03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
A B C D E F G H I J K L M
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
10°
FINISH ROOF SHEETING
0.6mm Chromadek finish
corrugated sheeting on 38x38mm
SA Pine 6 Grade Pulins Secured
to 140x76mm SA Pine Trusses
space 1000mm ctc (Advise engineers specs)
Plaster & Paint wall Finish
Plaster & Paint wall Finish
Plaster & Paint wall
Finish
Plaster & Paint wall Finish
600x600 Porcelain Tile 2mm
joints deco finish
FHFH
stainless steel sign
TBC
Refuse Area non- porous
finish ie: Plaster and Paint
Wall mounted light
fixtureStainless steel balustrade and
hand rail @900mm
FH FH
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
14 23
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
Stainless steel balustrade
and hand rail @900mm
Plaster & Paint wall
Finish
Plaster & Paint wall
Finish
FINISH ROOF SHEETING
0.6mm Chromadek finish
corrugated sheeting on 38x38mm
SA Pine 6 Grade Pulins Secured
to 140x76mm SA Pine Trusses
space 1000mm ctc (Advise engineers specs)
300x300mm Concrete Slanted Column
Erected According to Engineers Specs.
Clad Finish 150x150 Rough Cut
Granite Tiles
900
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
1 42 3
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
Stainless steel balustrade
and hand rail @900mm
Plaster & Paint wall
Finish
Plaster & Paint wall
Finish
FINISH ROOF SHEETING
0.6mm Chromadek finish
corrugated sheeting on 38x38mm
SA Pine 6 Grade Pulins Secured
to 140x76mm SA Pine Trusses
space 1000mm ctc (Advise engineers specs) 10°
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
ABCDEFGHIJKLM
Tap with Gully
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
whb
wc
urinal
sink
whb
wc
urinal
sink
Tap with Gully
whb
wc
urinal
sink
whb
wc
urinal
sink
All Windows recessed
1500mm from boundary
line
FINISH ROOF SHEETING
0.6mm Chromadek finish
corrugated sheeting on 38x38mm
SA Pine 6 Grade Pulins Secured
to 140x76mm SA Pine Trusses
space 1000mm ctc (Advise engineers specs)
Plaster & Paint wall
Finish
Plaster & Paint wall
Finish
01_Foundation
-510
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
D E F G H I
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
320
2140
Office Space Kitchenette Female WC Foyer/stair well
Office Space Kitchenette Female WC
Foyer/stair well
Office SpaceKitchenetteMale WC
Office SpaceKitchenetteMale WC
dpc dpc dpc dpc dpc
Structure
continues
Structurecontinues
1000
600x1200 Suspended ceiling
50mm Isover Insulation 600x1200 Suspended ceiling
50mm Isover Insulation
600x1200 Suspended ceiling
50mm Isover Insulation
600x1200Trof light fitting
600x1200Trof light fitting600x1200Trof light fitting600x1200Trof light fitting
600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting
600x1200Trof light fitting 600x1200Trof light fitting
6003401702400521832552400521858
01_Foundation
-510
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
14 23
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
03
Pg_01
10°
Grade 8 SA Pine Trusses
space 1000mm ctc (Advise
engineers specs)
Pre cast concrete
floor 250mm thick
1262
CeilingHeight2400CeilingHieght2400
Strip Foundation According
to Engineers Specs
01_Foundation
-510
01_Foundation
-510
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
1 42 3 Detail 1
05
Pg_02
Detail 2
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
04
Pg_02
07
Pg_02
06
Pg_02
Detail 4
Detail 3
10°
FH
01_Foundation
-510
03_Ground Floor
0
05_First Floor
2890
07_WallPlate
5610
02_NGL
-255
14 23
08_Roof pitch
7200
04_Lintel
2125
06_Lintel
5015
10°
Grade 8 SA Pine Trusses
space 1000mm ctc (Advise
engineers specs)
1862
Foyer
Foyer Entrance DBL Door
braced within curtain
wall
Canter lever balcony
CeilingHeight2400
CeilingHeight2140
900
Stainless steel balustrade
and hand rail @900mm
1000
Balcony DBL Door
braced within curtain
wall
6001687171321255951590
dpc
dpc
170
255241
ID² Interior Design Solutions
1.COPYRIGHT
1.1 Copyright exists in terms of the Copyright Act No 96 of 1978
1.2 copyright of these drawings and the design in which they were depicted
designer elements within Any Unauthorized copying of the drawing or use of
design constitutes an infringement of the copyrights and is a criminal offense
