Compliant Repair Solutions for Pipework and
Equipment in Petroleum, Petrochemical and
Natural Gas Industries
Compliant Repair Solutions for Pipework and Equipment in
Petroleum, Petrochemical and Natural Gas Industries
NACE Jubail Technical Workshop
Corrosion Under Insulation
10th December, 2015
Presented By: Mr. Bobby Satheesh
QA / QC Manager
Hajjan Trading and Industrial Services Co. Ltd. (HATCON)
Topics
■ Introduction
■ Need for Composite Repairs
■ Compliant V/s Non-Compliant Repairs
■ Governing Standards
■ Technical Considerations
■ Process Parameters
■ Product Parameters
■ Case Histories
■ HATCON Capabilities
■ Design, Installation, Supervision, Testing and Inspection
■ Conclusion
Introduction
■ Need for Composite Repairs
■ Various types of composite repair systems have been in place across the
years and are still being used to restore strength to weakened metallic
substrates damaged by corrosion, abrasion, impact etc.
Introduction
■ Compliant V/s Non-Compliant Repairs
■ Repairs can normally be divided into two broad categories based on the
methodology adopted
■ Both are being used worldwide to address the various problems faced by
plants when it comes to the damaging effects of wear and chemical attack
on pipes and equipment
■ Our desired scenario
- A safe, reliable system that can last for an intended lifetime
- What must the applied system go through?
– Various internal and external loads, effects of chemicals (water to hydrocarbons and
many more), corrosive external environment and multiple wear modes
■ Both compliant and non-compliant repairs basically appear the same; so
where’s the difference?
Introduction
■ Compliant V/s Non-Compliant Repairs
■ Compliant Repairs
- Designed using scientific methods and engineering formulae
- Each design in unique
- Applied only by validated and certified installers
- Fully traceable
- Confidence to the end user
– Product quality
– Process control
■ Non - Compliant Repairs
- Designed on the need of the hour and often based on empirical design
calculations – not scientific methods
- Traceability is not guaranteed
- Liabilities?
Introduction
■ Governing Standards:
[The above standards are available for purchase through the websites of ISO and ASME]
ISO 24817:2015
Petroleum, petrochemical and natural gas
industries – Composite repairs for pipework –
Qualification and design, installation, testing
and inspection
ASME PCC – 2 – 2015
Repair of Pressure Equipment and Piping
Technical Considerations – Process Parameters
■ System Life Cycle
■ Qualification of the repair system
■ Design
■ Installation, testing and inspection
■ Validation process and control
■ On-going integrity management through repair design life
■ Decommissioning of engineered composite repair
Technical Considerations – Process Parameters
■ Qualification of the repair system
■ Even before a product (system) can be recommended for a particular
application or situation, it must be pre-qualified for that scenario; else the
final repair is considered to be non-compliant
■ Pre-qualification tests (adapted from ISO 24817:2015; for information / educational purposes only):
- Mechanical properties
– Young’s modulus
– Poisson’s ratio
– Shear modulus
– Thermal expansion coefficient
– Tg (Glass transition temperature) or HDT (Heat Distortion Temperature)
of the resin when cured at relevant temperatures
– Barcol or Shore Hardness
- Adhesion strength
– Lap shear
- Performance data
– Energy release rate
– Short-term pipe spool survival test (ISO 24817, Annex C)
– Impact survival test (ISO 24817, Annex F)
Teststobecarriedoutinlinewith
relevantISO,ASTMstandardsor
AnnexuresofISO24817as
definedinISO24817:2015
Technical Considerations – Process Parameters
■ Qualification of the repair system
■ Belzona® SuperWrap II - Published Performance Data
Technical Considerations – Process Parameters
■ Design
■ Each repair is unique and designed only by certified designers using the
methodology defined in the standard
■ Designers must pass rigorous validation exams and meet minimum levels of
competence
■ Two design scenarios: Type A (Thin-wall defects) and Type B (Through-wall
defects)
Thin wall defects Through wall defects
Technical Considerations – Process Parameters
■ Design
■ Every design problem is only as good as the quality of the input
■ The input is provided by the client through ASR forms as shown below:
Technical Considerations – Process Parameters
■ Design
■ There are two outputs to every design problem which then becomes the
basis for estimating the quantity of materials required, costs, planning of
operational activities etc.
- Thickness of the repair (minimum required in axial / circumferential direction,
whichever is larger and within the constraint imposed by the standard)
, where D is the outer diameter of the pipe
- Total axial extent (total length of the repair and consists of the defect size, axial
length of the repair and the taper length which is set to approximately 5 times the
thickness of the system in either direction)
Technical Considerations – Process Parameters
■ Installation, testing and inspection
■ Just as every design problem is only as the input received, every
application is only as good as the quality of the installers responsible for
installing the system in line with the design specifications, while ensuring
that all Application Reports and necessary QA / QC documentation are
duly filled through the course of the application
■ In order for the repair to be compliant, the level of training of the Installer
(or Supervisor) and the class of repair is important as mandated by the
standard. Belzona® uses a slightly stricter approach here:
Class 1 repairs can be carried out by
Validated Installers
Class 2 and Class 3 repairs can be carried
out by Validated Installers only when the
application is Supervised by Validated
Supervisors
Technical Considerations – Process Parameters
■ Installation, testing and inspection
■ It is critical that various checks are carried out at “Hold Points” as defined
in the table below:
Technical Considerations – Process Parameters
■ Validation process and control
■ The validation process is strictly controlled through a series of intensive
courses, rigorous theoretical examinations and practical validation in
accordance with the requirements of the appropriate sections of ISO
24817:2015 standard
■ All personnel need to undergo and pass the validated Installers course,
have adequate years of experience and a current certification as mandated
by the standard, prior to be eligible to attend the validated Supervisor’s
course
■ All validated Installers and Supervisors are issued
■ Point to remember: Class 2 and Class 3 repairs need to have at least one
validated Supervisor on site to oversee the works at all times!
Technical Considerations – Process Parameters
■ Validation process and control
Technical Considerations – Process Parameters
■ On-going integrity management through repair design life
■ An important stage in the whole process and is the responsibility of the end
user to adopt a Risk Based Approach (RBI) type of inspection technique
- Due consideration must be given to the reason for which the engineered
compliant composite repair system was required in the first place
- For external corrosion mechanisms and externally applied loads (such as in case
of buried or submerged pipes), the integrity of the composite wrap may be
examined visually and by using other non-destructive techniques as applicable
- For internal corrosion modes, the client may use any technique as may be
convenient to them and appropriate to the situation at hand.
– Belzona® has carried out X-Ray detection tests and results have proven to be
excellent as shown on the next slide
Technical Considerations – Process Parameters
■ On-going integrity management through repair design life
Technical Considerations – Process Parameters
■ Decommissioning of engineered composite repair
■ A decision that is typically taken as the engineered composite repair
approaches its design life
■ Adequate systems of work and documentation must be maintained –
minutes of meetings shall be recorded; points raised and observations
shall be noted.
■ The final (timely and informed) decision would basically be to proceed with
a further repair or to seek a replacement of the composite repair system as
appropriate
Technical Considerations – Product Parameters
■ Belzona® Sue

