In Europe, extreme natural hazard events are not frequent but due to the complex interdependency of our critical infrastructure
systems these events can have a devastating impact in any part of Europe.
Protection against the impacts of natural hazards must be guaranteed for people to work and live in a secure and resilient
environment. No activity, including emergencies and rescue operations, can be carried out with the loss of key buildings and
facilities, transport networks and an interruption of essential supplies.
INFRARISK will develop reliable stress tests to establish the resilience of European Critical Infrastructures (CI) to rare low frequency
extreme events, thus contributing to the decision making process on how to build safer in the future. INFRARISK will focus on road
and rail infrastructure in Europe.
INFRARISK will enable infrastructure managers to minimise the impact of extreme events by providing them with the necessary tools
to develop robust mitigation and response strategies.
Essential in the INFRARISK approach is the dissemination aspect which involves several target levels and the development of
focused materials and products.
The INFRARISK project runs from October 2013 until September 2016
NOVEL INDICATORS FOR IDENTIFYING CRITICAL INFRASTRUCTURE
AT RISK FROM NATURAL HAZARDS
E. O’BRIEN1 & INFRARISK CONSORTIUM: A. O’CONNOR1, M. TUCKER1, M. NI CHOINE1 , B. ADEY2, J. HACKL2, M. HEITZLER2, I.
IOSIFESCU2, M. SEGARRA3, T. SALCEDA3, K. GAVIN4, K. MARTINOVIC4 , P. VAN GELDER5, Y. AVDEEVA5, M.J. JIMENEZ6, M.
GARCIA-FERNANDEZ6, D. D’AYALA7, T. CHENG7, P. GHEL7, K. TAALAB7, F. MEDDA7, P. PRAK8, D. ROMAN9, A. BERRE9, T.
RICHTEY10, Z. SABEUR11, K. MEACHAM11,
1 ROD, Dublin, 2 ETH, Zürich, 3 DSA, Madrid, 4 GDG, Dublin, 5 PSCT, Den Haag, 6 IGEO(CSIC, UCM), Madrid, 7 UCL, London, 8
PSJ, Ijsselstein, 9 SINTEF, Trondheim, 10 RCAB, Stockholm, 11 IT Innov, Southhampton
FP7-EU Project INFRARISK
INFRARISK will develop reliable stress tests to
establish the resilience of European Critical
Infrastructures (CI) to rare low frequency extreme
events, thus contributing to the decision making
process on how to build safer in the future.
INFRARISK will focus on road and rail infrastructure
in Europe.
This project has received funding from the European
Union’s Seventh Programme for research, technological
development and demonstration under grant agreement
No. 6033807
Novel indicators for identifying critical
INFRAstructure at RISK from Natural
Hazards
.infrarisk-fp7.eu InfraRisk infrarisk-fp7
INFRARISK will focus on:
• Developing a stress test structure for specific
natural hazards on CI networks and a framework for
linear infrastructure systems with wider extents and
many nodal points.
• Considering the impacts of earthquakes, slope
failure, mass movement, and flooding on European
roads, highways and railroads (Ten-T Core network).
• Facilitating implementation through the
development of GIS based and web based stress test
algorithms for complex infrastructure networks.
• Testing the framework developed through the
simulation of complex case studies.
• Exploitation strategies aimed at disseminating the
'knowledge' and not just the results.
Risk profiling of extreme impacts
Rare low-frequency natural hazard events, which have the
potential to have extreme impacts on critical infrastructure will be
identified.
Robust modeling of spatio-temporal processes with propagated
dynamic uncertainties in multiple risk complexity scenarios will be
developed.
The methodological core of the project is based on the
establishment of an ‘’overarching methodology’’, a harmonised risk
assessment process to evaluate the risks associated with multiple
infrastructure networks for various hazards with spatial and
temporal correlation.
The overarching methodology will capture and incorporate, into a
GIS platform, outputs from the extensive profiling of natural
hazards and infrastructure, the analysis of single event risk for
multiple hazards and the space-time variability analysis of a CI
network
Integrated approach to hazard assessment
An integrated approach to hazard assessment will be
developed considering the interdependencies of infrastructure
networks, the correlated nature of natural hazards, cascading
hazards and cascading effects, and spatial and temporal
vulnerability.
Stress test framework
Development of a stress test structure for multi-risk scenarios coupled with a tool for decision making based on the outcome of the
stress test.
Implementation
Development of an Operational Analysis Framework considering cascading hazards,
impacts and dependent geospatial vulnerabilities with practical software tools and
guidelines to provide greater support to the next generation of European infrastructure
managers.
Development of a collaborative integrated platform where risk management professionals
access and share data, information and risk scenarios results efficiently and intuitively.
WORK STREAMS
INFRARISK CONSORTIUM
The 11 members of seven different countries
represents a well balanced and strong partnership
among universities, research institutions, SME’s,
and Large Enterprise (LE).
Implementation Strategy
CaseStudySimulation
Stress Tests for
multi-risk scenarios
Harmonisation
Space-Time Modelling
of Structural Behaviours
and Natural Hazards
Single Risk Assessment
Risk Profiling of
Natural Hazards
and Infrastructure
Overarching methodology
IDST: INFRARISK Decision Support Tool
(Portal Samples)

