Governance
GOC

itSMF Canada NRC/RCN
RCAF Officer’s Mess 158 Gloucester St. Ottawa
March 26, 2008

Industry
Frameworks

Enabling the Management Accountability
Framework (MAF):
Challenges of IM/IT Governance
Frameworks

SWOT

Presented by:
Jerry Kopan,

Summary

ITIL V3 Expert, V2 Service Manager, PrISM, CMC, B.Sc.

jerry@mountainview.ca
www.mountainview.ca

ITSM Frameworks

1
Table of Contents
Governance
GOC

What is Governance?
Management Accountability Framework
Industry Governance Frameworks
IM/IT Governance Frameworks
SWOT Analysis of Governance Frameworks
Summary and Recommendations for enabling MAF
Questions – 10 minutes

Industry
Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

2
What is Governance?
Governance

Compare and contrast these terms:
Framework
Model
Process
Policies
Architecture
Best practices
Are there other terms?

GOC
Industry

–
–
–
–
–
–
–

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

3
TBS Definition of Governance
Governance
Frameworks
SWOT
Summary

ITSM Frameworks

Industry

www.mountainview.ca

GOC

Accountability - the obligation to demonstrate and take
responsibility for performance in light of commitments and
expected outcomes.
Authority – the legislation, document or other venue that
defines responsibilities within defined circumstance and
empowers an individual or organization to deliver on them.
Authority - delegated power to command and make final
decisions within a particular domain with the expectation of
being obeyed and held accountable for results.
Governance – exercising authority to provide direction and to
undertake, coordinate, and regulate activities in support of
achieving this direction and desired outcomes.
Outcome - an event, occurrence or condition that occurs as a
direct result of programs and activities.
Result - the impact or effect of a program or service.
Responsibility - something that one is required to do as part
of a job, role or legal obligation.

4
Other Governance Definitions
Governance

“IT Governance is the responsibility of the board of directors and executive management. It is an integral
part of enterprise governance and consists of leadership and organizational structures and processes that
ensure that the organization’s IT sustains and extends the organization’s strategies and objectives.”
ITGI, Board briefing in IT governance

GOC

“IT Governance specifies the decision-making authority and accountability to encourage desirable behaviors in
the use of IT. IT Governance provides a framework in which the decisions made about IT issues are
aligned with the overall business strategy and culture of the enterprise.”
“The Need for IT Governance: Now more than Ever”, Gartner Research note AV-21-4823, 2004

Industry

“A structure of relationships and processes to direct and control the enterprise in order to achieve the
enterprise’s goals by adding value while balancing risk versus return over IT and its processes.”
COBIT, ISACA

Frameworks

“Governance encompasses the roles, responsibilities and accountabilities of the Legislative Assembly
representing the public, and the organizations and management of government. Governance is the
structure and processes that support the realization of overall objectives and the strategies to achieve
them. It is concerned with the development, communication and implementation of government policy,
and in monitoring performance with respect to standards. Governance includes ongoing risk assessment
and management in the general course of delivering programs and services.”

SWOT

Ministry of Finance, Government of B.C.

www.mountainview.ca

ITSM Frameworks

Summary

“Information Technology Governance, IT Governance or ICT Governance, is a subset discipline of Corporate
Governance focused on information technology systems and their performance and risk management.
The rising interest in IT governance is partly due to compliance initiatives (e.g. Sarbanes-Oxley (USA) and
Basel II (Europe)), as well as the acknowledgement that IT projects can easily get out of control and
profoundly affect the performance of an organization.”
Wikipedia

5
Management Accountability Framework (MAF)
Governance

Treasury Board of Canada Secretariat
Elements of MAF

GOC

– Ten interconnected “expectations” defined as the essential
determinants of sound management decision making
– Key Indicators to indicate the breath of the expectations
– Shorter term measures

Industry
Frameworks

Click here to start video
Ivan Blake

SWOT

Executive Director
Treasury Board of Canada
MAF Development &
Implementation

(4:13)

Summary

www.mountainview.ca

ITSM Frameworks

6
Management Accountability Framework is …
Governance
Industry
Frameworks

Public Service Values
Governance and Strategic Directions
Policy and Programs
Results and Performance
Learning, Innovation and Change Management
Risk Management
People
Stewardship
Citizen-focused Service
Accountability
ITSM Frameworks

Summary

www.mountainview.ca

SWOT

–
–
–
–
–
–
–
–
–
–

GOC

not carved in stone
a tool, instrument, aid
an Framework for Accountability
about holding Deputy Ministers accountable for a certain quality of
management in the public service
part of the “Guide for Deputy Ministers”
a “Framework of Expectations”
written for DMs
the 10 things we expect from DMs for good management

7
Industry Governance Frameworks
Governance
GOC

Industry
Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

8
IT Governance Frameworks
Governance

Frameworks
SWOT
Summary

ITSM Frameworks

Industry

www.mountainview.ca

GOC

Information Technology Infrastructure Library (ITIL V2)
ITIL V3
ISO/IEC 20000
Information Security Management System (ISO 17799, 27001)
Control Objectives for Information and related Technology
(COBIT 4.1)
Six Sigma - DMAIC
American Productivity and Quality Centre (APQC 4.0)
Project Management Body of Knowledge (PMBoK 3.0)
PRojects IN Controlled Environments version 2 (PRINCE2)
Business Transformation Enablement Program (BTEP)
International Institute of Business Analysis (IIBA)
Capability Maturity Model Integration (CMMI)
Vendor specific: MOF, HP ITSM, IBM ITPM, …
ISO FCAPS
9
Generic Process Elements
Governance

Control

Policy
Objectives

Documentation

Feedback

Triggers

GOC

Owner

Industry

Process
Metric

CSI

Outputs

Customer

Including process
reports and reviews

SWOT

Enablers
People

Summary

www.mountainview.ca

Roles

Frameworks

Is it a
process or
an auditing
tool?

Activities

RACI

Supplier

Inputs

Products

Source: ITIL V3

ITSM Frameworks

10
OGC Guidance Website
Governance

Summary of OGC Guidance (January 2003)

No 19 PTN Update

sector in an uncertain world
aspects of CUP 60)

Appendix C: Risk Mitigation
July 1989

Summary

11

SWOT

ITSM Frameworks

Frameworks

www.mountainview.ca

Industry

Managing Services
Procurement strategies (PG No Overview and Case Studies
Appendix D: ePilots Project 5)
Technical Notes
No
(Vendors and
January 1991
(See 1, 19 & 51)
EC Guidance (updating CUP also guidance published commercially by OGC’s 2003/04e.g ITIL below) 27 Approved Suppliers A-Z of Terms of projects (PG No 6)
Plan to publish in partners
Financial aspects
How to account for PFI Transactions
Contractors) Lists
Documentation (replacing CUP 59 a to d)
Plan EC Procurement Procedure and Advertise in the OJEC
Work in hand 2002/03 Work Programme
Whole life costs (PG No 7)
How to followto publish in 2003/04
No 29 Quality Costs
June 1991
Procurement Training ITIL Plan to 53)
Plan
Delivery Lifecycle
How to 2003 to and Manage Advisers to PFI Projects
Ensuring grant-aided bodies deliver value for (replacing CUP publish January Appoint publish in 2003/04
Project evaluation and feedback (PG No 8)
No
June 1991
How to Appoint and Work with a Preferred Bidder 30 Specification Writing
money on procurements involving public money Service Delivery
Strategic (PG No 9)
Benchmarking Mangement
No 35 Life Cycle Costing
April
Service Support
How April 2003
Key Issues
Strategic Management1992
Why Construction Projects Fail
Plan to publish beforeto Construct a Public Sector Comparator
Achieving Excellence Through Health and Safety
Planning to Implement Service Management Delivery of Long Term PFI No 46 Quality Assurance
How to Manage the
Contracts
June 1994
Improving the efficiency and effectiveness of
Plan to publish before April 2003
(PG Governance
No 10)
SRO Breifing
Security Management Draft Competence Framework for Creating Effective PFI Project Teams – Draft
No 48 Bonds & Guarantees
August 1994
Quality management
procurement to achieve faster delivery
Senior Responsible Owner briefing (links to SRIE briefing)
CUP Guides
The Business Perspective
No 51 Introduction to thePolicies and standards
EC
July 1995
Construction and Use of Public Sector
Plan to publish before April 2003
ICT Infrastructure Management
No 12 Contracts and Contract Management for
Other
Property/workspace management
procurement rules
Delivery Pocketbook Application Management
Comparators
Construction Works March 1989
Staff Transfers from Central Government – A Fair Deal for Staff
Exploiting technology
Successful Delivery Pocketbook
September 1995
Guidance on Standardisation of PFI Contracts No 52 Programming and48 Bonds andManagement
including General Guidance, Information
No progress
Information guarantees August 1994
monitoring for works projects
Related Ppublications
Technology and Local Authorities
No 52 Programming and progress monitoring for
Risk management
Guidance – Generic operational guidance for heads of procurement and their teams
Faster procurement itSMF Pocket Guide
No 53 Procurement Training
January
works projects September 19951996
Benefits management
Published
Taskforce executive report on faster procurement Abbreviations and and Acronyms
itSMF Dictionary of Terms,
Case Studies
No 54 Value management Value Resources management
January 1996
Human management January 1996
No 54
value from software development Helicopter Aircrew Training Facility – PFI Case Study
PG 10 Achieving Excellence through Health and BetterPublished – October 2001
Medium Support
No 55 Ethics in Procurement
April 1997
Organisational learning
4. Risk and value management
Current Gateway Issues
Safety
Employment Service – IT Partnership
Continuous Improvement
April 1997
The Gateway Process a Managers Checklist
5. The integrated team:No 56 Debriefing
teamworking,
Private Finance and IS/IT: case study TAFMIS and After
Supplier Finance Appraisal – (replacing the financial
Published
Procurement – October 2001
Cost managementMay 1997
No
Colfox School, Dorset –partnering and incentives 57 DBFO School Project government
A Case Study on the First – Strategic partnering in and competencies
aspects of CUP 60)
Skills
Open Source Software
Workbooks
6. Procurement Study for the Welsh Office
OSIRIS Private Finance and IS/IT Caseand contract strategies
Dispute Resolution – (replacing CUP 50)
Managing performance
Value Published in March 2002 – The Role of Auditors
for Money – Procurement
Strategy Management
No 59 a Model
May 1997
Report on the Procurement of Custodial Services in life costs Appraisal case studies
7. Cost management: whole DCMF prisons – 2 Questionnaire
Security & Privacy
Green Public Private Partnerships
Published – July 2002
Gateways
DBFO – Value in Roads A Case study on the first Eight DBFO Roads IS/IT managementMay 1997
No 59 b Pre-Qualification
and financial control
Smaller Supplier….BetterBusiness Case
Value
Published – 2002
HM Treasury Procurement Guidance
The IND Caseworking Program Scottish Health Servicec Model Invitation to Tender Working
8. Improving performance: 59 Management Executive: Ferryfield House,
No
May 1997
Joined-up
Revised General GuidanceRisk Management of PFI EC Procurement– JulyEdinburgh
on Standardisation
Published Thresholds
2002
benchmarking and performance
Benchmarking/capability
No
July 1997
Programme ManagementEC Public Procurement State of Play
Contracts
Lewisham Extension to management
Docklands Light Railway 59 d Model Conditions of Contract
Procurement
No 60 Supplier appraisal (non-financial)
May 1997
OGC Guidance note – on calculation of the Authority’sEfficiency in Government Procurement Prison Services design
Published – JulyLowdham Grange
2002
Setting Direction
9. Quality in
Project Management
Environmental Issues in Purchasing
share of a refinancing gain
Overview
10. Health and safety: respect for
Contract Management
Framework Agreements
CUP Guidances: Overtaken – no revision or replacement required – guidances are
OGC Guidance on certain financing issues in PFI
Published – JulyOther Guidance – None OGC
2002
Identifying direction
people
Performance Management
Liability in GovernmentAppraisal and Evaluation in Central Government (the HMT Green Book)
Contracts
archived. (Superseded guides are not shown)
contracts
Business requirements
Benefits Management
Disposal of deals under the Private Finance To be published by March 2003
of Property
Examining the
Initiative (NAO)
Minimum number of Suppliers to Bid Value for Money
Business & supporting strategies
No 3 Supply and Service Agreements with the Agencies – January 1987
OGC – PFI Contracts – Insurance costs
Published – October 2002
Fraud Observance Guidance
To be published by March 2003
Ownership of IPR
Positioning for the future
No 14 Measuring Performance in Purchasing – March 1989
Contract Management guidelines (replacing CUP 61) Scope for Flexibility Under the2002
Published – November EC Rules
Programme and Contract Management
Construction Guidance: The Achieving Excellence suite of briefingsin Building and Construction – April 1989
Customer focus
No 17 Quality Assurance will replace the
Business Case
Published – 2002
Technical Specifications
Construction Procurement Guidance series No Guidance Function and Works estimatingOctober 1989
Managing Successful Projects with PRINCE2
Planning & Projects –
Existing ex-PACE & PPD 20 The P&S
Risk Management
Published – 2002
Managing Successful Programmes
(Replaces the PG guides and CUP guides detailed22 Stock Management – May 1990
Enterprise architecture
No in the right column below)
Guide to the Appointment of Consultants and Contractors (GACC) (1/99)
Supporting the Supplier Community
Tailoring PRINCE
Achieving Excellence – Constructing the GuideNo 23 Model Forms of Contract – September 1990
Estates Services
(ESG) (2/00)
People Issues and PRINCE
Implementing Plans
Best Government Client
Tendering for Government Contracts
Work in hand
Premises Management No 24 a b c d e Vehicles: Contract Hire Schemes – November 1990
Guide (PMG) (9/99)
PRINCE2 Pocketbook
Overview
No 27 Approved Suppliers (Vendors and Contractors) Lists – January 1991
Achieving SustainabilityBusiness Continuity
in Construction
SMEsPlan to publish January 2003
– Doing business with the Government (under development)Planning Guide (BCPG) (11/98)
Supplier Debriefing (replacing CUP 56) PRINCE2 exam
Managing change
Passing the
No 28 Contracts with a Private Sector Purchasing Agent – January 1991
Procurement
Fire Safety Guide (FSG) (7/00)
Business case
Business Benefits through Project Management
No 31 Use of Travel Agents – October 1991
Guide and
Achieving Excellence Action Plan Schedule to Requirements for Office Buildings (ROB) (3/98)
PFI/PPP Guidance – Published unless otherwise stated
No 32 Catering ServicesProgramme management
– January 1992
Crown (Target
Achieving Excellence Briefings Fire Standards (CFS) (10/99)
Procurement Guidance 1-10 Project management
No 35 Life
Deeds and Sealing Guide (8/00) Cycle Costing – April 1992
Procurement 1993
No 37 Managing Car Fleets – January
Requirements definition

