47 Seasons Lane, Londonderry, NH 03053, USA Phone: + (1) 603-401-7047 Steven Bonacorsi e-mail Steven Bonacorsi LinkedIn Steven Bonacorsi Twitter Lean Six Sigma Group