Introduction to
Technical resume
&
Interview PreparationInterview Preparation
For Engineers
December 2014
Mohammadreza Jarollahi, P. Eng., M.Sc.
Civil Engineer
Technical resume & Interview preparationTechnical resume & Interview preparation
This presentation is a brief introduction to
preparation of an engineering interview and based on:
Personal understanding of the APEGBC GuidelinePersonal understanding of the APEGBC Guideline
for registration and
Personal experience as one of the APEGBC
interviewers
Technical resume & Interview preparationTechnical resume & Interview preparation
To become a P.Eng. the Applicant
must have:
A minimum 1 year of application of
theory (design) experience and
a minimum of 3 years of onsite
experience prior to project management
Technical resume & Interview preparationTechnical resume & Interview preparation
ProvideYourTechnical Work Experience
Provide A List Of ProjectsYouWere
Involved
For each project:
Discuss your responsibilities and the
engineering (technical) aspects of your work
Technical resume & Interview preparationTechnical resume & Interview preparation
Provide General Information Of Each Project
The name of project and the location
Name of the client
Name of the consultant or designers
Name of the contractorName of the contractor
Started and Completed Dates of the Project
Amount of the allocated budget for the project in
Canadian Dollars
Categorized the groups and give the number of the
people involved in the project with their positions
and qualifications
Explain in which group you were active
Technical resume & Interview preparationTechnical resume & Interview preparation
For Each Project:
ExplainYour Responsibilities and IntroduceYour Direct Supervisor(s)
Provide the date you were working on the project
ProvideYour Supervisor’s Name,Title and Position
Provide your JobTitle and Position
ExplainYour Responsibilities and what YOU have done
Only talk about what ever you personally performed. If you wereOnly talk about what ever you personally performed. If you were
working in a group, explain what you have done in that group
Itemize and refer to all of your personal activities you performed
Be prepared to explain in detail about all the subjects you might
be questioned
Provide evidences for what you are explaining, just in case the
interviewers asked for them
Provide Design Sheets of the project if You were Designer or
the part which you designed
Provide some drawings as evidences
Provide some pictures of the project if implemented
Technical resume & Interview preparationTechnical resume & Interview preparation
If Applicable,TheTechnicalWork
Experience ShouldTargetTheExperience ShouldTargetThe
Following Items *
Technical resume & Interview preparationTechnical resume & Interview preparation
Quality Control and Assurance
Carry out design and shop drawing reviews
Produce quality control and quality inspection reports
Produce non-conformance and corrective action
reports
Initiate quality control program to ensure outcomesInitiate quality control program to ensure outcomes
are achieved to the required or specified standard
Arrange for and obtain performance tests, witnessing
of said tests and other reviews as necessary to ensure
that material and equipment meet quality and
performance requirements
Ensure commissioning is done properly, approved and
signed-off
Technical resume & Interview preparationTechnical resume & Interview preparation
Ensure Safety
Conduct Job Hazard Analysis (JHA) for all
scheduled activities
Produce safe job practices for JHA activities
and manage prevention of accidentsand manage prevention of accidents
Verify safety and environmental certifications
Demonstrate knowledge of safety and work-
safe regulations
Conduct safety meetings regularly
Manage remedial action and reporting when
accidents occur
Technical resume & Interview preparationTechnical resume & Interview preparation
Budget and Cost Management
Have a thorough understanding and preparation of estimates and
budget costs
Demonstrate understanding of the use of work breakdown
structure to define the scope, estimate costs and organize
schedules
Know the cost of labour, equipment, subsistence and
construction or project set-up
Produce budget, cost coding and all adjustments and reviewsProduce budget, cost coding and all adjustments and reviews
Review time sheets daily re: labour and equipment
Identify and track:
Production (daily);
Costs (daily);
All extra work performed (weekly); and/or
Equipment (owned and rented)
Monitor production of deliverables to ensure that cost trend
deviations from budget are quickly identified and remedied
Technical resume & Interview preparationTechnical resume & Interview preparation
Risk Assessment and Management
Identify risks and their potential impacts
Produce a risk minimization plan
Implement that risk minimization planImplement that risk minimization plan
Technical resume & Interview preparationTechnical resume & Interview preparation
Project Scope and Deliverables
Collaborate with clients/project owners to define
project scope and deliverables
Develop a project plan
Produce overall schedules prior to start of project
Have a thorough understanding of scope of work,Have a thorough understanding of scope of work,
specifications and drawings
Have a thorough understanding of sub-contractor’s
work
Identify measurable outcomes to evaluate the project
on completion
Review requested variations against contract terms
and conditions, agree on project outcomes and
variations in project requirements or conditions
Technical resume & Interview preparationTechnical resume & Interview preparation
Scheduling and Project Implementation
Determine and implement a project program (timeline)
Draft, develop and implement an Inspection and Testing Plan
