1. CURRICULUM VITAE
JAMAL ASHRAF
Email-Id: - jashraf54@yahoo.co.in
jashraf35@gmail.com
CONTACT No: : +919634548347+ 919523538484
+918430985773
OBJECTIVE
Seeking a challenging position in a progressive & dynamic organization where I can enhance my
professional, personal skills & gain experiences to achieve organizational goal.
TOTAL EXPERIENCES ---- 12 Years in ABROAD
SUMMERY OF EXPERIENCE
I have Bachelor degree (B_TECH. & DIPLOMA- ELECTRICAL ENGINEERING) with 12 Years Professional
experience in oil & gas projects construction &Pre-Commissioning / commissioning plans for Electrical works.
Abilities to adopt the work conditions swiftly, capable for facing challenges and meeting the hard target to maintain and
enforce a safe working environment to help maintain client satisfaction,
Good team work and record keeping abilities, Close Coordination with vendor/supplier regarding electrical equipment
spares and services,
Excellent oral and written communication skills
Employment History:
From: 17/12/2015 to 27/04/2016
Company: BWADI AL ZAJEERA(MEP)- OMAN
Location: GHALA INDUSTRIAL PROJECT.
Designation: Electrical Engineer
From: 07/01/2013 to 01/05/2015
Company: Samsung Engineering- IRAQ
Location: CPF-(LUKOIL) Oil & Gas Plant- West Qurna-2
Designation: Electrical Engineer
From: 22/08/2010 to 30/04/2012
Company: ACA ALLIANCE -IRAQ
Location: Water Treatment Plant -Diwanyah
Designation: Electrical Project Engineer
From: 28/05/2008 to.02/01/2009:
Company: BILT MIDDLE EAST LLC- DUBAI UAE
Location: Royal Terminal, Air Wing Phase-II (AX-151) Air Port Dubai,
Designation: Electrical Engineer
From: 15/10/2006 to 10/03/2008:
Company: AL Majal International Trading Contracting
Location: Ras Laffan gas plant
Designation: Electrical Engineer
From: 11/07/2002 to 22/08/2005:
Company: BK Gulf L.L.C. P.O. Box- 10079 Dubai – UAE
Location: Jebel Ali Ship Port.
Designation: Electrical Site Engineer
2. From: 20/11/1998 to 19/11/2001:
Company: NESMA EMCOR Ltd - Al-Khober K.S.A
Location: Saudi Aramco Gas Plan- Abbekake
Designation: Electrical Site Engineer
Responsibilities:
Monitoring all site activities as per Bar Chart, Plan & Budget on real time basis to
ensure completion of project within time and cost parameters for effective resource
deployment to maximize the output.
Overall coordination, Liaising with Clients, Consultant, Contractors & Vendors
with regarding the execution of job and planning /scheduling of site activities,
Technical specifications, approvals & obtaining statutory clearances.
Ensuring the timely availability of manpower equipment / materials for completion
of the project
Carry out the Inspections & Testing of materials in accordance to quality plan & to
the satisfaction of Consultant.
Preparation of work schedules, work progress reports, certification & invoicing of
the job & submittals to management.
Regular keeping record of changing activities of the civil contractor and other Sub-
contractor, MEP contractor
Weekly / monthly progress report to the management
Regular surveillance / inspection of construction activities as per project inspection
and test plan Involved.
Work orders follow ups in SAP. Such as planning & Scheduling Weekly plans
Installation, Commissioning of 400 KV switchyard, GE C ALSTHOM, ABB & GE
Multiline.
