SlideShare une entreprise Scribd logo
1  sur  7
Télécharger pour lire hors ligne
GENERAL NOTES
L.R. ELL.
L.P.
LG.
LB.
KGV
INV.
INSUL.
IN.
I.D.
HVAC
HST
HPT
HP
H.P.
HO
HGL
GPM
GALV.
GAL.
FT.
FS
FPM
F.O.T.
F.O.S.
F.O.B.
FL.
FLEX.
FIT
FIN. GR.
FIN. FL.
FE
EXIST
EW
ENCL.
EL.
ELEC.
EGL
EFF. %
EFF.
ECC. RED.
DWG'S
DN
DIA.
D.I.
DET.
DEG. F.
CS
CPVC
CORP.
CONT.
CONN.
CONC.
C.O.
CMU
~
C.I.
CFM
BCR. BOD
ARCH.
APPROX.
AFF
ACFM
XPROOF
WS
WC
WxH
W/
VAC
V
TYP.
T.O.D.
T.O.C.
THK.
TEMP.
SW
STR.
STD.
S.S.
SR
SQ.
SPECS.
SPD
SL
SH.
SG
SCR
SCH.
RPM
REQ'D.
REINF.
REF.
RED. FLG.
RED.
R
PVC
PSIG
PSIA
PSI
PSH
PS
PLUMB.
`
P
OPER.
O.D.
O.C.
NTS
NPT
NOM.
No.
N.O.
N.C.
MIN.
MH
MGD
MECH.
MATL.
MAX.
LxW
LSP
LSH
L.R. RED. ELL.
L.R. RED. BASE ELL.
GENERAL MECHANICAL ABBREVIATIONS
GENERAL MECHANICAL NOTES
3.
2.
1.
NOTES:
2
GN
NTS
SHEET MAY NOT APPEAR ON THIS SET OF DRAWINGS.
ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
REQUIRED ON MECHANICAL DRAWINGS.
FLANGED JOINTS. OTHER JOINTS ARE SHOWN AS
VALVES AND PIPE FITTINGS ARE SHOWN WITH
SPECIFICATIONS FOR ITEMS REQUIRED.
USE OF THE PLANS. REFER TO THE PLANS AND
THIS IS A GENERAL LEGEND PROVIDED TO FACILITATE
EXPLOSION PROOF
WATER SURFACE
WATER COLUMN
WIDTH x HEIGHT
WITH
VACUUM
VENT
TYPICAL
TOP OF DUCT
TOP OF CONCRETE
THICK
TEMPERATURE
SEAL WATER
STRUCTURAL
STANDARD
STAINLESS STEEL
RAW SEWAGE
SQUARE
SPECIFICATIONS
SUMP PUMP DISCHARGE
STOP LOG
SHEET
SLIDE GATE
SCREEN
SCHEDULE
REVOLUTIONS PER MINUTE
REQUIRED
REINFORCED
REFERENCE
REDUCING FLANGE
REDUCER
RADIUS
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH GAGE
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH
PRESSURE SWITCH HIGH
PRESSURE SWITCH
PLUMBING
PLATE
PRESSURE GAUGE
OPERATING
OUTSIDE DIAMETER
ON CENTER
NOT TO SCALE
NATIONAL PIPE THREAD
NOMINAL
NUMBER
NORMALLY OPEN
NORMALLY CLOSED
MINIMUM
MANHOLE
MILLION GALLONS PER DAY
MECHANICAL
MATERIAL
MAXIMUM
LENGTH X WIDTH
LIQUID SAMPLE PORT
PRESSURE SWITCH LOW
LONG RADIUS REDUCING ELBOW
LONG RADIUS REDUCING BASE ELBOW
LONG RADIUS ELBOW
LOW POINT
LONG
POUND
KNIFE GATE VALVE
INVERT
INSULATION
INCHES
INSIDE DIAMETER
HEATING VENTILATION
HOIST
HOSE PIPE THREAD
HORSE POWER
HIGH POINT
HYDRAULIC OIL
HYDRAULIC GRADE LINE
GALLONS PER MINUTE
GALVANIZED
GALLONS
FEET
FLOW SWITCH
FEET PER MINUTE
FLAT ON TOP
FLAT ON SIDE
FLAT ON BOTTOM
FLANGE
FLEXIBLE
FLOW INDICATING TRANSMITTER
FINISHED GRADE
FINISHED FLOOR
FLOWMETER
EXISTING
EFFLUENT WATER
ENCLOSURE
ELEVATION
ELECTRICAL
ENERGY GRADE LINE
% EFFICIENCY
EFFLUENT
ECCENTRIC REDUCER
DRAWINGS
DOWN
DIAMETER
DUCTILE IRON
DETAIL
DEGREES FEHRENHEIT
CHLORINATED POLYVINYL CHLORIDE
CORPORATION
CONTINUATION
CONNECTION
CONCRETE
CLEANOUT
CONCRETE MASONRY UNIT
CENTERLINE
CAST IRON
CUBIC FEET PER MINUTE
BOTTOM OF DUCT
BRIDGE CRANE
ARCHITECTURAL
APPROXIMATE
ABOVE FINISHED FLOOR
ACTUAL CUBIC FEET PER MINUTE
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
NATIONAL ELECTRIC CODE (NEC) FOR THE APPROPRIATE ENVIRONMENT.
ALL MECHANICAL AND ELECTRICAL ITEMS INSTALLED IN THE WORK AREAS SHALL BE SUITABLE FOR THE ENVIRONMENT FOR WHICH THEY WILL EXIST AND CLASSIFIED BY THE
SUPPORT SYSTEMS WITH SUITABLE SPACING AS REQUIRED BY THE PROJECT SPECIAL PROVISIONS.
PIPE SUPPORTS FOR PIPES LESS THAN 8-INCHES IN DIAMETER ARE NOT SHOWN ON THESE PLANS FOR CLARITY. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPE
EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER.
FITS INTO THE ALLOCATED SPACES WITH SUITABLE CLEARANCE FOR ACCESS. THE CONTRACTOR SHALL PROVIDE ALL ALTERATIONS REQUIRED TO ACCOMODATE SUCH
DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED AT THE ENGINEER'S DISCRETION, PROVIDED THAT THE EQUIPMENT MEETS THE SPECIFIED RATINGS AND
BE RESPONSIBLE FOR CHECKING ALL OF THE EQUIPMENT DIMENSIONS TO ENSURE THAT ALL COMPONENTS WILL FIT INTO THE DESIGNATED SPACES INDICATED ON THE