Produce or review custom design and specifications
Produce detailed designs and drawings when required
Installation Supervision
Commissioning of mechanical, electrical, water and/or sewage where
appropriate
Commissioning of service equipment and special installations of
functional, operational or architectural components wherefunctional, operational or architectural components where
appropriate
Produce submittal logs
Monitor project progress
• Compare progress to program/timeline and initiate remedial
action where necessary
• Produce next day planner – daily
• Tracking of Project schedules – weekly
• Produce two week schedules – bi-weekly
• Update project schedules – monthly
• Schedule sub-contractors’ activities
Plan and manage the integration of the transition of each stage of
the project cycle
Technical resume & Interview preparationTechnical resume & Interview preparation
Site Inspections
Arrange for and/or carry out inspections at the
vendors’ place of manufacture, in the contractors’
shops and on the site.
Review vendors’ and contractors’ drawings to ensure
compatibility with other equipment and compliancecompatibility with other equipment and compliance
with the contract documents (designs, drawings,
specifications).
Ensure compliance with safety requirements including
documented onsite safety inspections
Ensure compliance with quality control requirements
Ensure compliance by sub-contractors
Technical resume & Interview preparationTechnical resume & Interview preparation
Procurement and Resources Management
Determine procurement requirements for the project in
accordance with project budget
Produce materials logs
Procurement and expediting
Materials receiving
Inventory control for materials and toolsInventory control for materials and tools
Purchase order administration and packing slips control
Order material deliveries
Develop resource, material conservation, recovery and
waste management plans
Develop strategies to maintain the effective performance
of the resources
Diagnose problems and identify requirements for
appropriate testing
Technical resume & Interview preparationTechnical resume & Interview preparation
Manage People
Implement a people management plan
Monitor team and individual performance targets
Ensure the team has adequate skills and resources to
achieve the project outcomes
Participate in selection of staff
Discuss project scope and objectives with those involvedDiscuss project scope and objectives with those involved
in the project
Delegate achievement of outcomes to ensure cost, time
and material resources are appropriately allocated and
applied
Ensure compliance with safety, risk, cost and
environmental requirements
Provide performance feedback
Inform managers of relationship of project to other
program outcomes
Technical resume & Interview preparationTechnical resume & Interview preparation
Information and Communication
Management
Manage communication across the project
with all stakeholders
Design or agree upon documentation system
across the project
Communicate with the project team, clients,
stakeholders and regulators on project
progress where appropriate
Technical resume & Interview preparationTechnical resume & Interview preparation
Contract andTender Services
Prepare and produce contract or tender
documentation where appropriate
Respond to tender inquiries where
appropriate
Perform contract or tender evaluation and
analysis where appropriate
Prepare addenda
Technical resume & Interview preparationTechnical resume & Interview preparation
Finalize the Project
Review and document the project outcomes
against the project requirements
Establish the acceptance criteria for the
project in consultation with the client
Plan the hand over of the project
Technical resume & Interview preparationTechnical resume & Interview preparation
Environmental and Sustainability and
Regulatory Considerations
Have regard to, develop and implement
environmental and sustainability considerations from
project inception and development stages through to
project finalization
Identify and account for environmental and
sustainability concerns and requirements within thesustainability concerns and requirements within the
project deliverables
Establish environmental and sustainability criteria for
procurement of materials, equipment and services.
Understand, plan for and comply with legal and
regulatory requirements of the project, including
contracts, codes, labour law and other legislation
Understand, plan for, and comply with legal and
regulatory requirements of the project, including
contracts, codes, local and provincial legislation
Technical resume & Interview preparationTechnical resume & Interview preparation
Explain any challenges you were involved and
how you solved the problems
List of obstacles you observed in any stages;
negotiation, design, contractor / subcontractor
evaluation and selection, during implementation ofevaluation and selection, during implementation of
the project, risks, environment, budget, etc.
Explain what you have done to remove the issues
Technical resume & Interview preparationTechnical resume & Interview preparation
Explain Lesson Learned from each project
Explain the Root Cause of the problemsExplain the Root Cause of the problems
Explain the Corrective and Preventive
Actions you have applied
Technical resume & Interview preparationTechnical resume & Interview preparation
IntroduceYour Referrals:
Provide a list of your supervisors with their:
Names
Positions
Contact Information
Phones
Mail address
Email address
Technical resume & Interview preparationTechnical resume & Interview preparation
References:
APEGBC, Registration GuidelineAPEGBC, Registration Guideline
APEGBC Website: https://www.apeg.bc.ca
Thank YouThank You

