1 | P a g e
LUBE OIL RUNDOWN TANK – SYSTEM DESIGN
AND OPERATIONAL ASPECTS 13 JAN 2016
By: Muhammad Imran – Mechanical Rotating Engineer – LUKOIL International Services B.V Dubai
orce feed lube oil system is used for large rotating equipment including heavy duty Pumps,
Compressors and their drivers. Emphatically speaking, lube oil system is the life line for Rotating
Equipment and plays a pivotal role in achieving the plant reliability and availability. A badly
designed lube oil system directly impacts sustained operation of the main equipment. History is replete
with cases when a poorly designed lube oil system was the root cause of main equipment damage.
Bearings are sensitive machine elements; their life and performance heavily depend upon continuous
supply of clean lubricant at a certain required Flowrate, pressure and temperature. A force feed
lubrication system is used for this purpose which is a closed loop system consisting of a number of
components for storing (Reservoir), pressurizing (Pumps), cooling (Heat Exchangers), filtering and
maintaining a continuous supply and return of lubricant to each bearing through a network of piping,
valves, fittings and supported by a necessary instrumentation and control system.
Figure-1: A Typical Force Feed Lube Oil System
Rotor-Bearings interface generates tremendous amount of frictional heat and consequently excessive
rise in the bearing temperature. If not properly dissipated in a continuous manner, this frictional heat
F
2 | P a g e
would cause burning and ultimate melting of the bearing metal. Figure-2 shows a typical shaft and
bearing damage due to excessive temperature rise due loss of lubrication to the bearing.
Figure-2: Typical shaft and bearing damage due to loss of lubrication
Frictional heat generation and temperature rise of the bearings is a function of several factors including
static and dynamic loads, rotor speed and coefficient of friction etc. While static loads remain constant,
the dynamic loads and rotor shaft speed do vary. The rotor shaft speed grows from zero to the
operating speed during startup and decays from the operating speed to zero speed after shutdown. The
time period in which the rotor speed decays from the operating speed until a complete stoppage is
called coast-down period or run-down period. Figure-3 shows a typical coast-down curve for a 5.7 MW
motor driven centrifugal compressor train.
Figure-3: Typical Coast-Down Curve for a 5.7 MW Motor Driven Centrifugal Compressor Train
Dynamic loads and rotor speed gradually decays during coast-down, however static loads and coefficient
of friction remain constant. Therefore, rotor-bearing system continues to generate heat during coast-
3 | P a g e
down, though at a decreasing rate, and hence bearings still require continuous supply of lubricant until
the rotor comes to a zero speed. A well designed lube oil system should be able meet bearing
lubrication requirements during normal operation as well as during the entire coast-down period.
There are cases, for example power loss to the AC motor driven lube oil pumps, when both main and
auxiliary lube oil pumps are not available causing total loss of lubrication. In this case main motor is also
tripped (emergency shutdown by PALL) however the train bearing system still requires sustained
lubrication for a safe shutdown to avoid bearing damage during the coast-down period. Various
solutions are used for providing bearing lubrication during coast-down period in such emergency
situation. This paper describes design and operational aspects for atmospheric (non-pressurized) Lube
Oil Rundown Tanks which is one of the commonly used solutions for coast-down lubrication.
LUBE OIL RUNDOWN – AN OVERVIEW:
Lube oil rundown tank is a Horizontal or Vertical storage vessel which is installed at a certain height
above the shaft centerline of rotating equipment. The rundown tank holds a certain volume of lube oil
during normal operation and provides gravity flow to the bearings after shutdown during coast-down.
The tank elevation provides static head/pressure for the proper lube oil flow under gravity.
Figure-4: Schematic view of Compressor Train with Lube Oil Rundown Tank
4 | P a g e
Figure-5: A 3.5 MW Centrifugal Compressor Train with Lube Oil Rundown Tank
Figure-6: Closer view of Lube Oil Rundown Tank in Figure-5
5 | P a g e
RUNDOWN TANK SYSTEM COMPONENTS:
Figure-7 shows a simplified flow diagram for a typical force feed lube oil system with lube oil rundown
tank and associated system components.
Figure-7: Simplified Flow Diagram for a Typical Force Feed Lube Oil System
6 | P a g e
Following table summarizes rundown tank system components and their function relative to Figure-7.
Item Description Function
AT M Vent / Air breather
Venting and to break the vacuum inside rundown tank as the
tank is emptied during coast down period.
Level Transmitter To provide low level alarm and high level start permissive.
Rundown tank To hold certain volume of lube oil during normal operation.
Sight glass
To act as visible local indication to ensure that the rundown tank
is filled up during filling and subsequently act as indication to
ensure that lube oil is under continuous recirculation during
normal operation.
Filling valve NOTE-1 NORMNALLY CLOSED and is (manually/automatically) opened to
fill the rundown tank during each startup.
Check valve NOTE-2 To block main LO flow to rundown tank during normal operation.
Bi-directional line
1. To fill rundown tank during startup using lube oil pump.
2. To act as lube oil supply line from rundown tank to the lube oil
header during coast-down period after shutdown.
Orifice plate NOTE-3
To provide a controlled leak path in the rundown tank system to
ensure that during normal operation, the lube oil from the
supply header is continuously re-circulated through the rundown
tank back to the lube oil reservoir.
Check valve
To ensure lube oil rundown tank feeds lube only to the
equipment; preventing any lube oil flow going directly back to
the lube oil reservoir during coast down period.
Overflow / Recirculation
line
1. To act as overflow line during initial filling of rundown tank.
2. To act as a recirculation line during normal operation.
NOTE-1: API 614 base requirement is manual valve, solenoid operated valve can be used as an option for
automatic filling operation.
NOTE-2: API 614 requires this check valve to be drilled. The drilled hole acts as a leak path to achieve
lube oil recirculation through rundown tank during normal operation.