1.3 In addition to criminal prosecution, the owner is entitled to sue of damages
and claim delivery of such infringement documentation and copies thereof
1.4 The copyright infringement includes the sale or distribution thereof
2.LAWS AND REGULATIONS
2.1 All works and building materials are to comply with National Building
Regulations(SAB70400) and building standards Act No:103 of 1977, as amended
2.2 All work is to be carried out in accordance to strict by laws and regulations of
the regional local authorities
2.3 Light and ventilation are to comply to part O of the national building regulations
3.DRAWINGS
3.1 Shop drawings must be approved by designer PRIOR to any manufacture of
fittings or furniture items
3.2 Concise detail drawing are preferred over arrangement sketches and must its
own legality
3.3 One set of working documentation is to remain on site permanently till site is
completed.
3.4 All amended working documentation must replace previous working
documentation and must clear state AMENDED, a set of amend working drawings
are to be handed to contractor within a 12 hour period of amendment
4.DIMENSIONS
4.1 Contractors and subcontractor are to check and verify dimensions and detail
levels before commencing with work
4.2 Figured dimensions are to be use if working drawing scale is incorrect
5.VARIATION & AMENDMENTS
5.1 The designer is to be notified of all variations by the project manager
5.2 All relevant detail levels and dimensions of any working done must be checked
onsite by relevant contractors before the commencements of work, Any
discrepancies are to be reported to the project manager and designer
immediately
6.CONTRACTORS AND SUBCONTRACTORS
6.1 Contractors must ensure structural integrity of all components at all times and
ensure that the main structure is capable of supporting any additional components
and additional loads applied thereto
6.2 All electrical and water systems to be worked on by an authorized artisan with
corresponding documentation
7.SHOPFITTING ITEMS
7.1 Shop fitted items are to measured onsite and shop drawings are to be
approved by the designer and client PRIOR to commencement of work
8.PARITIONS
8.1 All portions walls connecting directly to the outside wall should ad heard to
NBR and fire regulations a minimun fire rating of 30min
8.2 All mechanical joints should ad hear to NBR and relevant suppliers
ID² Interior Design Solutions
SANS 10400-XA:2011
PART4
4 Requirements
4.1 Hot water supply
4.1.1(a) the volume of the annual average hot water heating
requirements
4.1.1(b) if solar water heating systems are used, these shall comply with
SANS 1307, SANS 10106,
SANS 10254 and SANS 10252-1.
4.1.3 All hot water service pipes shall be clad with insulation with a
minimum R-value in table 1&6
4.2 Energy usage and building envelope
4.2.1(a) in any building of occupancy classified in terms of Regulation A20
must have competent person certifies that such building
(excluding garage and storage areas) has atheoretical annual
energy consumption and demand, based on the design
assumptions contained in less than or equal to the values
specified in tables 2 & 3;
OR
4.2.1b) in any building of occupancy classified in terms of Regulation A20
as tables A2, A3, A4, C1, C2, E1,E2, E3, E4, F1, F2, F3, G1, H1,
H2, H3, H4, and H5, the orientation and shading are in
accordance with the requirements of SANS 204,
4.3 Design assumptions
where artificial ventilation systems are provided
1) the design occupancy times are in accordance with table 4;
2) the space temperature lies within the range of 19 °C to 2°5C
for 98 % of the plant operation time;
3) ventilation is provided in accordance with the requirements of
SANS 10400-O;
4) the internal heat gains in the building are from
i) the design population calculated in accordance with table 5 at
an average rate of 75 W sensible heat gain per person;
ii) hot meals in a dining room, restaurant or café, at at rate of 30
W heat gain per person- table 5;
iii) appliances and equipment- table 6;
iv) artificial lighting calculated with table 4;
4.3(b) hot water supplies
4.3(c) the maximum energy demand and maximum energy usage are
calculated for the total building and not for individual tenancies.