THE DRAWINGS, SCHEDULES, AND SPECIFICATIONS, HAVE BEEN PREPARED USING SPECIFIC MANUFACTURERS FOR THE BASIS OF DIMENSIONAL DESIGN. THE CONTRACTOR SHALL
CONDITIONS AND APPROVED SHOP DRAWINGS.
DROP, OFFSET, FITTING, OR STRUCTURAL ELEMENT THAT MAY BE REQUIRED. THE CONTRACTOR SHALL VERIFY EXACT PLACEMENT OF ALL DEVICES AND EQUIPMENT WITH FIELD
THE PLANS ARE GENERALLY DIAGRAMMATIC IN NATURE. ROUTING OF PIPING, DUCTWORK, CONDUITS, ETC., AS SHOWN ON THE DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE,
THE CONTRACTOR SHALL MAKE ALL REQUIRED FIELD MEASUREMENTS TO VERIFY EXISTING AND CONTRACT INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS.
ALL FLEXIBLE CONNECTORS, EXPANSION JOINTS, AND SLEEVE COUPLINGS SUBJECT TO PRESSURE SHALL BE RESTRAINED AS REQUIRED FOR EXPANSION AND FLEXIBILITY.
EQUIPMENT REMOVAL.
FOR FLANGED SYSTEMS, PROVIDE FLEXIBLE CONNECTORS WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION AND VALVE AND
SLEEVE COUPLINGS MAY BE USED WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION.
ALL PIPE PENETRATIONS THROUGH INTERIOR AND EXTERIOR WALLS AND FLOORS SHALL BE SEALED WATERTIGHT AND FIREPROOF RATED.
ALL DIMENSIONS LOCATING EQUIPMENT ARE FROM FINISHED WALL SURFACES OR CENTERLINES, AS INDICATED.
CONTRACTOR TO PROVIDE A LAYOUT DRAWING SHOWING ALL PIPING, SUPPORTS, AND APPURTENANCES.
PUBLIC HEALTH (IDPH) REGULATIONS.
ALL WORK TO BE IN ACCORDANCE WITH THE CITY OF CHICAGO BUILDING CODES, COOK COUNTY DEPARTMENT OF PUBLIC HEALTH AND ILLINOIS DEPARTMENT OF
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechNOT_150084_02.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
OVERALL PLAN VIEW PLN
3
SYSTEM AND PIPING
EXISTING WATER HEATING
NTS
OF BOILER ROOM
EXISTING WEST WALL
COLUMN
EXISTING BUILDING
ABANDONED IN PLACE
TO BE SEALED AND
EXISTING CATCH BASIN
WATER HEATERS
TYPE SEMI-INSTANTANEOUS
PROPOSED TRIPLEX, SKID
CONTROL PANELS
CONFIGURED
PROPOSED TRIPLEX
PIPING
ACCEPT PROPOSED
BE RECONFIGURED TO
HOT WATER PIPING TO
EXISTING STEAM ANDINSTANTANEUOUS WATER HEATER
STEAM LINES TO PROPOSED SEMI-
TO BE REUSED. CONNECT EXISTING
EXISTING STEAM SUPPLY HEADER
AND CEILINGS
ROUTING THRU EXISTING WALLS
CONTRACTOR TO COORDINATE
DIAGRAMATIC CONDUIT ROUTING,
EXISTING HALLWAY
FRANKEL BUILDING
LOCATED IN BASEMENT OF
EXISTING BOILER ROOM L41
EXISTING MECHANICAL ROOM L42
(TO REMAIN)
SUMP PUMP
CONDENSATE
STEAM LINE
CONDUIT
INTERMEDIATE METAL
GROUND THWN IN 1"
NEUTRAL AND 3/C #12
3-1/C #12, 1/C #12
APPROX. 2' HIGH x 3' WIDE
METRO MIX MIXING VALVE HEADER
PROPOSED LOCATION OF
INSTANTANEOUS WATER HEATER SKID
CONTROL PANELS ON SEMI-
FOR POWER TO THE 3 PROPOSED
CIRCUIT BREAKERS IN PANELBOARD
PROVIDE 3 NEW, 2O AMP, 1-POLE
EXISTING LIGHTING PANEL RP-1.
OPERATIONAL
IN PLACE AND
HEATING SYSTEM IS
AFTER NEW WATER
ANCILLARY PIPING
REMOVED, WITH ALL
WATER HEATER TO BE
EXISTING 1500 GALLON
HOT WATER2" STEAM
1 8/10/16 IDPH COMMENTS GAH
BELOW FOR ROOM LOCATIONS
BUILDING LAYOUT PLAN
SEE EXISTING BASEMENT
(ROOMS L41 & L42)
LOCATION OF WORK AREA
EXISTING BASEMENT BUILDING LAYOUT PLAN
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechPLN_150084_03.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
8/10/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
1
1
STEAM AND HEAT EXCHANGER
1'
6.
5.
4.
3.
2.
1.
NOTES:
NO.
ITEM
1
THRUSH STEAM TO WATER HEAT EXCHANGER
STRUCTURAL STEEL FRAME
PART NUMBER
4" X 2" FABRICATED ELBOW
2" GATE VALVE
2" FABRICATED SPOOL
2" STEAM CONTROL VALVE
2" STRAINER
2" FABRICATED TEE
2" GLOBE VALVE
2" FABRICATED ELBOW
2" FABRICATED HEADER
2" CONDENSATE HEADER
3" WAFER SILENT CHECK VALVE
3" HOT WATER HEADER
3" X 2" FABRICATED ELBOW
2" BUTTERFLY VALVE - 3H
3" COLD WATER HEADER
2" GATE VALVE
2" BALL VALVE
STEAM TRAP
2" CHECK VALVE
2" STRAINER
SUCTION PRESSURE GAUGE
CONTROLS ENCLOSURE24
23
22
21
20
19
18
17
16
15
14
13
12
10
11
9
7
6
8
5
4
3
2
3
3
6
1
3
3
1
3
1