GOC

Ethics in Procurement (replacing CUP 55)
Plan to publish before April 2003
Best Practice Products – High-level Guides for top management in Departments
Management of Risk Generic guidance
Published
Procurement Guidance 1-10
Achieving
Possibilities for 2003/04 Work Programme
Partnerships for Prosperity (P4P) Excellence Briefings (Target
Management of Risk: Guidance for PractitionersDate January 2003)
Published
2001 Plan to Guide after PFI Procurement Process
Why IT Projects Fail
Specification Writing (replacing CUP 30) – AprilA Step-by-Step publishto the March 2003
Code of Good Practice – eProcurement and suppliers
for customers Guidance
Documents
Essential requirements for construction
Managing Partnering Relationships
Published – July Public Private Partnerships: the Government's Approach
2001 Plan to publish Core March 2003
Quality Costs (replacing CUP 29)
after
Government Overview
procurement (PG Good
The Government Procurement Code of No 1) Practice
Policy Statements, Technical Notes and other material
IT-enabled business change 2001
– Published
How Major Service Contracts Can Go Wrong (replacing CUP 46) – September Plan to publish after March 2003
Published
eProcurement Market
Quality Assurance
PFI and Public Expenditure Allocations
1. Achieving Excellence: Initiative into
Value for money in construction procurements
Guidelines on Business Continuity Management
Gateway to Success
Published – December 2001
The Business Opportunity
Frameworks/Approved Supplier List (replacing Public Sectorto publish Action Value for Money
Plan Comparators and
after March 2003
(PG No 2)
CUP
Planning Your Approach
Value for Money Evaluation 27)Major Service Risk Guidelines – March 2002 Public Expenditure Allocations for NDPBs Guidances: Current
Published
CUP in
PFI and
2. Project organisation: No 1 Post Tender Negotiation
roles and
Appointment of consultants and contractors (PG
Delivery Lifecycle
Implementation
May 1986
Procurements
PFI
Effective Partnering (possible replacement for CUPProjects: to publish responsibilities and Consultation with Staff and3)
Plan Disclosure of Information
after March 2003
No Other Interested and Techniques
Setting Direction
Appendix A: Tools March 1989
No 12 Contracts and Contract
Risk Allocation in Long-term Contracts
Published – December 2002
Parties
57)
Implementing plans
3. Project procurement lifecycle
Teamworking,B: Standards and Security (PG No
Appendix partnering and incentives
Forming Partnering relationships with the private Strategic non-financial Provision of Informationby end of March 2003 Management for Construction Works
Published – December 2002 to publish to Parliament
Supplier Appraisal (replacing the Management
Plan
4)
ITIL Version 2
Governance

ITIL Publications

GOC

Incident
Problem
Change
Configuration
Release
Service Desk

Service
Delivery

ICT
Infrastructure
Management

Security
Management

Certification

The Business

Service
Support

Frameworks

The
Business
Perspective

The Technology

Service Management

Industry

Planning to Implement Service Management

Application Management
SWOT
Summary

Capacity
Availability
Service Level
IT Service Continuity
Financial
http://www.ogc.gov.uk/
www.mountainview.ca

ITSM Frameworks

12
ITIL Version 3
Governance

Service Strategy
–
–
–
–

Service Generation: Define the market, Develop the offerings, Develop strategic assets,
Prepare for execution
Service Portfolio Management (SPM)
Demand Management
Financial Management **

Service Transition
Change Management **
Service Asset and Configuration Management (SACM) **
Release and Deployment Management **
Transition Planning and Support
Service Validation and Testing
Evaluation
Knowledge Management
Risk Management

Frameworks

–
–
–
–
–
–
–
–

Certification

Service Level Management (SLM) **
Service Catalogue Management
Availability Management **
Information Security Management (ISM)
Supplier Management
Capacity Management **
IT Service Continuity Management **

Industry

–
–
–
–
–
–
–

GOC

Service Design

–
–
–
–
–

SWOT

Service Operation
Incident Management **
Event Management
Request Fulfilment
Problem Management **
Access Management

–
–

Summary

Continual Service Improvement
The 7 step improvement process
PDCA

www.mountainview.ca

ITSM Frameworks

13
ITIL® Certification (as of March 2008)
Governance

Version 2

Version 3
Advanced Expert

GOC

SM
Bridge
5

Service
Manager
17

Expert

Industry

Minimum 22 Credits Required ~ $20k
Managing Across the Lifecycle
5

IPPI
3

www.mountainview.ca

SS
3

SD
3

Foundation
Bridge
0.5

ITSM Frameworks

ST
3

Capability Stream

SO CSI
3
3

PPO
4

SOA
4

RCV
4

OSA
4

Summary

FB:

Lifecycle Stream

IPSR
3

SWOT

Foundation
1.5

12

IPRC
3

Frameworks

IPAD
3

Foundation
2

14
ITIL V2 and V3 Differences

Six Sigma

Application

Business Perspective

ICT

Planning to Implement

Security

Financial

ITSCM

Availability

Capacity

Service Level

Service Desk

Configuration

Release

Change

Problem

Incident

www.mountainview.ca

No issue
Major

Summary

FB:

SWOT

C
e
r
t
i
f
i
c
a
t
i
o
n

Frameworks

3

Industry

V
e
r
s
i
o
n

GOC

I
T
I
L

SS: The Service Generation
Define the market
Develop the offerings
Develop strategic assets
Prepare for execution
SS: Service Portfolio Management
SS: Demand Management
SS: Financial Management
SD: Service Level Management
SD: Service Catalogue Management
SD: Availability Management
SD: Information Security Management
SD: Supplier Management
SD: Capacity Management
SD: IT Service Continuity Management
ST: Change Management
ST: Service Asset and Configuration Management
ST: Release and Deployment Management
ST: Transition Planning and Support
ST: Service Validation and Testing
ST: Evaluation
ST: Knowledge Management
Risk Management
SO: Incident Management
SO: Event Management
SO: Request Fulfillment
SO: Problem Management
SO: Access Management
CSI: Contiuous Improvement Method
CSI: 7 Step Improvement Model
CSI: PDCA
Function: Service Desk
Function: Application Management
Function: Operations Management
Function: Technical Management

Governance

other complementary book

ITIL Version 2 Certification

Minor
Insignificant

ITSM Frameworks

15
COBIT 4.1
Planning and Organization
Define a Strategic IT Plan and direction
Define the Information Architecture
Determine Technological Direction
Define the IT Processes, Organization and Relationships
Manage the IT Investment
Communicate Management Aims and Direction
Manage IT Human Resources
Manage Quality
Access and Manage IT Risks
Manage Projects
Identify Automated Solutions
Acquire and Maintain Application Software
Acquire and Maintain Technology Infrastructure
Enable Operation and Use
Procure IT Resources
Manage Changes
Install and Accredit Solutions and Changes

Frameworks

AI1
AI2
AI3
AI4
AI5
AI6
AI7

Industry

Acquisition and Implementation

Delivery and Support
Define and Manage Service Levels
Manage Third-party Services
Manage Performance and Capacity
Ensure Continuous Service
Ensure Systems Security
Identify and Allocate Costs
Educate and Train Users
Manage Service Desk and Incidents
Manage the Configuration
Manage Problems
Manage Data
Manage the Physical Environment
Manage Operations

SWOT
Summary

DS1
DS2
DS3
DS4
DS5
DS6
DS7
DS8
DS9
DS10
DS11
DS12
DS13

Monitoring
ME1
ME2
ME3
ME4

www.mountainview.ca

ITSM Frameworks

GOC

PO1
PO2
PO3
PO4
PO5
PO6
PO7
PO8
PO9
PO10

Governance

Control OBjectives for
Information and related
Technology
IT governance, control
framework and maturity model
Ensure IT resources are aligned
with an enterprise's business
objectives
Ensure that services and
information, when delivered,
meet quality and security needs
34 control objectives
Auditor's tool
Developed by the Information
Systems Audit and Control
Association (www.isaca.org)

Monitor and Evaluate IT Processes
Monitor and Evaluate Internal Control
Ensure Regulatory Compliance
Provide IT Governance

16
AI6 Manage Changes
Governance
GOC
Industry

Frameworks

All changes, including emergency maintenance and patches,
relating to infrastructure and applications within the production
environment are formally managed in a controlled manner.
Changes (including those to procedures, processes, system and
service parameters) are logged, assessed and authorised prior to
implementation and reviewed against planned outcomes
following implementation.
This assures mitigation of the risks of negatively impacting the
stability or integrity of the production environment.

SWOT
Summary

www.mountainview.ca

ITSM Frameworks

17
AI6 Control Objectives
Governance

AI6.1 Change Standards and Procedures
–

Set up formal change management procedures to handle in a standardized manner
all requests (including maintenance and patches) for changes to applications,
procedures, processes, system and service parameters, and the underlying
platforms.

GOC

AI6.2 Impact Assessment, Prioritization and Authorization
–

Industry

–

Assess all requests for change in a structured way to determine the impact on the
operational system and its functionality.
Ensure that changes are categorized, prioritized and authorised.

AI6.3 Emergency Changes
–

AI6.4 Change Status Tracking and Reporting
–
–

Establish a tracking and reporting system to document rejected changes,
communicate the status of approved and in-process changes, and complete changes.
Make certain that approved changes are implemented as planned.

–

SWOT

AI6.5 Change Closure and Documentation
Whenever changes are implemented, update the associated system and user
documentation and procedures accordingly.

ITSM Frameworks

Summary

What is the difference between ITIL and COBIT?

www.mountainview.ca

Frameworks

Establish a process for defining, raising, testing, documenting, assessing and
authorizing emergency changes that do not follow the established change process.