table 4.1
4.4 Building envelope requirements
4.4.1 Orientation
4.4.1.1 The building should be compact in plan, with the rooms that are
used most and the major areas of glazing placed on the
northern side of the building to allow solar heat to penetrate the glazing
during the winter months.
4.4.1.2 The roof overhang to the northern wall shall be sufficient to shade
the windows from midday summer sunshine in accordance with
SANS 204. Windows facing east and west should be limited in
number and confined to the minimum required for daylight and
ventilation.
4.4.2 Floors
Where an underfloor heating system (e.g. in-screed,
underlaminate heating, undercarpet heating, undertile heating, cutin
underfloor heating, and water-based underfloor heating) is installed,
the heating system shall be insulated underneath the slab with
insulation that has a minimum R-value of not less then 1,0.
4.4.3 External walls
4.4.3.1 Non-masonry walls shall achieve a minimum total R-value of
a) climatic zones 1 and 6: 2,2
b) climatic zones 2, 3, 4 and 5: 1,9.
4.4.3.2 The following types of masonry walling comply with the R-value
requirements:
a) double-skin masonry with no cavity, plastered internally, or
rendered externally; or
b) single-leaf masonry walls with a nominal wall thickness greater
than or equal to 140 mm (excluding plastering and rendering), plastered
internally and rendered externally.The requirements refer to the
external walls of the habitable portions of the building fabric only.
4.4.3.3 For masonry walling types not covered in 4.4.3.2, such wallssh all
achieve a minimum total R-value of 0,35. The total R-value shall
be determined by means of a test conducted in accordance
with ASTM C 1363, ASTM C 518 or ASTM C 177.Surface film resistance shall
be in accordance with SANS 6946.4.4.3.4 Other walling
requirements shall be in accordance with SANS 10400-K.
4.4.4 Fenestration
4.4.4.1 Buildings with up to 15 % fenestration area to nett floor arepae r
storey comply with the minimum energy performance equirements.
4.4.4.2 Buildings with a fenestration area to nett floor area per stortehya t
exceeds 15 % shall comply with the equirements for fenestration in
accordance with SANS 204.
4.4.4.3 All fenestration air infiltration shall be in accordance with SANS 613.
4.4.5 Roof assemblies
4.4.5.1 A roof assembly R-value specified in table 7
4.4.5.2 A roof assembly that has metal sheet roofing fixed to metal purlins,
metal rafters or metal battens shall have a thermal break consisting
of a material with an R-value of not less than 0,2 installed between the
metal sheet roofing and its supporting member
4.4.5.3 Metal sheeting types of roofing assembly -table
PO BOX 20958
Noordbrug
Potchefstroom
2522
Cel:082 479 2017
Client :
Project Name :
Project Site Address:
Inception Date : Current Date :
Project Status:
Page Title:
Design:
Council Approval :
Scale:
Drawn:
Date :
Client Approval : Date :
ClimateZone:2
Page #:
Project #:
As
indicated
2015/06/0112:30:03PM
Author
Planning
Elevations & Sections
05/28/15
Pg_02
Capalie Botha
Office Block Maree Str
Erf: 2640/10 No 3 Maree Str, Potchefstroom,
Tlokwe
Author
1 : 100
West Exterior Elevation
1
1 : 100
North Exterior Elevation
2
1 : 100
South Exterior Elevation
31 : 100
East Exterior Elevation
4
1 : 50
Section C
D
1 : 100
Section A
A
1 : 50
Section B
B
1 : 100
Section D
C 1 : 20
Detail 05
05 1 : 20
Detail 06
06 1 : 20
Detail 07
07
1 : 20
Detail 04
04
0.6 chromadek roof sheeting
76x38mm SA pine grade 8 purlins
generic seamless gutter profile mounted to
fascia board
SA pine grade 8 truss spaced @1000mm
nail plate
suspension tee for suspended ceiling
50mm Isover insulation
5mm galvanized anchor wire
290mm cavity wall with wall ties @ every
3 course
0.6 chromadek roof sheeting
76x38mm SA pine grade 8 purlins
SA pine grade 8 truss spaced @1000mm
290mm cavity wall with wall ties @ every
3 course
2mm thick truss wall hanger bolted to wall
with expansion bolts
Strip Foundation According
to Engineers Specs
150mm layer hardcore fill
170mm re-inforced concrete floor
255mm pre-cast concrete floor
according to engineers
specifications
1200x600 tile suspended ceiling
set @ 2400mm above FFL
coolinterior
Rev
No.
Description of
changes Date

