Planning Defined
Planning vs. Coordinating
Planning at Various Management Levels
The Planning Process
Types of Plans

Importance of Planning
Making Planning Effective
Provides direction
Reduces uncertainty
Minimizes waste and redundancy
Sets the standards for controlling




Top
Management

Middle
Management

Lower Management

Middle
Management

Lower Management

Middle
Management

Lower Management

Middle
Management
Written document for implementing & controlling an
organization’s marketing activities related to a particular
marketing strategy
Written document for that states the quantity of output a
company must produce in board terms and by product
family
Document that summarizes the current financial
situation of the firm, analyzes financial needs, and
recommends a direction for financial activities.
Document that indicates the
human
resource
needs of a company detailed in
terms of quantity and quality and
based on the requirements of the
company’s strategic plan.
Planning reduces uncertainty, risk and confusion in operation.
Planning guides the decision making by the managers.
Planning helps in achieving coordination and facilitates control.

Planning with an element of flexibility makes the organization
adaptable.
Planning leads to economy and efficiency in operations.

Planning begins with the determination of objectives and
directed towards their achievement.
Engineer Hermogenes Ancheta has just received his appointment papers
from his new immediate superior, the Vice President for Operations. He has been
promoted from Assistant Manager to Manager of the Maintenance Department.
After congratulating him, his boss gave him a verbal directive that he should put
some order in his department and make it work in the most effective and efficient
manner possible.
Engineer Ancheta has just passed the board examination for Mechanical
Engineering when he joined Motorbus Company in 1993. By June 1995, he
informed his former classmates at the University of Santo Tomas that he was
promoted as Assistant Manager for Maintenance.
The former manager of the department, Engineer Gaudencio Inductivo, joined the
company since it started operations in 1989. A total of ten buses began plying the
Manila-Isabela route. A maintenance unit was put up at the Manila Terminal in
Sampaloc. Another unit serves the Ilagan, Isabela terminal. Each unit has a fulltime mechanic and one assistant.
When a company bus comes in for repair, the mechanic diagnoses the
various automotive systems in the bus and later produces a list of parts needing
replacement. The mechanic sends the list to Engineer Inductivo, who in
turn, forwards the same to the company accountant for approval of the purchase
request. Oftentimes, Engineer Inductivo performs actual purchasing himself.
Later, he sends the purchased items to the mechanic who made the request.
The maintenance units were operating normally until 40 new buses were
produced by the company in 1993. Since then, every maintenance personnel were
so busy that they threatened to quit their jobs unless additional mechanics and
assistants were recruited. By the end of 1993, each unit has a personnel
complement of 5 mechanics and 5 assistants.
Even with the current developments, the old method of purchasing was
no improved. Purchase requests started to pile up. Mechanics and drivers began
complaining to the VP for Operations about delays in the delivery of needed parts.
The VP for Operations immediately sent a note to Engineer Induvtivo
ordering that the problem should be resolved immediately. Engineer Inductivo
was hard pressed and he could not offer an immediate solution. The next
day, Engineer Inductivo informed the VP for Operations that he is requesting for
the approval of his application for retirement as he is already 62 years old.
The VP forwarded the request to the President with an endorsement
justifying the request. On the same day, the request for retirement was approved.
The next day, Engineer Ancheta received his appointment papers promoting him
to Manager.
One of the first things Engineer Ancheta did was to inspect the storage room for
parts. He found out that the room was full of uneven supply of parts. Some parts
were excessive quantities, while some important ones were inadequately stocked.
A corner of the room contains a big volume of obsolete parts.
At the end of the day, Engineer Ancheta was informed by the VP
that the company will be fielding an additional 50 new busses within 30
days. This will mean that by next month, about 100 buses will be servicing
the various routes assigned to Motorbus Company.
Engineer Ancheta is now mulling over how he will make the
operations of his department as efficient and effective as possible.