Contenu connexe

Tendances

Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginnersMOHAMMAD ATIF ALI
 
Overview fusion welding standards (lasstandaarden engels)
Overview fusion welding standards (lasstandaarden engels)Overview fusion welding standards (lasstandaarden engels)
Overview fusion welding standards (lasstandaarden engels)René Varkevisser
 
What is wps important tips regarding to wps
What is wps important tips regarding to wpsWhat is wps important tips regarding to wps
What is wps important tips regarding to wpsWeld Maniac
 
Fabrication and Quality Control of structural steel
Fabrication and Quality Control of structural steelFabrication and Quality Control of structural steel
Fabrication and Quality Control of structural steelAhmed Allam
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
3 - Introduction to Conformity Assessment and ISO CASCO.pdf
3 - Introduction to Conformity Assessment and ISO CASCO.pdf3 - Introduction to Conformity Assessment and ISO CASCO.pdf
3 - Introduction to Conformity Assessment and ISO CASCO.pdfssuser035fe5
 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswipguest831c1e
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
Structural Steel Welding Inspection
Structural Steel Welding InspectionStructural Steel Welding Inspection
Structural Steel Welding InspectionAsirul Hoq
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.pptpeter770054
 
Procedure identification and traceability
Procedure   identification and traceabilityProcedure   identification and traceability
Procedure identification and traceabilityWilliam Laride
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 

Tendances (20)

Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
 
Overview fusion welding standards (lasstandaarden engels)
Overview fusion welding standards (lasstandaarden engels)Overview fusion welding standards (lasstandaarden engels)
Overview fusion welding standards (lasstandaarden engels)
 
What is wps important tips regarding to wps
What is wps important tips regarding to wpsWhat is wps important tips regarding to wps
What is wps important tips regarding to wps
 
Fabrication and Quality Control of structural steel
Fabrication and Quality Control of structural steelFabrication and Quality Control of structural steel
Fabrication and Quality Control of structural steel
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
3 - Introduction to Conformity Assessment and ISO CASCO.pdf
3 - Introduction to Conformity Assessment and ISO CASCO.pdf3 - Introduction to Conformity Assessment and ISO CASCO.pdf
3 - Introduction to Conformity Assessment and ISO CASCO.pdf
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswip
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Welding inspection cswip
Welding inspection cswip Welding inspection cswip
Welding inspection cswip
 
