DRAWING CONTROL SHEET EE-364657 AS BUILT BY DATE 09.02.2015
BY INDEX
PLANT
NO.
REV. NO.
DATE
AINDAR/HAWIYAH AREAS
SA_TW22 BB + 12M BE+ 2MLE(1) + 8MLE(2) + 8MLE(3) + 2MLE(4)
SA_TW23 BB + 12M BE+ 2MLE(1) + 2MLE(2) + 8MLE(3) + 8MLE(4)
SA_TW24 BB + 12M BE+ 8MLE(1) + 8MLE(2) + 2MLE(3) + 2MLE(4)
BB + 12M BE+ 4MLE(1) +4MLE(2) +4MLE(3) + 4MLE(4)
SA_TW19 BB + 12M BE+ 6MLE(1) +6MLE(2) +6MLE(3) + 6MLE(4)
SA_TW20 BB + 12M BE+ 8MLE(1) +8MLE(2) + 8MLE(3) + 8MLE(4)
SA_TW21 BB + 12M BE+ 8MLE(1) + 2MLE(2) + 2MLE(3) + 8MLE(4)
BB + 6M BE+ 8MLE(1) +8MLE(2) + 8MLE(3) + 8MLE(4)
SA_TW13 BB + 6M BE+ 8MLE(1) + 2MLE(2) + 2MLE(3) + 8MLE(4)
SA_TW14 BB + 6M BE+ 2MLE(1) + 8MLE(2) + 8MLE(3) + 2MLE(4)
BB + 6M BE+ 2MLE(1) +2MLE(2) + 2MLE(3) + 2MLE(4)
SA_TW10 BB + 6M BE+ 4MLE(1) +4MLE(2) +4MLE(3) + 4MLE(4)
SA_TW11 BB + 6M BE+ 6MLE(1) +6MLE(2) +6MLE(3) + 6MLE(4)
CERT.
UC
UC
APPD.
UC
UC
CHKD.
RT
RT
DESCRIPTION
ISSUEDFORAPPROVAL
ISSUEDFORAPPROVAL
LEG EXTENSION COMBINATION
SA_TW01 BB + 2MLE(1) +2MLE(2) + 2MLE(3) + 2MLE(4)
SA_TW02 BB + 4MLE(1) +4MLE(2) +4MLE(3) + 4MLE(4)
SA_TW03 BB + 6MLE(1) +6MLE(2) +6MLE(3) + 6MLE(4)
SA_TW04 BB + 8MLE(1) +8MLE(2) + 8MLE(3) + 8MLE(4)
BY
SJL/
SRC
SJL/
SRC
SA_TW09
SA_TW05 BB + 8MLE(1) + 2MLE(2) + 2MLE(3) + 8MLE(4)
SA_TW06 BB + 2MLE(1) + 8MLE(2) + 8MLE(3) + 2MLE(4)
SA_TW07 BB + 2MLE(1) + 2MLE(2) + 8MLE(3) + 8MLE(4)
SA_TW08 BB + 8MLE(1) + 8MLE(2) + 2MLE(3) + 2MLE(4)
DATE
27.11.2014
09.02.2015
SA_TW12
REVISIONS
DRAWN
SJL/ SRC
DATE 09.02.2015
SA_TW15 BB + 6M BE+ 2MLE(1) + 2MLE(2) + 8MLE(3) + 8MLE(4)
SA_TW16 BB + 6M BE+ 8MLE(1) + 8MLE(2) + 2MLE(3) + 2MLE(4)
SA_TW17 BB + 12M BE+ 2MLE(1) +2MLE(2) + 2MLE(3) + 2MLE(4)
SA_TW18
CHKD. BY RT
DATE 09.02.2015
APPROVED
ENG. DEPT.
DATE
OPRG. DEPT.
CERTIFIED
DRAWING TITLE DRAWING NO SHT. NO.
BCONTRACT NO.
SOUTHERN AREA OIL OPERATION (SAOO) POWER
SYSTEM RELIABILITY IMPROVEMENT PROJECT
EE-364708 38 OF 189
4400003815/00 SAUDI ARABIA
DESIGN SUBMITTAL FOR TOWER TYPE - SA
A -