18
AI6 RACI
Governance

Roles versus Positions in ITIL
Mapping roles to positions

GOC
Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

19
AI6 Goals and Metrics
Governance
GOC
Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

20
Six Sigma
Governance

Define
Measure

GOC

Analyze
Improve

Industry

Developed at Motorola, circa 1983
Sigma, or standard deviation, identifies
the variability within a population
DMAIC
6σ = 3.4 defects per million
99.99966% free of defects

Control

Frameworks

Normal
Distribution
(Bell Curve)

Standard Deviation
(σ = 68%, 2σ = 95%)

LCL

UCL
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

21
American Productivity and Quality Centre (APQC 4.0)
Governance
Industry

Human Capital Management
Financial Management
Information Technology
Innovation
Knowledge Management
Product Development
Supply Chain

Frameworks
SWOT

–
–
–
–
–
–
–

GOC

“Benchmarking business processes affords your organization
quantitative analysis of how you compare to your peers”
APQC is a member-based nonprofit that provides benchmarking
and best-practice research for approximately 500 organizations
worldwide in all industries
Scope:

www.mountainview.ca

Summary

Founded in 1977
http://www.apqc.org

ITSM Frameworks

22
APQC Category Level
Governance
GOC

1.0 Develop Vision and Strategy
2.0 Design and Develop Products and Services
3.0 Market and Sell Products and Services
4.0 Deliver Products and Services
5.0 Manage Customer Service
6.0 Develop and Manage Human Capital
7.0 Manage Information Technology
8.0 Manage Financial Resources
9.0 Acquire, Construct, and Manage Property
10.0 Manage Environmental Health and Safety (EHS)
11.0 Manage External Relationships
12.0 Manage Knowledge, Improvement and Change

Industry

Frameworks
SWOT

www.mountainview.ca

ITSM Frameworks

Summary

Click here for APQC Spreadsheet

23
ISO/IEC 20000:2005
Governance
GOC

ISO/IEC 20000 is the first international standard for IT Service
Management
Click to open Part 1; Click to open Part 2
States compliance requirements
– i.e. “All incidents shall be recorded.”

Industry

Ten sections

Summary

ITSM Frameworks

SWOT

www.mountainview.ca

Frameworks

1. Scope
2. Terms & Definitions
3. Planning and Implementing Service Management
4. Requirements for a Management System
5. Planning & Implementing New or Changed Services
6. Service Delivery Process
7. Relationship Processes
8. Control Processes
9. Resolution Processes
10.Release Process
24
PMBoK and PRINCE2
Governance
GOC

PMBoK™ Third Edition
Project Management Body Of Knowledge
Project Management Institute (PMI)
The project manager is responsible for determining what
elements of PMBoK are appropriate for any given project
Click here for PMBoK v3

Industry

Frameworks
SWOT

PRINCE2
PRojects IN Controlled Environments version 2
Creates a management environment to achieve the stated aim of
the project
Based on a project life cycle
Link
PRINCE2 v3

Summary

www.mountainview.ca

ITSM Frameworks

25
PMBoK 2004 – 4.6 Integrated Change Control
Governance
GOC
Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

26
ISO 17799
Governance

ISO17799, is a detailed security standard. It is organized into ten
major sections. Their objectives are:
1. Business Continuity Planning
To counteract interruptions to business activities and to critical business processes from the effects of major failures or disasters.
1) To control access to information 2) To prevent unauthorised access to information systems 3) To ensure the protection of networked services 4) To prevent
unauthorized computer access 5) To detect unauthorised activities. 6) To ensure information security when using mobile computing and tele-networking facilities

GOC

2. System Access Control
3. System Development and Maintenance
4. Physical and Environmental Security
To prevent unauthorised access, damage and interference to business premises and information; to prevent loss, damage or compromise of assets and interruption
to business activities; to prevent compromise or theft of information and information processing facilities.

Industry

1) To ensure security is built into operational systems; 2) To prevent loss, modification or misuse of user data in application systems; 3) To protect the
confidentiality, authenticity and integrity of information; 4) To ensure IT projects and support activities are conducted in a secure manner; 5) To maintain the
security of application system software and data.

5. Compliance
6. Personnel Security
To reduce risks of human error, theft, fraud or misuse of facilities; to ensure that users are aware of information security threats and concerns, and are equipped
to support the corporate security policy in the course of their normal work; to minimise the damage from security incidents and malfunctions and learn from such
incidents.

7. Security Organisation

Frameworks

1) To avoid breaches of any criminal or civil law, statutory, regulatory or contractual obligations and of any security requirements 2) To ensure compliance of
systems with organizational security policies and standards 3) To maximize the effectiveness of and to minimize interference to/from the system audit process.

1) To manage information security within the Company; 2) To maintain the security of organizational information processing facilities and information assets
accessed by third parties. 3) To maintain the security of information when the responsibility for information processing has been outsourced to another
organization.
1) To ensure the correct and secure operation of information processing facilities; 2) To minimise the risk of systems failures; 3) To protect the integrity of
software and information; 4) To maintain the integrity and availability of information processing and communication; 5) To ensure the safeguarding of information
in networks and the protection of the supporting infrastructure; 6) To prevent damage to assets and interruptions to business activities; 7) To prevent loss,
modification or misuse of information exchanged between organizations.

SWOT

8. Computer & Network Management

9. Asset Classification and Control
To maintain appropriate protection of corporate assets and to ensure that information assets receive an appropriate level of protection.

Summary

10. Security Policy
To provide management direction and support for information security.

Within each section are the detailed statements that comprise the standard.

www.mountainview.ca

ITSM Frameworks

27
ISO/IEC 27001:2005
Governance
GOC
Industry

Frameworks
SWOT

ISO 27002 (formerly called ISO 17799) and the emerging ISO
27001 addresses information security
ISO 27002 is a code of practice for information security. It
details hundreds of specific controls which may be applied to
secure information and related assets. It comprises 115 pages
organized over 15 major sections
ISO 27001 is a specification for an Information Security
Management System, sometimes abbreviated to ISMS
ISO 27001 is the foundation for third party audit and
certification. It comprises 34 pages over 8 major sections
Both standards are intended to apply to all organizations,
whether commercial or otherwise, and should assist anyone with
responsibility for managing information security

Summary

www.mountainview.ca

ITSM Frameworks

28
Capability Maturity Model Integration (CMMI)
Governance
Industry

Initial
Repeatable
Defined
Managed
Optimizing

Frameworks
SWOT

–
–
–
–
–

GOC

Sponsored by U.S. Department of Defense in the late 1980s
Initially aimed at helping DoD identify qualified application
development contractors
Controlled by the Software Engineering Institute at Carnegie
Melon University (www.sei.cmu.edu/cmm)
It’s a process improvement approach
The 5 levels are:

Summary

www.mountainview.ca

ITSM Frameworks

29
ITIL Variants
Governance
GOC

HP ITSM Reference Model
Microsoft Operations Framework (MOF)
IBM ITPM
Etc.

Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

30
ISO FCAPS
Governance
GOC

Fault Management
Configuration Management
Accounting Management
Performance Management
Security Management

Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

31
CIO/IT Balanced Scorecard
Governance

How do we look
to management ?

Demand

Corporate Perspective
Measures

How do we look to
users ?
Customer Perspective
User Perspective
Measures

Objectives

Measures

Objectives

SWOT

Learning and Growth
Perspective

Frameworks

Objectives

Industry

How effective,
efficient, economic
and equitable are
we?
Internal
Perspective

GOC

Objectives

Measures

Supply
Summary

How are we positioned to
meet future challenges ?
www.mountainview.ca

ITSM Frameworks

32
Process Modeling Languages
Governance

Frameworks
SWOT
Summary

ITSM Frameworks

Industry

www.mountainview.ca

GOC

BTEP - Business Transformation Enablement Program (TBS)
BPMN – Business Process Modeling Notation
IDEF – ICAM Definition Languages (Integrated Computer-Aided Manufacturing)
UML - Unified Modeling Language
Petri-net (CPN)
Yourdon (DFD)
Booch
Rumbaugh
Shlaer-Mellor
Coad/Yourdon
Martin
Chen
SSADM
Bachman
Gantt
Object Oriented
Soft Systems
Meta Modelling
Flow Chart
ABC
Workflow
Simulation
33
Zachman Framework - Enterprise Architecture
Governance

Row 1 – Contextual: Scope
– External Requirements and Drivers
– Business Function Modeling
– Business Process Models

What

How

Where

Who

When

GOC

Row 2 – Conceptual: Enterprise Model
Why

– Physical Models
– Solution Definition and Development

Row 5 – As Built: Deployment Model

Conceptual

Conceptual

3

Logical

Logical

4

Physical

Physical

5

As Built

As Built

6

Functioning

Functioning
What

How

Where

Who

When

Why

SWOT

– As Built
– Deployment

Contextual

Frameworks

Row 4 – Physical: Technology Model

Contextual

Industry

– Logical Models
– Requirements Definition

1
2

Row 3 – Logical: System Model

Row 6 – Functioning: Evaluation Model
– Functioning Enterprise
– Evaluation

Summary

Source: Zachman Enterprise Architecture Framework

www.mountainview.ca

ITSM Frameworks

34
IBM Software Change Management Products
Governance
GOC

IBM Rational ClearQuest®: Automated and flexible software
change management across the software lifecycle.
IBM Rational ClearQuest MultiSite: Provides replication and
synchronization of Rational ClearQuest repositories across
distributed sites.
IBM® Rational® ClearCase® Change Management Solution:
Integrated software configuration management and software
change management
IBM Rational ClearCase Change Management Solution Enterprise
Edition: Integrated software configuration management and
software change management, including repository replication
and synchronization across distributed sites.

Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

35
Information Services Procurement Library (ISPL)

SWOT
Summary

ITSM Frameworks

Frameworks

www.mountainview.ca

Industry

procurement managers,
acquisition managers,
program managers,
contract managers,
facilities managers,
service level managers,
and project managers in the IT area.

GOC

–
–
–
–
–
–
–

Governance

Focuses purely on the procurement of information services.
Focuses on the relationship between the customer and supplier
organization
A best practice library for the management of Information
Technology related acquisition processes
Helps both the customer and supplier organization to achieve the
desired quality using the corresponded amount of time and
money by providing methods and best practices for risk
management, contract management, and planning.
The target audience for ISPL is:

36
Software Development Lifecycle Methods
Governance

Frameworks
SWOT
Summary

ITSM Frameworks

Industry

www.mountainview.ca

GOC

Waterfall model
Spiral model
Model driven development
User experience
Top-down and bottom-up design
Chaos model
Evolutionary prototyping
Prototyping
ICONIX Process (UML-based object modeling with use cases)
Unified Process
V-model
Extreme Programming
Software Development Rhythms
Incremental funding methodology
IBM Rational Unified Process (RUP)

37
International Institute of Business Analysis (IIBA)
Governance
GOC

Independent non-profit professional association serving the
growing field of Business Analysis.
http://www.theiiba.org/
Click to open IIBA Body of Knowledge

Industry

Frameworks
SWOT
Summary

www.mountainview.ca

ITSM Frameworks

38
Business Transformation Enablement Program (BTEP)
Governance

BTEP Strategic Design and Planning Methodology
Define Problem Domain
Build Initial Business Models
Investigate Business Problems
Develop the Business Vision
Develop Transformation Strategies
Design the Target Business
Build Business Case for Transformation
Build the Transformation Master Plan

GOC
Industry

Frameworks

1
2
3
4
5
6
7
8

Click here for BTEP Handbook

SWOT
Summary

www.mountainview.ca

ITSM Frameworks

39
Opportunities
Governance
GOC

IT Governance enables Accountability and Control
IT Governance establishes Roles and Responsibilities
IT Governance establishes Policies
IT Governance enables Decision Support thus Strategic Direction
IT Governance improves Transparency, Results and Performance
for the Customer/User
IT Governance increases revenue/reduces the variance in
budgets
IT Governance Learning and Innovation
IT Governance reduces Risk

Industry
Frameworks

SWOT
Summary

www.mountainview.ca

ITSM Frameworks

40
Threats
Governance
GOC

Regulatory non-compliance
Public embarrassment
Public commissions and investigations
Bureaucracy = Responsibility without Accountability
Customer dissatisfaction
Higher costs without a return

Industry
Frameworks

SWOT
Summary

www.mountainview.ca

ITSM Frameworks

41
Strengths
Governance
GOC

Make sense from their perspective
Common language for people and products
Rationale for specific requirements
Identifies control mechanisms - metrics, KPIs
Defines accountability and responsibility
Reduce the total cost of ownership

Industry
Frameworks

SWOT
Summary

www.mountainview.ca

ITSM Frameworks

42
Weaknesses
Governance
GOC
Industry
Frameworks

Each Governance Framework has its limitations
Adopting a proprietary Governance Framework will lock you into
the vendor’s products and/or services
Most Governance Frameworks are not in harmony with others definition of terms are not consistent
Governance Frameworks can be complex
Products are aligned with Governance Frameworks that lead to
interoperability challenges
People align with Governance Frameworks that lead to
arguments and confusion