Contenu connexe

Tendances

introduction to engineering economy
introduction to engineering economy   introduction to engineering economy
introduction to engineering economy Sebghatullah Karimi
 
Engineering Economics: Solved exam problems [ch1-ch4]
Engineering Economics: Solved exam problems [ch1-ch4]Engineering Economics: Solved exam problems [ch1-ch4]
Engineering Economics: Solved exam problems [ch1-ch4]Mohsin Siddique
 
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. AbatayoBPA ABATAYO Land Surveying Services
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Juan Paolo Somorostro - Aranas, MPA, BSOSM
 
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Er. Bade Bhausaheb
 
Chapter-4 Time value of money
Chapter-4  Time value of moneyChapter-4  Time value of money
Chapter-4 Time value of moneyBibek Paudyal
 
Samples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the PhilippinesSamples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the PhilippinesJohanna Manzo
 
3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)Diptesh Dash
 
Hitachi parts pull out request letter
Hitachi parts pull out request letterHitachi parts pull out request letter
Hitachi parts pull out request letterneillien
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion EconomyJoseph Konnully
 
classification-of-engineering-services-ppt.pptx
classification-of-engineering-services-ppt.pptxclassification-of-engineering-services-ppt.pptx
classification-of-engineering-services-ppt.pptxMichaelAngeloFernand4
 
The professional interview questions
The professional interview questionsThe professional interview questions
The professional interview questionsFuad Chiwa
 

Tendances (20)

introduction to engineering economy
introduction to engineering economy   introduction to engineering economy
introduction to engineering economy
 
Resume ni Engr. renz kevin
Resume ni Engr. renz kevinResume ni Engr. renz kevin
Resume ni Engr. renz kevin
 
238057402 forestry
238057402 forestry238057402 forestry
238057402 forestry
 
Engineering Economics: Solved exam problems [ch1-ch4]
Engineering Economics: Solved exam problems [ch1-ch4]Engineering Economics: Solved exam problems [ch1-ch4]
Engineering Economics: Solved exam problems [ch1-ch4]
 
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
 
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. AbatayoGe 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
 
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
 
OJT Resume
OJT ResumeOJT Resume
OJT Resume
 
resume for OJT
resume for OJTresume for OJT
resume for OJT
 
Introduction to engineering economy
Introduction to engineering economyIntroduction to engineering economy
Introduction to engineering economy
 
Engineering Economy
Engineering EconomyEngineering Economy
Engineering Economy
 
Chapter-4 Time value of money
Chapter-4  Time value of moneyChapter-4  Time value of money
Chapter-4 Time value of money
 
Samples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the PhilippinesSamples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the Philippines
 
Route to Professional Engineer through IEM/BEM in Malaysia.
Route to Professional Engineer through IEM/BEM in Malaysia. Route to Professional Engineer through IEM/BEM in Malaysia.
Route to Professional Engineer through IEM/BEM in Malaysia.
 
3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)
 
Hitachi parts pull out request letter
Hitachi parts pull out request letterHitachi parts pull out request letter
Hitachi parts pull out request letter
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion Economy
 
classification-of-engineering-services-ppt.pptx
classification-of-engineering-services-ppt.pptxclassification-of-engineering-services-ppt.pptx
classification-of-engineering-services-ppt.pptx
 
The professional interview questions
The professional interview questionsThe professional interview questions
The professional interview questions
 

En vedette

아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINESeungMo Oh
 
A1 m3 primera presentacion en prezi
A1 m3 primera presentacion en preziA1 m3 primera presentacion en prezi
A1 m3 primera presentacion en prezipiedads
 
Dedagroup - Cloud Sourcing for Fashion
Dedagroup - Cloud Sourcing for FashionDedagroup - Cloud Sourcing for Fashion
Dedagroup - Cloud Sourcing for FashionDedagroup
 
아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINESeungMo Oh
 
UNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la información
UNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la informaciónUNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la información
UNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la informaciónJaqueline Rivera A
 
Presentación power point proceso del conocer y su relacion con la magia la re...
Presentación power point proceso del conocer y su relacion con la magia la re...Presentación power point proceso del conocer y su relacion con la magia la re...
Presentación power point proceso del conocer y su relacion con la magia la re...MEILYN LISETH BELLO PAEZ
 