Contenu connexe

Tendances

HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309Altamash Khan
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektMorten Lund
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Projectcharliewynn_3
 
Download certificate.action
Download certificate.actionDownload certificate.action
Download certificate.actionGraham Scheffers
 
Gree catalogo completo linha comercial 2012
Gree   catalogo completo linha comercial 2012Gree   catalogo completo linha comercial 2012
Gree catalogo completo linha comercial 2012Guilherme Gugelmin
 
Rittal Aksesuvarları
Rittal AksesuvarlarıRittal Aksesuvarları
Rittal Aksesuvarlarıerdinc klima
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
Rittal - İklimlendirme ve Soğutma Ürünleri 024 075
Rittal - İklimlendirme ve Soğutma Ürünleri 024 075Rittal - İklimlendirme ve Soğutma Ürünleri 024 075
Rittal - İklimlendirme ve Soğutma Ürünleri 024 075erdinc klima
 
2016 Parkline Catalog
2016 Parkline Catalog2016 Parkline Catalog
2016 Parkline CatalogJeff Suda
 

Tendances (19)

HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Five zones split tube furnace with 80 mm
Five zones split tube furnace with 80 mmFive zones split tube furnace with 80 mm
Five zones split tube furnace with 80 mm
 
Download certificate.action
Download certificate.actionDownload certificate.action
Download certificate.action
 
Gree multi vrf r410 a (1)
Gree   multi vrf r410 a (1)Gree   multi vrf r410 a (1)
Gree multi vrf r410 a (1)
 
Gree catalogo completo linha comercial 2012
Gree   catalogo completo linha comercial 2012Gree   catalogo completo linha comercial 2012
Gree catalogo completo linha comercial 2012
 
Rittal Aksesuvarları
Rittal AksesuvarlarıRittal Aksesuvarları
Rittal Aksesuvarları
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
working drawings
working drawingsworking drawings
working drawings
 
Rittal - İklimlendirme ve Soğutma Ürünleri 024 075
Rittal - İklimlendirme ve Soğutma Ürünleri 024 075Rittal - İklimlendirme ve Soğutma Ürünleri 024 075
Rittal - İklimlendirme ve Soğutma Ürünleri 024 075
 
outdoor cabinets
outdoor cabinetsoutdoor cabinets
outdoor cabinets
 
8 months work
8 months work8 months work
8 months work
 
2016 Parkline Catalog
2016 Parkline Catalog2016 Parkline Catalog
2016 Parkline Catalog
 

En vedette

Imma Light Steel Gauge Buildings
Imma Light Steel Gauge BuildingsImma Light Steel Gauge Buildings
Imma Light Steel Gauge BuildingsMurat Ilica
 