Contenu connexe

Tendances

Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3Sunil Mall
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measuresPavan Kumar
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJTapesh Ajmera
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costsharwoodr
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012satish526
 
curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pietersPieters (Paul)
 

Tendances (20)

Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measures
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
Leon Tisdale Show
Leon Tisdale ShowLeon Tisdale Show
Leon Tisdale Show
 
Henry CV
Henry CVHenry CV
Henry CV
 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
 
3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs
 
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
 
curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieters
 
PRANAB _Resume
PRANAB _ResumePRANAB _Resume
PRANAB _Resume
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 

En vedette

6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509scottri
 
Resume preparation pictoria slideshow
Resume preparation pictoria slideshowResume preparation pictoria slideshow
Resume preparation pictoria slideshowShubha Indurkhya
 
Resume Preparation Tips
 Resume Preparation Tips Resume Preparation Tips
Resume Preparation TipsKatherineMary1
 
Interview presentation
Interview presentationInterview presentation
Interview presentationJavier Sanz
 
Presentation on interview
Presentation on interviewPresentation on interview
Presentation on interviewAnushka Singh
 
Copysniper How to Create/edit Sales Page
Copysniper How to Create/edit Sales Page Copysniper How to Create/edit Sales Page
Copysniper How to Create/edit Sales Page Anthony Gardiner
 
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...Jason Blair
 
Red++ final preso
Red++ final presoRed++ final preso
Red++ final presohildeedee
 
Chu de02 tunghiencuu_nhom07
Chu de02 tunghiencuu_nhom07Chu de02 tunghiencuu_nhom07
Chu de02 tunghiencuu_nhom07Nguyen Linh Tam
 
Step by step process for issuance of student pilot certificates using updated...
Step by step process for issuance of student pilot certificates using updated...Step by step process for issuance of student pilot certificates using updated...
Step by step process for issuance of student pilot certificates using updated...Jason Blair
 
キラキラ会議
キラキラ会議キラキラ会議
キラキラ会議実 武地
 
Chude01 tu nghiencuu_nhom07
Chude01 tu nghiencuu_nhom07Chude01 tu nghiencuu_nhom07
Chude01 tu nghiencuu_nhom07Nguyen Linh Tam
 
Chu de03 tunghiencuu_nhom07
Chu de03 tunghiencuu_nhom07Chu de03 tunghiencuu_nhom07
Chu de03 tunghiencuu_nhom07Nguyen Linh Tam
 

En vedette (20)

Dissertation Defence
Dissertation DefenceDissertation Defence
Dissertation Defence
 
University Of Brighton Ho P David Davies 270410 V2
University Of Brighton   Ho P   David Davies 270410 V2University Of Brighton   Ho P   David Davies 270410 V2
University Of Brighton Ho P David Davies 270410 V2
 