Contenu connexe

Tendances

Novel indicators for identifying critical INFRAstructure at RISK from natural...
Novel indicators for identifying critical INFRAstructure at RISK from natural...Novel indicators for identifying critical INFRAstructure at RISK from natural...
Novel indicators for identifying critical INFRAstructure at RISK from natural...Infra Risk
 
HYPERWIND Project: global and systemic monitoring of offshore renewable power...
HYPERWIND Project: global and systemic monitoring of offshore renewable power...HYPERWIND Project: global and systemic monitoring of offshore renewable power...
HYPERWIND Project: global and systemic monitoring of offshore renewable power...Jean-Claude Meteodyn
 
Wolfgang Kröger - Reflections focused on the electric power supply system
Wolfgang Kröger - Reflections focused on the electric power supply systemWolfgang Kröger - Reflections focused on the electric power supply system
Wolfgang Kröger - Reflections focused on the electric power supply systemGlobal Risk Forum GRFDavos
 
The risks of terrorist use of quantum computing clusters for destabilization ...
The risks of terrorist use of quantum computing clusters for destabilization ...The risks of terrorist use of quantum computing clusters for destabilization ...
The risks of terrorist use of quantum computing clusters for destabilization ...Andrei Korneyev
 
CAMS GS Urban Thermal Environment by Keramitsoglou
CAMS GS Urban Thermal Environment by Keramitsoglou CAMS GS Urban Thermal Environment by Keramitsoglou
CAMS GS Urban Thermal Environment by Keramitsoglou Copernicus ECMWF
 

Tendances (7)

Novel indicators for identifying critical INFRAstructure at RISK from natural...
Novel indicators for identifying critical INFRAstructure at RISK from natural...Novel indicators for identifying critical INFRAstructure at RISK from natural...
Novel indicators for identifying critical INFRAstructure at RISK from natural...
 
HYPERWIND Project: global and systemic monitoring of offshore renewable power...
HYPERWIND Project: global and systemic monitoring of offshore renewable power...HYPERWIND Project: global and systemic monitoring of offshore renewable power...
HYPERWIND Project: global and systemic monitoring of offshore renewable power...
 
Press release 3rd pilot
Press release 3rd pilotPress release 3rd pilot
Press release 3rd pilot
 
Wolfgang Kröger - Reflections focused on the electric power supply system
Wolfgang Kröger - Reflections focused on the electric power supply systemWolfgang Kröger - Reflections focused on the electric power supply system
Wolfgang Kröger - Reflections focused on the electric power supply system
 
Resilience Thoma JRC Ispra Mai 2014
Resilience Thoma JRC Ispra Mai 2014Resilience Thoma JRC Ispra Mai 2014
Resilience Thoma JRC Ispra Mai 2014
 
The risks of terrorist use of quantum computing clusters for destabilization ...
The risks of terrorist use of quantum computing clusters for destabilization ...The risks of terrorist use of quantum computing clusters for destabilization ...
The risks of terrorist use of quantum computing clusters for destabilization ...
 