Dedagroup consulenza e formazione per una pa senza carta
Dedagroup consulenza e formazione per una pa senza cartaDedagroup consulenza e formazione per una pa senza carta
Dedagroup consulenza e formazione per una pa senza cartaDedagroup
 
Chapter 1
Chapter 1Chapter 1
Chapter 1gbrand
 
L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...
L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...
L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...Matteo Damiani
 
teoria de la forma
teoria de la formateoria de la forma
teoria de la formadeltha12
 
La (in)sicurezza nell'era della IoT
La (in)sicurezza nell'era della IoTLa (in)sicurezza nell'era della IoT
La (in)sicurezza nell'era della IoTMassimo Giaimo
 
Programa smturismo 2016
Programa smturismo 2016Programa smturismo 2016
Programa smturismo 2016Invattur
 
Ch 3 Constitutional Limitations on the Prohibition of Criminal Conduct
Ch 3 Constitutional Limitations on the Prohibition of Criminal ConductCh 3 Constitutional Limitations on the Prohibition of Criminal Conduct
Ch 3 Constitutional Limitations on the Prohibition of Criminal Conductrharrisonaz
 
Causation End of Unit Assessment
Causation End of Unit AssessmentCausation End of Unit Assessment
Causation End of Unit AssessmentMiss Hart
 

En vedette (20)

아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- June 2013. Industrial Communication Network MAGAZINE
 
A1 m3 primera presentacion en prezi
A1 m3 primera presentacion en preziA1 m3 primera presentacion en prezi
A1 m3 primera presentacion en prezi
 
Dedagroup - Cloud Sourcing for Fashion
Dedagroup - Cloud Sourcing for FashionDedagroup - Cloud Sourcing for Fashion
Dedagroup - Cloud Sourcing for Fashion
 
아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE
아이씨엔 매거진- October 2013. Industrial Communication Network MAGAZINE
 
FinalDraftRevisisions
FinalDraftRevisisionsFinalDraftRevisisions
FinalDraftRevisisions
 
SISTEMAS OPERATIVOS.
SISTEMAS OPERATIVOS.SISTEMAS OPERATIVOS.
SISTEMAS OPERATIVOS.
 
UNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la información
UNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la informaciónUNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la información
UNIDAD DE APRENDIZAJE I Búsqueda, veracidad y seguridad de la información
 
Movie
MovieMovie
Movie
 
RAGHUST.doc
RAGHUST.docRAGHUST.doc
RAGHUST.doc
 
Presentación power point proceso del conocer y su relacion con la magia la re...
Presentación power point proceso del conocer y su relacion con la magia la re...Presentación power point proceso del conocer y su relacion con la magia la re...
Presentación power point proceso del conocer y su relacion con la magia la re...
 
El transformador
El transformadorEl transformador
El transformador
 
Dedagroup consulenza e formazione per una pa senza carta
Dedagroup consulenza e formazione per una pa senza cartaDedagroup consulenza e formazione per una pa senza carta
Dedagroup consulenza e formazione per una pa senza carta
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...
L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...
L'evoluzione della filiera ICT: una proposta interpretativa per le dinamiche ...
 
teoria de la forma
teoria de la formateoria de la forma
teoria de la forma
 
La (in)sicurezza nell'era della IoT
La (in)sicurezza nell'era della IoTLa (in)sicurezza nell'era della IoT
La (in)sicurezza nell'era della IoT
 
Transformadores
TransformadoresTransformadores
Transformadores
 
Programa smturismo 2016
Programa smturismo 2016Programa smturismo 2016
Programa smturismo 2016
 
Ch 3 Constitutional Limitations on the Prohibition of Criminal Conduct
Ch 3 Constitutional Limitations on the Prohibition of Criminal ConductCh 3 Constitutional Limitations on the Prohibition of Criminal Conduct
Ch 3 Constitutional Limitations on the Prohibition of Criminal Conduct
 