1
3
3
6
3
3
3
6
3
1
3
3
3
3
DESCRIPTION
DSH8324
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
FLANGED
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
ELECTRONIC CONTROLLED
FLANGED CONNECTION
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
FLANGED
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
SOCKET WELD X P.E. SCHED. 80 BLK. PIPE
SILENT CHECK VALVE, WAFER STYLE, ANSI CLASS 125/250
ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE
ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE
ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE
SOCKET WELD
CARBON STEEL BALL VALVE
FT-S8-15
STAINLESS STEEL NPT CHECK VALVE
KECKLEY STYLE B
SUCTION PRESSURE - 100 PSI
WITH ALARM OPTION
3
QTY.
SCALE 1:8
TYP. AT 3 PLACES
DETAIL A
SPLIT
SKID
SPLIT
SKID
281/4"233/4"29"
10 3/4"
91/4"
493/4"
801/2"
CLEARANCE
REQD.NEC
42"
0"
2"
8"
20"
32"
48"
60"
76"
81"
0"
1"
86"
14"
36 1/4"
48 1/4"
53 1/2"
58 1/4"
74 1/4"
76 1/4"
4 1/2"
14"
9 1/2"
36 1/4"
53 1/2"
76 1/4"
TOP VIEW
REAR VIEW
FRONT VIEW
SIDE VIEW
ALL STEAM SUPPLY PIPING TO BE SCH. 40 BLK. STL.
ALL CONDENSATE PIPING TO SCH. 80 BLK. STL.
ESTIMATED SYSTEM WEIGHT: 5000 LBS
DISCHARGE CONNECTION ORIENTATION.
CONTRACTOR/ENGINEER TO VERIFY SUCTION &
SOME ITEMS NOT SHOWN FOR CLARITY.
SUBMITTALS.
WILL BE FORWARDED UPON RECEIPT OF APPROVED
FOR CONSTRUCTION. CONSTRUCTION DRAWINGS
THIS DRAWING IS PRELIMINARY LAYOUT ONLY. NOT
ANSI CLASS 125/150 BUTTERFLY VALVE - 250 PSI MAX
MDT1
4
PLANS AND SECTIONS
PROPOSED SEMI INSTANTANEOUS HOT WATER HEATER
HOT WATER2" STEAM
19 18 15 22 2016 21 18
24 24 24
2
13
14
A
14
17
12
1
11 5 8 49 10 13
3 23 4228 6 72
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechMDT1_150084_04.dgn
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
CONDENSATE PUMP
TO EXISTING
EXPANSION TANK
RETURN
HOT WATER
COLD WATER
HOT WATER
DWH #1
DWH #2
DWH #3
15 PSI STEAM
INLET
HOT WATER
INLET
COLD WATER
RETURN
BUILDING
OUTLET
MIXED WATER
SENSOR
METRO MIX
GENERATION SOURCE
RETURN TO HOT WATER
PIPING DIAGRAMS
LEGEND
P
GLOBE VALVE
CHECK VALVE
STRAINER
TEMPERATURE GAUGE
PRESSURE GAUGE
UNION
RECIRCULATION PUMP
CONTROL VALVE
TRAP
HOSE BIB
T
MDT2
5NTS
PROPOSED METRO MIX MIXING VALVE ONE LINE DIAGRAM
PROPOSED STEAM AND HEAT EXCHANGER ONE LINE DIAGRAM
PROPOSED EQUIPMENT SCHEDULE
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechMDT2_150084_05.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
TT
T
T
P
P
P
P
6
MDT3
N.T.S.
NTS
METRO MIX MIXING VALVE DETAIL
STAINLESS STEEL PIPE
1 1/2" THREADED
STEEL PIPE
1" THREADED STAINLESS
?
?
? ?
?
? ?
?
?
?
?
GAUGE
PRESSURE
GAUGE
PRESSURE
GAUGE
TEMP.
GAUGE
TEMP.
GAUGE
TEMP.
GAUGE
TEMP.
GAUGE
PRESSURE
MOUNTING PLATE
FABRICATED
GAUGE
PRESSURE
MIXING VALVE
1 8/10/16 IDPH COMMENTS GAH
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechMDT3_150084_06.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
8/10/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
1
1
PROPOSED METRO MIX MIXING VALVE HEADER
EXISTING CONDITION PICTURES
WATER HEATER TO BE LOCATED IN THIS AREA
EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS
WATER HEATER TO BE LOCATED IN THIS AREA
EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS
AND PRESSURE GAUGE TO BE REMOVED
EXISTING HOT WATER TANK SUPPLY LINES
FOR PROPOSED CONTROL PANELS
PROVIDE 3 1-POLE 20 AMP CIRCUIT BREAKERS
EXISTING LIGHTING PANEL IN MECH RM L41 TO
PIPING TO BE REMOVED
EXISTING WATER TANK AND RELATED
PUMP STATION
WALL SOUTH OF CONDENSATE
EXISTING WEST BOILER ROOM
NEW WATER HEATER
ACCOMODATE
TO BE REWORKED TO
EXISTING STEAM PIPING
BE ABANDONED AND SEALED
EXISTING CATCH BASIN TORECIRCULATIONRETURN
RETURN TO HEATER
MIXEDWATEROUTLET
HOTWATERINLET
COLDWATERINLET
SPECIFICATIONS
7
SPC
NTS
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechSPC_150084_07.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC

Contenu connexe

Tendances

Farmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution CenterFarmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution CenterRichard Clark
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeRichard Clark
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation SystemWafik Zakhary
 
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSAL
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSALNO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSAL
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSALKensonSunBernade
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2Wafik Zakhary
 
WH Cooke Thermocouple Catalog
WH Cooke Thermocouple CatalogWH Cooke Thermocouple Catalog
WH Cooke Thermocouple CatalogJosh McLucas
 
Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365komporariston
 
Instalasi water heater 081313462267
Instalasi water heater 081313462267Instalasi water heater 081313462267
Instalasi water heater 081313462267pasangwaterheater
 

Tendances (17)

Distributor ariston bekasi 082113812149
Distributor ariston bekasi 082113812149Distributor ariston bekasi 082113812149
Distributor ariston bekasi 082113812149
 
Farmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution CenterFarmers Grand Rapids MI Print Distribution Center
Farmers Grand Rapids MI Print Distribution Center
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO Office
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
Sample-Report
Sample-ReportSample-Report
Sample-Report
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation System
 
TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15
 
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSAL
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSALNO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSAL
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSAL
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2
 
WH Cooke Thermocouple Catalog
WH Cooke Thermocouple CatalogWH Cooke Thermocouple Catalog
WH Cooke Thermocouple Catalog
 
Pismo Beach Hotel- Basement plan- Waste & Vent
Pismo Beach Hotel- Basement plan- Waste & VentPismo Beach Hotel- Basement plan- Waste & Vent
Pismo Beach Hotel- Basement plan- Waste & Vent
 
Slatkin
SlatkinSlatkin
Slatkin
 
Forklift pumps
Forklift pumpsForklift pumps
Forklift pumps
 
KITCHEN_REV-FLOOR (3)
KITCHEN_REV-FLOOR (3)KITCHEN_REV-FLOOR (3)
KITCHEN_REV-FLOOR (3)
 
LR- 0000012.PDF
LR- 0000012.PDFLR- 0000012.PDF
LR- 0000012.PDF
 
Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365
 
Instalasi water heater 081313462267
Instalasi water heater 081313462267Instalasi water heater 081313462267
Instalasi water heater 081313462267
 

En vedette

How to Maximize Social Security
 How to Maximize Social Security How to Maximize Social Security
How to Maximize Social Securityfreddysaamy
 
Updated_Resume_11-11-16b
Updated_Resume_11-11-16bUpdated_Resume_11-11-16b
Updated_Resume_11-11-16bMia Edwards
 
Eco projet «pour la planète bleue
Eco projet «pour la planète bleueEco projet «pour la planète bleue
Eco projet «pour la planète bleuearinasalivon
 
Guc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3n
Guc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3nGuc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3n
Guc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3nLuz Milagro
 
A Robust Object Recognition using LBP, LTP and RLBP
A Robust Object Recognition using LBP, LTP and RLBPA Robust Object Recognition using LBP, LTP and RLBP
A Robust Object Recognition using LBP, LTP and RLBPEditor IJMTER
 
Maximising Network Connectivity
Maximising Network ConnectivityMaximising Network Connectivity
Maximising Network ConnectivityWestbase.io
 
Spain teachers
Spain teachersSpain teachers
Spain teachersfranjana
 
Famous dishes of jaipur
Famous dishes of jaipurFamous dishes of jaipur
Famous dishes of jaipurAbdul Raheem
 
Basic geology for Oil Exploration
Basic geology for Oil ExplorationBasic geology for Oil Exploration
Basic geology for Oil ExplorationDavid Simatupang
 
face recognition system using LBP
face recognition system using LBPface recognition system using LBP
face recognition system using LBPMarwan H. Noman
 

En vedette (11)

How to Maximize Social Security
 How to Maximize Social Security How to Maximize Social Security
How to Maximize Social Security
 
Updated_Resume_11-11-16b
Updated_Resume_11-11-16bUpdated_Resume_11-11-16b
Updated_Resume_11-11-16b
 
Eco projet «pour la planète bleue
Eco projet «pour la planète bleueEco projet «pour la planète bleue
Eco projet «pour la planète bleue
 
Guc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3n
Guc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3nGuc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3n
Guc3ada devocional-creciendo-a-travc3a9s-de-la-oracic3b3n
 
A Robust Object Recognition using LBP, LTP and RLBP
A Robust Object Recognition using LBP, LTP and RLBPA Robust Object Recognition using LBP, LTP and RLBP
A Robust Object Recognition using LBP, LTP and RLBP
 
Maximising Network Connectivity
Maximising Network ConnectivityMaximising Network Connectivity
Maximising Network Connectivity
 
Spain teachers
Spain teachersSpain teachers
Spain teachers
 
Famous dishes of jaipur
Famous dishes of jaipurFamous dishes of jaipur
Famous dishes of jaipur
 
Basic geology for Oil Exploration
Basic geology for Oil ExplorationBasic geology for Oil Exploration
Basic geology for Oil Exploration
 
face recognition system using LBP
face recognition system using LBPface recognition system using LBP
face recognition system using LBP
 