CAMS GS Urban Thermal Environment by Keramitsoglou
CAMS GS Urban Thermal Environment by Keramitsoglou CAMS GS Urban Thermal Environment by Keramitsoglou
CAMS GS Urban Thermal Environment by Keramitsoglou
 

En vedette

Actividad power point (1)
Actividad power point (1)Actividad power point (1)
Actividad power point (1)edithtobar
 
Learning Anywhere: Mobile, Social and Virtual
Learning Anywhere: Mobile, Social and VirtualLearning Anywhere: Mobile, Social and Virtual
Learning Anywhere: Mobile, Social and VirtualCynthia Clay
 
Oracle Inline Memory
Oracle Inline MemoryOracle Inline Memory
Oracle Inline MemoryRemil Mohanan
 
DEFENCE STRATEGY-READY FOR PRINT
DEFENCE STRATEGY-READY FOR PRINTDEFENCE STRATEGY-READY FOR PRINT
DEFENCE STRATEGY-READY FOR PRINTMARIUS EUGEN OPRAN
 
Mecanismos de evasión de las defensas del organismo
Mecanismos de evasión de las defensas del organismoMecanismos de evasión de las defensas del organismo
Mecanismos de evasión de las defensas del organismoJohn Molina
 
Raport Praktyki w zarządzaniu talentami w Polsce
Raport Praktyki w zarządzaniu talentami w PolsceRaport Praktyki w zarządzaniu talentami w Polsce
Raport Praktyki w zarządzaniu talentami w PolsceHouse of Skills
 
áReas de brodmann
áReas de brodmannáReas de brodmann
áReas de brodmannerickgt400
 
Sem.2 4th quarter biology agenda and targets 2016.v2.posting
   Sem.2 4th quarter biology agenda and targets 2016.v2.posting   Sem.2 4th quarter biology agenda and targets 2016.v2.posting
Sem.2 4th quarter biology agenda and targets 2016.v2.postingLorraine Stratton
 
Biology agenda and targets 2015 sem. 1 revised.3
  Biology agenda and targets 2015 sem. 1 revised.3  Biology agenda and targets 2015 sem. 1 revised.3
Biology agenda and targets 2015 sem. 1 revised.3Lorraine Stratton
 
A dictionary of basic japanese grammar
A dictionary of basic japanese grammarA dictionary of basic japanese grammar
A dictionary of basic japanese grammarthomaskerins3
 
Present Simple and Present Progressive o Continuo - Haloween
Present Simple and Present Progressive o Continuo - HaloweenPresent Simple and Present Progressive o Continuo - Haloween
Present Simple and Present Progressive o Continuo - HaloweenPatricia Vanessa Gutierrez Najar
 

En vedette (16)

Data Separation
Data SeparationData Separation
Data Separation
 
Actividad power point (1)
Actividad power point (1)Actividad power point (1)
Actividad power point (1)
 
Symbolic Interactionism
Symbolic InteractionismSymbolic Interactionism
Symbolic Interactionism
 
BCZ - Bambu Carbono Zero
BCZ - Bambu Carbono ZeroBCZ - Bambu Carbono Zero
BCZ - Bambu Carbono Zero
 
Learning Anywhere: Mobile, Social and Virtual
Learning Anywhere: Mobile, Social and VirtualLearning Anywhere: Mobile, Social and Virtual
Learning Anywhere: Mobile, Social and Virtual
 
O bambu como revestimento
O bambu como revestimentoO bambu como revestimento
O bambu como revestimento
 
Oracle Inline Memory
Oracle Inline MemoryOracle Inline Memory
Oracle Inline Memory
 
DEFENCE STRATEGY-READY FOR PRINT
DEFENCE STRATEGY-READY FOR PRINTDEFENCE STRATEGY-READY FOR PRINT
DEFENCE STRATEGY-READY FOR PRINT
 
Mecanismos de evasión de las defensas del organismo
Mecanismos de evasión de las defensas del organismoMecanismos de evasión de las defensas del organismo
Mecanismos de evasión de las defensas del organismo
 
Raport Praktyki w zarządzaniu talentami w Polsce
Raport Praktyki w zarządzaniu talentami w PolsceRaport Praktyki w zarządzaniu talentami w Polsce
Raport Praktyki w zarządzaniu talentami w Polsce
 
áReas de brodmann
áReas de brodmannáReas de brodmann
áReas de brodmann
 
Sem.2 4th quarter biology agenda and targets 2016.v2.posting
   Sem.2 4th quarter biology agenda and targets 2016.v2.posting   Sem.2 4th quarter biology agenda and targets 2016.v2.posting
Sem.2 4th quarter biology agenda and targets 2016.v2.posting
 