NOTE-3: API 614 does not specify this orifice plate. However, some end users prefer this orifice plate as
an alternative design. If this orifice plate is provided, then the check valve (item: 6) is provided as un-
drilled.
1
2
3
4
6
5
7
8
9
10
7 | P a g e
RUNDOWN TANK SYSTEM – OPERATIONAL ASPECTS:
The rundown tank system operation can be described under three stages.
Stage-1 – Start-up:
Rundown tank is empty during first startup and after each emergency shutdown. Rundown tank level is
used as one of the start permissives in the start logic of the main rotating equipment. Therefore, it is
necessary to first fill the lube oil rundown tank. For this purpose, the Auxiliary Lube oil pump (AOP) is
started and following lube oil flow is established in a closed loop.
LO Reservoir  Auxiliary LO Pump  LO Cooler & Filters  LO Supply Header  Equipment Bearings 
Drain Header  LO Reservoir
Then rundown tank filling valve (Item# 5/Figure-7) is opened and lube oil flow is established to the
rundown tank. The sight glass (Item# 4/Figure-7) is watched by the field operator to ensure that
rundown tank filling operation is successfully established. Once the tank is filled upto desired level, the
Level Low Alarm (LAL) disappears, the High Level Alarm (LAH) is indicated and the start permissive for
the rundown tank level NOT LOW is cleared in the control system. This completes the rundown tank
filling operation. At this point, the rundown tank filling valve (Item# 5/Figure-7) is returned back to its
normally closed position.
See Figure-8 for illustration of this stage.
Stage-2 – Normal Operation of Main Equipment:
Main Lube Oil Pump (MOP) keeps the lube oil supply header pressurized and maintains lube oil flow to
the bearings. Rundown tank filling valve is closed and lube oil flow to the rundown tank is blocked by the
check valve (Item# 6/Figure-7) except a small quantity of flow passing through the orifice (Item#
8/Figure-7) or check valve (Item# 6/Figure-7) drilled hole if a drilled check valve is used instead of orifice
plate. This small leakage flow through the orifice plate or check valve drilled hole maintains a continuous
lube oil recirculation back to the lube oil reservoir through the overflow line (Item# 5/Figure-7). This
recirculation helps to avoid lube oil stagnation and sediment accumulation in the rundown tank. Also, it
helps to maintain the rundown tank oil temperature at or closer to the lube oil supply temperature to
the bearings.
See Figure-9 for illustration of this stage.
Stage 3 – Coast-Down after ESD Trip:
By virtue of the system design (i.e. rundown tank elevation), the maximum Static Head by rundown tank
is lower than lube-oil trip set pressure. Therefore, static head in the lube oil rundown tank does not
maintain oil flow to the lube oil supply header as long as the lube oil supply header pressure is
maintained above the lube-oil trip set pressure.
When both the main and auxiliary lube oil pumps are lost such as in case of total power failure, the lube
oil supply header pressure falls below the lube-oil trip set pressure. The main equipment trips and
enters into its coast-down period. Soon after this moment, the Static Head from rundown tank is
relatively higher than the prevailing LO header pressure. Therefore, a gravity flow is established by the
rundown across the check valve (Item# 6/Figure-7) down to the bearings through the LO supply header.
See Figure-10 for illustration of this stage.
8 | P a g e
Figure-8: Lube Oil System Startup and Rundown Tank Filling
STARTUP / RUNDOWN
TANK FILLING
9 | P a g e
Figure-9: Lube Oil System and Rundown Tank – Oil flow during Normal Operation
NORMAL OPERATION
10 | P a g e
Figure-10: Lube Oil System and Rundown Tank – Oil flow during Coast-Down Period
COAST-DOWN AFTER ESD TRIP
11 | P a g e
RUNDOWN TANK SYSTEM - DESIGN ASPECTS:
The lube oil rundown tank system is designed as per minimum requirements in the API 614 standard and
good engineering practices as described below.
Rundown Tank Capacity:
Rundown tank capacity is the most critical design parameter. The capacity sizing should be such that it
provides lube oil gravity flow for the entire coast-down period ensuring safe shutdown of the equipment
without any bearing damage. The tank size depends upon the required lube oil supply flowrate (m3/h)
and total coast-down time. API 614 requires rundown tank to be sized for not less than 3 minutes (min.
recommended coast-down time) of normal operating lube-oil flow.
Coast-Down Time:
The actual coast-down time is provided by the supplier of the equipment to be served by the lube oil
system. The coast-down time is affected by the train inertia as well as the system pressure (resistance).
The lower the system resistance during the coast down period, the longer the equipment will continue
to run before reaching zero speed. Therefore, calculation of coast-down time must include the process
information such as coast-down is considered with or without depressurization. Similarly, the operating
speed before trip also affect the coast-down period. The lower the speed before trip, the longer is the
coast-down time. Therefore, for variable speed machines, the coast-down time should be evaluated for
various operating speeds and longest coast-down time should be selected.
Tank Maximum Static Head - Installation Elevation:
The rundown tank is installed at a certain specific height above the equipment centerline. API 614
stipulates that the vendor shall specify the allowable minimum and maximum height of the rundown
tank bottom nozzle above the machine centerline; the maximum Static Head shall not be less than the
lube-oil trip pressure but not less than 30 kPa (0.3 barg; 5 psig) at the beginning of coast-down. This
maximum static head consideration is important to ensure that there is no interference with the normal
trip function based on PALL.
Figure-11: Schematic illustration for various Pressure Levels and Tank Maximum Static Head
Note: the above schematic is just conceptual illustration and does not represent actual pressure profile.
Tank Volume (L) = Normal Lube Oil Flow (L/min.) x Coast-Down Time (min.)
12 | P a g e
Lube Oil Recirculation:
API 614 specifies a drilled check valve (Item#6 / figure-7) in the rundown tank system. The purpose of
drilled hole is to facilitate a continuous leakage flow to the rundown tank during normal operation. This
leakage slowly but continuously raises the rundown tank level and excess oil flows back to the lube oil