Mamífers
MamífersMamífers
Mamífers
 

Similaire à Mt Sinai WH Rplcmnt 081016

15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility PlanKevin Stober
 
kBIM-MEPT---Legends-and-Schedules.pdf
kBIM-MEPT---Legends-and-Schedules.pdfkBIM-MEPT---Legends-and-Schedules.pdf
kBIM-MEPT---Legends-and-Schedules.pdfSamLang10
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specificationskristinemassey
 
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016Brooke Leigh
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
72 roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...
72   roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...72   roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...
72 roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...Mello_Patent_Registry
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)E'ville Eye
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
DNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBDNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBclayrhr
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghPFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghJhomelEbero
 
0102070018-21+24.PDF
0102070018-21+24.PDF0102070018-21+24.PDF
0102070018-21+24.PDFJamie Emmart
 
106 peter j. mello - 7531028 - air conditioning system with modular electri...
106   peter j. mello - 7531028 - air conditioning system with modular electri...106   peter j. mello - 7531028 - air conditioning system with modular electri...
106 peter j. mello - 7531028 - air conditioning system with modular electri...Mello_Patent_Registry
 
Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.MIGUEL SALDIVAR HERNANDEZ
 

Similaire à Mt Sinai WH Rplcmnt 081016 (20)

15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan
 
kBIM-MEPT---Legends-and-Schedules.pdf
kBIM-MEPT---Legends-and-Schedules.pdfkBIM-MEPT---Legends-and-Schedules.pdf
kBIM-MEPT---Legends-and-Schedules.pdf
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specifications
 
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
 
LA FLORESTA
LA FLORESTALA FLORESTA
LA FLORESTA
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
72 roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...
72   roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...72   roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...
72 roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...
 
254815797-PLANOS-Estandares.pdf
254815797-PLANOS-Estandares.pdf254815797-PLANOS-Estandares.pdf
254815797-PLANOS-Estandares.pdf
 
Symbols
SymbolsSymbols
Symbols
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Construction Document set
Construction Document setConstruction Document set
Construction Document set
 
DNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBDNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SB
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghPFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
 
560 000-st-i-027
560 000-st-i-027560 000-st-i-027
560 000-st-i-027
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
0102070018-21+24.PDF
0102070018-21+24.PDF0102070018-21+24.PDF
0102070018-21+24.PDF
 
106 peter j. mello - 7531028 - air conditioning system with modular electri...
106   peter j. mello - 7531028 - air conditioning system with modular electri...106   peter j. mello - 7531028 - air conditioning system with modular electri...
106 peter j. mello - 7531028 - air conditioning system with modular electri...
 
Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.
 