Kalyani Techno Craft, Nagpur, Steel Villa Structures
Kalyani Techno Craft, Nagpur, Steel Villa StructuresKalyani Techno Craft, Nagpur, Steel Villa Structures
Kalyani Techno Craft, Nagpur, Steel Villa StructuresIndiaMART InterMESH Limited
 
Utilization of Bottle Caps for Concrete Residential Floorslabs
Utilization of Bottle Caps for Concrete Residential FloorslabsUtilization of Bottle Caps for Concrete Residential Floorslabs
Utilization of Bottle Caps for Concrete Residential FloorslabsCivil Engineering Student
 
LIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURELIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTUREANKIT BAHAL
 
SerVilla - LGS Light Gauge Steel Frame Construction - Steel Villa
SerVilla - LGS Light Gauge Steel Frame Construction - Steel VillaSerVilla - LGS Light Gauge Steel Frame Construction - Steel Villa
SerVilla - LGS Light Gauge Steel Frame Construction - Steel VillaSerVilla Anahtar Teslim Villa
 

En vedette (7)

Imma Light Steel Gauge Buildings
Imma Light Steel Gauge BuildingsImma Light Steel Gauge Buildings
Imma Light Steel Gauge Buildings
 
Kalyani Techno Craft, Nagpur, Steel Villa Structures
Kalyani Techno Craft, Nagpur, Steel Villa StructuresKalyani Techno Craft, Nagpur, Steel Villa Structures
Kalyani Techno Craft, Nagpur, Steel Villa Structures
 
Light Gauge Steel
Light Gauge SteelLight Gauge Steel
Light Gauge Steel
 
Utilization of Bottle Caps for Concrete Residential Floorslabs
Utilization of Bottle Caps for Concrete Residential FloorslabsUtilization of Bottle Caps for Concrete Residential Floorslabs
Utilization of Bottle Caps for Concrete Residential Floorslabs
 
LIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURELIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURE
 
SerVilla - LGS Light Gauge Steel Frame Construction - Steel Villa
SerVilla - LGS Light Gauge Steel Frame Construction - Steel VillaSerVilla - LGS Light Gauge Steel Frame Construction - Steel Villa
SerVilla - LGS Light Gauge Steel Frame Construction - Steel Villa
 
Lot12A Ardeen st
Lot12A Ardeen stLot12A Ardeen st
Lot12A Ardeen st
 

Similaire à Capalli Botha - Sheet - Pg_02 - Elevations & Sections03

Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Ian de Mink
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEduardo H. Pare
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)Yousef Riad
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorJayson Ang
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsBelilove Company-Engineers
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfCanberra Institute of technology
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Pitched Roof
Pitched RoofPitched Roof
Pitched RoofRishii2i
 
Cold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionCold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionScott Conwell, FAIA, FCSI
 

Similaire à Capalli Botha - Sheet - Pg_02 - Elevations & Sections03 (20)

Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
Taiyaba rashid acp
Taiyaba rashid acpTaiyaba rashid acp
Taiyaba rashid acp
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Aluminum work
Aluminum workAluminum work
Aluminum work
 
Pitched Roof
Pitched RoofPitched Roof
Pitched Roof
 
Car park bq
Car park bqCar park bq
Car park bq
 
Cold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry ConstructionCold Weather Requirements for Masonry Construction
Cold Weather Requirements for Masonry Construction
 