Biology agenda and targets 2015 sem. 1 revised.3
  Biology agenda and targets 2015 sem. 1 revised.3  Biology agenda and targets 2015 sem. 1 revised.3
Biology agenda and targets 2015 sem. 1 revised.3
 
A dictionary of basic japanese grammar
A dictionary of basic japanese grammarA dictionary of basic japanese grammar
A dictionary of basic japanese grammar
 
An Illustrated DNA Tale pp
An Illustrated DNA Tale ppAn Illustrated DNA Tale pp
An Illustrated DNA Tale pp
 
Present Simple and Present Progressive o Continuo - Haloween
Present Simple and Present Progressive o Continuo - HaloweenPresent Simple and Present Progressive o Continuo - Haloween
Present Simple and Present Progressive o Continuo - Haloween
 

Similaire à 2nd European Conference on Earthquake Engineering and Seismology. 24-29 August 2014, Istanbul, Turkey. ‘Novel Indicators for identifying critical INFRAstructure at RISK from natural hazards

InfraRIsk EPA FACT SHEET
InfraRIsk EPA FACT SHEETInfraRIsk EPA FACT SHEET
InfraRIsk EPA FACT SHEETInfra Risk
 
InfraRisk EU FACT SHEET
InfraRisk EU FACT SHEETInfraRisk EU FACT SHEET
InfraRisk EU FACT SHEETInfra Risk
 
InfraRisk Newsletter 1
InfraRisk Newsletter 1InfraRisk Newsletter 1
InfraRisk Newsletter 1Infra Risk
 
INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...
INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...
INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...Infra Risk
 
WCRR 2016 paper 392
WCRR 2016 paper 392WCRR 2016 paper 392
WCRR 2016 paper 392tonylancia
 
InfraRisk Press Release
InfraRisk Press ReleaseInfraRisk Press Release
InfraRisk Press ReleaseInfra Risk
 
Fire risk analysis of structures and infrastructures: theory and application ...
Fire risk analysis of structures and infrastructures: theory and application ...Fire risk analysis of structures and infrastructures: theory and application ...
Fire risk analysis of structures and infrastructures: theory and application ...Franco Bontempi Org Didattica
 
TRA 2018 Vienna Publication: Advancing active safety towards the protection o...
TRA 2018 Vienna Publication: Advancing active safety towards the protection o...TRA 2018 Vienna Publication: Advancing active safety towards the protection o...
TRA 2018 Vienna Publication: Advancing active safety towards the protection o...Ilona Anna Cieslik
 
2.2 Episecc project Overview
2.2   Episecc project Overview2.2   Episecc project Overview
2.2 Episecc project OverviewFraunhofer FOKUS
 
Industrial Safety and Security in Horizon 2020
Industrial Safety and Security in Horizon 2020Industrial Safety and Security in Horizon 2020
Industrial Safety and Security in Horizon 2020Community Protection Forum
 
An overarching process to evaluate risks associated with infrastructure netwo...
An overarching process to evaluate risks associated with infrastructure netwo...An overarching process to evaluate risks associated with infrastructure netwo...
An overarching process to evaluate risks associated with infrastructure netwo...Infra Risk
 
D2.1 First Report on RESISTANT's observatory_v1 .pdf
D2.1 First Report on RESISTANT's observatory_v1 .pdfD2.1 First Report on RESISTANT's observatory_v1 .pdf
D2.1 First Report on RESISTANT's observatory_v1 .pdfresistantproject
 
Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection Carl Jackson
 
Cp18 cyrail final conference en
Cp18 cyrail final conference enCp18 cyrail final conference en
Cp18 cyrail final conference enUICcom
 
Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protectionEdge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protectionCarl Jackson
 
Img s sumary-paper_for_march19_meeting
Img s sumary-paper_for_march19_meetingImg s sumary-paper_for_march19_meeting
Img s sumary-paper_for_march19_meetingMarco Manso
 
Preprint-WCMRI,IFERP,Singapore,28 October 2022.pdf
Preprint-WCMRI,IFERP,Singapore,28 October 2022.pdfPreprint-WCMRI,IFERP,Singapore,28 October 2022.pdf
Preprint-WCMRI,IFERP,Singapore,28 October 2022.pdfChristo Ananth
 
Dsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhofer
Dsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhoferDsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhofer
Dsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhoferDeltares
 

Similaire à 2nd European Conference on Earthquake Engineering and Seismology. 24-29 August 2014, Istanbul, Turkey. ‘Novel Indicators for identifying critical INFRAstructure at RISK from natural hazards (20)

InfraRIsk EPA FACT SHEET
InfraRIsk EPA FACT SHEETInfraRIsk EPA FACT SHEET
InfraRIsk EPA FACT SHEET
 
InfraRisk EU FACT SHEET
InfraRisk EU FACT SHEETInfraRisk EU FACT SHEET
InfraRisk EU FACT SHEET
 
InfraRisk Newsletter 1
InfraRisk Newsletter 1InfraRisk Newsletter 1
InfraRisk Newsletter 1
 
INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...
INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...
INFRARISK. Novel Indicators for identifying critical INFRAstructure at RISK f...
 
WCRR 2016 paper 392
WCRR 2016 paper 392WCRR 2016 paper 392
WCRR 2016 paper 392
 
InfraRisk Press Release
InfraRisk Press ReleaseInfraRisk Press Release
InfraRisk Press Release
 
Fire risk analysis of structures and infrastructures: theory and application ...
Fire risk analysis of structures and infrastructures: theory and application ...Fire risk analysis of structures and infrastructures: theory and application ...
Fire risk analysis of structures and infrastructures: theory and application ...
 
TRA 2018 Vienna Publication: Advancing active safety towards the protection o...
TRA 2018 Vienna Publication: Advancing active safety towards the protection o...TRA 2018 Vienna Publication: Advancing active safety towards the protection o...
TRA 2018 Vienna Publication: Advancing active safety towards the protection o...
 
2.2 Episecc project Overview
2.2   Episecc project Overview2.2   Episecc project Overview
2.2 Episecc project Overview
 
Industrial Safety and Security in Horizon 2020
Industrial Safety and Security in Horizon 2020Industrial Safety and Security in Horizon 2020
Industrial Safety and Security in Horizon 2020
 
An overarching process to evaluate risks associated with infrastructure netwo...
An overarching process to evaluate risks associated with infrastructure netwo...An overarching process to evaluate risks associated with infrastructure netwo...
An overarching process to evaluate risks associated with infrastructure netwo...
 
D2.1 First Report on RESISTANT's observatory_v1 .pdf
D2.1 First Report on RESISTANT's observatory_v1 .pdfD2.1 First Report on RESISTANT's observatory_v1 .pdf
D2.1 First Report on RESISTANT's observatory_v1 .pdf
 
Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection
 
SMARTI
SMARTISMARTI
SMARTI
 
Cp18 cyrail final conference en
Cp18 cyrail final conference enCp18 cyrail final conference en
Cp18 cyrail final conference en
 
Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protectionEdge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection
 
Img s sumary-paper_for_march19_meeting
Img s sumary-paper_for_march19_meetingImg s sumary-paper_for_march19_meeting
Img s sumary-paper_for_march19_meeting
 
Preprint-WCMRI,IFERP,Singapore,28 October 2022.pdf
Preprint-WCMRI,IFERP,Singapore,28 October 2022.pdfPreprint-WCMRI,IFERP,Singapore,28 October 2022.pdf
Preprint-WCMRI,IFERP,Singapore,28 October 2022.pdf
 
Press release 2nd pilot
Press release 2nd pilotPress release 2nd pilot
Press release 2nd pilot
 
Dsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhofer
Dsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhoferDsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhofer
Dsd int 2014 - open mi symposium -cipr-net and openmi, erick rome, fraunhofer
 

Dernier

Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls AgencyHire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls AgencySheetal Arora
 
CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service 🪡
CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service  🪡CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service  🪡
CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service 🪡anilsa9823
 
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 60009654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000Sapana Sha
 
Zoology 4th semester series (krishna).pdf
Zoology 4th semester series (krishna).pdfZoology 4th semester series (krishna).pdf
Zoology 4th semester series (krishna).pdfSumit Kumar yadav
 
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPirithiRaju
 
Animal Communication- Auditory and Visual.pptx
Animal Communication- Auditory and Visual.pptxAnimal Communication- Auditory and Visual.pptx
Animal Communication- Auditory and Visual.pptxUmerFayaz5
 
