¶ Formwork is the temporary structure used as a mould to caste structural
members at site.
¶ These are also knownas farmas or false work or shuttering.
¶ It is erectedat its correct positionbefore concrete is poured in it.
¶ This poured concrete is then consolidated and allowed to harden to give desired
strength.
¶ It is allowed to remain in position till the poured concrete gains sufficient strength
to withstandthe stresses coming on it in absence of formwork.
¶ After this the formwork is removedand this process is knownas stripping.
 Costly item and its proper design and maintenance can affect
economic considerations considerably.
 It costs almost as much as 20-25% of the total construction cost
of the structural members in building works and even more in
the case of bridges.
 For construction of lot of similar elements, formwork is designed in
such a way that stripping and erection involves least possibilities of
damages and least labor, and also this is made out of separate panels
with provisions of adjustments.
 For this type of formwork, during erection or stripping, only bolts or
pins are to be inserted or removed.
 Such type of formwork should preferably be of structural steel but
timber formwork may also work with being economical, considering
disadvantages of warping, swellingand shrinkage effects.
¥ Requirements of timber formwork:
i. Be well seasoned.
ii. Be light in weight.
iii. Be easily workable with nails without splitting.
iv. Be free from knots.
¥ Standard formworks can be adopted for different components of formwork
for shuttering of different sections of 4.5m span and 3.5m height.
¥ For structures not meeting the above demands, special design of formwork
should be done based on the dead loads and live loads acting on the structure
and also some relevant factors.
¥ For normal constructional work with same dimensions of formwork,
shuttering can be also formed in such a way that it can be moved to the other
location without dismantling and fixed there in the new position.
¥ Each set of formwork can be used 10-12 times for normal constructional
works.
¥ For shuttering of concrete surfaces to be
exposed, smooth and even surfaced
formwork should be used to obtain directly
smooth exposed surface of concrete and
thus eliminating the need of finishing to the
concrete members.
¥ For surfaces that are not exposed directly,
uneven or undressed timber planks can be
used.
¥ The formwork should be jointed using the
grooved and tongued joints.
╬ Consists of panels fabricated of thin steel plates stiffened
along the edge by small steel angles, which can be held
together by clamps and bolts along each edge, and kept in
alignment using vertical or horizontal timber or steel
centring.
╬ Usual size of wall or slab panels vary from 60cm * 60cm to
60cm * 120cm (2’ *2’ to 2’ * 4’).
╬ These type of formwork is mostly used in large
constructional projects and where repeated use is possible.
╬ These are extensively used for pre-cast concrete members
and also the most suitable for shuttering of circular or
curved sections such as tanks, columns, chimneys etc. and
for large structures like large sewer, tunnels, retaining
walls etc.
Use of plywood is getting more popular these days,
and these are attached to the timber frames to
make up panels of desired shapes and sizes.
These types of shuttering can be easily assembled
with the use of bolting, riveting etc.
These types of shuttering is highly suggestive in
the large constructional projects where exposed
concrete surface is large in area such as faces of
retaining walls, concrete dams, floor slabs etc.
 These type of formwork can be used
economically in following considerations:
i. Perfectly smooth and finished external
surface can be obtained and thus expense of
external finishing (plastering) can be saved.
ii. Large sized panels can be formed thus saving
the labour charges for assembling and
dismantling.
iii. Number of re-uses can be increased to 20-25
times.
Easy in erection and stripping.
Can be used repeatedly for many times.
Comparatively stronger.
No possibilities of shrinkage, warping or
swelling.
Easy in erection.
Economical
Can be erected in any shape and size as per
requirement.
Formwork material must be cheap and easily available in local market.
It must be sufficiently rigid to avoid excessive deflections while
concreting.
Must be strongenough to effectively resist all loads comingon it.
Easy to erect and strip.
Must rest on strong and un-yielding supports.
Joints should be stiff and strong and water-tight.
Surface in direct contact (internal surface) must be enough smooth to
give finishedsurface.
It must be water tight and non absorbing to maintain w/c ratio avoiding
leakage/absorbingof water fromthe concrete.
Dead load of green concrete
Hydrostatic pressure of green concrete
Live load of working labors
Impact effect at the time of pouring concrete into the
formwork.
Vibrations in concrete during pouring concrete into
the formwork.
Temporary live load due to labors
and equipments including impact
may be taken as 370 kg/m2.
Planks for formwork of vertical
facing of columns etc. are known
as sheathing.
Planks for formwork of floor
slabs are known as decking.
of concrete, in initial stages of pouring
depends upon amount of water, size of
aggregates, rate of pouring etc.
Hydrostatic pressure is maximum at
the time of pouring, but gradually
decreases with setting of concrete
and hardening.
Hydrostatic pressure mainly depends
on the depth of concrete poured
before starting of setting.
Hydrostatic pressure considerations
may include height of concrete which
Equivalent fluid weight of concrete up to 1.5m height may be
assumedas2300 .
Equivalent fluid weight of concrete may be reduced to 1200
when poured for 6mheightin one hour.
For pouring heights between 1.5-6.0m and setting time ¾-1 hour,
equivalent fluid weight may be calculated by linear interpolation
between 2300-1200 .
Maximum deflection of sheathing and joists must be limited to
2.5m.
3
m
kg
3
m
kg
3
m
kg
CornerAngle Outside CornerForm
Inside Corner Form "L" - type pin & U-clip
Formwork Fittings
Formwork for
Foundations
•It consists of
• Side Supports
• Side Planks
• Cleats
Side Support Side Planks
Cleats
Formwork For Column
•It consists of the following
•Side & End Planks
•Yoke
•Nut & Bolts