Structural Steel Welding Inspection
Structural Steel Welding InspectionStructural Steel Welding Inspection
Structural Steel Welding Inspection
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt
 
Procedure identification and traceability
Procedure   identification and traceabilityProcedure   identification and traceability
Procedure identification and traceability
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
Aws d1.1 guides
Aws d1.1 guidesAws d1.1 guides
Aws d1.1 guides
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 

En vedette

En vedette (6)

Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processes
 
Calibration service
Calibration serviceCalibration service
Calibration service
 
Non destructive testing
Non destructive testing Non destructive testing
Non destructive testing
 
Pesticide testing
Pesticide testingPesticide testing
Pesticide testing
 
Pqr0
Pqr0Pqr0
Pqr0
 
Asnt mpt ii
Asnt mpt iiAsnt mpt ii
Asnt mpt ii
 

Similaire à 9 belzona-2 - compliant repairs

Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation inacatrine
 
General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning pptDayasagar Govidaraju
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptxDayasagar Govidaraju
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev
 
Ahmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed Fawzy
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
 
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...Kevin Perry
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013leo040490
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revertMike Lewin
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Chintan Gohil
 

Similaire à 9 belzona-2 - compliant repairs (20)

kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation
 
General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning ppt
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptx
 
Resume
ResumeResume
Resume
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )
 
Ahmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineer
 
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdfFAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
 
Husains CV
Husains CVHusains CV
Husains CV
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
Ashish jariwala -Resume
Ashish jariwala -ResumeAshish jariwala -Resume
Ashish jariwala -Resume
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revert
 
Ajay_CV_SQA
Ajay_CV_SQAAjay_CV_SQA
Ajay_CV_SQA
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_
 
CV
CVCV
CV
 
G Butler - CV 2016
G Butler - CV 2016G Butler - CV 2016
G Butler - CV 2016
 

Plus de Jithu John

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptxJithu John
 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cuiJithu John
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010Jithu John
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009Jithu John
 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gudJithu John
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsJithu John
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
 

Plus de Jithu John (14)

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx
 
my ppt.pptx
my ppt.pptxmy ppt.pptx
my ppt.pptx
 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cui
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
Alignment
AlignmentAlignment
Alignment
 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009
 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steels
 
Weld defects
Weld defectsWeld defects
Weld defects
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 

Dernier

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Dernier (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