reservoir via overflow line. This design ensures that there is no stagnation and hence no accumulation of
sediments in the rundown tank. Also, this recirculation maintains the lube oil temperature inside the
rundown tank at or closer to the lube oil temperature in the lube oil supply header. This prevents
feeding of a cold/viscous lubricant to the bearings during Coast-down event and avoids bearing damage
due to thermal shock.
In the alternate design approach, an orifice plate (Item# 8/Figure-7) is provided instead of a drilled check
valve for the recirculation flow. If this orifice plate is provided, then check valve (Item#6 / figure-7) is
provided as undrilled. The orifice size or the drilled hole size should be designed such that the whole
contents of the rundown tank are renewed with fresh lube oil in a couple of hours’ time.
Sight Flow Glass in the Overflow Line:
API 614 specifies a sight flow glass in the overflow line. This sight glass acts as visible local indication to
ensure that the rundown tank is filled up during filling and subsequently act as indication to ensure that
lube oil is under continuous recirculation during normal operation. This sight flow glass should be
located such that it can be readily observed such as the oil reservoir or equipment operating deck.
Rundown Tank Level Monitoring:
API 614 specifies that rundown tank shall be provided with low-level alarm and high-level permissive
start functions. API 614 figure B.15 shows two level switches LSL and LSH for these functions. However,
API 614 also accepts that these functions may be served by a common device. Therefore, instead of two
level switches, a single level transmitter can also be used for LAL and LAH functions.
Rundown Tank Filling Valve:
API 614 specifies a manually operated filling valve as base scope. This valve is normally closed and
opened only during rundown tank filling before the equipment startup. However, this valve may also be
solenoid-controlled to allow an automated start.
Rundown Tank Material:
A careful consideration to the rundown tank material is extremely important. The rundown tank
represents a large vessel which is connected to the lube oil system downstream of lube oil filters.
Therefore, any rust, scale or corrosion in the rundown tank will go directly into the bearings during
coast-down lubrication and could cause damage to the bearings.
API 614 specifies that lube oil rundown tank shall be made of austenitic stainless steel material.
Rundown Tank Drain Connection:
As one of best practice, the rundown tank drain nozzle is extended (usually 25 mm) inside the tank. This
design helps to retain any foreign matter/sediments in the tank bottom and allow only the clean oil to
flow down the drain nozzle from top of nozzle projection. In this case, sometimes an additional flush
mounted drain connection is provided for complete drainage during maintenance. See typical design
shown in Figure-12.
13 | P a g e
Rundown Tank Provision for Inspection:
API 614 specifies a DN 150 (NPS6) nozzle for accessing and inspecting the interior of the rundown tank
shall be provided. Alternatively, a bolted cover can be provided in lieu of the DN 150 (NPS6) nozzle for
access and inspection. See typical design shown in Figure-12.
Figure-12-a: RDT with Inspection Cover Figure-12-b: RDT with Inspection Hole
CONCLUDING REMARKS:
Lube oil unit is the most critical auxiliary system for rotating machinery. The operational and design
aspects of each system component should be fully known and understood by all the concerned
engineers. Large rotating equipment involves machinery trains with high inertia loads and considerable
coast-down time after shutdown. Bearing lubrication during coast-down period is critical in case of
emergency shutdown situation when the AC motor driven lube oil pumps are not available. Lube oil
rundown tanks are commonly used as a most reliable solution for coast-down period lubrication during
emergency shutdown.
Inspection
Hole
Bolted cover
for Inspection
Projected
drain nozzle
Additional
drain
nozzle flush
mounted
flush
Projected
drain nozzle
14 | P a g e
Rundown tank capacity is the most important design element. There are cases when inadequate
capacity of rundown tank caused equipment damage during coast-down. Therefore, a close
coordination should be done with the rotating equipment vendor to ensure that the all the design
parameters are properly considered for adequate sizing of the rundown tank. Actual coast-down time
calculation/curves should be reviewed to ensure that all the relevant design inputs have been
considered in the calculations.
The design basis for the recirculation orifice or check valve drilled hole should be clarified to ensure that
a proper recirculation flowrate has been considered. The recirculation flowrate should be able to
achieve total renewal of the rundown tank inventory in a couple of hours’ time during normal operation.
Rundown tank installation height should be clarified with machinery vendor and the information should
be transferred to the relevant engineering disciplines. The tank installation height should be verified
during the 3D model review and it should be included in the checklist to be verified after mechanical
completion to ensure that vendor recommendation for tank installation height has been considered.
When rundown tank is used in the system, the lube oil reservoir sizing must be done such that it is able
to receive rundown tank total inventory volume without causing overflow after the coast-down period.
The check valve (Item# 9/Figure-7) is critically important and should be included in the check list after
mechanical completion to ensure that the check valve is present in the system. In addition, make sure
that the tie-in for rundown tank fill/drain line is connected to the lube oil header downstream of this
check valve. Failing to meet these requirements will make the rundown tank system in-effective due to
loss of lube oil back to the reservoir without reaching the bearings.
About the author
Muhammad Imran is Mechanical Rotating Equipment Engineer presently working with
LUKOIL International Services B.V based in Dubai. He has 15 years of professional
experience in Oil & Gas and Petrochemical projects including EPC detail engineering,
PRE-FEED, FEED and hands-on experience in the Pre-commissioning, Commissioning,
Startup and initial operations. Before joining LUKOIL, he worked for WorleyParsons
Qatar as Lead Mechanical Design Engineer for Rotating Equipment and Packages. He
can be reached at “muhundis@gmail.com”.