Pests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdfPests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdfPirithiRaju
 
Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticsPulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticssakshisoni2385
 
Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...
Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...
Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...anilsa9823
 
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCRStunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCRDelhi Call girls
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)Areesha Ahmad
 
DIFFERENCE IN BACK CROSS AND TEST CROSS
DIFFERENCE IN  BACK CROSS AND TEST CROSSDIFFERENCE IN  BACK CROSS AND TEST CROSS
DIFFERENCE IN BACK CROSS AND TEST CROSSLeenakshiTyagi
 
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...Sérgio Sacani
 
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...Sérgio Sacani
 
Chemistry 4th semester series (krishna).pdf
Chemistry 4th semester series (krishna).pdfChemistry 4th semester series (krishna).pdf
Chemistry 4th semester series (krishna).pdfSumit Kumar yadav
 
GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)Areesha Ahmad
 
Biopesticide (2).pptx .This slides helps to know the different types of biop...
Biopesticide (2).pptx  .This slides helps to know the different types of biop...Biopesticide (2).pptx  .This slides helps to know the different types of biop...
Biopesticide (2).pptx .This slides helps to know the different types of biop...RohitNehra6
 
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...ssifa0344
 
Disentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOSTDisentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOSTSérgio Sacani
 

Dernier (20)

Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls AgencyHire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
 
CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service 🪡
CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service  🪡CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service  🪡
CALL ON ➥8923113531 🔝Call Girls Kesar Bagh Lucknow best Night Fun service 🪡
 
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 60009654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
 
Zoology 4th semester series (krishna).pdf
Zoology 4th semester series (krishna).pdfZoology 4th semester series (krishna).pdf
Zoology 4th semester series (krishna).pdf
 
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
 
Animal Communication- Auditory and Visual.pptx
Animal Communication- Auditory and Visual.pptxAnimal Communication- Auditory and Visual.pptx
Animal Communication- Auditory and Visual.pptx
 
Pests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdfPests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdf
 
Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticsPulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
 
Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...
Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...
Lucknow 💋 Russian Call Girls Lucknow Finest Escorts Service 8923113531 Availa...
 
CELL -Structural and Functional unit of life.pdf
CELL -Structural and Functional unit of life.pdfCELL -Structural and Functional unit of life.pdf
CELL -Structural and Functional unit of life.pdf
 
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCRStunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)
 
DIFFERENCE IN BACK CROSS AND TEST CROSS
DIFFERENCE IN  BACK CROSS AND TEST CROSSDIFFERENCE IN  BACK CROSS AND TEST CROSS
DIFFERENCE IN BACK CROSS AND TEST CROSS
 
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
 
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
All-domain Anomaly Resolution Office U.S. Department of Defense (U) Case: “Eg...
 
Chemistry 4th semester series (krishna).pdf
Chemistry 4th semester series (krishna).pdfChemistry 4th semester series (krishna).pdf
Chemistry 4th semester series (krishna).pdf
 
GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)GBSN - Microbiology (Unit 1)
GBSN - Microbiology (Unit 1)
 
Biopesticide (2).pptx .This slides helps to know the different types of biop...
Biopesticide (2).pptx  .This slides helps to know the different types of biop...Biopesticide (2).pptx  .This slides helps to know the different types of biop...
Biopesticide (2).pptx .This slides helps to know the different types of biop...
 
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
 
Disentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOSTDisentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOST
 

2nd European Conference on Earthquake Engineering and Seismology. 24-29 August 2014, Istanbul, Turkey. ‘Novel Indicators for identifying critical INFRAstructure at RISK from natural hazards