Sr.
No Structural Member
OPC
(Ordinary Portland
Cement)
RapidHardening
Cement
1 Beamsides,walls & Columns 2-3Days 2 Days
2 Slab (Vertical Supports remains intact) 4 Days 3 Days
3 Slab (CompleteFormworkremoval) 10 Days 5 Days
4 Beams(Removal of Sheeting, Props
remains intact)
8 Days 5 Days
5 Beams& Arches (Completeformwork
removal) (upto 6 m span)
14 Days 5-8 Days
6 Beams& Arches (Completeformwork
removal) (more than 6 m span)
21 Days 8-10 Days
Formwork-Types and Their Advantages
Formwork-Types and Their Advantages

Contenu connexe

Tendances

REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
Natalie Ulza
 
footing
footingfooting
footing
illpa
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
Nabeel Rajpoot
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
Rahul
 

Tendances (20)

Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Special concrete
Special concreteSpecial concrete
Special concrete
 
Special Concretes
Special Concretes Special Concretes
Special Concretes
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
footing
footingfooting
footing
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Brick Masonry and Stone Masonry
Brick Masonry and Stone MasonryBrick Masonry and Stone Masonry
Brick Masonry and Stone Masonry
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Slipform
SlipformSlipform
Slipform
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Damp proofing ppt
Damp proofing pptDamp proofing ppt
Damp proofing ppt
 
GUNITING
GUNITINGGUNITING
GUNITING
 
TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)
 
Shoring
ShoringShoring
Shoring
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 

Similaire à Formwork-Types and Their Advantages

Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
LiesaStone
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
Mylene Delmoro
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
Mylene Delmoro
 

Similaire à Formwork-Types and Their Advantages (20)

Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
Form Work
Form Work Form Work
Form Work
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Formwork
FormworkFormwork
Formwork
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Wall materials
Wall materialsWall materials
Wall materials
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 
CONCRETE TECHNOLOGY
CONCRETE TECHNOLOGYCONCRETE TECHNOLOGY
CONCRETE TECHNOLOGY
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Formwork by chakamba john
Formwork by chakamba johnFormwork by chakamba john
Formwork by chakamba john
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Control joints
Control jointsControl joints
Control joints
 

Dernier

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Dernier (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