Capalli Botha - Sheet - Pg_02 - Elevations & Sections03

  • 1. 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 A B C D E F G H I J K L M 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 10° FINISH ROOF SHEETING 0.6mm Chromadek finish corrugated sheeting on 38x38mm SA Pine 6 Grade Pulins Secured to 140x76mm SA Pine Trusses space 1000mm ctc (Advise engineers specs) Plaster & Paint wall Finish Plaster & Paint wall Finish Plaster & Paint wall Finish Plaster & Paint wall Finish 600x600 Porcelain Tile 2mm joints deco finish FHFH stainless steel sign TBC Refuse Area non- porous finish ie: Plaster and Paint Wall mounted light fixtureStainless steel balustrade and hand rail @900mm FH FH 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 14 23 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 Stainless steel balustrade and hand rail @900mm Plaster & Paint wall Finish Plaster & Paint wall Finish FINISH ROOF SHEETING 0.6mm Chromadek finish corrugated sheeting on 38x38mm SA Pine 6 Grade Pulins Secured to 140x76mm SA Pine Trusses space 1000mm ctc (Advise engineers specs) 300x300mm Concrete Slanted Column Erected According to Engineers Specs. Clad Finish 150x150 Rough Cut Granite Tiles 900 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 1 42 3 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 Stainless steel balustrade and hand rail @900mm Plaster & Paint wall Finish Plaster & Paint wall Finish FINISH ROOF SHEETING 0.6mm Chromadek finish corrugated sheeting on 38x38mm SA Pine 6 Grade Pulins Secured to 140x76mm SA Pine Trusses space 1000mm ctc (Advise engineers specs) 10° 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 ABCDEFGHIJKLM Tap with Gully 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 whb wc urinal sink whb wc urinal sink Tap with Gully whb wc urinal sink whb wc urinal sink All Windows recessed 1500mm from boundary line FINISH ROOF SHEETING 0.6mm Chromadek finish corrugated sheeting on 38x38mm SA Pine 6 Grade Pulins Secured to 140x76mm SA Pine Trusses space 1000mm ctc (Advise engineers specs) Plaster & Paint wall Finish Plaster & Paint wall Finish 01_Foundation -510 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 D E F G H I 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 320 2140 Office Space Kitchenette Female WC Foyer/stair well Office Space Kitchenette Female WC Foyer/stair well Office SpaceKitchenetteMale WC Office SpaceKitchenetteMale WC dpc dpc dpc dpc dpc Structure continues Structurecontinues 1000 600x1200 Suspended ceiling 50mm Isover Insulation 600x1200 Suspended ceiling 50mm Isover Insulation 600x1200 Suspended ceiling 50mm Isover Insulation 600x1200Trof light fitting 600x1200Trof light fitting600x1200Trof light fitting600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 600x1200Trof light fitting 6003401702400521832552400521858 01_Foundation -510 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 14 23 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 03 Pg_01 10° Grade 8 SA Pine Trusses space 1000mm ctc (Advise engineers specs) Pre cast concrete floor 250mm thick 1262 CeilingHeight2400CeilingHieght2400 Strip Foundation According to Engineers Specs 01_Foundation -510 01_Foundation -510 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 1 42 3 Detail 1 05 Pg_02 Detail 2 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 04 Pg_02 07 Pg_02 06 Pg_02 Detail 4 Detail 3 10° FH 01_Foundation -510 03_Ground Floor 0 05_First Floor 2890 07_WallPlate 5610 02_NGL -255 14 23 08_Roof pitch 7200 04_Lintel 2125 06_Lintel 5015 10° Grade 8 SA Pine Trusses space 1000mm ctc (Advise engineers specs) 1862 Foyer Foyer Entrance DBL Door braced within curtain wall Canter lever balcony CeilingHeight2400 CeilingHeight2140 900 Stainless steel balustrade and hand rail @900mm 1000 Balcony DBL Door braced within curtain wall 6001687171321255951590 dpc dpc 170 255241 ID² Interior Design Solutions 1.COPYRIGHT 1.1 Copyright exists in terms of the Copyright Act No 96 of 1978 1.2 copyright of these drawings and the design in which they were depicted designer elements within Any Unauthorized copying of the drawing or use of design constitutes an infringement of the copyrights and is a criminal offense 