SWOT
Summary

www.mountainview.ca

ITSM Frameworks

43
Avoid IT Governance Battles
Governance

AVL

ITIL V2
INC

Vendors
IBM
Microsoft
HP

GOC

ITIL V3

COBIT 4.1
CMMI
Six Sigma

Industry

APQC
Booz Allen
Gartner
Meta

ITSM Frameworks

SAP
PeopleSoft
CA
Oracle

Summary

www.mountainview.ca

PMBoK 3
PRINCE2

SWOT

Proprietary
Organic
Home Grown

Frameworks

ISO20000
ISO27001
ISO9000
FCAPS

44
Understand Process, People and Product
Governance

Input

Input

GOC
Industry

Process

Frameworks

People

Product

SWOT

Output

Output

Summary

www.mountainview.ca

ITSM Frameworks

45
Avoid Open Loop Processes

GOC
Industry
Network

SWOT

Summary

Example: car brakes
www.mountainview.ca

ITSM Frameworks

Frameworks

Typical IT Challenges
•Lack of direction and focus
Account
Help
•Limited management information - decisions based on 'I think' rather
Facilities
Management
Desk
than 'I know'
Management
Finance
Operations
•Limited structure in the customer support mechanism
•Low customer confidence/perception
•Out of date customer support system
•Under managed support resources
•Continual fire-fighting and break-fix
Project
•Recurring problems being resolved repeatedly rather than eliminated
MF
UX
Management
•Interrupt-driven
Application
•Over dependency on key staff
Development
•Uncoordinated and unrecorded change takes place that impact service
•Unaware of changes in the business
•Unclear staff resource/cost requirements
•Inconsistent quality of call response and response times

Governance

Processes in which the value of the outcome has no influence on
the input
They take controlling action based simply on inputs

46
Create a PDCA Culture

GOC
Industry
Frameworks
SWOT

What type of ITSM organization do you have?

Governance

Plan - Establish the objectives and processes necessary to deliver
results in accordance with the specifications
Do - Implement the processes
Check - Monitor and evaluate the processes and results against
objectives and Specifications and report the outcome
Act - Apply actions to the outcome for necessary improvement.
This means reviewing all steps (Plan, Do, Check, Act) and
modifying the process to improve it before its next
implementation

P

P

P

D

D

C

C

A

A

C

D

P

P

D

D

C

C

A

A

www.mountainview.ca

ITSM Frameworks

Summary

A

47
Understand the CIO Perspective

Report
Metrics
KPIs

Report
Metrics
KPIs

Report
Metrics
KPIs

Report
Metrics
KPIs

Report
Metrics
KPIs

Report
Metrics
KPIs

Governance

CIO
Report
Metrics
KPIs

GOC

IT Service Management V2

&
Service
Network
Desk /
ITSM CrossServices Processes:
Functional
Help Desk
ISO17799
Facilities
Report Service Strategy, Service Design, Service Transition, Service Operation,
Legato
ISO27001
Metrics
Continuous Service Improvement
IBM
Help Desk
Tivoli
COBIT
KPIs
HP
Institute
OpenView
Cisco
CiscoWorks
Security

Domain or Function Specific Processes

Domain or Function Specific Processes

Domain or Function Specific Processes

Domain or Function Specific Processes

Domain or Function Specific Processes

Domain or Function Specific Processes

Domain or Function Specific Processes

Operations
Infrastructure
Backup
Monitoring

Application
Report
Development
Metrics
KPIs
SDLC

SWOT

PMBoK

IT Service Management V3
Systems

Frameworks

Application
Management
Web
Finance
Sales
Procurement
Directory

??

Report
Metrics
??
KPIs

ITSM Cross Functional Processes:
Change, Incident, Configuration, Release, Problem, ??
??
??
Availability, Capacity, ITSCM, Finance, SLM

Industry

Report
??
Metrics
KPIs

Summary

www.mountainview.ca

ITSM Frameworks

48
V3 SACM: Configuration Management System
Wisdom

Governance
Industry

Knowledge

GOC
SWOT

Information

Frameworks

Data

Summary

Source: ITIL V3

www.mountainview.ca

ITSM Frameworks

49
V3 Service Transition: Process Relationships
Governance

Continuous Service Improvement

Change Management
RFC1

RFC2

RFC3

RFC4

RFC5

RFC6
GOC

Service Asset and Configuration Management
BL1

BL2

BL3

BL4

BL5

BL6

BL7
Industry

Service Transition Planning and Support
Oversee management organization and stakeholder change

E1
Service
Strategy

Service
Design

Plan and
Prepare
Release

E2

Build and
Test

Service
Testing and
Pilots

E3

Plan and
Prepare for
Deployment

E4

Review and
Close Service
Transition

Service
Operation

Early Life Support

SWOT

Release and Deployment Management

Transfer,
Deploy,
Retire

Frameworks

Evaluation of a Change or Service Change

Service Validation and Testing

Service Transition supports the entire Lifecycle

Continual Service Improvement

Change Management (4.2)
RF C1

RFC2

RFC3

RF C4

RFC5

RF C6

Service Asset and Configuration Management (4.3)
BL

BL

BL

BL

BL

BL

BL

Service Transition Planning and Support (4.1)

Oversee management of organization and stakeholder change (5)
Evaluation of a Change or Service (4.6)
E1

Servi ce
St rat egy

Service
Desi gn

Pl an and
prepare
rel ease

E2

Build and
t est

Service
t est ing and
pilot s

Release and Deployment Management (4.4)

E3

Plan and
prepare for
deployment

Transfer,
deploy,
ret ire

Review and
close service
transi tion

Servi ce
Operat ions

Early Life Support

Service Validation and Testing (4.5)

Knowledge Management (4.7)

Focus of
activity related
to service
transition

Other IT IL core
publication

ITIL process in this
publication that
supports the whole
service lifecycle

E

BL

RFC

www.mountainview.ca

ITSM Frameworks

Summary

Knowledge Management

BL = Baseline
E = Evaluation

Point to Evaluate the Service Design

Point to capture Baseline

Request for Change

50
Enable Governance with ISO/IEC 20000
Governance

Click for assessment

GOC
Industry
Frameworks
SWOT

Summary

www.mountainview.ca

ITSM Frameworks

51
Understand Statistical Process Control: Theory
Governance

Deals with architectures, mechanisms, and algorithms for
controlling the output of a specific process

GOC

Error Signal

Controller

Output

Industry

Input

Frameworks

Reference Sensor

SWOT

Summary

www.mountainview.ca

ITSM Frameworks

52
Implement Statistical Process Control: Practical
Governance
GOC

Source: Remedy Trouble Tickets (Federal Government)
Sample size: 65000
Category: Email
Average versus UCL and LCL

Industry
Frameworks

Input?
Controller?
Sensor?
Error Signal?
Output?

SWOT

UCL
AVG

LCL
Summary

www.mountainview.ca

ITSM Frameworks

53
Thank you
Governance

PRESENTED BY:
Jerry Kopan, (613)867-5170 cell
jerry@mountainview.ca

GOC
Industry

PRESENTATION CAN BE OBTAINED FROM:
www.itsmf.ca
www.mountainview.ca

Frameworks

ITIL V2 Service Support Book on sale: 25% Discount
MOUNTAINVIEW TRAINING and CONSULTING
ITIL V2 & V3 Certification
V2 Foundation (2 days)
Practitioner (IPSR, IPRC, IPAD, IPPI)
Service Manager
V3 Foundation (3 days)
Foundation Bridge (1 day)
Service Manager Bridge Prep (CBT)

ITSM Frameworks

Summary

www.mountainview.ca

SWOT

–
–
–
–
–
–

54

Contenu connexe

Tendances

COBIT 5 as a standard in the Jordanian banking system
COBIT 5 as a standard in the Jordanian banking systemCOBIT 5 as a standard in the Jordanian banking system
COBIT 5 as a standard in the Jordanian banking systemMark Constable
 
Qap cobit2019-20181111
Qap cobit2019-20181111Qap cobit2019-20181111
Qap cobit2019-20181111Patrick Soenen
 
Mark thomas cobit-and-frameworks
Mark thomas cobit-and-frameworksMark thomas cobit-and-frameworks
Mark thomas cobit-and-frameworksAbou Tesnime
 
Cobit, itil and cmmi - a tutorial
Cobit, itil and cmmi  - a tutorialCobit, itil and cmmi  - a tutorial
Cobit, itil and cmmi - a tutorialseveman
 
Cobit 2019 framework by ISACA
Cobit 2019 framework by ISACACobit 2019 framework by ISACA
Cobit 2019 framework by ISACAMDFazlaRabbiAbir
 
Superior it governance with iso 38500.key
Superior it governance with iso 38500.keySuperior it governance with iso 38500.key
Superior it governance with iso 38500.keyBasta Group BV
 
COBIT 5 Basic Concepts
COBIT 5 Basic ConceptsCOBIT 5 Basic Concepts
COBIT 5 Basic ConceptsSpyros Ktenas
 
Big Data Framework - How to get started!
Big Data Framework - How to get started!Big Data Framework - How to get started!
Big Data Framework - How to get started!Mark Constable
 
Introduction to COBIT 5 and IT management
Introduction to COBIT 5 and IT managementIntroduction to COBIT 5 and IT management
Introduction to COBIT 5 and IT managementChristian F. Nissen
 
Program and Portfolio Management Basics Brief
Program and Portfolio Management Basics BriefProgram and Portfolio Management Basics Brief
Program and Portfolio Management Basics BriefSpyros Ktenas
 
Frameworks For Predictability
Frameworks For PredictabilityFrameworks For Predictability
Frameworks For Predictabilitytlknecht
 

Tendances (20)

COBIT 5 as a standard in the Jordanian banking system
COBIT 5 as a standard in the Jordanian banking systemCOBIT 5 as a standard in the Jordanian banking system
COBIT 5 as a standard in the Jordanian banking system
 
Audit rizkie hafizzah
Audit rizkie hafizzahAudit rizkie hafizzah
Audit rizkie hafizzah
 
Qap cobit2019-20181111
Qap cobit2019-20181111Qap cobit2019-20181111
Qap cobit2019-20181111
 
Mark thomas cobit-and-frameworks
Mark thomas cobit-and-frameworksMark thomas cobit-and-frameworks
Mark thomas cobit-and-frameworks
 
Donna Febriani
Donna FebrianiDonna Febriani
Donna Febriani
 
Christophe feltus introduction to iso 38500 v1 0
Christophe feltus introduction to iso 38500 v1 0Christophe feltus introduction to iso 38500 v1 0
Christophe feltus introduction to iso 38500 v1 0
 
Val it 2.0
Val it 2.0Val it 2.0
Val it 2.0
 
Cobit, itil and cmmi - a tutorial
Cobit, itil and cmmi  - a tutorialCobit, itil and cmmi  - a tutorial
Cobit, itil and cmmi - a tutorial
 
Cobit 2019 framework by ISACA
Cobit 2019 framework by ISACACobit 2019 framework by ISACA
Cobit 2019 framework by ISACA
 
Superior it governance with iso 38500.key
Superior it governance with iso 38500.keySuperior it governance with iso 38500.key
Superior it governance with iso 38500.key
 
COBIT 5 Basic Concepts
COBIT 5 Basic ConceptsCOBIT 5 Basic Concepts
COBIT 5 Basic Concepts
 
CObIT
CObITCObIT
CObIT
 
What is Cobit
What is CobitWhat is Cobit
What is Cobit
 
ISO 27014 et 38500
ISO 27014 et 38500ISO 27014 et 38500
ISO 27014 et 38500
 
Big Data Framework - How to get started!
Big Data Framework - How to get started!Big Data Framework - How to get started!
Big Data Framework - How to get started!
 