Causation End of Unit Assessment
Causation End of Unit AssessmentCausation End of Unit Assessment
Causation End of Unit Assessment
 

Similaire à Engineering Management_PLANNING

Job Responsibilities of A Maintenance Engineer
Job Responsibilities of A Maintenance EngineerJob Responsibilities of A Maintenance Engineer
Job Responsibilities of A Maintenance EngineerSAJID ALI RUK
 
includes the followingBusiness Case InvestigationIdenti.docx
includes the followingBusiness Case InvestigationIdenti.docxincludes the followingBusiness Case InvestigationIdenti.docx
includes the followingBusiness Case InvestigationIdenti.docxannettsparrow
 
Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXRohit Tyagi
 
Costing and cost reduction
Costing and cost reductionCosting and cost reduction
Costing and cost reductionSupa Buoy
 
siwes technical report in mechanical engineering, automobile workshop
siwes technical report in mechanical engineering, automobile workshopsiwes technical report in mechanical engineering, automobile workshop
siwes technical report in mechanical engineering, automobile workshopjsunny155
 
Anthony Frank resume
Anthony Frank resumeAnthony Frank resume
Anthony Frank resumeTony Frank
 
Final Report-Suyesh Nigam [PGDM151701104 (F1)]
Final Report-Suyesh Nigam [PGDM151701104 (F1)]Final Report-Suyesh Nigam [PGDM151701104 (F1)]
Final Report-Suyesh Nigam [PGDM151701104 (F1)]Suyesh Nigam
 
Ayres -michael---resume
Ayres -michael---resumeAyres -michael---resume
Ayres -michael---resumeMichael Ayres
 
Mehrban Administration CV
Mehrban Administration CVMehrban Administration CV
Mehrban Administration CVMehrban Afzal
 
Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Gurmeet Singh Guliani
 

Similaire à Engineering Management_PLANNING (20)

Iibm organisational behaviour
Iibm organisational behaviourIibm organisational behaviour
Iibm organisational behaviour
 
Job Responsibilities of A Maintenance Engineer
Job Responsibilities of A Maintenance EngineerJob Responsibilities of A Maintenance Engineer
Job Responsibilities of A Maintenance Engineer
 
includes the followingBusiness Case InvestigationIdenti.docx
includes the followingBusiness Case InvestigationIdenti.docxincludes the followingBusiness Case InvestigationIdenti.docx
includes the followingBusiness Case InvestigationIdenti.docx
 
Resume MG
Resume MGResume MG
Resume MG
 
Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
 
Costing and cost reduction
Costing and cost reductionCosting and cost reduction
Costing and cost reduction
 
CHIRAG C V
CHIRAG C VCHIRAG C V
CHIRAG C V
 
siwes technical report in mechanical engineering, automobile workshop
siwes technical report in mechanical engineering, automobile workshopsiwes technical report in mechanical engineering, automobile workshop
siwes technical report in mechanical engineering, automobile workshop
 
Anthony Frank resume
Anthony Frank resumeAnthony Frank resume
Anthony Frank resume
 
Final Report-Suyesh Nigam [PGDM151701104 (F1)]
Final Report-Suyesh Nigam [PGDM151701104 (F1)]Final Report-Suyesh Nigam [PGDM151701104 (F1)]
Final Report-Suyesh Nigam [PGDM151701104 (F1)]
 
Plant & Maintenance Engineering
Plant & Maintenance EngineeringPlant & Maintenance Engineering
Plant & Maintenance Engineering
 
Anthony gachie c.v
Anthony gachie c.v  Anthony gachie c.v
Anthony gachie c.v
 
JP Sharma _ CV
JP Sharma _ CVJP Sharma _ CV
JP Sharma _ CV
 
mod2
mod2mod2
mod2
 
Ayres -michael---resume
Ayres -michael---resumeAyres -michael---resume
Ayres -michael---resume
 
Mehrban Administration CV
Mehrban Administration CVMehrban Administration CV
Mehrban Administration CV
 
Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
Consulting Offer for SMEs
Consulting Offer for SMEsConsulting Offer for SMEs
Consulting Offer for SMEs
 
Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016
 
CV
CVCV
CV
 

Dernier

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 

Dernier (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 

Engineering Management_PLANNING

  • 1.
  • 2. Planning Defined Planning vs. Coordinating Planning at Various Management Levels The Planning Process Types of Plans Importance of Planning Making Planning Effective
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. Provides direction Reduces uncertainty Minimizes waste and redundancy Sets the standards for controlling
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 16.
  • 17.
  • 18. Written document for implementing & controlling an organization’s marketing activities related to a particular marketing strategy Written document for that states the quantity of output a company must produce in board terms and by product family Document that summarizes the current financial situation of the firm, analyzes financial needs, and recommends a direction for financial activities. Document that indicates the human resource needs of a company detailed in terms of quantity and quality and based on the requirements of the company’s strategic plan.
  • 19.
  • 20.
  • 21. Planning reduces uncertainty, risk and confusion in operation. Planning guides the decision making by the managers. Planning helps in achieving coordination and facilitates control. Planning with an element of flexibility makes the organization adaptable. Planning leads to economy and efficiency in operations. Planning begins with the determination of objectives and directed towards their achievement.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Engineer Hermogenes Ancheta has just received his appointment papers from his new immediate superior, the Vice President for Operations. He has been promoted from Assistant Manager to Manager of the Maintenance Department. After congratulating him, his boss gave him a verbal directive that he should put some order in his department and make it work in the most effective and efficient manner possible. Engineer Ancheta has just passed the board examination for Mechanical Engineering when he joined Motorbus Company in 1993. By June 1995, he informed his former classmates at the University of Santo Tomas that he was promoted as Assistant Manager for Maintenance. The former manager of the department, Engineer Gaudencio Inductivo, joined the company since it started operations in 1989. A total of ten buses began plying the Manila-Isabela route. A maintenance unit was put up at the Manila Terminal in Sampaloc. Another unit serves the Ilagan, Isabela terminal. Each unit has a fulltime mechanic and one assistant.
  • 28. When a company bus comes in for repair, the mechanic diagnoses the various automotive systems in the bus and later produces a list of parts needing replacement. The mechanic sends the list to Engineer Inductivo, who in turn, forwards the same to the company accountant for approval of the purchase request. Oftentimes, Engineer Inductivo performs actual purchasing himself. Later, he sends the purchased items to the mechanic who made the request. The maintenance units were operating normally until 40 new buses were produced by the company in 1993. Since then, every maintenance personnel were so busy that they threatened to quit their jobs unless additional mechanics and assistants were recruited. By the end of 1993, each unit has a personnel complement of 5 mechanics and 5 assistants. Even with the current developments, the old method of purchasing was no improved. Purchase requests started to pile up. Mechanics and drivers began complaining to the VP for Operations about delays in the delivery of needed parts.
  • 29. The VP for Operations immediately sent a note to Engineer Induvtivo ordering that the problem should be resolved immediately. Engineer Inductivo was hard pressed and he could not offer an immediate solution. The next day, Engineer Inductivo informed the VP for Operations that he is requesting for the approval of his application for retirement as he is already 62 years old. The VP forwarded the request to the President with an endorsement justifying the request. On the same day, the request for retirement was approved. The next day, Engineer Ancheta received his appointment papers promoting him to Manager. One of the first things Engineer Ancheta did was to inspect the storage room for parts. He found out that the room was full of uneven supply of parts. Some parts were excessive quantities, while some important ones were inadequately stocked. A corner of the room contains a big volume of obsolete parts.
  • 30. At the end of the day, Engineer Ancheta was informed by the VP that the company will be fielding an additional 50 new busses within 30 days. This will mean that by next month, about 100 buses will be servicing the various routes assigned to Motorbus Company. Engineer Ancheta is now mulling over how he will make the operations of his department as efficient and effective as possible.