BASIC MECHENICAL
ENGINEERING
BME2003
Dr. D.K. Mudaiya
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
“BOILERS”
 A steam boiler or steam generator is a closed vessel in
which water is heated, vaporized and converted into
steam at a pressure higher than the atmospheric
pressure.
The heat energy required for steam generation
is produced by burning of the fuel in the furnace.
These fuels may be
 Solid fuels – Coal etc.
 Liquid fuels – Diesel, furnace oil etc.
 Gaseous fuels- Natural gas, LPG etc.
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
 The steam produced in the boiler may be supplied
 (a) To external combustion engine i.e. Steam engines,
Steam turbines etc.
 (b) At Low pressure for industrial process work in
cotton mills, Sugar industries, Breweries etc.
 (c) For producing Hot water, which can be used for
heating installations at much lower pressure.
COCHRAN
BOILER
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
Boiler Principle Parts & their Functions
Drum:- The boiler drum consists of shell and end
heads. The shell of the boiler consists of one or more
steel plates bent into cylindrical form and riveted.
 The ends of the shell are closed by means of the flat or
curved plates called Boiler heads.
 Grate:- it is the space located below the furnace and
consists of cast iron bars upon which the fuel is burnt.
 The air can pass through the space between the bars
and can support the combustion process.
 The ashes can fall down through these spaces.
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
 Furnace:- it is the space above the grate and below
the boiler shell.
 It is the space where volatile matter and combustible
gases are burnt and flue gases are generated.
 Flue Gases:- It is the hot mixture of products of
combustion, generated in the furnace.
 Heating Surface:- It is the surface of the boiler
which is exposed to hot flue gases on one side and
water on the other side.
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
 Water Space:- The space of the boiler occupied by
water is called water space.
 Steam Space:- The entire space of boiler shell which is
not occupied by water is called steam space.
 Feed Water :- The water supplied to the boiler is
called feed water.
 Working Pressure:- It is the pressure of steam
generated in the boiler and super
heater.
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
 Air Preheater:- The fresh air going to furnace is
preheated to improve the combustion process. The
device of air heating system is known as Air preheater.
 Economizer:- The feed water supplied to boiler is
preheated by the waste hot gases before they escape to
the chimney.
Therefore some of the waste heat is
recovered by feed water and plant efficiency improves.
SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY
 Super Heater:- It is a device which heat the
saturated steam generated in the boiler..
 The super heaters are located above the furnace .
 They increase heat content of steam without
increasing the pressure.
 Super heaters are always placed at first bend of the
flue gases.

Contenu connexe

Similaire à BOILERS L3.pptx

Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safetyRakeshBhowmick1
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
Details on superheated steam boilers
Details on  superheated steam boilersDetails on  superheated steam boilers
Details on superheated steam boilerszgboilers
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02arvind singh rathore
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUManohar Nagar
 
Study of Boilers for Mechanical Engineering
Study of Boilers for Mechanical EngineeringStudy of Boilers for Mechanical Engineering
Study of Boilers for Mechanical EngineeringAbdullahKafi18
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Preeti Pradhan
 
Ipe301 e internal combustion engines
Ipe301 e internal combustion enginesIpe301 e internal combustion engines
Ipe301 e internal combustion enginesK. M.
 
STEAM Boiler for Thermal Engineering Mech
STEAM Boiler for Thermal Engineering MechSTEAM Boiler for Thermal Engineering Mech
STEAM Boiler for Thermal Engineering MechBalaji Ganesh
 
Steam boilers
Steam boilersSteam boilers
Steam boilerssing367
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyShobhan Biswas
 

Similaire à BOILERS L3.pptx (20)

Utility_01.pptx
Utility_01.pptxUtility_01.pptx
Utility_01.pptx
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safety
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Details on superheated steam boilers
Details on  superheated steam boilersDetails on  superheated steam boilers
Details on superheated steam boilers
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 
Powerengineering
PowerengineeringPowerengineering
Powerengineering
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
Thermax report (1)
Thermax report (1)Thermax report (1)
Thermax report (1)
 
Study of Boilers for Mechanical Engineering
Study of Boilers for Mechanical EngineeringStudy of Boilers for Mechanical Engineering
Study of Boilers for Mechanical Engineering
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
SIP_Final_1
SIP_Final_1SIP_Final_1
SIP_Final_1
 
Boiler turbe failores
Boiler turbe failoresBoiler turbe failores
Boiler turbe failores
 
Ipe301 e internal combustion engines
Ipe301 e internal combustion enginesIpe301 e internal combustion engines
Ipe301 e internal combustion engines
 
STEAM Boiler for Thermal Engineering Mech
STEAM Boiler for Thermal Engineering MechSTEAM Boiler for Thermal Engineering Mech
STEAM Boiler for Thermal Engineering Mech
 
Bandel training
Bandel trainingBandel training
Bandel training
 
Boiler
BoilerBoiler
Boiler
 
Steam boilers
Steam boilersSteam boilers
Steam boilers
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical only
 

Dernier

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 

Dernier (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 

BOILERS L3.pptx

  • 2. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY “BOILERS”  A steam boiler or steam generator is a closed vessel in which water is heated, vaporized and converted into steam at a pressure higher than the atmospheric pressure. The heat energy required for steam generation is produced by burning of the fuel in the furnace. These fuels may be  Solid fuels – Coal etc.  Liquid fuels – Diesel, furnace oil etc.  Gaseous fuels- Natural gas, LPG etc.
  • 3. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY  The steam produced in the boiler may be supplied  (a) To external combustion engine i.e. Steam engines, Steam turbines etc.  (b) At Low pressure for industrial process work in cotton mills, Sugar industries, Breweries etc.  (c) For producing Hot water, which can be used for heating installations at much lower pressure.
  • 5. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY Boiler Principle Parts & their Functions Drum:- The boiler drum consists of shell and end heads. The shell of the boiler consists of one or more steel plates bent into cylindrical form and riveted.  The ends of the shell are closed by means of the flat or curved plates called Boiler heads.  Grate:- it is the space located below the furnace and consists of cast iron bars upon which the fuel is burnt.  The air can pass through the space between the bars and can support the combustion process.  The ashes can fall down through these spaces.
  • 6. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY  Furnace:- it is the space above the grate and below the boiler shell.  It is the space where volatile matter and combustible gases are burnt and flue gases are generated.  Flue Gases:- It is the hot mixture of products of combustion, generated in the furnace.  Heating Surface:- It is the surface of the boiler which is exposed to hot flue gases on one side and water on the other side.
  • 7. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY  Water Space:- The space of the boiler occupied by water is called water space.  Steam Space:- The entire space of boiler shell which is not occupied by water is called steam space.  Feed Water :- The water supplied to the boiler is called feed water.  Working Pressure:- It is the pressure of steam generated in the boiler and super heater.
  • 8. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY  Air Preheater:- The fresh air going to furnace is preheated to improve the combustion process. The device of air heating system is known as Air preheater.  Economizer:- The feed water supplied to boiler is preheated by the waste hot gases before they escape to the chimney. Therefore some of the waste heat is recovered by feed water and plant efficiency improves.
  • 9. SAGAR INSTITUTE OF RESEARCH AND TECHNOLOGY  Super Heater:- It is a device which heat the saturated steam generated in the boiler..  The super heaters are located above the furnace .  They increase heat content of steam without increasing the pressure.  Super heaters are always placed at first bend of the flue gases.