Contenu connexe

Tendances

AIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGERAIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGER
Ahsan Shakil
 
Pump training
Pump trainingPump training
Pump training
Durgham75
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
Amol Dudhate
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
Vijay Raj
 

Tendances (20)

Three Phase Separators
Three Phase SeparatorsThree Phase Separators
Three Phase Separators
 
Basics of valves
Basics of valvesBasics of valves
Basics of valves
 
Heat exchanger - Training course material
Heat exchanger - Training course materialHeat exchanger - Training course material
Heat exchanger - Training course material
 
BASIC PARTS OF STEAM TURBINE
BASIC PARTS OF STEAM TURBINEBASIC PARTS OF STEAM TURBINE
BASIC PARTS OF STEAM TURBINE
 
Radial and axial thrust in centrifugal pump and Methods use to balance them
Radial and axial thrust in centrifugal pump and Methods use to balance themRadial and axial thrust in centrifugal pump and Methods use to balance them
Radial and axial thrust in centrifugal pump and Methods use to balance them
 
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIALCENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
 
AIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGERAIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGER
 
Steam ejector working principle
Steam ejector working principleSteam ejector working principle
Steam ejector working principle
 
Types of compressor and application in oil and gas industry
Types of compressor and application in oil and gas industryTypes of compressor and application in oil and gas industry
Types of compressor and application in oil and gas industry
 
Compressor
CompressorCompressor
Compressor
 
Pump api 675 presentation
Pump api 675 presentationPump api 675 presentation
Pump api 675 presentation
 
Pump training
Pump trainingPump training
Pump training
 
condensate system
condensate systemcondensate system
condensate system
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Boiler Water Circulation Pumps
Boiler Water Circulation PumpsBoiler Water Circulation Pumps
Boiler Water Circulation Pumps
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
compressor notes.pdf
compressor notes.pdfcompressor notes.pdf
compressor notes.pdf
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 

En vedette

HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]
Subham Shit
 
Top 5 mechanical project engineer interview questions with answers
Top 5 mechanical project engineer interview questions with answersTop 5 mechanical project engineer interview questions with answers
Top 5 mechanical project engineer interview questions with answers
maxzing17
 
Reducing Emissions From Compressor Seals
Reducing Emissions From Compressor SealsReducing Emissions From Compressor Seals
Reducing Emissions From Compressor Seals
Saurabh Jain
 
Varnish in turbine lube
Varnish in turbine lubeVarnish in turbine lube
Varnish in turbine lube
bocah666
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
Nagesh H
 

En vedette (20)

How to Avoid Those Common Site Troubles During Commissioning
How to Avoid Those Common Site Troubles During CommissioningHow to Avoid Those Common Site Troubles During Commissioning
How to Avoid Those Common Site Troubles During Commissioning
 
LOW NPSH & CASES OF VERTICAL BARREL (VS6) TYPE PUMP SELECTION
LOW NPSH & CASES OF VERTICAL BARREL (VS6) TYPE PUMP SELECTIONLOW NPSH & CASES OF VERTICAL BARREL (VS6) TYPE PUMP SELECTION
LOW NPSH & CASES OF VERTICAL BARREL (VS6) TYPE PUMP SELECTION
 
Common MCF Bypass Line for Multiple Pumps
Common MCF Bypass Line for Multiple PumpsCommon MCF Bypass Line for Multiple Pumps
Common MCF Bypass Line for Multiple Pumps
 
Pump Sizing - Adding Minimum flow to Rated Flow, WHEN & WHY
Pump Sizing - Adding Minimum flow to Rated Flow, WHEN & WHYPump Sizing - Adding Minimum flow to Rated Flow, WHEN & WHY
Pump Sizing - Adding Minimum flow to Rated Flow, WHEN & WHY
 
HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]
 
Top 5 mechanical project engineer interview questions with answers
Top 5 mechanical project engineer interview questions with answersTop 5 mechanical project engineer interview questions with answers
Top 5 mechanical project engineer interview questions with answers
 
Reducing Emissions From Compressor Seals
Reducing Emissions From Compressor SealsReducing Emissions From Compressor Seals
Reducing Emissions From Compressor Seals
 
Different types of hydraulic accumulators
Different types of hydraulic  accumulatorsDifferent types of hydraulic  accumulators
Different types of hydraulic accumulators
 
Gas turbine aeroderivative Module LM6000 PC
Gas turbine aeroderivative Module LM6000 PCGas turbine aeroderivative Module LM6000 PC
Gas turbine aeroderivative Module LM6000 PC
 
Different types of hydraulic accumulators
Different types of hydraulic  accumulatorsDifferent types of hydraulic  accumulators
Different types of hydraulic accumulators
 