6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509
 
Resume preparation pictoria slideshow
Resume preparation pictoria slideshowResume preparation pictoria slideshow
Resume preparation pictoria slideshow
 
Resume Preparation Tips
 Resume Preparation Tips Resume Preparation Tips
Resume Preparation Tips
 
Resume preparation
Resume preparationResume preparation
Resume preparation
 
Interview presentation
Interview presentationInterview presentation
Interview presentation
 
Presentation on interview
Presentation on interviewPresentation on interview
Presentation on interview
 
Copysniper How to Create/edit Sales Page
Copysniper How to Create/edit Sales Page Copysniper How to Create/edit Sales Page
Copysniper How to Create/edit Sales Page
 
Ann Perty
Ann PertyAnn Perty
Ann Perty
 
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
 
LORENA CULLQUIPUMA
LORENA CULLQUIPUMALORENA CULLQUIPUMA
LORENA CULLQUIPUMA
 
Red++ final preso
Red++ final presoRed++ final preso
Red++ final preso
 
Chu de02 tunghiencuu_nhom07
Chu de02 tunghiencuu_nhom07Chu de02 tunghiencuu_nhom07
Chu de02 tunghiencuu_nhom07
 
Step by step process for issuance of student pilot certificates using updated...
Step by step process for issuance of student pilot certificates using updated...Step by step process for issuance of student pilot certificates using updated...
Step by step process for issuance of student pilot certificates using updated...
 
Andro preso
Andro presoAndro preso
Andro preso
 
キラキラ会議
キラキラ会議キラキラ会議
キラキラ会議
 
Chude01 tu nghiencuu_nhom07
Chude01 tu nghiencuu_nhom07Chude01 tu nghiencuu_nhom07
Chude01 tu nghiencuu_nhom07
 
Chu de03 tunghiencuu_nhom07
Chu de03 tunghiencuu_nhom07Chu de03 tunghiencuu_nhom07
Chu de03 tunghiencuu_nhom07
 
Social media of Yesterday, Today and Tomorrow
Social media of Yesterday, Today and Tomorrow Social media of Yesterday, Today and Tomorrow
Social media of Yesterday, Today and Tomorrow
 

Similaire à R2 technical resume & interview preparation

Similaire à R2 technical resume & interview preparation (20)

Daniel Lee
Daniel LeeDaniel Lee
Daniel Lee
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
CV - Kelum Hemka Siriwardhena
CV - Kelum Hemka SiriwardhenaCV - Kelum Hemka Siriwardhena
CV - Kelum Hemka Siriwardhena
 
2015 - CV of Michael Julius Orjaleza
2015 - CV  of Michael Julius Orjaleza 2015 - CV  of Michael Julius Orjaleza
2015 - CV of Michael Julius Orjaleza
 
Resume_Supply chain Specialist
Resume_Supply chain SpecialistResume_Supply chain Specialist
Resume_Supply chain Specialist
 
136 work planning and programming
136 work planning and programming136 work planning and programming
136 work planning and programming
 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CV
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 

Dernier

Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 

Dernier (20)

Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 

R2 technical resume & interview preparation

  • 1. Introduction to Technical resume & Interview PreparationInterview Preparation For Engineers December 2014 Mohammadreza Jarollahi, P. Eng., M.Sc. Civil Engineer
  • 2. Technical resume & Interview preparationTechnical resume & Interview preparation This presentation is a brief introduction to preparation of an engineering interview and based on: Personal understanding of the APEGBC GuidelinePersonal understanding of the APEGBC Guideline for registration and Personal experience as one of the APEGBC interviewers
  • 3. Technical resume & Interview preparationTechnical resume & Interview preparation To become a P.Eng. the Applicant must have: A minimum 1 year of application of theory (design) experience and a minimum of 3 years of onsite experience prior to project management
  • 4. Technical resume & Interview preparationTechnical resume & Interview preparation ProvideYourTechnical Work Experience Provide A List Of ProjectsYouWere Involved For each project: Discuss your responsibilities and the engineering (technical) aspects of your work
  • 5. Technical resume & Interview preparationTechnical resume & Interview preparation Provide General Information Of Each Project The name of project and the location Name of the client Name of the consultant or designers Name of the contractorName of the contractor Started and Completed Dates of the Project Amount of the allocated budget for the project in Canadian Dollars Categorized the groups and give the number of the people involved in the project with their positions and qualifications Explain in which group you were active
  • 6. Technical resume & Interview preparationTechnical resume & Interview preparation For Each Project: ExplainYour Responsibilities and IntroduceYour Direct Supervisor(s) Provide the date you were working on the project ProvideYour Supervisor’s Name,Title and Position Provide your JobTitle and Position ExplainYour Responsibilities and what YOU have done Only talk about what ever you personally performed. If you wereOnly talk about what ever you personally performed. If you were working in a group, explain what you have done in that group Itemize and refer to all of your personal activities you performed Be prepared to explain in detail about all the subjects you might be questioned Provide evidences for what you are explaining, just in case the interviewers asked for them Provide Design Sheets of the project if You were Designer or the part which you designed Provide some drawings as evidences Provide some pictures of the project if implemented
  • 7. Technical resume & Interview preparationTechnical resume & Interview preparation If Applicable,TheTechnicalWork Experience ShouldTargetTheExperience ShouldTargetThe Following Items *
  • 8. Technical resume & Interview preparationTechnical resume & Interview preparation Quality Control and Assurance Carry out design and shop drawing reviews Produce quality control and quality inspection reports Produce non-conformance and corrective action reports Initiate quality control program to ensure outcomesInitiate quality control program to ensure outcomes are achieved to the required or specified standard Arrange for and obtain performance tests, witnessing of said tests and other reviews as necessary to ensure that material and equipment meet quality and performance requirements Ensure commissioning is done properly, approved and signed-off
  • 9. Technical resume & Interview preparationTechnical resume & Interview preparation Ensure Safety Conduct Job Hazard Analysis (JHA) for all scheduled activities Produce safe job practices for JHA activities and manage prevention of accidentsand manage prevention of accidents Verify safety and environmental certifications Demonstrate knowledge of safety and work- safe regulations Conduct safety meetings regularly Manage remedial action and reporting when accidents occur
  • 10. Technical resume & Interview preparationTechnical resume & Interview preparation Budget and Cost Management Have a thorough understanding and preparation of estimates and budget costs Demonstrate understanding of the use of work breakdown structure to define the scope, estimate costs and organize schedules Know the cost of labour, equipment, subsistence and construction or project set-up Produce budget, cost coding and all adjustments and reviewsProduce budget, cost coding and all adjustments and reviews Review time sheets daily re: labour and equipment Identify and track: Production (daily); Costs (daily); All extra work performed (weekly); and/or Equipment (owned and rented) Monitor production of deliverables to ensure that cost trend deviations from budget are quickly identified and remedied
  • 11. Technical resume & Interview preparationTechnical resume & Interview preparation Risk Assessment and Management Identify risks and their potential impacts Produce a risk minimization plan Implement that risk minimization planImplement that risk minimization plan
  • 12. Technical resume & Interview preparationTechnical resume & Interview preparation Project Scope and Deliverables Collaborate with clients/project owners to define project scope and deliverables Develop a project plan Produce overall schedules prior to start of project Have a thorough understanding of scope of work,Have a thorough understanding of scope of work, specifications and drawings Have a thorough understanding of sub-contractor’s work Identify measurable outcomes to evaluate the project on completion Review requested variations against contract terms and conditions, agree on project outcomes and variations in project requirements or conditions
