SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Six Sigma in Action:
                   Web Application Performance




Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                                    TEDS Systems Performance
Customer Profile - 31,000 active Training & Employee
Development System (TEDS) users – and potentially every GE
Medical Systems employee, contractor, and vendor.                                                                   Process Capability Analysis for Module 2nd C
                                                                                                            Process Capability – Before
                                                                                                                                  USL
Business Problem & Impact                                               USL
                                                                                 Process Data
                                                                                              4.00000                                                                                                                 ST
                                                                                                                                                                                                                      LT
Average web page load time was 5.8 seconds. GEMS Learning               Target
                                                                        LSL
                                                                                                        *
                                                                                                        *
                                                                        Mean                  4.70867
Solutions General Manager Pete McCabe requested a 4 sec.                Sample N
                                                                        StDev (ST)           0.607092
                                                                                                       21


average time based on general rules from other web applications,        StDev (LT)           0.624410


such as the GEMS homepage.                                               Potential (ST) Capability
                                                                        Cp                              *


Measure & Analyze                                                       CPU
                                                                        CPL
                                                                        Cpk
                                                                                                 -0.39


                                                                                                 -0.39
                                                                                                        *


Data Collection: Web page load time was measured. The existing          Cpm                             *
                                                                                                               3                       4                    5                             6                7


process sigma was less than 1.                                               Overall (LT) Capability            Observed Performance                  Expected ST Performance                  Expected LT Performance
                                                                        Pp                              *     PPM < LSL                    *     PPM < LSL                        *           PPM < LSL                  *
Root Cause: The JRun server was improperly configured not to            PPU
                                                                        PPL
                                                                                                 -0.38
                                                                                                        *
                                                                                                              PPM > USL
                                                                                                              PPM Total
                                                                                                                                904761.90
                                                                                                                                904761.90
                                                                                                                                                 PPM > USL
                                                                                                                                                 PPM Total
                                                                                                                                                                       878458.02
                                                                                                                                                                       878458.02
                                                                                                                                                                                              PPM > USL
                                                                                                                                                                                              PPM Total
                                                                                                                                                                                                               871799.38
                                                                                                                                                                                                               871799.38

compile data, which slowed down many processes.                         Ppk                      -0.38




Improve & Control                                                                                                    Process Capability Analysis for Module 2nd C
Removed the Djava.compiler=none setting from JRun server,                                                    Process Capability – After                                                                   USL
taking it out of debug mode and allowing it to run more                 USL
                                                                                 Process Data
                                                                                              4.00000                                                                                                                    ST
                                                                        Target                          *                                                                                                                LT
efficiently. Load times decreased 3.1 seconds and the sigma             LSL                             *
                                                                        Mean                  1.69512
increased to greater than 6. To control the process, the TEDS           Sample N                       52
                                                                        StDev (ST)           0.276561
server was placed under the Topaz monitoring scheme, which              StDev (LT)           0.325387


sends a text message alert to a pager when the page load                 Potential (ST) Capability

time drops below 4 seconds.                                             Cp
                                                                        CPU                       2.78
                                                                                                        *


                                                                        CPL                             *

Results/Benefits                                                        Cpk
                                                                        Cpm
                                                                                                  2.78
                                                                                                        *
                                                                                                                    1.0          1.5           2.0               2.5        3.0                3.5         4.0
By decreasing the web page load time of the average TEDS page                Overall (LT) Capability               Observed Performance               Expected ST Performance                   Expected LT Performance
by 3.1 seconds (making it 47% faster), this frees up over $34K in       Pp
                                                                        PPU                       2.36
                                                                                                        *     PPM < LSL
                                                                                                              PPM > USL                0.00
                                                                                                                                           *         PPM < LSL
                                                                                                                                                     PPM > USL               0.00
                                                                                                                                                                                      *       PPM < LSL
                                                                                                                                                                                              PPM > USL              0.00
                                                                                                                                                                                                                             *


productivity cost savings per year. Additionally, all page load times   PPL
                                                                        Ppk                       2.36
                                                                                                        *     PPM Total                0.00          PPM Total               0.00             PPM Total              0.00


average less than 4 seconds, satisfying the main customer CTQ.


                    A savings of over $34,000 per year.