Centrifugal pump lecture 1
Centrifugal pump lecture 1Centrifugal pump lecture 1
Centrifugal pump lecture 1
 
Varnish in turbine lube
Varnish in turbine lubeVarnish in turbine lube
Varnish in turbine lube
 
Day 3: Fans and Pumps
Day 3: Fans and Pumps Day 3: Fans and Pumps
Day 3: Fans and Pumps
 
Lube Oil Blending Plant 2012
Lube Oil Blending Plant 2012Lube Oil Blending Plant 2012
Lube Oil Blending Plant 2012
 
Presentation Lube Oil Blending Plant Performance Evaluation
Presentation Lube Oil Blending Plant Performance EvaluationPresentation Lube Oil Blending Plant Performance Evaluation
Presentation Lube Oil Blending Plant Performance Evaluation
 
Centrifugal Compressor
Centrifugal CompressorCentrifugal Compressor
Centrifugal Compressor
 
Centrifugal compressor
Centrifugal compressor Centrifugal compressor
Centrifugal compressor
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plant
 
STEAM TURBINE BASIC
STEAM TURBINE BASIC STEAM TURBINE BASIC
STEAM TURBINE BASIC
 

Similaire à Lube Oil Rundown Tank - System Design and Operational Aspects

DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...
DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...
DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...
P singh
 
Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02
Naimat Khan
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
SURAJ KUMAR
 
Steam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLCSteam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLC
Nilesh Jha
 

Similaire à Lube Oil Rundown Tank - System Design and Operational Aspects (20)

THER TURBINE LUBRICATING OIL SYSTEM
THER TURBINE LUBRICATING OIL SYSTEMTHER TURBINE LUBRICATING OIL SYSTEM
THER TURBINE LUBRICATING OIL SYSTEM
 
Seal Oil System.pptx
Seal Oil System.pptxSeal Oil System.pptx
Seal Oil System.pptx
 
Lubrication in ice. ppt 4 [autosaved]
Lubrication in ice. ppt 4 [autosaved]Lubrication in ice. ppt 4 [autosaved]
Lubrication in ice. ppt 4 [autosaved]
 
Lubrication.pdf
Lubrication.pdfLubrication.pdf
Lubrication.pdf
 
Leroi om-rotary-screw-manual
Leroi om-rotary-screw-manualLeroi om-rotary-screw-manual
Leroi om-rotary-screw-manual
 
Chap21
Chap21Chap21
Chap21
 
DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...
DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...
DESIGN CALCULATION FOR EQUIPMENT AND COMPONENTS SPECIFICATION OF LUBRICATING ...
 
Lubrication System - IC Engine - Unit-III
Lubrication System - IC Engine - Unit-IIILubrication System - IC Engine - Unit-III
Lubrication System - IC Engine - Unit-III
 
Hydraulics-fundamentals of hydraulics.ppt
Hydraulics-fundamentals of hydraulics.pptHydraulics-fundamentals of hydraulics.ppt
Hydraulics-fundamentals of hydraulics.ppt
 
934 - 07_Lubrication.pdf
934 - 07_Lubrication.pdf934 - 07_Lubrication.pdf
934 - 07_Lubrication.pdf
 
Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
40266484-Fundamentals-of-Hydraulics.pdf
40266484-Fundamentals-of-Hydraulics.pdf40266484-Fundamentals-of-Hydraulics.pdf
40266484-Fundamentals-of-Hydraulics.pdf
 
CARGO OIL PUMPING SYSTEM.pdf
CARGO OIL PUMPING SYSTEM.pdfCARGO OIL PUMPING SYSTEM.pdf
CARGO OIL PUMPING SYSTEM.pdf
 
CARGO OIL PUMPING SYSTEM.pdf
CARGO OIL PUMPING SYSTEM.pdfCARGO OIL PUMPING SYSTEM.pdf
CARGO OIL PUMPING SYSTEM.pdf
 
Marine Diesel Engine main Systemss.pptx
Marine Diesel Engine  main Systemss.pptxMarine Diesel Engine  main Systemss.pptx
Marine Diesel Engine main Systemss.pptx
 
ENGINE LUBRICATING SYSTEM
ENGINE LUBRICATING SYSTEMENGINE LUBRICATING SYSTEM
ENGINE LUBRICATING SYSTEM
 
Model GP Maintenance Manual
Model GP Maintenance ManualModel GP Maintenance Manual
Model GP Maintenance Manual
 
STEAM TURBINE LUBE OIL SYSTEM PROTECTION USING SCADA AND PLC
 STEAM TURBINE LUBE OIL SYSTEM PROTECTION USING SCADA AND PLC STEAM TURBINE LUBE OIL SYSTEM PROTECTION USING SCADA AND PLC
STEAM TURBINE LUBE OIL SYSTEM PROTECTION USING SCADA AND PLC
 
Steam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLCSteam Turbine Lube Oil System Protections Using SCADA & PLC
Steam Turbine Lube Oil System Protections Using SCADA & PLC
 