Formwork-Types and Their Advantages

  • 1.
  • 2. CreatedBy: Jay S. Singhania (14….6107) Pratik Sisodiya(14….6108) VirenTrivedi (14….6115) Ajit Shiyal (14….6105) Civil-B V-Sem
  • 3. ¶ Formwork is the temporary structure used as a mould to caste structural members at site. ¶ These are also knownas farmas or false work or shuttering. ¶ It is erectedat its correct positionbefore concrete is poured in it. ¶ This poured concrete is then consolidated and allowed to harden to give desired strength. ¶ It is allowed to remain in position till the poured concrete gains sufficient strength to withstandthe stresses coming on it in absence of formwork. ¶ After this the formwork is removedand this process is knownas stripping.
  • 4.  Costly item and its proper design and maintenance can affect economic considerations considerably.  It costs almost as much as 20-25% of the total construction cost of the structural members in building works and even more in the case of bridges.
  • 5.  For construction of lot of similar elements, formwork is designed in such a way that stripping and erection involves least possibilities of damages and least labor, and also this is made out of separate panels with provisions of adjustments.  For this type of formwork, during erection or stripping, only bolts or pins are to be inserted or removed.  Such type of formwork should preferably be of structural steel but timber formwork may also work with being economical, considering disadvantages of warping, swellingand shrinkage effects.
  • 6.
  • 7. ¥ Requirements of timber formwork: i. Be well seasoned. ii. Be light in weight. iii. Be easily workable with nails without splitting. iv. Be free from knots. ¥ Standard formworks can be adopted for different components of formwork for shuttering of different sections of 4.5m span and 3.5m height. ¥ For structures not meeting the above demands, special design of formwork should be done based on the dead loads and live loads acting on the structure and also some relevant factors. ¥ For normal constructional work with same dimensions of formwork, shuttering can be also formed in such a way that it can be moved to the other location without dismantling and fixed there in the new position. ¥ Each set of formwork can be used 10-12 times for normal constructional works.
  • 8. ¥ For shuttering of concrete surfaces to be exposed, smooth and even surfaced formwork should be used to obtain directly smooth exposed surface of concrete and thus eliminating the need of finishing to the concrete members. ¥ For surfaces that are not exposed directly, uneven or undressed timber planks can be used. ¥ The formwork should be jointed using the grooved and tongued joints.
  • 9.
  • 10. ╬ Consists of panels fabricated of thin steel plates stiffened along the edge by small steel angles, which can be held together by clamps and bolts along each edge, and kept in alignment using vertical or horizontal timber or steel centring. ╬ Usual size of wall or slab panels vary from 60cm * 60cm to 60cm * 120cm (2’ *2’ to 2’ * 4’). ╬ These type of formwork is mostly used in large constructional projects and where repeated use is possible. ╬ These are extensively used for pre-cast concrete members and also the most suitable for shuttering of circular or curved sections such as tanks, columns, chimneys etc. and for large structures like large sewer, tunnels, retaining walls etc.
  • 11.
  • 12.
  • 13. Use of plywood is getting more popular these days, and these are attached to the timber frames to make up panels of desired shapes and sizes. These types of shuttering can be easily assembled with the use of bolting, riveting etc. These types of shuttering is highly suggestive in the large constructional projects where exposed concrete surface is large in area such as faces of retaining walls, concrete dams, floor slabs etc.
  • 14.  These type of formwork can be used economically in following considerations: i. Perfectly smooth and finished external surface can be obtained and thus expense of external finishing (plastering) can be saved. ii. Large sized panels can be formed thus saving the labour charges for assembling and dismantling. iii. Number of re-uses can be increased to 20-25 times.
  • 15. Easy in erection and stripping. Can be used repeatedly for many times. Comparatively stronger. No possibilities of shrinkage, warping or swelling.
  • 16. Easy in erection. Economical Can be erected in any shape and size as per requirement.
  • 17. Formwork material must be cheap and easily available in local market. It must be sufficiently rigid to avoid excessive deflections while concreting. Must be strongenough to effectively resist all loads comingon it. Easy to erect and strip. Must rest on strong and un-yielding supports. Joints should be stiff and strong and water-tight. Surface in direct contact (internal surface) must be enough smooth to give finishedsurface. It must be water tight and non absorbing to maintain w/c ratio avoiding leakage/absorbingof water fromthe concrete.
  • 18. Dead load of green concrete Hydrostatic pressure of green concrete Live load of working labors Impact effect at the time of pouring concrete into the formwork. Vibrations in concrete during pouring concrete into the formwork.
  • 19. Temporary live load due to labors and equipments including impact may be taken as 370 kg/m2. Planks for formwork of vertical facing of columns etc. are known as sheathing. Planks for formwork of floor slabs are known as decking.
  • 20. of concrete, in initial stages of pouring depends upon amount of water, size of aggregates, rate of pouring etc. Hydrostatic pressure is maximum at the time of pouring, but gradually decreases with setting of concrete and hardening. Hydrostatic pressure mainly depends on the depth of concrete poured before starting of setting. Hydrostatic pressure considerations may include height of concrete which
  • 21. Equivalent fluid weight of concrete up to 1.5m height may be assumedas2300 . Equivalent fluid weight of concrete may be reduced to 1200 when poured for 6mheightin one hour. For pouring heights between 1.5-6.0m and setting time ¾-1 hour, equivalent fluid weight may be calculated by linear interpolation between 2300-1200 . Maximum deflection of sheathing and joists must be limited to 2.5m. 3 m kg 3 m kg 3 m kg
  • 22.
  • 23. CornerAngle Outside CornerForm Inside Corner Form "L" - type pin & U-clip Formwork Fittings
  • 24. Formwork for Foundations •It consists of • Side Supports • Side Planks • Cleats Side Support Side Planks Cleats
  • 25. Formwork For Column •It consists of the following •Side & End Planks •Yoke •Nut & Bolts
  • 26.
  • 27.  Sr. No Structural Member OPC (Ordinary Portland Cement) RapidHardening Cement 1 Beamsides,walls & Columns 2-3Days 2 Days 2 Slab (Vertical Supports remains intact) 4 Days 3 Days 3 Slab (CompleteFormworkremoval) 10 Days 5 Days 4 Beams(Removal of Sheeting, Props remains intact) 8 Days 5 Days 5 Beams& Arches (Completeformwork removal) (upto 6 m span) 14 Days 5-8 Days 6 Beams& Arches (Completeformwork removal) (more than 6 m span) 21 Days 8-10 Days