1.3 In addition to criminal prosecution, the owner is entitled to sue of damages and claim delivery of such infringement documentation and copies thereof 1.4 The copyright infringement includes the sale or distribution thereof 2.LAWS AND REGULATIONS 2.1 All works and building materials are to comply with National Building Regulations(SAB70400) and building standards Act No:103 of 1977, as amended 2.2 All work is to be carried out in accordance to strict by laws and regulations of the regional local authorities 2.3 Light and ventilation are to comply to part O of the national building regulations 3.DRAWINGS 3.1 Shop drawings must be approved by designer PRIOR to any manufacture of fittings or furniture items 3.2 Concise detail drawing are preferred over arrangement sketches and must its own legality 3.3 One set of working documentation is to remain on site permanently till site is completed. 3.4 All amended working documentation must replace previous working documentation and must clear state AMENDED, a set of amend working drawings are to be handed to contractor within a 12 hour period of amendment 4.DIMENSIONS 4.1 Contractors and subcontractor are to check and verify dimensions and detail levels before commencing with work 4.2 Figured dimensions are to be use if working drawing scale is incorrect 5.VARIATION & AMENDMENTS 5.1 The designer is to be notified of all variations by the project manager 5.2 All relevant detail levels and dimensions of any working done must be checked onsite by relevant contractors before the commencements of work, Any discrepancies are to be reported to the project manager and designer immediately 6.CONTRACTORS AND SUBCONTRACTORS 6.1 Contractors must ensure structural integrity of all components at all times and ensure that the main structure is capable of supporting any additional components and additional loads applied thereto 6.2 All electrical and water systems to be worked on by an authorized artisan with corresponding documentation 7.SHOPFITTING ITEMS 7.1 Shop fitted items are to measured onsite and shop drawings are to be approved by the designer and client PRIOR to commencement of work 8.PARITIONS 8.1 All portions walls connecting directly to the outside wall should ad heard to NBR and fire regulations a minimun fire rating of 30min 8.2 All mechanical joints should ad hear to NBR and relevant suppliers ID² Interior Design Solutions SANS 10400-XA:2011 PART4 4 Requirements 4.1 Hot water supply 4.1.1(a) the volume of the annual average hot water heating requirements 4.1.1(b) if solar water heating systems are used, these shall comply with SANS 1307, SANS 10106, SANS 10254 and SANS 10252-1. 4.1.3 All hot water service pipes shall be clad with insulation with a minimum R-value in table 1&6 4.2 Energy usage and building envelope 4.2.1(a) in any building of occupancy classified in terms of Regulation A20 must have competent person certifies that such building (excluding garage and storage areas) has atheoretical annual energy consumption and demand, based on the design assumptions contained in less than or equal to the values specified in tables 2 & 3; OR 4.2.1b) in any building of occupancy classified in terms of Regulation A20 as tables A2, A3, A4, C1, C2, E1,E2, E3, E4, F1, F2, F3, G1, H1, H2, H3, H4, and H5, the orientation and shading are in accordance with the requirements of SANS 204, 4.3 Design assumptions where artificial ventilation systems are provided 1) the design occupancy times are in accordance with table 4; 2) the space temperature lies within the range of 19 °C to 2°5C for 98 % of the plant operation time; 3) ventilation is provided in accordance with the requirements of SANS 10400-O; 4) the internal heat gains in the building are from i) the design population calculated in accordance with table 5 at an average rate of 75 W sensible heat gain per person; ii) hot meals in a dining room, restaurant or café, at at rate of 30 W heat gain per person- table 5; iii) appliances and equipment- table 6; iv) artificial lighting calculated with table 4; 4.3(b) hot water supplies 4.3(c) the maximum energy demand and maximum energy usage are calculated for the total building and not for individual tenancies. table 4.1 4.4 Building envelope requirements 4.4.1 Orientation 4.4.1.1 The building should be compact in plan, with the rooms that are used most and the major areas of glazing placed on the northern side of the building to allow solar heat to penetrate the glazing during the winter months. 