Mt Sinai WH Rplcmnt 081016

  • 1.
  • 2. GENERAL NOTES L.R. ELL. L.P. LG. LB. KGV INV. INSUL. IN. I.D. HVAC HST HPT HP H.P. HO HGL GPM GALV. GAL. FT. FS FPM F.O.T. F.O.S. F.O.B. FL. FLEX. FIT FIN. GR. FIN. FL. FE EXIST EW ENCL. EL. ELEC. EGL EFF. % EFF. ECC. RED. DWG'S DN DIA. D.I. DET. DEG. F. CS CPVC CORP. CONT. CONN. CONC. C.O. CMU ~ C.I. CFM BCR. BOD ARCH. APPROX. AFF ACFM XPROOF WS WC WxH W/ VAC V TYP. T.O.D. T.O.C. THK. TEMP. SW STR. STD. S.S. SR SQ. SPECS. SPD SL SH. SG SCR SCH. RPM REQ'D. REINF. REF. RED. FLG. RED. R PVC PSIG PSIA PSI PSH PS PLUMB. ` P OPER. O.D. O.C. NTS NPT NOM. No. N.O. N.C. MIN. MH MGD MECH. MATL. MAX. LxW LSP LSH L.R. RED. ELL. L.R. RED. BASE ELL. GENERAL MECHANICAL ABBREVIATIONS GENERAL MECHANICAL NOTES 3. 2. 1. NOTES: 2 GN NTS SHEET MAY NOT APPEAR ON THIS SET OF DRAWINGS. ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS REQUIRED ON MECHANICAL DRAWINGS. FLANGED JOINTS. OTHER JOINTS ARE SHOWN AS VALVES AND PIPE FITTINGS ARE SHOWN WITH SPECIFICATIONS FOR ITEMS REQUIRED. USE OF THE PLANS. REFER TO THE PLANS AND THIS IS A GENERAL LEGEND PROVIDED TO FACILITATE EXPLOSION PROOF WATER SURFACE WATER COLUMN WIDTH x HEIGHT WITH VACUUM VENT TYPICAL TOP OF DUCT TOP OF CONCRETE THICK TEMPERATURE SEAL WATER STRUCTURAL STANDARD STAINLESS STEEL RAW SEWAGE SQUARE SPECIFICATIONS SUMP PUMP DISCHARGE STOP LOG SHEET SLIDE GATE SCREEN SCHEDULE REVOLUTIONS PER MINUTE REQUIRED REINFORCED REFERENCE REDUCING FLANGE REDUCER RADIUS POLYVINYL CHLORIDE POUNDS PER SQUARE INCH GAGE POUNDS PER SQUARE INCH ABSOLUTE POUNDS PER SQUARE INCH PRESSURE SWITCH HIGH PRESSURE SWITCH PLUMBING PLATE PRESSURE GAUGE OPERATING OUTSIDE DIAMETER ON CENTER NOT TO SCALE NATIONAL PIPE THREAD NOMINAL NUMBER NORMALLY OPEN NORMALLY CLOSED MINIMUM MANHOLE MILLION GALLONS PER DAY MECHANICAL MATERIAL MAXIMUM LENGTH X WIDTH LIQUID SAMPLE PORT PRESSURE SWITCH LOW LONG RADIUS REDUCING ELBOW LONG RADIUS REDUCING BASE ELBOW LONG RADIUS ELBOW LOW POINT LONG POUND KNIFE GATE VALVE INVERT INSULATION INCHES INSIDE DIAMETER HEATING VENTILATION HOIST HOSE PIPE THREAD HORSE POWER HIGH POINT HYDRAULIC OIL HYDRAULIC GRADE LINE GALLONS PER MINUTE GALVANIZED GALLONS FEET FLOW SWITCH FEET PER MINUTE FLAT ON TOP FLAT ON SIDE FLAT ON BOTTOM FLANGE FLEXIBLE FLOW INDICATING TRANSMITTER FINISHED GRADE FINISHED FLOOR FLOWMETER EXISTING EFFLUENT WATER ENCLOSURE ELEVATION ELECTRICAL ENERGY GRADE LINE % EFFICIENCY EFFLUENT ECCENTRIC REDUCER DRAWINGS DOWN DIAMETER DUCTILE IRON DETAIL DEGREES FEHRENHEIT CHLORINATED POLYVINYL CHLORIDE CORPORATION CONTINUATION CONNECTION CONCRETE CLEANOUT CONCRETE MASONRY UNIT CENTERLINE CAST IRON CUBIC FEET PER MINUTE BOTTOM OF DUCT BRIDGE CRANE ARCHITECTURAL APPROXIMATE ABOVE FINISHED FLOOR ACTUAL CUBIC FEET PER MINUTE 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. NATIONAL ELECTRIC CODE (NEC) FOR THE APPROPRIATE ENVIRONMENT. ALL MECHANICAL AND ELECTRICAL ITEMS INSTALLED IN THE WORK AREAS SHALL BE SUITABLE FOR THE ENVIRONMENT FOR WHICH THEY WILL EXIST AND CLASSIFIED BY THE SUPPORT SYSTEMS WITH SUITABLE SPACING AS REQUIRED BY THE PROJECT SPECIAL PROVISIONS. PIPE SUPPORTS FOR PIPES LESS THAN 8-INCHES IN DIAMETER ARE NOT SHOWN ON THESE PLANS FOR CLARITY. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPE EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. FITS INTO THE ALLOCATED SPACES WITH SUITABLE CLEARANCE FOR ACCESS. THE CONTRACTOR SHALL PROVIDE ALL ALTERATIONS REQUIRED TO ACCOMODATE SUCH DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED AT THE ENGINEER'S DISCRETION, PROVIDED THAT THE EQUIPMENT MEETS THE SPECIFIED RATINGS AND BE RESPONSIBLE FOR CHECKING ALL OF THE EQUIPMENT DIMENSIONS TO ENSURE THAT ALL COMPONENTS WILL FIT INTO THE DESIGNATED SPACES INDICATED ON THE THE DRAWINGS, SCHEDULES, AND SPECIFICATIONS, HAVE BEEN PREPARED USING SPECIFIC MANUFACTURERS FOR THE BASIS OF DIMENSIONAL DESIGN. THE CONTRACTOR SHALL CONDITIONS AND APPROVED SHOP DRAWINGS. DROP, OFFSET, FITTING, OR STRUCTURAL ELEMENT THAT MAY BE REQUIRED. THE CONTRACTOR SHALL VERIFY EXACT PLACEMENT OF ALL DEVICES AND EQUIPMENT WITH FIELD THE PLANS ARE GENERALLY DIAGRAMMATIC IN NATURE. ROUTING OF PIPING, DUCTWORK, CONDUITS, ETC., AS SHOWN ON THE DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE, THE