Responsible for all aspects of underground work including cable pulling, installing
instruments & threaded rod; install CMS, trucking, tray, ladder rack, confine
space entry, small power and lighting, terminating and gladding SWA
Direct manufacturing, installing, and testing of electrical equipment to ensure that
products meet specifications and codes
Installation, testing, Pre-Commissioning / commissioning plans for electrical works. of
transformer 11KV/3.3KV, 3.3KV/440, 33/11KV EHV-SF6, (VCB, ACB, SF6)
circuit breakers and isolators with earth switch, Erection of Gas Isolation Bus Bar
and main breaker (Simelectro) between Erection of lighting, fire fighting, paging
and phone system, Gas station,
Installation of Lightening Arrester.
FAT , SAT, Installation , Commissioning of HV/LV switch boards, Switchgear &
instrumentation (S&I),GEC and SIEMENS, )
Installation & Testing of AC / DC UPS with battery rack.
Installation of MOVs (BEFFI, ROTORK)
Installation of plant earthing and testing by using earth megger and also
conductivity test.
Cable lying, cable fault finding using cable fault locator,
3. Installation, testing, pre-Commissioning, for HV/LV motors, (Desalted Feed Pump,
Crude oil Export Booster Pump,) and LT (HP/LLP/Air blower Motors) and
Preparation of motor Solo Run test.
Installation, testing, pre-Commissioning of Power system turbo gas power
generation HV, GIS Insulated Switchgears and cable termination of , MV, LV
panels
Installation of MV&LV Bus Bar Torque Test, MV&LV Bus bar- HI pot &
Insulation Resistance Testing & CT Insulation Test. Follow up of erection and
commissioning on low voltage switchboard
Installation, testing, pre-commissioning of DLS (Digital Logic Systems.)
The supervision of the project Manager and control works of Under the Electrical
to the ensure that the project will be done in accordance with all the approved
construction. Drawings, contract documents specifications and applicable
standards. And monitors the actual execution of all electrical works and any
ancillary civil/mechanical.
Responsible for implementation and monitoring of all site related work
Estimate ,Prepare and assign the resources such as manpower ,materials,
consumables, equipment ,tools, etc required for all electrical works prior to
execution.
Plan and analyze all possible construction methodologies and recommend
The best options to the operations Manager for approval prior to execution at site.
Interpret construction drawings and study the contract documents and applicable
standards or specification prior to execution of any jobs.
Assign targets for accomplishments and ensure targets are met on daily basis.
Liaise with client representative and satisfy technical queried.
General EHS System Responsibilities
Follow strictly Health and Safety procedures.
Report all process or other incidents that may cause environmental harm to the
relevant personnel, regardless of severity.
Actively participate in the implementation and maintenance of the Total
Environmental Management System.
Identifying and evaluating potential / existing safety problems, suggesting solutions
and recommending suitable corrective measures.
Assist with identification of hazards arising from activities in work area, ensuring
that all are communicated to relevant personnel in order to maintain a hazard free
work area.
APR (Authorized permit Receiver) Training.
JHA ( Job Hazard Analysis)
Permit To Work ( One of the best system)
Accident Investigation and Reporting System.
Give tool box talk to all maintenance crew.
Collect work permit before execution of any job from authority and act
accordingly.
Observe safety hazard and proper control manage method in the working place.
4. Safety Induction – Industry Overview; OIL&GAS Plant Hazards; Environment.
TECHNICAL QUALIFICATIONS
B.Tech Electrical Engineering
P. Technical University.
Diploma in Electrical Engineering
AMU Aligarh, India in the Year 1995 to 1998
ACADEMIC QUALIFICATIONS
12th With First Division in 1994
COMPUTER SKILLS: AUTO-CAD & M S OFFICE
PASSPORT DETAILS:
Passport No: N -4948780
Place of Issue: PATNA
Date of Issue: 13/11/2015
Date 0f Expiry: 12/11/2025
PERSONAL DETAILS:
Father’s Name: Mr. Jamadar Mian
Mother’s Name: Mrs. Sabra Khatoon
Date of Birth: 01.01.1976
Nationality: Indian
Sex: Male
Marital Status: Married
Languages: English, Hindi, Urdu,
Religion: Muslim