Lube Oil Rundown Tank - System Design and Operational Aspects

  • 1. 1 | P a g e LUBE OIL RUNDOWN TANK – SYSTEM DESIGN AND OPERATIONAL ASPECTS 13 JAN 2016 By: Muhammad Imran – Mechanical Rotating Engineer – LUKOIL International Services B.V Dubai orce feed lube oil system is used for large rotating equipment including heavy duty Pumps, Compressors and their drivers. Emphatically speaking, lube oil system is the life line for Rotating Equipment and plays a pivotal role in achieving the plant reliability and availability. A badly designed lube oil system directly impacts sustained operation of the main equipment. History is replete with cases when a poorly designed lube oil system was the root cause of main equipment damage. Bearings are sensitive machine elements; their life and performance heavily depend upon continuous supply of clean lubricant at a certain required Flowrate, pressure and temperature. A force feed lubrication system is used for this purpose which is a closed loop system consisting of a number of components for storing (Reservoir), pressurizing (Pumps), cooling (Heat Exchangers), filtering and maintaining a continuous supply and return of lubricant to each bearing through a network of piping, valves, fittings and supported by a necessary instrumentation and control system. Figure-1: A Typical Force Feed Lube Oil System Rotor-Bearings interface generates tremendous amount of frictional heat and consequently excessive rise in the bearing temperature. If not properly dissipated in a continuous manner, this frictional heat F
  • 2. 2 | P a g e would cause burning and ultimate melting of the bearing metal. Figure-2 shows a typical shaft and bearing damage due to excessive temperature rise due loss of lubrication to the bearing. Figure-2: Typical shaft and bearing damage due to loss of lubrication Frictional heat generation and temperature rise of the bearings is a function of several factors including static and dynamic loads, rotor speed and coefficient of friction etc. While static loads remain constant, the dynamic loads and rotor shaft speed do vary. The rotor shaft speed grows from zero to the operating speed during startup and decays from the operating speed to zero speed after shutdown. The time period in which the rotor speed decays from the operating speed until a complete stoppage is called coast-down period or run-down period. Figure-3 shows a typical coast-down curve for a 5.7 MW motor driven centrifugal compressor train. Figure-3: Typical Coast-Down Curve for a 5.7 MW Motor Driven Centrifugal Compressor Train Dynamic loads and rotor speed gradually decays during coast-down, however static loads and coefficient of friction remain constant. Therefore, rotor-bearing system continues to generate heat during coast-
  • 3. 3 | P a g e down, though at a decreasing rate, and hence bearings still require continuous supply of lubricant until the rotor comes to a zero speed. A well designed lube oil system should be able meet bearing lubrication requirements during normal operation as well as during the entire coast-down period. There are cases, for example power loss to the AC motor driven lube oil pumps, when both main and auxiliary lube oil pumps are not available causing total loss of lubrication. In this case main motor is also tripped (emergency shutdown by PALL) however the train bearing system still requires sustained lubrication for a safe shutdown to avoid bearing damage during the coast-down period. Various solutions are used for providing bearing lubrication during coast-down period in such emergency situation. This paper describes design and operational aspects for atmospheric (non-pressurized) Lube Oil Rundown Tanks which is one of the commonly used solutions for coast-down lubrication. LUBE OIL RUNDOWN – AN OVERVIEW: Lube oil rundown tank is a Horizontal or Vertical storage vessel which is installed at a certain height above the shaft centerline of rotating equipment. The rundown tank holds a certain volume of lube oil during normal operation and provides gravity flow to the bearings after shutdown during coast-down. The tank elevation provides static head/pressure for the proper lube oil flow under gravity. Figure-4: Schematic view of Compressor Train with Lube Oil Rundown Tank
  • 4. 4 | P a g e Figure-5: A 3.5 MW Centrifugal Compressor Train with Lube Oil Rundown Tank Figure-6: Closer view of Lube Oil Rundown Tank in Figure-5
  • 5. 5 | P a g e RUNDOWN TANK SYSTEM COMPONENTS: Figure-7 shows a simplified flow diagram for a typical force feed lube oil system with lube oil rundown tank and associated system components. Figure-7: Simplified Flow Diagram for a Typical Force Feed Lube Oil System
  • 6. 6 | P a g e Following table summarizes rundown tank system components and their function relative to Figure-7. Item Description Function AT M Vent / Air breather Venting and to break the vacuum inside rundown tank as the tank is emptied during coast down period. Level Transmitter To provide low level alarm and high level start permissive. Rundown tank To hold certain volume of lube oil during normal operation. Sight glass To act as visible local indication to ensure that the rundown tank is filled up during filling and subsequently act as indication to ensure that lube oil is under continuous recirculation during normal operation. Filling valve NOTE-1 NORMNALLY CLOSED and is (manually/automatically) opened to fill the rundown tank during each startup. Check valve NOTE-2 To block main LO flow to rundown tank during normal operation. Bi-directional line 1. To fill rundown tank during startup using lube oil pump. 2. To act as lube oil supply line from rundown tank to the lube oil header during coast-down period after shutdown. Orifice plate NOTE-3 To provide a controlled leak path in the rundown tank system to ensure that during normal operation, the lube oil from the supply header is continuously re-circulated through the rundown tank back to the lube oil reservoir. Check valve To ensure lube oil rundown tank feeds lube only to the equipment; preventing any lube oil flow going directly back to the lube oil reservoir during coast down period. Overflow / Recirculation line 1. To act as overflow line during initial filling of rundown tank. 2. To act as a recirculation line during normal operation. NOTE-1: API 614 base requirement is manual valve, solenoid operated valve can be used as an option for automatic filling operation. NOTE-2: API 614 requires this check valve to be drilled. The drilled hole acts as a leak path to achieve lube oil recirculation through rundown tank during normal operation. NOTE-3: API 614 does not specify this orifice plate. However, some end users prefer this orifice plate as an alternative design. If this orifice plate is provided, then the check valve (item: 6) is provided as un- drilled. 1 2 3 4 6 5 7 8 9 10