Contenu connexe

Similaire à Web Page Load Cycle Time Six Sigma Case Study

Michel izygon
Michel izygonMichel izygon
Michel izygon
NASAPMC
 
Linked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And ScalabilityLinked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And Scalability
ConSanFrancisco123
 
Symposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT KanpurSymposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT Kanpur
Rishi Pathak
 
Les.sorge
Les.sorgeLes.sorge
Les.sorge
NASAPMC
 
Les.sorge
Les.sorgeLes.sorge
Les.sorge
NASAPMC
 

Similaire à Web Page Load Cycle Time Six Sigma Case Study (20)

Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Print Server Availability Six Sigma Case Study
Print Server Availability Six Sigma Case StudyPrint Server Availability Six Sigma Case Study
Print Server Availability Six Sigma Case Study
 
System X - About Benchmarks
System X - About BenchmarksSystem X - About Benchmarks
System X - About Benchmarks
 
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise ITIT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Michel izygon
Michel izygonMichel izygon
Michel izygon
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
IT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIXIT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIX
 
Internship Project (Lasindu) WSO2
Internship Project (Lasindu) WSO2Internship Project (Lasindu) WSO2
Internship Project (Lasindu) WSO2
 
Linked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And ScalabilityLinked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And Scalability
 
Symposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT KanpurSymposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT Kanpur
 
Les.sorge
Les.sorgeLes.sorge
Les.sorge
 
Les.sorge
Les.sorgeLes.sorge
Les.sorge
 

Plus de Steven Bonacorsi

Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
Steven Bonacorsi
 

Plus de Steven Bonacorsi (20)

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos Only
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012Performance Strategy &amp; Change Management Brochure 11 13 2012
Performance Strategy &amp; Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Web Page Load Cycle Time Six Sigma Case Study

  • 1. Six Sigma in Action: Web Application Performance Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action TEDS Systems Performance Customer Profile - 31,000 active Training & Employee Development System (TEDS) users – and potentially every GE Medical Systems employee, contractor, and vendor. Process Capability Analysis for Module 2nd C Process Capability – Before USL Business Problem & Impact USL Process Data 4.00000 ST LT Average web page load time was 5.8 seconds. GEMS Learning Target LSL * * Mean 4.70867 Solutions General Manager Pete McCabe requested a 4 sec. Sample N StDev (ST) 0.607092 21 average time based on general rules from other web applications, StDev (LT) 0.624410 such as the GEMS homepage. Potential (ST) Capability Cp * Measure & Analyze CPU CPL Cpk -0.39 -0.39 * Data Collection: Web page load time was measured. The existing Cpm * 3 4 5 6 7 process sigma was less than 1. Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Performance Pp * PPM < LSL * PPM < LSL * PPM < LSL * Root Cause: The JRun server was improperly configured not to PPU PPL -0.38 * PPM > USL PPM Total 904761.90 904761.90 PPM > USL PPM Total 878458.02 878458.02 PPM > USL PPM Total 871799.38 871799.38 compile data, which slowed down many processes. Ppk -0.38 Improve & Control Process Capability Analysis for Module 2nd C Removed the Djava.compiler=none setting from JRun server, Process Capability – After USL taking it out of debug mode and allowing it to run more USL Process Data 4.00000 ST Target * LT efficiently. Load times decreased 3.1 seconds and the sigma LSL * Mean 1.69512 increased to greater than 6. To control the process, the TEDS Sample N 52 StDev (ST) 0.276561 server was placed under the Topaz monitoring scheme, which StDev (LT) 0.325387 sends a text message alert to a pager when the page load Potential (ST) Capability time drops below 4 seconds. Cp CPU 2.78 * CPL * Results/Benefits Cpk Cpm 2.78 * 1.0 1.5 2.0 2.5 3.0 3.5 4.0 By decreasing the web page load time of the average TEDS page Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Performance by 3.1 seconds (making it 47% faster), this frees up over $34K in Pp PPU 2.36 * PPM < LSL PPM > USL 0.00 * PPM < LSL PPM > USL 0.00 * PPM < LSL PPM > USL 0.00 * productivity cost savings per year. Additionally, all page load times PPL Ppk 2.36 * PPM Total 0.00 PPM Total 0.00 PPM Total 0.00 average less than 4 seconds, satisfying the main customer CTQ. A savings of over $34,000 per year.