IT Governance - COBIT Perspective
IT Governance - COBIT PerspectiveIT Governance - COBIT Perspective
IT Governance - COBIT Perspective
 
Cobit5
Cobit5Cobit5
Cobit5
 
Introduction to COBIT 5 and IT management
Introduction to COBIT 5 and IT managementIntroduction to COBIT 5 and IT management
Introduction to COBIT 5 and IT management
 
Program and Portfolio Management Basics Brief
Program and Portfolio Management Basics BriefProgram and Portfolio Management Basics Brief
Program and Portfolio Management Basics Brief
 
Frameworks For Predictability
Frameworks For PredictabilityFrameworks For Predictability
Frameworks For Predictability
 

Similaire à Mountainview ITSM: Enabling MAF with IT Governance Frameworks

Governance Tools Boyd Carter 2006
Governance Tools Boyd Carter 2006Governance Tools Boyd Carter 2006
Governance Tools Boyd Carter 2006Freelancer Training
 
Pmi, Opm3 And Cmmi Assessment Overview
Pmi, Opm3 And Cmmi Assessment OverviewPmi, Opm3 And Cmmi Assessment Overview
Pmi, Opm3 And Cmmi Assessment OverviewAlan McSweeney
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkIJCSIS Research Publications
 
3 2006 06 cs6 4 gait principles v3a
3 2006 06 cs6 4 gait principles v3a3 2006 06 cs6 4 gait principles v3a
3 2006 06 cs6 4 gait principles v3aGene Kim
 
ICT Governance for Enterprise Control & Value Creation - Day1
ICT Governance for Enterprise Control & Value Creation - Day1ICT Governance for Enterprise Control & Value Creation - Day1
ICT Governance for Enterprise Control & Value Creation - Day1Jenny Tsuboyama energizIN
 
IT Governance Vs IT Management Presentation V0.1
IT Governance Vs IT Management   Presentation V0.1IT Governance Vs IT Management   Presentation V0.1
IT Governance Vs IT Management Presentation V0.1Richard Willis
 
Governance V3 (2)
Governance V3 (2)Governance V3 (2)
Governance V3 (2)guestf73e68
 
Ea As A Strategy M Veeraragaloo Approach
Ea As A Strategy   M Veeraragaloo ApproachEa As A Strategy   M Veeraragaloo Approach
Ea As A Strategy M Veeraragaloo ApproachMaganathin Veeraragaloo
 
A Practical GuidetoFederal Enterprise ArchitectureCh.docx
A Practical GuidetoFederal Enterprise ArchitectureCh.docxA Practical GuidetoFederal Enterprise ArchitectureCh.docx
A Practical GuidetoFederal Enterprise ArchitectureCh.docxevonnehoggarth79783
 
Session3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycleSession3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycleBantu Sai Ramesh
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementStork
 
Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...GeoEnable Limited
 
IT frameworks
IT frameworksIT frameworks
IT frameworkscyouss
 
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...ijait
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsMichael Sim
 
Struktur Komponen, Area Fokus, Faktor Desain.pdf
Struktur Komponen, Area Fokus, Faktor Desain.pdfStruktur Komponen, Area Fokus, Faktor Desain.pdf
Struktur Komponen, Area Fokus, Faktor Desain.pdfDhata Praditya
 

Similaire à Mountainview ITSM: Enabling MAF with IT Governance Frameworks (20)

Governance Tools Boyd Carter 2006
Governance Tools Boyd Carter 2006Governance Tools Boyd Carter 2006
Governance Tools Boyd Carter 2006
 
Pmi, Opm3 And Cmmi Assessment Overview
Pmi, Opm3 And Cmmi Assessment OverviewPmi, Opm3 And Cmmi Assessment Overview
Pmi, Opm3 And Cmmi Assessment Overview
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance Framework
 
3 2006 06 cs6 4 gait principles v3a
3 2006 06 cs6 4 gait principles v3a3 2006 06 cs6 4 gait principles v3a
3 2006 06 cs6 4 gait principles v3a
 
ICT Governance for Enterprise Control & Value Creation - Day1
ICT Governance for Enterprise Control & Value Creation - Day1ICT Governance for Enterprise Control & Value Creation - Day1
ICT Governance for Enterprise Control & Value Creation - Day1
 
IT Governance Vs IT Management Presentation V0.1
IT Governance Vs IT Management   Presentation V0.1IT Governance Vs IT Management   Presentation V0.1
IT Governance Vs IT Management Presentation V0.1
 
Governance V3 (2)
Governance V3 (2)Governance V3 (2)
Governance V3 (2)
 
Ea As A Strategy M Veeraragaloo Approach
Ea As A Strategy   M Veeraragaloo ApproachEa As A Strategy   M Veeraragaloo Approach
Ea As A Strategy M Veeraragaloo Approach
 
A Practical GuidetoFederal Enterprise ArchitectureCh.docx
A Practical GuidetoFederal Enterprise ArchitectureCh.docxA Practical GuidetoFederal Enterprise ArchitectureCh.docx
A Practical GuidetoFederal Enterprise ArchitectureCh.docx
 
Session3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycleSession3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycle
 
Implementing IT Service Management: A Guide to Success
Implementing IT Service Management: A Guide to SuccessImplementing IT Service Management: A Guide to Success
Implementing IT Service Management: A Guide to Success
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
 
An IT Governance program
An IT Governance programAn IT Governance program
An IT Governance program
 
Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...
 
IT frameworks
IT frameworksIT frameworks
IT frameworks
 
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced Scorecards
 
COBIT 2019 - DIGITAL TRUST FRAMEWORK
COBIT 2019 - DIGITAL TRUST FRAMEWORKCOBIT 2019 - DIGITAL TRUST FRAMEWORK
COBIT 2019 - DIGITAL TRUST FRAMEWORK
 
mm CGEIT Best Practices and Concepts
mm CGEIT Best Practices and Conceptsmm CGEIT Best Practices and Concepts
mm CGEIT Best Practices and Concepts
 
Struktur Komponen, Area Fokus, Faktor Desain.pdf
Struktur Komponen, Area Fokus, Faktor Desain.pdfStruktur Komponen, Area Fokus, Faktor Desain.pdf
Struktur Komponen, Area Fokus, Faktor Desain.pdf
 

Plus de Jerry Kopan

Mountainview it governance framework navigator v3.11.3
Mountainview it governance framework navigator v3.11.3Mountainview it governance framework navigator v3.11.3
Mountainview it governance framework navigator v3.11.3Jerry Kopan
 
Mountainview ITSM: ITIL edition 2011 Process and Function Poster
Mountainview ITSM: ITIL edition 2011 Process and Function PosterMountainview ITSM: ITIL edition 2011 Process and Function Poster
Mountainview ITSM: ITIL edition 2011 Process and Function PosterJerry Kopan
 
Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...
Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...
Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...Jerry Kopan
 
Mountainview ITSM: ITIL Edition 2007 Process Poster
Mountainview ITSM: ITIL Edition 2007 Process PosterMountainview ITSM: ITIL Edition 2007 Process Poster
Mountainview ITSM: ITIL Edition 2007 Process PosterJerry Kopan
 
Mountainview ITSM: Reducing Project failure by integrating PMBoK and ITSM
Mountainview ITSM: Reducing Project failure by integrating PMBoK and ITSMMountainview ITSM: Reducing Project failure by integrating PMBoK and ITSM
Mountainview ITSM: Reducing Project failure by integrating PMBoK and ITSMJerry Kopan
 
Mountainview ITSM: ITIL Periodic Table of Processes and Functions
Mountainview ITSM: ITIL Periodic Table of Processes and FunctionsMountainview ITSM: ITIL Periodic Table of Processes and Functions
Mountainview ITSM: ITIL Periodic Table of Processes and FunctionsJerry Kopan
 

Plus de Jerry Kopan (6)

Mountainview it governance framework navigator v3.11.3
Mountainview it governance framework navigator v3.11.3Mountainview it governance framework navigator v3.11.3
Mountainview it governance framework navigator v3.11.3
 
Mountainview ITSM: ITIL edition 2011 Process and Function Poster
Mountainview ITSM: ITIL edition 2011 Process and Function PosterMountainview ITSM: ITIL edition 2011 Process and Function Poster
Mountainview ITSM: ITIL edition 2011 Process and Function Poster
 
Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...
Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...
Mountainview ITSM: Navigating through the Risks and Challenges of IT Projects...
 
Mountainview ITSM: ITIL Edition 2007 Process Poster
Mountainview ITSM: ITIL Edition 2007 Process PosterMountainview ITSM: ITIL Edition 2007 Process Poster
Mountainview ITSM: ITIL Edition 2007 Process Poster
 
Mountainview ITSM: Reducing Project failure by integrating PMBoK and ITSM
Mountainview ITSM: Reducing Project failure by integrating PMBoK and ITSMMountainview ITSM: Reducing Project failure by integrating PMBoK and ITSM
Mountainview ITSM: Reducing Project failure by integrating PMBoK and ITSM
 
Mountainview ITSM: ITIL Periodic Table of Processes and Functions
Mountainview ITSM: ITIL Periodic Table of Processes and FunctionsMountainview ITSM: ITIL Periodic Table of Processes and Functions
Mountainview ITSM: ITIL Periodic Table of Processes and Functions
 

Dernier

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 

Dernier (20)