  • 7. 7 | P a g e RUNDOWN TANK SYSTEM – OPERATIONAL ASPECTS: The rundown tank system operation can be described under three stages. Stage-1 – Start-up: Rundown tank is empty during first startup and after each emergency shutdown. Rundown tank level is used as one of the start permissives in the start logic of the main rotating equipment. Therefore, it is necessary to first fill the lube oil rundown tank. For this purpose, the Auxiliary Lube oil pump (AOP) is started and following lube oil flow is established in a closed loop. LO Reservoir  Auxiliary LO Pump  LO Cooler & Filters  LO Supply Header  Equipment Bearings  Drain Header  LO Reservoir Then rundown tank filling valve (Item# 5/Figure-7) is opened and lube oil flow is established to the rundown tank. The sight glass (Item# 4/Figure-7) is watched by the field operator to ensure that rundown tank filling operation is successfully established. Once the tank is filled upto desired level, the Level Low Alarm (LAL) disappears, the High Level Alarm (LAH) is indicated and the start permissive for the rundown tank level NOT LOW is cleared in the control system. This completes the rundown tank filling operation. At this point, the rundown tank filling valve (Item# 5/Figure-7) is returned back to its normally closed position. See Figure-8 for illustration of this stage. Stage-2 – Normal Operation of Main Equipment: Main Lube Oil Pump (MOP) keeps the lube oil supply header pressurized and maintains lube oil flow to the bearings. Rundown tank filling valve is closed and lube oil flow to the rundown tank is blocked by the check valve (Item# 6/Figure-7) except a small quantity of flow passing through the orifice (Item# 8/Figure-7) or check valve (Item# 6/Figure-7) drilled hole if a drilled check valve is used instead of orifice plate. This small leakage flow through the orifice plate or check valve drilled hole maintains a continuous lube oil recirculation back to the lube oil reservoir through the overflow line (Item# 5/Figure-7). This recirculation helps to avoid lube oil stagnation and sediment accumulation in the rundown tank. Also, it helps to maintain the rundown tank oil temperature at or closer to the lube oil supply temperature to the bearings. See Figure-9 for illustration of this stage. Stage 3 – Coast-Down after ESD Trip: By virtue of the system design (i.e. rundown tank elevation), the maximum Static Head by rundown tank is lower than lube-oil trip set pressure. Therefore, static head in the lube oil rundown tank does not maintain oil flow to the lube oil supply header as long as the lube oil supply header pressure is maintained above the lube-oil trip set pressure. When both the main and auxiliary lube oil pumps are lost such as in case of total power failure, the lube oil supply header pressure falls below the lube-oil trip set pressure. The main equipment trips and enters into its coast-down period. Soon after this moment, the Static Head from rundown tank is relatively higher than the prevailing LO header pressure. Therefore, a gravity flow is established by the rundown across the check valve (Item# 6/Figure-7) down to the bearings through the LO supply header. See Figure-10 for illustration of this stage.
  • 8. 8 | P a g e Figure-8: Lube Oil System Startup and Rundown Tank Filling STARTUP / RUNDOWN TANK FILLING
  • 9. 9 | P a g e Figure-9: Lube Oil System and Rundown Tank – Oil flow during Normal Operation NORMAL OPERATION
  • 10. 10 | P a g e Figure-10: Lube Oil System and Rundown Tank – Oil flow during Coast-Down Period COAST-DOWN AFTER ESD TRIP
  • 11. 11 | P a g e RUNDOWN TANK SYSTEM - DESIGN ASPECTS: The lube oil rundown tank system is designed as per minimum requirements in the API 614 standard and good engineering practices as described below. Rundown Tank Capacity: Rundown tank capacity is the most critical design parameter. The capacity sizing should be such that it provides lube oil gravity flow for the entire coast-down period ensuring safe shutdown of the equipment without any bearing damage. The tank size depends upon the required lube oil supply flowrate (m3/h) and total coast-down time. API 614 requires rundown tank to be sized for not less than 3 minutes (min. recommended coast-down time) of normal operating lube-oil flow. Coast-Down Time: The actual coast-down time is provided by the supplier of the equipment to be served by the lube oil system. The coast-down time is affected by the train inertia as well as the system pressure (resistance). The lower the system resistance during the coast down period, the longer the equipment will continue to run before reaching zero speed. Therefore, calculation of coast-down time must include the process information such as coast-down is considered with or without depressurization. Similarly, the operating speed before trip also affect the coast-down period. The lower the speed before trip, the longer is the coast-down time. Therefore, for variable speed machines, the coast-down time should be evaluated for various operating speeds and longest coast-down time should be selected. Tank Maximum Static Head - Installation Elevation: The rundown tank is installed at a certain specific height above the equipment centerline. API 614 stipulates that the vendor shall specify the allowable minimum and maximum height of the rundown tank bottom nozzle above the machine centerline; the maximum Static Head shall not be less than the lube-oil trip pressure but not less than 30 kPa (0.3 barg; 5 psig) at the beginning of coast-down. This maximum static head consideration is important to ensure that there is no interference with the normal trip function based on PALL. Figure-11: Schematic illustration for various Pressure Levels and Tank Maximum Static Head Note: the above schematic is just conceptual illustration and does not represent actual pressure profile. Tank Volume (L) = Normal Lube Oil Flow (L/min.) x Coast-Down Time (min.)