  • 1. In Europe, extreme natural hazard events are not frequent but due to the complex interdependency of our critical infrastructure systems these events can have a devastating impact in any part of Europe. Protection against the impacts of natural hazards must be guaranteed for people to work and live in a secure and resilient environment. No activity, including emergencies and rescue operations, can be carried out with the loss of key buildings and facilities, transport networks and an interruption of essential supplies. INFRARISK will develop reliable stress tests to establish the resilience of European Critical Infrastructures (CI) to rare low frequency extreme events, thus contributing to the decision making process on how to build safer in the future. INFRARISK will focus on road and rail infrastructure in Europe. INFRARISK will enable infrastructure managers to minimise the impact of extreme events by providing them with the necessary tools to develop robust mitigation and response strategies. Essential in the INFRARISK approach is the dissemination aspect which involves several target levels and the development of focused materials and products. The INFRARISK project runs from October 2013 until September 2016 NOVEL INDICATORS FOR IDENTIFYING CRITICAL INFRASTRUCTURE AT RISK FROM NATURAL HAZARDS E. O’BRIEN1 & INFRARISK CONSORTIUM: A. O’CONNOR1, M. TUCKER1, M. NI CHOINE1 , B. ADEY2, J. HACKL2, M. HEITZLER2, I. IOSIFESCU2, M. SEGARRA3, T. SALCEDA3, K. GAVIN4, K. MARTINOVIC4 , P. VAN GELDER5, Y. AVDEEVA5, M.J. JIMENEZ6, M. GARCIA-FERNANDEZ6, D. D’AYALA7, T. CHENG7, P. GHEL7, K. TAALAB7, F. MEDDA7, P. PRAK8, D. ROMAN9, A. BERRE9, T. RICHTEY10, Z. SABEUR11, K. MEACHAM11, 1 ROD, Dublin, 2 ETH, Zürich, 3 DSA, Madrid, 4 GDG, Dublin, 5 PSCT, Den Haag, 6 IGEO(CSIC, UCM), Madrid, 7 UCL, London, 8 PSJ, Ijsselstein, 9 SINTEF, Trondheim, 10 RCAB, Stockholm, 11 IT Innov, Southhampton FP7-EU Project INFRARISK INFRARISK will develop reliable stress tests to establish the resilience of European Critical Infrastructures (CI) to rare low frequency extreme events, thus contributing to the decision making process on how to build safer in the future. INFRARISK will focus on road and rail infrastructure in Europe. This project has received funding from the European Union’s Seventh Programme for research, technological development and demonstration under grant agreement No. 6033807 Novel indicators for identifying critical INFRAstructure at RISK from Natural Hazards .infrarisk-fp7.eu InfraRisk infrarisk-fp7 INFRARISK will focus on: • Developing a stress test structure for specific natural hazards on CI networks and a framework for linear infrastructure systems with wider extents and many nodal points. • Considering the impacts of earthquakes, slope failure, mass movement, and flooding on European roads, highways and railroads (Ten-T Core network). • Facilitating implementation through the development of GIS based and web based stress test algorithms for complex infrastructure networks. • Testing the framework developed through the simulation of complex case studies. • Exploitation strategies aimed at disseminating the 'knowledge' and not just the results. Risk profiling of extreme impacts Rare low-frequency natural hazard events, which have the potential to have extreme impacts on critical infrastructure will be identified. Robust modeling of spatio-temporal processes with propagated dynamic uncertainties in multiple risk complexity scenarios will be developed. The methodological core of the project is based on the establishment of an ‘’overarching methodology’’, a harmonised risk assessment process to evaluate the risks associated with multiple infrastructure networks for various hazards with spatial and temporal correlation. The overarching methodology will capture and incorporate, into a GIS platform, outputs from the extensive profiling of natural hazards and infrastructure, the analysis of single event risk for multiple hazards and the space-time variability analysis of a CI network Integrated approach to hazard assessment An integrated approach to hazard assessment will be developed considering the interdependencies of infrastructure networks, the correlated nature of natural hazards, cascading hazards and cascading effects, and spatial and temporal vulnerability. Stress test framework Development of a stress test structure for multi-risk scenarios coupled with a tool for decision making based on the outcome of the stress test. Implementation Development of an Operational Analysis Framework considering cascading hazards, impacts and dependent geospatial vulnerabilities with practical software tools and guidelines to provide greater support to the next generation of European infrastructure managers. Development of a collaborative integrated platform where risk management professionals access and share data, information and risk scenarios results efficiently and intuitively. WORK STREAMS INFRARISK CONSORTIUM The 11 members of seven different countries represents a well balanced and strong partnership among universities, research institutions, SME’s, and Large Enterprise (LE). Implementation Strategy CaseStudySimulation Stress Tests for multi-risk scenarios Harmonisation Space-Time Modelling of Structural Behaviours and Natural Hazards Single Risk Assessment Risk Profiling of Natural Hazards and Infrastructure Overarching methodology IDST: INFRARISK Decision Support Tool (Portal Samples)