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 

Mountainview ITSM: Enabling MAF with IT Governance Frameworks

  • 1. Governance GOC itSMF Canada NRC/RCN RCAF Officer’s Mess 158 Gloucester St. Ottawa March 26, 2008 Industry Frameworks Enabling the Management Accountability Framework (MAF): Challenges of IM/IT Governance Frameworks SWOT Presented by: Jerry Kopan, Summary ITIL V3 Expert, V2 Service Manager, PrISM, CMC, B.Sc. jerry@mountainview.ca www.mountainview.ca ITSM Frameworks 1
  • 2. Table of Contents Governance GOC What is Governance? Management Accountability Framework Industry Governance Frameworks IM/IT Governance Frameworks SWOT Analysis of Governance Frameworks Summary and Recommendations for enabling MAF Questions – 10 minutes Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 2
  • 3. What is Governance? Governance Compare and contrast these terms: Framework Model Process Policies Architecture Best practices Are there other terms? GOC Industry – – – – – – – Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 3
  • 4. TBS Definition of Governance Governance Frameworks SWOT Summary ITSM Frameworks Industry www.mountainview.ca GOC Accountability - the obligation to demonstrate and take responsibility for performance in light of commitments and expected outcomes. Authority – the legislation, document or other venue that defines responsibilities within defined circumstance and empowers an individual or organization to deliver on them. Authority - delegated power to command and make final decisions within a particular domain with the expectation of being obeyed and held accountable for results. Governance – exercising authority to provide direction and to undertake, coordinate, and regulate activities in support of achieving this direction and desired outcomes. Outcome - an event, occurrence or condition that occurs as a direct result of programs and activities. Result - the impact or effect of a program or service. Responsibility - something that one is required to do as part of a job, role or legal obligation. 4
  • 5. Other Governance Definitions Governance “IT Governance is the responsibility of the board of directors and executive management. It is an integral part of enterprise governance and consists of leadership and organizational structures and processes that ensure that the organization’s IT sustains and extends the organization’s strategies and objectives.” ITGI, Board briefing in IT governance GOC “IT Governance specifies the decision-making authority and accountability to encourage desirable behaviors in the use of IT. IT Governance provides a framework in which the decisions made about IT issues are aligned with the overall business strategy and culture of the enterprise.” “The Need for IT Governance: Now more than Ever”, Gartner Research note AV-21-4823, 2004 Industry “A structure of relationships and processes to direct and control the enterprise in order to achieve the enterprise’s goals by adding value while balancing risk versus return over IT and its processes.” COBIT, ISACA Frameworks “Governance encompasses the roles, responsibilities and accountabilities of the Legislative Assembly representing the public, and the organizations and management of government. Governance is the structure and processes that support the realization of overall objectives and the strategies to achieve them. It is concerned with the development, communication and implementation of government policy, and in monitoring performance with respect to standards. Governance includes ongoing risk assessment and management in the general course of delivering programs and services.” SWOT Ministry of Finance, Government of B.C. www.mountainview.ca ITSM Frameworks Summary “Information Technology Governance, IT Governance or ICT Governance, is a subset discipline of Corporate Governance focused on information technology systems and their performance and risk management. The rising interest in IT governance is partly due to compliance initiatives (e.g. Sarbanes-Oxley (USA) and Basel II (Europe)), as well as the acknowledgement that IT projects can easily get out of control and profoundly affect the performance of an organization.” Wikipedia 5
  • 6. Management Accountability Framework (MAF) Governance Treasury Board of Canada Secretariat Elements of MAF GOC – Ten interconnected “expectations” defined as the essential determinants of sound management decision making – Key Indicators to indicate the breath of the expectations – Shorter term measures Industry Frameworks Click here to start video Ivan Blake SWOT Executive Director Treasury Board of Canada MAF Development & Implementation (4:13) Summary www.mountainview.ca ITSM Frameworks 6
  • 7. Management Accountability Framework is … Governance Industry Frameworks Public Service Values Governance and Strategic Directions Policy and Programs Results and Performance Learning, Innovation and Change Management Risk Management People Stewardship Citizen-focused Service Accountability ITSM Frameworks Summary www.mountainview.ca SWOT – – – – – – – – – – GOC not carved in stone a tool, instrument, aid an Framework for Accountability about holding Deputy Ministers accountable for a certain quality of management in the public service part of the “Guide for Deputy Ministers” a “Framework of Expectations” written for DMs the 10 things we expect from DMs for good management 7
  • 9. IT Governance Frameworks Governance Frameworks SWOT Summary ITSM Frameworks Industry www.mountainview.ca GOC Information Technology Infrastructure Library (ITIL V2) ITIL V3 ISO/IEC 20000 Information Security Management System (ISO 17799, 27001) Control Objectives for Information and related Technology (COBIT 4.1) Six Sigma - DMAIC American Productivity and Quality Centre (APQC 4.0) Project Management Body of Knowledge (PMBoK 3.0) PRojects IN Controlled Environments version 2 (PRINCE2) Business Transformation Enablement Program (BTEP) International Institute of Business Analysis (IIBA) Capability Maturity Model Integration (CMMI) Vendor specific: MOF, HP ITSM, IBM ITPM, … ISO FCAPS 9
  • 10. Generic Process Elements Governance Control Policy Objectives Documentation Feedback Triggers GOC Owner Industry Process Metric CSI Outputs Customer Including process reports and reviews SWOT Enablers People Summary www.mountainview.ca Roles Frameworks Is it a process or an auditing tool? Activities RACI Supplier Inputs Products Source: ITIL V3 ITSM Frameworks 10
  • 11. OGC Guidance Website Governance Summary of OGC Guidance (January 2003) No 19 PTN Update sector in an uncertain world aspects of CUP 60) Appendix C: Risk Mitigation July 1989 Summary 11 SWOT ITSM Frameworks Frameworks www.mountainview.ca Industry Managing Services Procurement strategies (PG No Overview and Case Studies Appendix D: ePilots Project 5) Technical Notes No (Vendors and January 1991 (See 1, 19 & 51) EC Guidance (updating CUP also guidance published commercially by OGC’s 2003/04e.g ITIL below) 27 Approved Suppliers A-Z of Terms of projects (PG No 6) Plan to publish in partners Financial aspects How to account for PFI Transactions Contractors) Lists Documentation (replacing CUP 59 a to d) Plan EC Procurement Procedure and Advertise in the OJEC Work in hand 2002/03 Work Programme Whole life costs (PG No 7) How to followto publish in 2003/04 No 29 Quality Costs June 1991 Procurement Training ITIL Plan to 53) Plan Delivery Lifecycle How to 2003 to and Manage Advisers to PFI Projects Ensuring grant-aided bodies deliver value for (replacing CUP publish January Appoint publish in 2003/04 Project evaluation and feedback (PG No 8) No June 1991 How to Appoint and Work with a Preferred Bidder 30 Specification Writing money on procurements involving public money Service Delivery Strategic (PG No 9) Benchmarking Mangement No 35 Life Cycle Costing April Service Support How April 2003 Key Issues Strategic Management1992 Why Construction Projects Fail Plan to publish beforeto Construct a Public Sector Comparator Achieving Excellence Through Health and Safety Planning to Implement Service Management Delivery of Long Term PFI No 46 Quality Assurance How to Manage the Contracts June 1994 Improving the efficiency and effectiveness of Plan to publish before April 2003 (PG Governance No 10) SRO Breifing Security Management Draft Competence Framework for Creating Effective PFI Project Teams – Draft No 48 Bonds & Guarantees August 1994 Quality management procurement to achieve faster delivery Senior Responsible Owner briefing (links to SRIE briefing) CUP Guides The Business Perspective No 51 Introduction to thePolicies and standards EC July 1995 Construction and Use of Public Sector Plan to publish before April 2003 ICT Infrastructure Management No 12 Contracts and Contract Management for Other Property/workspace management procurement rules Delivery Pocketbook Application Management Comparators Construction Works March 1989 Staff Transfers from Central Government – A Fair Deal for Staff Exploiting technology Successful Delivery Pocketbook September 1995 Guidance on Standardisation of PFI Contracts No 52 Programming and48 Bonds andManagement including General Guidance, Information No progress Information guarantees August 1994 monitoring for works projects Related Ppublications Technology and Local Authorities No 52 Programming and progress monitoring for Risk management Guidance – Generic operational guidance for heads of procurement and their teams Faster procurement itSMF Pocket Guide No 53 Procurement Training January works projects September 19951996 Benefits management Published Taskforce executive report on faster procurement Abbreviations and and Acronyms itSMF Dictionary of Terms, Case Studies No 54 Value management Value Resources management January 1996 Human management January 1996 No 54 value from software development Helicopter Aircrew Training Facility – PFI Case Study PG 10 Achieving Excellence through Health and BetterPublished – October 2001 Medium Support No 55 Ethics in Procurement April 1997 Organisational learning 4. Risk and value management Current Gateway Issues Safety Employment Service – IT Partnership Continuous Improvement April 1997 The Gateway Process a Managers Checklist 5. The integrated team:No 56 Debriefing teamworking, Private Finance and IS/IT: case study TAFMIS and After Supplier Finance Appraisal – (replacing the financial Published Procurement – October 2001 Cost managementMay 1997 No Colfox School, Dorset –partnering and incentives 57 DBFO School Project government A Case Study on the First – Strategic partnering in and competencies aspects of CUP 60) Skills Open Source Software Workbooks 6. Procurement Study for the Welsh Office OSIRIS Private Finance and IS/IT Caseand contract strategies Dispute Resolution – (replacing CUP 50) Managing performance Value Published in March 2002 – The Role of Auditors for Money – Procurement Strategy Management No 59 a Model May 1997 Report on the Procurement of Custodial Services in life costs Appraisal case studies 7. Cost management: whole DCMF prisons – 2 Questionnaire Security & Privacy Green Public Private Partnerships Published – July 2002 Gateways DBFO – Value in Roads A Case study on the first Eight DBFO Roads IS/IT managementMay 1997 No 59 b Pre-Qualification and financial control Smaller Supplier….BetterBusiness Case Value Published – 2002 HM Treasury Procurement Guidance The IND Caseworking Program Scottish Health Servicec Model Invitation to Tender Working 8. Improving performance: 59 Management Executive: Ferryfield House, No May 1997 Joined-up Revised General GuidanceRisk Management of PFI EC Procurement– JulyEdinburgh on Standardisation Published Thresholds 2002 benchmarking and performance Benchmarking/capability No July 1997 Programme ManagementEC Public Procurement State of Play Contracts Lewisham Extension to management Docklands Light Railway 59 d Model Conditions of Contract Procurement No 60 Supplier appraisal (non-financial) May 1997 OGC Guidance note – on calculation of the Authority’sEfficiency in Government Procurement Prison Services design Published – JulyLowdham Grange 2002 Setting Direction 9. Quality in Project Management Environmental Issues in Purchasing share of a refinancing gain Overview 10. Health and safety: respect for Contract Management Framework Agreements CUP Guidances: Overtaken – no revision or replacement required – guidances are OGC Guidance on certain financing issues in PFI Published – JulyOther Guidance – None OGC 2002 Identifying direction people Performance Management Liability in GovernmentAppraisal and Evaluation in Central Government (the HMT Green Book) Contracts archived. (Superseded guides are not shown) contracts Business requirements Benefits Management Disposal of deals under the Private Finance To be published by March 2003 of Property Examining the Initiative (NAO) Minimum number of Suppliers to Bid Value for Money Business & supporting strategies No 3 Supply and Service Agreements with the Agencies – January 1987 OGC – PFI Contracts – Insurance costs Published – October 2002 Fraud Observance Guidance To be published by March 2003 Ownership of IPR Positioning for the future No 14 Measuring Performance in Purchasing – March 1989 Contract Management guidelines (replacing CUP 61) Scope for Flexibility Under the2002 Published – November EC Rules Programme and Contract Management Construction Guidance: The Achieving Excellence suite of briefingsin Building and Construction – April 1989 Customer focus No 17 Quality Assurance will replace the Business Case Published – 2002 Technical Specifications Construction Procurement Guidance series No Guidance Function and Works estimatingOctober 1989 Managing Successful Projects with PRINCE2 Planning & Projects – Existing ex-PACE & PPD 20 The P&S Risk Management Published – 2002 Managing Successful Programmes (Replaces the PG guides and CUP guides detailed22 Stock Management – May 1990 Enterprise architecture No in the right column below) Guide to the Appointment of Consultants and Contractors (GACC) (1/99) Supporting the Supplier Community Tailoring PRINCE Achieving Excellence – Constructing the GuideNo 23 Model Forms of Contract – September 1990 Estates Services (ESG) (2/00) People Issues and PRINCE Implementing Plans Best Government Client Tendering for Government Contracts Work in hand Premises Management No 24 a b c d e Vehicles: Contract Hire Schemes – November 1990 Guide (PMG) (9/99) PRINCE2 Pocketbook Overview No 27 Approved Suppliers (Vendors and Contractors) Lists – January 1991 Achieving SustainabilityBusiness Continuity in Construction SMEsPlan to publish January 2003 – Doing business with the Government (under development)Planning Guide (BCPG) (11/98) Supplier Debriefing (replacing CUP 56) PRINCE2 exam Managing change Passing the No 28 Contracts with a Private Sector Purchasing Agent – January 1991 Procurement Fire Safety Guide (FSG) (7/00) Business case Business Benefits through Project Management No 31 Use of Travel Agents – October 1991 Guide and Achieving Excellence Action Plan Schedule to Requirements for Office Buildings (ROB) (3/98) PFI/PPP Guidance – Published unless otherwise stated No 32 Catering ServicesProgramme management – January 1992 Crown (Target Achieving Excellence Briefings Fire Standards (CFS) (10/99) Procurement Guidance 1-10 Project management No 35 Life Deeds and Sealing Guide (8/00) Cycle Costing – April 1992 