  • 12. 12 | P a g e Lube Oil Recirculation: API 614 specifies a drilled check valve (Item#6 / figure-7) in the rundown tank system. The purpose of drilled hole is to facilitate a continuous leakage flow to the rundown tank during normal operation. This leakage slowly but continuously raises the rundown tank level and excess oil flows back to the lube oil reservoir via overflow line. This design ensures that there is no stagnation and hence no accumulation of sediments in the rundown tank. Also, this recirculation maintains the lube oil temperature inside the rundown tank at or closer to the lube oil temperature in the lube oil supply header. This prevents feeding of a cold/viscous lubricant to the bearings during Coast-down event and avoids bearing damage due to thermal shock. In the alternate design approach, an orifice plate (Item# 8/Figure-7) is provided instead of a drilled check valve for the recirculation flow. If this orifice plate is provided, then check valve (Item#6 / figure-7) is provided as undrilled. The orifice size or the drilled hole size should be designed such that the whole contents of the rundown tank are renewed with fresh lube oil in a couple of hours’ time. Sight Flow Glass in the Overflow Line: API 614 specifies a sight flow glass in the overflow line. This sight glass acts as visible local indication to ensure that the rundown tank is filled up during filling and subsequently act as indication to ensure that lube oil is under continuous recirculation during normal operation. This sight flow glass should be located such that it can be readily observed such as the oil reservoir or equipment operating deck. Rundown Tank Level Monitoring: API 614 specifies that rundown tank shall be provided with low-level alarm and high-level permissive start functions. API 614 figure B.15 shows two level switches LSL and LSH for these functions. However, API 614 also accepts that these functions may be served by a common device. Therefore, instead of two level switches, a single level transmitter can also be used for LAL and LAH functions. Rundown Tank Filling Valve: API 614 specifies a manually operated filling valve as base scope. This valve is normally closed and opened only during rundown tank filling before the equipment startup. However, this valve may also be solenoid-controlled to allow an automated start. Rundown Tank Material: A careful consideration to the rundown tank material is extremely important. The rundown tank represents a large vessel which is connected to the lube oil system downstream of lube oil filters. Therefore, any rust, scale or corrosion in the rundown tank will go directly into the bearings during coast-down lubrication and could cause damage to the bearings. API 614 specifies that lube oil rundown tank shall be made of austenitic stainless steel material. Rundown Tank Drain Connection: As one of best practice, the rundown tank drain nozzle is extended (usually 25 mm) inside the tank. This design helps to retain any foreign matter/sediments in the tank bottom and allow only the clean oil to flow down the drain nozzle from top of nozzle projection. In this case, sometimes an additional flush mounted drain connection is provided for complete drainage during maintenance. See typical design shown in Figure-12.
  • 13. 13 | P a g e Rundown Tank Provision for Inspection: API 614 specifies a DN 150 (NPS6) nozzle for accessing and inspecting the interior of the rundown tank shall be provided. Alternatively, a bolted cover can be provided in lieu of the DN 150 (NPS6) nozzle for access and inspection. See typical design shown in Figure-12. Figure-12-a: RDT with Inspection Cover Figure-12-b: RDT with Inspection Hole CONCLUDING REMARKS: Lube oil unit is the most critical auxiliary system for rotating machinery. The operational and design aspects of each system component should be fully known and understood by all the concerned engineers. Large rotating equipment involves machinery trains with high inertia loads and considerable coast-down time after shutdown. Bearing lubrication during coast-down period is critical in case of emergency shutdown situation when the AC motor driven lube oil pumps are not available. Lube oil rundown tanks are commonly used as a most reliable solution for coast-down period lubrication during emergency shutdown. Inspection Hole Bolted cover for Inspection Projected drain nozzle Additional drain nozzle flush mounted flush Projected drain nozzle
  • 14. 14 | P a g e Rundown tank capacity is the most important design element. There are cases when inadequate capacity of rundown tank caused equipment damage during coast-down. Therefore, a close coordination should be done with the rotating equipment vendor to ensure that the all the design parameters are properly considered for adequate sizing of the rundown tank. Actual coast-down time calculation/curves should be reviewed to ensure that all the relevant design inputs have been considered in the calculations. The design basis for the recirculation orifice or check valve drilled hole should be clarified to ensure that a proper recirculation flowrate has been considered. The recirculation flowrate should be able to achieve total renewal of the rundown tank inventory in a couple of hours’ time during normal operation. Rundown tank installation height should be clarified with machinery vendor and the information should be transferred to the relevant engineering disciplines. The tank installation height should be verified during the 3D model review and it should be included in the checklist to be verified after mechanical completion to ensure that vendor recommendation for tank installation height has been considered. When rundown tank is used in the system, the lube oil reservoir sizing must be done such that it is able to receive rundown tank total inventory volume without causing overflow after the coast-down period. The check valve (Item# 9/Figure-7) is critically important and should be included in the check list after mechanical completion to ensure that the check valve is present in the system. In addition, make sure that the tie-in for rundown tank fill/drain line is connected to the lube oil header downstream of this check valve. Failing to meet these requirements will make the rundown tank system in-effective due to loss of lube oil back to the reservoir without reaching the bearings. About the author Muhammad Imran is Mechanical Rotating Equipment Engineer presently working with LUKOIL International Services B.V based in Dubai. He has 15 years of professional experience in Oil & Gas and Petrochemical projects including EPC detail engineering, PRE-FEED, FEED and hands-on experience in the Pre-commissioning, Commissioning, Startup and initial operations. Before joining LUKOIL, he worked for WorleyParsons Qatar as Lead Mechanical Design Engineer for Rotating Equipment and Packages. He can be reached at “muhundis@gmail.com”.