CONTRACTOR SHALL MAKE ALL REQUIRED FIELD MEASUREMENTS TO VERIFY EXISTING AND CONTRACT INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS. ALL FLEXIBLE CONNECTORS, EXPANSION JOINTS, AND SLEEVE COUPLINGS SUBJECT TO PRESSURE SHALL BE RESTRAINED AS REQUIRED FOR EXPANSION AND FLEXIBILITY. EQUIPMENT REMOVAL. FOR FLANGED SYSTEMS, PROVIDE FLEXIBLE CONNECTORS WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION AND VALVE AND SLEEVE COUPLINGS MAY BE USED WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION. ALL PIPE PENETRATIONS THROUGH INTERIOR AND EXTERIOR WALLS AND FLOORS SHALL BE SEALED WATERTIGHT AND FIREPROOF RATED. ALL DIMENSIONS LOCATING EQUIPMENT ARE FROM FINISHED WALL SURFACES OR CENTERLINES, AS INDICATED. CONTRACTOR TO PROVIDE A LAYOUT DRAWING SHOWING ALL PIPING, SUPPORTS, AND APPURTENANCES. PUBLIC HEALTH (IDPH) REGULATIONS. ALL WORK TO BE IN ACCORDANCE WITH THE CITY OF CHICAGO BUILDING CODES, COOK COUNTY DEPARTMENT OF PUBLIC HEALTH AND ILLINOIS DEPARTMENT OF CLIENT: DRAWING NO. SHEET OF TITLE: NO. DATE NATURE OF REVISION FILE NAME N:chicago150084MechNOT_150084_02.sht CHKD. JPCDSGN. JPCCHKD. SCALE: DWN. 7/6/2016PLOT DATE: jkennedyCAD USER: PROJ. NO. MODEL: Default DATE: ELP 15-0084 JTK GAH CHICAGO, IL 60608 1501 SOUTH CALIFORNIA AVENUE MT. SINAI HOSPITAL 7 HW HEATER REPLACEMENT PROJ. 7//5/16 MT. SINAI HOSPITAL - DOMESTIC
  • 3. OVERALL PLAN VIEW PLN 3 SYSTEM AND PIPING EXISTING WATER HEATING NTS OF BOILER ROOM EXISTING WEST WALL COLUMN EXISTING BUILDING ABANDONED IN PLACE TO BE SEALED AND EXISTING CATCH BASIN WATER HEATERS TYPE SEMI-INSTANTANEOUS PROPOSED TRIPLEX, SKID CONTROL PANELS CONFIGURED PROPOSED TRIPLEX PIPING ACCEPT PROPOSED BE RECONFIGURED TO HOT WATER PIPING TO EXISTING STEAM ANDINSTANTANEUOUS WATER HEATER STEAM LINES TO PROPOSED SEMI- TO BE REUSED. CONNECT EXISTING EXISTING STEAM SUPPLY HEADER AND CEILINGS ROUTING THRU EXISTING WALLS CONTRACTOR TO COORDINATE DIAGRAMATIC CONDUIT ROUTING, EXISTING HALLWAY FRANKEL BUILDING LOCATED IN BASEMENT OF EXISTING BOILER ROOM L41 EXISTING MECHANICAL ROOM L42 (TO REMAIN) SUMP PUMP CONDENSATE STEAM LINE CONDUIT INTERMEDIATE METAL GROUND THWN IN 1" NEUTRAL AND 3/C #12 3-1/C #12, 1/C #12 APPROX. 2' HIGH x 3' WIDE METRO MIX MIXING VALVE HEADER PROPOSED LOCATION OF INSTANTANEOUS WATER HEATER SKID CONTROL PANELS ON SEMI- FOR POWER TO THE 3 PROPOSED CIRCUIT BREAKERS IN PANELBOARD PROVIDE 3 NEW, 2O AMP, 1-POLE EXISTING LIGHTING PANEL RP-1. OPERATIONAL IN PLACE AND HEATING SYSTEM IS AFTER NEW WATER ANCILLARY PIPING REMOVED, WITH ALL WATER HEATER TO BE EXISTING 1500 GALLON HOT WATER2" STEAM 1 8/10/16 IDPH COMMENTS GAH BELOW FOR ROOM LOCATIONS BUILDING LAYOUT PLAN SEE EXISTING BASEMENT (ROOMS L41 & L42) LOCATION OF WORK AREA EXISTING BASEMENT BUILDING LAYOUT PLAN CLIENT: DRAWING NO. SHEET OF TITLE: NO. DATE NATURE OF REVISION FILE NAME N:chicago150084MechPLN_150084_03.sht CHKD. JPCDSGN. JPCCHKD. SCALE: DWN. 8/10/2016PLOT DATE: jkennedyCAD USER: PROJ. NO. MODEL: Default DATE: ELP 15-0084 JTK GAH CHICAGO, IL 60608 1501 SOUTH CALIFORNIA AVENUE MT. SINAI HOSPITAL 7 HW HEATER REPLACEMENT PROJ. 7//5/16 MT. SINAI HOSPITAL - DOMESTIC 1 1
  • 4. STEAM AND HEAT EXCHANGER 1' 6. 5. 4. 3. 2. 1. NOTES: NO. ITEM 1 THRUSH STEAM TO WATER HEAT EXCHANGER STRUCTURAL STEEL FRAME PART NUMBER 4" X 2" FABRICATED ELBOW 2" GATE VALVE 2" FABRICATED SPOOL 2" STEAM CONTROL VALVE 2" STRAINER 2" FABRICATED TEE 2" GLOBE VALVE 2" FABRICATED ELBOW 2" FABRICATED HEADER 2" CONDENSATE HEADER 3" WAFER SILENT CHECK VALVE 3" HOT WATER HEADER 3" X 2" FABRICATED ELBOW 2" BUTTERFLY VALVE - 3H 3" COLD WATER HEADER 2" GATE VALVE 2" BALL VALVE STEAM TRAP 2" CHECK VALVE 2" STRAINER SUCTION PRESSURE GAUGE CONTROLS ENCLOSURE24 23 22 21 20 19 18 17 16 15 14 13 12 10 11 9 7 6 8 5 4 3 2 3 3 6 1 3 3 1 3 1 1 3 3 6 3 3 3 6 3 1 3 3 3 3 DESCRIPTION DSH8324 ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE FLANGED ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE ELECTRONIC CONTROLLED FLANGED CONNECTION ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE FLANGED ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE SOCKET WELD X P.E. SCHED. 