Procurement 1993 No 37 Managing Car Fleets – January Requirements definition GOC Ethics in Procurement (replacing CUP 55) Plan to publish before April 2003 Best Practice Products – High-level Guides for top management in Departments Management of Risk Generic guidance Published Procurement Guidance 1-10 Achieving Possibilities for 2003/04 Work Programme Partnerships for Prosperity (P4P) Excellence Briefings (Target Management of Risk: Guidance for PractitionersDate January 2003) Published 2001 Plan to Guide after PFI Procurement Process Why IT Projects Fail Specification Writing (replacing CUP 30) – AprilA Step-by-Step publishto the March 2003 Code of Good Practice – eProcurement and suppliers for customers Guidance Documents Essential requirements for construction Managing Partnering Relationships Published – July Public Private Partnerships: the Government's Approach 2001 Plan to publish Core March 2003 Quality Costs (replacing CUP 29) after Government Overview procurement (PG Good The Government Procurement Code of No 1) Practice Policy Statements, Technical Notes and other material IT-enabled business change 2001 – Published How Major Service Contracts Can Go Wrong (replacing CUP 46) – September Plan to publish after March 2003 Published eProcurement Market Quality Assurance PFI and Public Expenditure Allocations 1. Achieving Excellence: Initiative into Value for money in construction procurements Guidelines on Business Continuity Management Gateway to Success Published – December 2001 The Business Opportunity Frameworks/Approved Supplier List (replacing Public Sectorto publish Action Value for Money Plan Comparators and after March 2003 (PG No 2) CUP Planning Your Approach Value for Money Evaluation 27)Major Service Risk Guidelines – March 2002 Public Expenditure Allocations for NDPBs Guidances: Current Published CUP in PFI and 2. Project organisation: No 1 Post Tender Negotiation roles and Appointment of consultants and contractors (PG Delivery Lifecycle Implementation May 1986 Procurements PFI Effective Partnering (possible replacement for CUPProjects: to publish responsibilities and Consultation with Staff and3) Plan Disclosure of Information after March 2003 No Other Interested and Techniques Setting Direction Appendix A: Tools March 1989 No 12 Contracts and Contract Risk Allocation in Long-term Contracts Published – December 2002 Parties 57) Implementing plans 3. Project procurement lifecycle Teamworking,B: Standards and Security (PG No Appendix partnering and incentives Forming Partnering relationships with the private Strategic non-financial Provision of Informationby end of March 2003 Management for Construction Works Published – December 2002 to publish to Parliament Supplier Appraisal (replacing the Management Plan 4)
  • 12. ITIL Version 2 Governance ITIL Publications GOC Incident Problem Change Configuration Release Service Desk Service Delivery ICT Infrastructure Management Security Management Certification The Business Service Support Frameworks The Business Perspective The Technology Service Management Industry Planning to Implement Service Management Application Management SWOT Summary Capacity Availability Service Level IT Service Continuity Financial http://www.ogc.gov.uk/ www.mountainview.ca ITSM Frameworks 12
  • 13. ITIL Version 3 Governance Service Strategy – – – – Service Generation: Define the market, Develop the offerings, Develop strategic assets, Prepare for execution Service Portfolio Management (SPM) Demand Management Financial Management ** Service Transition Change Management ** Service Asset and Configuration Management (SACM) ** Release and Deployment Management ** Transition Planning and Support Service Validation and Testing Evaluation Knowledge Management Risk Management Frameworks – – – – – – – – Certification Service Level Management (SLM) ** Service Catalogue Management Availability Management ** Information Security Management (ISM) Supplier Management Capacity Management ** IT Service Continuity Management ** Industry – – – – – – – GOC Service Design – – – – – SWOT Service Operation Incident Management ** Event Management Request Fulfilment Problem Management ** Access Management – – Summary Continual Service Improvement The 7 step improvement process PDCA www.mountainview.ca ITSM Frameworks 13
  • 14. ITIL® Certification (as of March 2008) Governance Version 2 Version 3 Advanced Expert GOC SM Bridge 5 Service Manager 17 Expert Industry Minimum 22 Credits Required ~ $20k Managing Across the Lifecycle 5 IPPI 3 www.mountainview.ca SS 3 SD 3 Foundation Bridge 0.5 ITSM Frameworks ST 3 Capability Stream SO CSI 3 3 PPO 4 SOA 4 RCV 4 OSA 4 Summary FB: Lifecycle Stream IPSR 3 SWOT Foundation 1.5 12 IPRC 3 Frameworks IPAD 3 Foundation 2 14
  • 15. ITIL V2 and V3 Differences Six Sigma Application Business Perspective ICT Planning to Implement Security Financial ITSCM Availability Capacity Service Level Service Desk Configuration Release Change Problem Incident www.mountainview.ca No issue Major Summary FB: SWOT C e r t i f i c a t i o n Frameworks 3 Industry V e r s i o n GOC I T I L SS: The Service Generation Define the market Develop the offerings Develop strategic assets Prepare for execution SS: Service Portfolio Management SS: Demand Management SS: Financial Management SD: Service Level Management SD: Service Catalogue Management SD: Availability Management SD: Information Security Management SD: Supplier Management SD: Capacity Management SD: IT Service Continuity Management ST: Change Management ST: Service Asset and Configuration Management ST: Release and Deployment Management ST: Transition Planning and Support ST: Service Validation and Testing ST: Evaluation ST: Knowledge Management Risk Management SO: Incident Management SO: Event Management SO: Request Fulfillment SO: Problem Management SO: Access Management CSI: Contiuous Improvement Method CSI: 7 Step Improvement Model CSI: PDCA Function: Service Desk Function: Application Management Function: Operations Management Function: Technical Management Governance other complementary book ITIL Version 2 Certification Minor Insignificant ITSM Frameworks 15
  • 16. COBIT 4.1 Planning and Organization Define a Strategic IT Plan and direction Define the Information Architecture Determine Technological Direction Define the IT Processes, Organization and Relationships Manage the IT Investment Communicate Management Aims and Direction Manage IT Human Resources Manage Quality Access and Manage IT Risks Manage Projects Identify Automated Solutions Acquire and Maintain Application Software Acquire and Maintain Technology Infrastructure Enable Operation and Use Procure IT Resources Manage Changes Install and Accredit Solutions and Changes Frameworks AI1 AI2 AI3 AI4 AI5 AI6 AI7 Industry Acquisition and Implementation Delivery and Support Define and Manage Service Levels Manage Third-party Services Manage Performance and Capacity Ensure Continuous Service Ensure Systems Security Identify and Allocate Costs Educate and Train Users Manage Service Desk and Incidents Manage the Configuration Manage Problems Manage Data Manage the Physical Environment Manage Operations SWOT Summary DS1 DS2 DS3 DS4 DS5 DS6 DS7 DS8 DS9 DS10 DS11 DS12 DS13 Monitoring ME1 ME2 ME3 ME4 www.mountainview.ca ITSM Frameworks GOC PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 Governance Control OBjectives for Information and related Technology IT governance, control framework and maturity model Ensure IT resources are aligned with an enterprise's business objectives Ensure that services and information, when delivered, meet quality and security needs 34 control objectives Auditor's tool Developed by the Information Systems Audit and Control Association (www.isaca.org) Monitor and Evaluate IT Processes Monitor and Evaluate Internal Control Ensure Regulatory Compliance Provide IT Governance 16
  • 17. AI6 Manage Changes Governance GOC Industry Frameworks All changes, including emergency maintenance and patches, relating to infrastructure and applications within the production environment are formally managed in a controlled manner. Changes (including those to procedures, processes, system and service parameters) are logged, assessed and authorised prior to implementation and reviewed against planned outcomes following implementation. This assures mitigation of the risks of negatively impacting the stability or integrity of the production environment. SWOT Summary www.mountainview.ca ITSM Frameworks 17
  • 18. AI6 Control Objectives Governance AI6.1 Change Standards and Procedures – Set up formal change management procedures to handle in a standardized manner all requests (including maintenance and patches) for changes to applications, procedures, processes, system and service parameters, and the underlying platforms. GOC AI6.2 Impact Assessment, Prioritization and Authorization – Industry – Assess all requests for change in a structured way to determine the impact on the operational system and its functionality. Ensure that changes are categorized, prioritized and authorised. AI6.3 Emergency Changes – AI6.4 Change Status Tracking and Reporting – – Establish a tracking and reporting system to document rejected changes, communicate the status of approved and in-process changes, and complete changes. Make certain that approved changes are implemented as planned. – SWOT AI6.5 Change Closure and Documentation Whenever changes are implemented, update the associated system and user documentation and procedures accordingly. ITSM Frameworks Summary What is the difference between ITIL and COBIT? www.mountainview.ca Frameworks Establish a process for defining, raising, testing, documenting, assessing and authorizing emergency changes that do not follow the established change process. 18
  • 19. AI6 RACI Governance Roles versus Positions in ITIL Mapping roles to positions GOC Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 19
  • 20. AI6 Goals and Metrics Governance GOC Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 20
  • 21. Six Sigma Governance Define Measure GOC Analyze Improve Industry Developed at Motorola, circa 1983 Sigma, or standard deviation, identifies the variability within a population DMAIC 6σ = 3.4 defects per million 99.99966% free of defects Control Frameworks Normal Distribution (Bell Curve) Standard Deviation (σ = 68%, 2σ = 95%) LCL UCL SWOT Summary www.mountainview.ca ITSM Frameworks 21
  • 22. American Productivity and Quality Centre (APQC 4.0) Governance Industry Human Capital Management Financial Management Information Technology Innovation Knowledge Management Product Development Supply Chain Frameworks SWOT – – – – – – – GOC “Benchmarking business processes affords your organization quantitative analysis of how you compare to your peers” APQC is a member-based nonprofit that provides benchmarking and best-practice research for approximately 500 organizations worldwide in all industries Scope: www.mountainview.ca Summary Founded in 1977 http://www.apqc.org ITSM Frameworks 22
  • 23. APQC Category Level Governance GOC 1.0 Develop Vision and Strategy 2.0 Design and Develop Products and Services 3.0 Market and Sell Products and Services 4.0 Deliver Products and Services 5.0 Manage Customer Service 6.0 Develop and Manage Human Capital 7.0 Manage Information Technology 8.0 Manage Financial Resources 9.0 Acquire, Construct, and Manage Property 10.0 Manage Environmental Health and Safety (EHS) 11.0 Manage External Relationships 12.0 Manage Knowledge, Improvement and Change Industry Frameworks SWOT www.mountainview.ca ITSM Frameworks Summary Click here for APQC Spreadsheet 23
  • 24. ISO/IEC 20000:2005 Governance GOC ISO/IEC 20000 is the first international standard for IT Service Management Click to open Part 1; Click to open Part 2 States compliance requirements – i.e. “All incidents shall be recorded.” Industry Ten sections Summary ITSM Frameworks SWOT www.mountainview.ca Frameworks 1. Scope 2. Terms & Definitions 3. Planning and Implementing Service Management 4. Requirements for a Management System 5. Planning & Implementing New or Changed Services 6. Service Delivery Process 7. Relationship Processes 8. Control Processes 9. Resolution Processes 10.Release Process 24
  • 25. PMBoK and PRINCE2 Governance GOC PMBoK™ Third Edition Project Management Body Of Knowledge Project Management Institute (PMI) The project manager is responsible for determining what elements of PMBoK are appropriate for any given project Click here for PMBoK v3 Industry Frameworks SWOT PRINCE2 PRojects IN Controlled Environments version 2 Creates a management environment to achieve the stated aim of the project Based on a project life cycle Link PRINCE2 v3 Summary www.mountainview.ca ITSM Frameworks 25
  • 26. PMBoK 2004 – 4.6 Integrated Change Control Governance GOC Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 26
  • 27. ISO 17799 Governance ISO17799, is a detailed security standard. It is organized into ten major sections. Their objectives are: 1. Business Continuity Planning To counteract interruptions to business activities and to critical business processes from the effects of major failures or disasters. 1) To control access to information 2) To prevent unauthorised access to information systems 3) To ensure the protection of networked services 4) To prevent unauthorized computer access 5) To detect unauthorised activities. 6) To ensure information security when using mobile computing and tele-networking facilities GOC 2. System Access Control 3. System Development and Maintenance 4. Physical and Environmental Security To prevent unauthorised access, damage and interference to business premises and information; to prevent loss, damage or compromise of assets and interruption to business activities; to prevent compromise or theft of information and information processing facilities. Industry 1) To ensure security is built into operational systems; 2) To prevent loss, modification or misuse of user data in application systems; 3) To protect the confidentiality, authenticity and integrity of information; 4) To ensure IT projects and support activities are conducted in a secure manner; 5) To maintain the security of application system software and data. 5. Compliance 6. Personnel Security To reduce risks of human error, theft, fraud or misuse of facilities; to ensure that users are aware of information security threats and concerns, and are equipped to support the corporate security policy in the course of their normal work; to minimise the damage from security incidents and malfunctions and learn from such incidents. 7. Security Organisation Frameworks 1) To avoid breaches of any criminal or civil law, statutory, regulatory or contractual obligations and of any security requirements 2) To ensure compliance of systems with organizational security policies and standards 3) To maximize the effectiveness of and to minimize interference to/from the system audit process. 1) To manage information security within the Company; 2) To maintain the security of organizational information processing facilities and information assets accessed by third parties. 3) To maintain the security of information when the responsibility for information processing has been outsourced to another organization. 1) To ensure the correct and secure operation of information processing facilities; 2) To minimise the risk of systems failures; 3) To protect the integrity of software and information; 4) To maintain the integrity and availability of information processing and communication; 5) To ensure the safeguarding of information in networks and the protection of the supporting infrastructure; 6) To prevent damage to assets and interruptions to business activities; 7) To prevent loss, modification or misuse of information exchanged between organizations. SWOT 8. Computer & Network Management 9. Asset Classification and Control To maintain appropriate protection of corporate assets and to ensure that information assets receive an appropriate level of protection. Summary 10. Security Policy To provide management direction and support for information security. Within each section are the detailed statements that comprise the standard. www.mountainview.ca ITSM Frameworks 27