4.4.1.2 The roof overhang to the northern wall shall be sufficient to shade the windows from midday summer sunshine in accordance with SANS 204. Windows facing east and west should be limited in number and confined to the minimum required for daylight and ventilation. 4.4.2 Floors Where an underfloor heating system (e.g. in-screed, underlaminate heating, undercarpet heating, undertile heating, cutin underfloor heating, and water-based underfloor heating) is installed, the heating system shall be insulated underneath the slab with insulation that has a minimum R-value of not less then 1,0. 4.4.3 External walls 4.4.3.1 Non-masonry walls shall achieve a minimum total R-value of a) climatic zones 1 and 6: 2,2 b) climatic zones 2, 3, 4 and 5: 1,9. 4.4.3.2 The following types of masonry walling comply with the R-value requirements: a) double-skin masonry with no cavity, plastered internally, or rendered externally; or b) single-leaf masonry walls with a nominal wall thickness greater than or equal to 140 mm (excluding plastering and rendering), plastered internally and rendered externally.The requirements refer to the external walls of the habitable portions of the building fabric only. 4.4.3.3 For masonry walling types not covered in 4.4.3.2, such wallssh all achieve a minimum total R-value of 0,35. The total R-value shall be determined by means of a test conducted in accordance with ASTM C 1363, ASTM C 518 or ASTM C 177.Surface film resistance shall be in accordance with SANS 6946.4.4.3.4 Other walling requirements shall be in accordance with SANS 10400-K. 4.4.4 Fenestration 4.4.4.1 Buildings with up to 15 % fenestration area to nett floor arepae r storey comply with the minimum energy performance equirements. 4.4.4.2 Buildings with a fenestration area to nett floor area per stortehya t exceeds 15 % shall comply with the equirements for fenestration in accordance with SANS 204. 4.4.4.3 All fenestration air infiltration shall be in accordance with SANS 613. 4.4.5 Roof assemblies 4.4.5.1 A roof assembly R-value specified in table 7 4.4.5.2 A roof assembly that has metal sheet roofing fixed to metal purlins, metal rafters or metal battens shall have a thermal break consisting of a material with an R-value of not less than 0,2 installed between the metal sheet roofing and its supporting member 4.4.5.3 Metal sheeting types of roofing assembly -table PO BOX 20958 Noordbrug Potchefstroom 2522 Cel:082 479 2017 Client : Project Name : Project Site Address: Inception Date : Current Date : Project Status: Page Title: Design: Council Approval : Scale: Drawn: Date : Client Approval : Date : ClimateZone:2 Page #: Project #: As indicated 2015/06/0112:30:03PM Author Planning Elevations & Sections 05/28/15 Pg_02 Capalie Botha Office Block Maree Str Erf: 2640/10 No 3 Maree Str, Potchefstroom, Tlokwe Author 1 : 100 West Exterior Elevation 1 1 : 100 North Exterior Elevation 2 1 : 100 South Exterior Elevation 31 : 100 East Exterior Elevation 4 1 : 50 Section C D 1 : 100 Section A A 1 : 50 Section B B 1 : 100 Section D C 1 : 20 Detail 05 05 1 : 20 Detail 06 06 1 : 20 Detail 07 07 1 : 20 Detail 04 04 0.6 chromadek roof sheeting 76x38mm SA pine grade 8 purlins generic seamless gutter profile mounted to fascia board SA pine grade 8 truss spaced @1000mm nail plate suspension tee for suspended ceiling 50mm Isover insulation 5mm galvanized anchor wire 290mm cavity wall with wall ties @ every 3 course 0.6 chromadek roof sheeting 76x38mm SA pine grade 8 purlins SA pine grade 8 truss spaced @1000mm 290mm cavity wall with wall ties @ every 3 course 2mm thick truss wall hanger bolted to wall with expansion bolts Strip Foundation According to Engineers Specs 150mm layer hardcore fill 170mm re-inforced concrete floor 255mm pre-cast concrete floor according to engineers specifications 1200x600 tile suspended ceiling set @ 2400mm above FFL coolinterior Rev No. Description of changes Date