80 BLK. PIPE SILENT CHECK VALVE, WAFER STYLE, ANSI CLASS 125/250 ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE SOCKET WELD CARBON STEEL BALL VALVE FT-S8-15 STAINLESS STEEL NPT CHECK VALVE KECKLEY STYLE B SUCTION PRESSURE - 100 PSI WITH ALARM OPTION 3 QTY. SCALE 1:8 TYP. AT 3 PLACES DETAIL A SPLIT SKID SPLIT SKID 281/4"233/4"29" 10 3/4" 91/4" 493/4" 801/2" CLEARANCE REQD.NEC 42" 0" 2" 8" 20" 32" 48" 60" 76" 81" 0" 1" 86" 14" 36 1/4" 48 1/4" 53 1/2" 58 1/4" 74 1/4" 76 1/4" 4 1/2" 14" 9 1/2" 36 1/4" 53 1/2" 76 1/4" TOP VIEW REAR VIEW FRONT VIEW SIDE VIEW ALL STEAM SUPPLY PIPING TO BE SCH. 40 BLK. STL. ALL CONDENSATE PIPING TO SCH. 80 BLK. STL. ESTIMATED SYSTEM WEIGHT: 5000 LBS DISCHARGE CONNECTION ORIENTATION. CONTRACTOR/ENGINEER TO VERIFY SUCTION & SOME ITEMS NOT SHOWN FOR CLARITY. SUBMITTALS. WILL BE FORWARDED UPON RECEIPT OF APPROVED FOR CONSTRUCTION. CONSTRUCTION DRAWINGS THIS DRAWING IS PRELIMINARY LAYOUT ONLY. NOT ANSI CLASS 125/150 BUTTERFLY VALVE - 250 PSI MAX MDT1 4 PLANS AND SECTIONS PROPOSED SEMI INSTANTANEOUS HOT WATER HEATER HOT WATER2" STEAM 19 18 15 22 2016 21 18 24 24 24 2 13 14 A 14 17 12 1 11 5 8 49 10 13 3 23 4228 6 72 CLIENT: DRAWING NO. SHEET OF TITLE: NO. DATE NATURE OF REVISION FILE NAME N:chicago150084MechMDT1_150084_04.dgn CHKD. JPCDSGN. JPCCHKD. SCALE: DWN. 7/6/2016PLOT DATE: jkennedyCAD USER: PROJ. NO. MODEL: Default DATE: ELP 15-0084 JTK GAH CHICAGO, IL 60608 1501 SOUTH CALIFORNIA AVENUE MT. SINAI HOSPITAL 7 HW HEATER REPLACEMENT PROJ. 7//5/16 MT. SINAI HOSPITAL - DOMESTIC
  • 5. CONDENSATE PUMP TO EXISTING EXPANSION TANK RETURN HOT WATER COLD WATER HOT WATER DWH #1 DWH #2 DWH #3 15 PSI STEAM INLET HOT WATER INLET COLD WATER RETURN BUILDING OUTLET MIXED WATER SENSOR METRO MIX GENERATION SOURCE RETURN TO HOT WATER PIPING DIAGRAMS LEGEND P GLOBE VALVE CHECK VALVE STRAINER TEMPERATURE GAUGE PRESSURE GAUGE UNION RECIRCULATION PUMP CONTROL VALVE TRAP HOSE BIB T MDT2 5NTS PROPOSED METRO MIX MIXING VALVE ONE LINE DIAGRAM PROPOSED STEAM AND HEAT EXCHANGER ONE LINE DIAGRAM PROPOSED EQUIPMENT SCHEDULE CLIENT: DRAWING NO. SHEET OF TITLE: NO. DATE NATURE OF REVISION FILE NAME N:chicago150084MechMDT2_150084_05.sht CHKD. JPCDSGN. JPCCHKD. SCALE: DWN. 7/6/2016PLOT DATE: jkennedyCAD USER: PROJ. NO. MODEL: Default DATE: ELP 15-0084 JTK GAH CHICAGO, IL 60608 1501 SOUTH CALIFORNIA AVENUE MT. SINAI HOSPITAL 7 HW HEATER REPLACEMENT PROJ. 7//5/16 MT. SINAI HOSPITAL - DOMESTIC TT T T P P P P
  • 6. 6 MDT3 N.T.S. NTS METRO MIX MIXING VALVE DETAIL STAINLESS STEEL PIPE 1 1/2" THREADED STEEL PIPE 1" THREADED STAINLESS ? ? ? ? ? ? ? ? ? ? ? GAUGE PRESSURE GAUGE PRESSURE GAUGE TEMP. GAUGE TEMP. GAUGE TEMP. GAUGE TEMP. GAUGE PRESSURE MOUNTING PLATE FABRICATED GAUGE PRESSURE MIXING VALVE 1 8/10/16 IDPH COMMENTS GAH CLIENT: DRAWING NO. SHEET OF TITLE: NO. DATE NATURE OF REVISION FILE NAME N:chicago150084MechMDT3_150084_06.sht CHKD. JPCDSGN. JPCCHKD. SCALE: DWN. 8/10/2016PLOT DATE: jkennedyCAD USER: PROJ. NO. MODEL: Default DATE: ELP 15-0084 JTK GAH CHICAGO, IL 60608 1501 SOUTH CALIFORNIA AVENUE MT. SINAI HOSPITAL 7 HW HEATER REPLACEMENT PROJ. 7//5/16 MT. SINAI HOSPITAL - DOMESTIC 1 1 PROPOSED METRO MIX MIXING VALVE HEADER EXISTING CONDITION PICTURES WATER HEATER TO BE LOCATED IN THIS AREA EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS WATER HEATER TO BE LOCATED IN THIS AREA EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS AND PRESSURE GAUGE TO BE REMOVED EXISTING HOT WATER TANK SUPPLY LINES FOR PROPOSED CONTROL PANELS PROVIDE 3 1-POLE 20 AMP CIRCUIT BREAKERS EXISTING LIGHTING PANEL IN MECH RM L41 TO PIPING TO BE REMOVED EXISTING WATER TANK AND RELATED PUMP STATION WALL SOUTH OF CONDENSATE EXISTING WEST BOILER ROOM NEW WATER HEATER ACCOMODATE TO BE REWORKED TO EXISTING STEAM PIPING BE ABANDONED AND SEALED EXISTING CATCH BASIN TORECIRCULATIONRETURN RETURN TO HEATER MIXEDWATEROUTLET HOTWATERINLET COLDWATERINLET
  • 7. SPECIFICATIONS 7 SPC NTS CLIENT: DRAWING NO. SHEET OF TITLE: NO. DATE NATURE OF REVISION FILE NAME N:chicago150084MechSPC_150084_07.sht CHKD. JPCDSGN. JPCCHKD. SCALE: DWN. 7/6/2016PLOT DATE: jkennedyCAD USER: PROJ. NO. MODEL: Default DATE: ELP 15-0084 JTK GAH CHICAGO, IL 60608 1501 SOUTH CALIFORNIA AVENUE MT. SINAI HOSPITAL 7 HW HEATER REPLACEMENT PROJ. 7//5/16 MT. SINAI HOSPITAL - DOMESTIC