9 belzona-2 - compliant repairs

  • 1. Compliant Repair Solutions for Pipework and Equipment in Petroleum, Petrochemical and Natural Gas Industries
  • 2. Compliant Repair Solutions for Pipework and Equipment in Petroleum, Petrochemical and Natural Gas Industries NACE Jubail Technical Workshop Corrosion Under Insulation 10th December, 2015 Presented By: Mr. Bobby Satheesh QA / QC Manager Hajjan Trading and Industrial Services Co. Ltd. (HATCON)
  • 3. Topics ■ Introduction ■ Need for Composite Repairs ■ Compliant V/s Non-Compliant Repairs ■ Governing Standards ■ Technical Considerations ■ Process Parameters ■ Product Parameters ■ Case Histories ■ HATCON Capabilities ■ Design, Installation, Supervision, Testing and Inspection ■ Conclusion
  • 4. Introduction ■ Need for Composite Repairs ■ Various types of composite repair systems have been in place across the years and are still being used to restore strength to weakened metallic substrates damaged by corrosion, abrasion, impact etc.
  • 5. Introduction ■ Compliant V/s Non-Compliant Repairs ■ Repairs can normally be divided into two broad categories based on the methodology adopted ■ Both are being used worldwide to address the various problems faced by plants when it comes to the damaging effects of wear and chemical attack on pipes and equipment ■ Our desired scenario - A safe, reliable system that can last for an intended lifetime - What must the applied system go through? – Various internal and external loads, effects of chemicals (water to hydrocarbons and many more), corrosive external environment and multiple wear modes ■ Both compliant and non-compliant repairs basically appear the same; so where’s the difference?
  • 6. Introduction ■ Compliant V/s Non-Compliant Repairs ■ Compliant Repairs - Designed using scientific methods and engineering formulae - Each design in unique - Applied only by validated and certified installers - Fully traceable - Confidence to the end user – Product quality – Process control ■ Non - Compliant Repairs - Designed on the need of the hour and often based on empirical design calculations – not scientific methods - Traceability is not guaranteed - Liabilities?
  • 7. Introduction ■ Governing Standards: [The above standards are available for purchase through the websites of ISO and ASME] ISO 24817:2015 Petroleum, petrochemical and natural gas industries – Composite repairs for pipework – Qualification and design, installation, testing and inspection ASME PCC – 2 – 2015 Repair of Pressure Equipment and Piping
  • 8. Technical Considerations – Process Parameters ■ System Life Cycle ■ Qualification of the repair system ■ Design ■ Installation, testing and inspection ■ Validation process and control ■ On-going integrity management through repair design life ■ Decommissioning of engineered composite repair
  • 9. Technical Considerations – Process Parameters ■ Qualification of the repair system ■ Even before a product (system) can be recommended for a particular application or situation, it must be pre-qualified for that scenario; else the final repair is considered to be non-compliant ■ Pre-qualification tests (adapted from ISO 24817:2015; for information / educational purposes only): - Mechanical properties – Young’s modulus – Poisson’s ratio – Shear modulus – Thermal expansion coefficient – Tg (Glass transition temperature) or HDT (Heat Distortion Temperature) of the resin when cured at relevant temperatures – Barcol or Shore Hardness - Adhesion strength – Lap shear - Performance data – Energy release rate – Short-term pipe spool survival test (ISO 24817, Annex C) – Impact survival test (ISO 24817, Annex F) Teststobecarriedoutinlinewith relevantISO,ASTMstandardsor AnnexuresofISO24817as definedinISO24817:2015
  • 10. Technical Considerations – Process Parameters ■ Qualification of the repair system ■ Belzona® SuperWrap II - Published Performance Data
  • 11. Technical Considerations – Process Parameters ■ Design ■ Each repair is unique and designed only by certified designers using the methodology defined in the standard ■ Designers must pass rigorous validation exams and meet minimum levels of competence ■ Two design scenarios: Type A (Thin-wall defects) and Type B (Through-wall defects) Thin wall defects Through wall defects
  • 12. Technical Considerations – Process Parameters ■ Design ■ Every design problem is only as good as the quality of the input ■ The input is provided by the client through ASR forms as shown below:
  • 13. Technical Considerations – Process Parameters ■ Design ■ There are two outputs to every design problem which then becomes the basis for estimating the quantity of materials required, costs, planning of operational activities etc. - Thickness of the repair (minimum required in axial / circumferential direction, whichever is larger and within the constraint imposed by the standard) , where D is the outer diameter of the pipe - Total axial extent (total length of the repair and consists of the defect size, axial length of the repair and the taper length which is set to approximately 5 times the thickness of the system in either direction)
  • 14. Technical Considerations – Process Parameters ■ Installation, testing and inspection ■ Just as every design problem is only as the input received, every application is only as good as the quality of the installers responsible for installing the system in line with the design specifications, while ensuring that all Application Reports and necessary QA / QC documentation are duly filled through the course of the application ■ In order for the repair to be compliant, the level of training of the Installer (or Supervisor) and the class of repair is important as mandated by the standard. Belzona® uses a slightly stricter approach here: Class 1 repairs can be carried out by Validated Installers Class 2 and Class 3 repairs can be carried out by Validated Installers only when the application is Supervised by Validated Supervisors
  • 15. Technical Considerations – Process Parameters ■ Installation, testing and inspection ■ It is critical that various checks are carried out at “Hold Points” as defined in the table below:
  • 16. Technical Considerations – Process Parameters ■ Validation process and control ■ The validation process is strictly controlled through a series of intensive courses, rigorous theoretical examinations and practical validation in accordance with the requirements of the appropriate sections of ISO 24817:2015 standard ■ All personnel need to undergo and pass the validated Installers course, have adequate years of experience and a current certification as mandated by the standard, prior to be eligible to attend the validated Supervisor’s course ■ All validated Installers and Supervisors are issued ■ Point to remember: Class 2 and Class 3 repairs need to have at least one validated Supervisor on site to oversee the works at all times!
  • 17. Technical Considerations – Process Parameters ■ Validation process and control
  • 18. Technical Considerations – Process Parameters ■ On-going integrity management through repair design life ■ An important stage in the whole process and is the responsibility of the end user to adopt a Risk Based Approach (RBI) type of inspection technique - Due consideration must be given to the reason for which the engineered compliant composite repair system was required in the first place - For external corrosion mechanisms and externally applied loads (such as in case of buried or submerged pipes), the integrity of the composite wrap may be examined visually and by using other non-destructive techniques as applicable - For internal corrosion modes, the client may use any technique as may be convenient to them and appropriate to the situation at hand. – Belzona® has carried out X-Ray detection tests and results have proven to be excellent as shown on the next slide
  • 19. Technical Considerations – Process Parameters ■ On-going integrity management through repair design life
  • 20. Technical Considerations – Process Parameters ■ Decommissioning of engineered composite repair ■ A decision that is typically taken as the engineered composite repair approaches its design life ■ Adequate systems of work and documentation must be maintained – minutes of meetings shall be recorded; points raised and observations shall be noted. ■ The final (timely and informed) decision would basically be to proceed with a further repair or to seek a replacement of the composite repair system as appropriate
  • 21. Technical Considerations – Product Parameters ■ Belzona® Sue