  • 13. Technical resume & Interview preparationTechnical resume & Interview preparation Scheduling and Project Implementation Determine and implement a project program (timeline) Draft, develop and implement an Inspection and Testing Plan Produce or review custom design and specifications Produce detailed designs and drawings when required Installation Supervision Commissioning of mechanical, electrical, water and/or sewage where appropriate Commissioning of service equipment and special installations of functional, operational or architectural components wherefunctional, operational or architectural components where appropriate Produce submittal logs Monitor project progress • Compare progress to program/timeline and initiate remedial action where necessary • Produce next day planner – daily • Tracking of Project schedules – weekly • Produce two week schedules – bi-weekly • Update project schedules – monthly • Schedule sub-contractors’ activities Plan and manage the integration of the transition of each stage of the project cycle
  • 14. Technical resume & Interview preparationTechnical resume & Interview preparation Site Inspections Arrange for and/or carry out inspections at the vendors’ place of manufacture, in the contractors’ shops and on the site. Review vendors’ and contractors’ drawings to ensure compatibility with other equipment and compliancecompatibility with other equipment and compliance with the contract documents (designs, drawings, specifications). Ensure compliance with safety requirements including documented onsite safety inspections Ensure compliance with quality control requirements Ensure compliance by sub-contractors
  • 15. Technical resume & Interview preparationTechnical resume & Interview preparation Procurement and Resources Management Determine procurement requirements for the project in accordance with project budget Produce materials logs Procurement and expediting Materials receiving Inventory control for materials and toolsInventory control for materials and tools Purchase order administration and packing slips control Order material deliveries Develop resource, material conservation, recovery and waste management plans Develop strategies to maintain the effective performance of the resources Diagnose problems and identify requirements for appropriate testing
  • 16. Technical resume & Interview preparationTechnical resume & Interview preparation Manage People Implement a people management plan Monitor team and individual performance targets Ensure the team has adequate skills and resources to achieve the project outcomes Participate in selection of staff Discuss project scope and objectives with those involvedDiscuss project scope and objectives with those involved in the project Delegate achievement of outcomes to ensure cost, time and material resources are appropriately allocated and applied Ensure compliance with safety, risk, cost and environmental requirements Provide performance feedback Inform managers of relationship of project to other program outcomes
  • 17. Technical resume & Interview preparationTechnical resume & Interview preparation Information and Communication Management Manage communication across the project with all stakeholders Design or agree upon documentation system across the project Communicate with the project team, clients, stakeholders and regulators on project progress where appropriate
  • 18. Technical resume & Interview preparationTechnical resume & Interview preparation Contract andTender Services Prepare and produce contract or tender documentation where appropriate Respond to tender inquiries where appropriate Perform contract or tender evaluation and analysis where appropriate Prepare addenda
  • 19. Technical resume & Interview preparationTechnical resume & Interview preparation Finalize the Project Review and document the project outcomes against the project requirements Establish the acceptance criteria for the project in consultation with the client Plan the hand over of the project
  • 20. Technical resume & Interview preparationTechnical resume & Interview preparation Environmental and Sustainability and Regulatory Considerations Have regard to, develop and implement environmental and sustainability considerations from project inception and development stages through to project finalization Identify and account for environmental and sustainability concerns and requirements within thesustainability concerns and requirements within the project deliverables Establish environmental and sustainability criteria for procurement of materials, equipment and services. Understand, plan for and comply with legal and regulatory requirements of the project, including contracts, codes, labour law and other legislation Understand, plan for, and comply with legal and regulatory requirements of the project, including contracts, codes, local and provincial legislation
  • 21. Technical resume & Interview preparationTechnical resume & Interview preparation Explain any challenges you were involved and how you solved the problems List of obstacles you observed in any stages; negotiation, design, contractor / subcontractor evaluation and selection, during implementation ofevaluation and selection, during implementation of the project, risks, environment, budget, etc. Explain what you have done to remove the issues
  • 22. Technical resume & Interview preparationTechnical resume & Interview preparation Explain Lesson Learned from each project Explain the Root Cause of the problemsExplain the Root Cause of the problems Explain the Corrective and Preventive Actions you have applied
  • 23. Technical resume & Interview preparationTechnical resume & Interview preparation IntroduceYour Referrals: Provide a list of your supervisors with their: Names Positions Contact Information Phones Mail address Email address
  • 24. Technical resume & Interview preparationTechnical resume & Interview preparation References: APEGBC, Registration GuidelineAPEGBC, Registration Guideline APEGBC Website: https://www.apeg.bc.ca