  • 28. ISO/IEC 27001:2005 Governance GOC Industry Frameworks SWOT ISO 27002 (formerly called ISO 17799) and the emerging ISO 27001 addresses information security ISO 27002 is a code of practice for information security. It details hundreds of specific controls which may be applied to secure information and related assets. It comprises 115 pages organized over 15 major sections ISO 27001 is a specification for an Information Security Management System, sometimes abbreviated to ISMS ISO 27001 is the foundation for third party audit and certification. It comprises 34 pages over 8 major sections Both standards are intended to apply to all organizations, whether commercial or otherwise, and should assist anyone with responsibility for managing information security Summary www.mountainview.ca ITSM Frameworks 28
  • 29. Capability Maturity Model Integration (CMMI) Governance Industry Initial Repeatable Defined Managed Optimizing Frameworks SWOT – – – – – GOC Sponsored by U.S. Department of Defense in the late 1980s Initially aimed at helping DoD identify qualified application development contractors Controlled by the Software Engineering Institute at Carnegie Melon University (www.sei.cmu.edu/cmm) It’s a process improvement approach The 5 levels are: Summary www.mountainview.ca ITSM Frameworks 29
  • 30. ITIL Variants Governance GOC HP ITSM Reference Model Microsoft Operations Framework (MOF) IBM ITPM Etc. Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 30
  • 31. ISO FCAPS Governance GOC Fault Management Configuration Management Accounting Management Performance Management Security Management Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 31
  • 32. CIO/IT Balanced Scorecard Governance How do we look to management ? Demand Corporate Perspective Measures How do we look to users ? Customer Perspective User Perspective Measures Objectives Measures Objectives SWOT Learning and Growth Perspective Frameworks Objectives Industry How effective, efficient, economic and equitable are we? Internal Perspective GOC Objectives Measures Supply Summary How are we positioned to meet future challenges ? www.mountainview.ca ITSM Frameworks 32
  • 33. Process Modeling Languages Governance Frameworks SWOT Summary ITSM Frameworks Industry www.mountainview.ca GOC BTEP - Business Transformation Enablement Program (TBS) BPMN – Business Process Modeling Notation IDEF – ICAM Definition Languages (Integrated Computer-Aided Manufacturing) UML - Unified Modeling Language Petri-net (CPN) Yourdon (DFD) Booch Rumbaugh Shlaer-Mellor Coad/Yourdon Martin Chen SSADM Bachman Gantt Object Oriented Soft Systems Meta Modelling Flow Chart ABC Workflow Simulation 33
  • 34. Zachman Framework - Enterprise Architecture Governance Row 1 – Contextual: Scope – External Requirements and Drivers – Business Function Modeling – Business Process Models What How Where Who When GOC Row 2 – Conceptual: Enterprise Model Why – Physical Models – Solution Definition and Development Row 5 – As Built: Deployment Model Conceptual Conceptual 3 Logical Logical 4 Physical Physical 5 As Built As Built 6 Functioning Functioning What How Where Who When Why SWOT – As Built – Deployment Contextual Frameworks Row 4 – Physical: Technology Model Contextual Industry – Logical Models – Requirements Definition 1 2 Row 3 – Logical: System Model Row 6 – Functioning: Evaluation Model – Functioning Enterprise – Evaluation Summary Source: Zachman Enterprise Architecture Framework www.mountainview.ca ITSM Frameworks 34
  • 35. IBM Software Change Management Products Governance GOC IBM Rational ClearQuest®: Automated and flexible software change management across the software lifecycle. IBM Rational ClearQuest MultiSite: Provides replication and synchronization of Rational ClearQuest repositories across distributed sites. IBM® Rational® ClearCase® Change Management Solution: Integrated software configuration management and software change management IBM Rational ClearCase Change Management Solution Enterprise Edition: Integrated software configuration management and software change management, including repository replication and synchronization across distributed sites. Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 35
  • 36. Information Services Procurement Library (ISPL) SWOT Summary ITSM Frameworks Frameworks www.mountainview.ca Industry procurement managers, acquisition managers, program managers, contract managers, facilities managers, service level managers, and project managers in the IT area. GOC – – – – – – – Governance Focuses purely on the procurement of information services. Focuses on the relationship between the customer and supplier organization A best practice library for the management of Information Technology related acquisition processes Helps both the customer and supplier organization to achieve the desired quality using the corresponded amount of time and money by providing methods and best practices for risk management, contract management, and planning. The target audience for ISPL is: 36
  • 37. Software Development Lifecycle Methods Governance Frameworks SWOT Summary ITSM Frameworks Industry www.mountainview.ca GOC Waterfall model Spiral model Model driven development User experience Top-down and bottom-up design Chaos model Evolutionary prototyping Prototyping ICONIX Process (UML-based object modeling with use cases) Unified Process V-model Extreme Programming Software Development Rhythms Incremental funding methodology IBM Rational Unified Process (RUP) 37
  • 38. International Institute of Business Analysis (IIBA) Governance GOC Independent non-profit professional association serving the growing field of Business Analysis. http://www.theiiba.org/ Click to open IIBA Body of Knowledge Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 38
  • 39. Business Transformation Enablement Program (BTEP) Governance BTEP Strategic Design and Planning Methodology Define Problem Domain Build Initial Business Models Investigate Business Problems Develop the Business Vision Develop Transformation Strategies Design the Target Business Build Business Case for Transformation Build the Transformation Master Plan GOC Industry Frameworks 1 2 3 4 5 6 7 8 Click here for BTEP Handbook SWOT Summary www.mountainview.ca ITSM Frameworks 39
  • 40. Opportunities Governance GOC IT Governance enables Accountability and Control IT Governance establishes Roles and Responsibilities IT Governance establishes Policies IT Governance enables Decision Support thus Strategic Direction IT Governance improves Transparency, Results and Performance for the Customer/User IT Governance increases revenue/reduces the variance in budgets IT Governance Learning and Innovation IT Governance reduces Risk Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 40
  • 41. Threats Governance GOC Regulatory non-compliance Public embarrassment Public commissions and investigations Bureaucracy = Responsibility without Accountability Customer dissatisfaction Higher costs without a return Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 41
  • 42. Strengths Governance GOC Make sense from their perspective Common language for people and products Rationale for specific requirements Identifies control mechanisms - metrics, KPIs Defines accountability and responsibility Reduce the total cost of ownership Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 42
  • 43. Weaknesses Governance GOC Industry Frameworks Each Governance Framework has its limitations Adopting a proprietary Governance Framework will lock you into the vendor’s products and/or services Most Governance Frameworks are not in harmony with others definition of terms are not consistent Governance Frameworks can be complex Products are aligned with Governance Frameworks that lead to interoperability challenges People align with Governance Frameworks that lead to arguments and confusion SWOT Summary www.mountainview.ca ITSM Frameworks 43
  • 44. Avoid IT Governance Battles Governance AVL ITIL V2 INC Vendors IBM Microsoft HP GOC ITIL V3 COBIT 4.1 CMMI Six Sigma Industry APQC Booz Allen Gartner Meta ITSM Frameworks SAP PeopleSoft CA Oracle Summary www.mountainview.ca PMBoK 3 PRINCE2 SWOT Proprietary Organic Home Grown Frameworks ISO20000 ISO27001 ISO9000 FCAPS 44
  • 45. Understand Process, People and Product Governance Input Input GOC Industry Process Frameworks People Product SWOT Output Output Summary www.mountainview.ca ITSM Frameworks 45
  • 46. Avoid Open Loop Processes GOC Industry Network SWOT Summary Example: car brakes www.mountainview.ca ITSM Frameworks Frameworks Typical IT Challenges •Lack of direction and focus Account Help •Limited management information - decisions based on 'I think' rather Facilities Management Desk than 'I know' Management Finance Operations •Limited structure in the customer support mechanism •Low customer confidence/perception •Out of date customer support system •Under managed support resources •Continual fire-fighting and break-fix Project •Recurring problems being resolved repeatedly rather than eliminated MF UX Management •Interrupt-driven Application •Over dependency on key staff Development •Uncoordinated and unrecorded change takes place that impact service •Unaware of changes in the business •Unclear staff resource/cost requirements •Inconsistent quality of call response and response times Governance Processes in which the value of the outcome has no influence on the input They take controlling action based simply on inputs 46
  • 47. Create a PDCA Culture GOC Industry Frameworks SWOT What type of ITSM organization do you have? Governance Plan - Establish the objectives and processes necessary to deliver results in accordance with the specifications Do - Implement the processes Check - Monitor and evaluate the processes and results against objectives and Specifications and report the outcome Act - Apply actions to the outcome for necessary improvement. This means reviewing all steps (Plan, Do, Check, Act) and modifying the process to improve it before its next implementation P P P D D C C A A C D P P D D C C A A www.mountainview.ca ITSM Frameworks Summary A 47
  • 48. Understand the CIO Perspective Report Metrics KPIs Report Metrics KPIs Report Metrics KPIs Report Metrics KPIs Report Metrics KPIs Report Metrics KPIs Governance CIO Report Metrics KPIs GOC IT Service Management V2 & Service Network Desk / ITSM CrossServices Processes: Functional Help Desk ISO17799 Facilities Report Service Strategy, Service Design, Service Transition, Service Operation, Legato ISO27001 Metrics Continuous Service Improvement IBM Help Desk Tivoli COBIT KPIs HP Institute OpenView Cisco CiscoWorks Security Domain or Function Specific Processes Domain or Function Specific Processes Domain or Function Specific Processes Domain or Function Specific Processes Domain or Function Specific Processes Domain or Function Specific Processes Domain or Function Specific Processes Operations Infrastructure Backup Monitoring Application Report Development Metrics KPIs SDLC SWOT PMBoK IT Service Management V3 Systems Frameworks Application Management Web Finance Sales Procurement Directory ?? Report Metrics ?? KPIs ITSM Cross Functional Processes: Change, Incident, Configuration, Release, Problem, ?? ?? ?? Availability, Capacity, ITSCM, Finance, SLM Industry Report ?? Metrics KPIs Summary www.mountainview.ca ITSM Frameworks 48
  • 49. V3 SACM: Configuration Management System Wisdom Governance Industry Knowledge GOC SWOT Information Frameworks Data Summary Source: ITIL V3 www.mountainview.ca ITSM Frameworks 49
  • 50. V3 Service Transition: Process Relationships Governance Continuous Service Improvement Change Management RFC1 RFC2 RFC3 RFC4 RFC5 RFC6 GOC Service Asset and Configuration Management BL1 BL2 BL3 BL4 BL5 BL6 BL7 Industry Service Transition Planning and Support Oversee management organization and stakeholder change E1 Service Strategy Service Design Plan and Prepare Release E2 Build and Test Service Testing and Pilots E3 Plan and Prepare for Deployment E4 Review and Close Service Transition Service Operation Early Life Support SWOT Release and Deployment Management Transfer, Deploy, Retire Frameworks Evaluation of a Change or Service Change Service Validation and Testing Service Transition supports the entire Lifecycle Continual Service Improvement Change Management (4.2) RF C1 RFC2 RFC3 RF C4 RFC5 RF C6 Service Asset and Configuration Management (4.3) BL BL BL BL BL BL BL Service Transition Planning and Support (4.1) Oversee management of organization and stakeholder change (5) Evaluation of a Change or Service (4.6) E1 Servi ce St rat egy Service Desi gn Pl an and prepare rel ease E2 Build and t est Service t est ing and pilot s Release and Deployment Management (4.4) E3 Plan and prepare for deployment Transfer, deploy, ret ire Review and close service transi tion Servi ce Operat ions Early Life Support Service Validation and Testing (4.5) Knowledge Management (4.7) Focus of activity related to service transition Other IT IL core publication ITIL process in this publication that supports the whole service lifecycle E BL RFC www.mountainview.ca ITSM Frameworks Summary Knowledge Management BL = Baseline E = Evaluation Point to Evaluate the Service Design Point to capture Baseline Request for Change 50
  • 51. Enable Governance with ISO/IEC 20000 Governance Click for assessment GOC Industry Frameworks SWOT Summary www.mountainview.ca ITSM Frameworks 51
  • 52. Understand Statistical Process Control: Theory Governance Deals with architectures, mechanisms, and algorithms for controlling the output of a specific process GOC Error Signal Controller Output Industry Input Frameworks Reference Sensor SWOT Summary www.mountainview.ca ITSM Frameworks 52
  • 53. Implement Statistical Process Control: Practical Governance GOC Source: Remedy Trouble Tickets (Federal Government) Sample size: 65000 Category: Email Average versus UCL and LCL Industry Frameworks Input? Controller? Sensor? Error Signal? Output? SWOT UCL AVG LCL Summary www.mountainview.ca ITSM Frameworks 53
  • 54. Thank you Governance PRESENTED BY: Jerry Kopan, (613)867-5170 cell jerry@mountainview.ca GOC Industry PRESENTATION CAN BE OBTAINED FROM: www.itsmf.ca www.mountainview.ca Frameworks ITIL V2 Service Support Book on sale: 25% Discount MOUNTAINVIEW TRAINING and CONSULTING ITIL V2 & V3 Certification V2 Foundation (2 days) Practitioner (IPSR, IPRC, IPAD, IPPI) Service Manager V3 Foundation (3 days) Foundation Bridge (1 day) Service Manager Bridge Prep (CBT) ITSM Frameworks Summary www.mountainview.ca SWOT – – – – – – 54