CURRICULUM VITAE JOHN ADAMS
EMPLOYMENT HISTORY
2007-Current John Adams & Associates
Jacobs PhilippinesInc.
2014 – 2015 Project Manager
TVI Unit 3. Optimisation/Conform Document. Aboitiz Power
Develop conforming Technical Specification for unsolicited bid
for additional 150 mw CFB generator from Unit 1 & 2 EPC `
contractor. Included coal pile and limestone processes. As
owners clients representative focus on economy of scale and
O&M efficiencies.
2014 – current Commercial Manager Bid & Pre construction
Project Manager Construction
Puyo Hydro Project – Ist Gen Power
Member of bid team and tender negotiation group. Included
negotiation for owners engineer for project, GBR & tunneling
strategy, project execution plan. Contract for Owners Engineer
Awarded 2014.
2012- 2013` Project Director
Luzon Hydro Corporation – Aboitiz Power Philippines
Bakun Hydro Power Headrace Tunnel Rehabilitation Project
Project included intake works, generating units and head race
tunnel. At time of appointment project was 6 months behind
schedule. Contractor had no experience and little understanding
of the work. Developed execution strategy and execution plan,
long distance pump and concrete strategy for 3858 m pumped
concrete placement. Completed ahead revised schedule. Long
distance pumping of 3858m with 361m head is record for Asia.
2
John Adams
2010-2011 Recovery Manager / Project Manager / Head of Project
Gati Infrastructure Ltd.- Sikkim India
101 MW Chuzachen RoR Hydro Electric Power Project-HRT
Brought to project to complete tunneling/ concrete lining works
and BOP that was plagued with poor leadership, non-
performance of main contractor, no controls, no knowledge of
long distance concrete pumping (2000 +metres) and in-ability to
plan or progress works. Project was 2.5 yrs behind schedule
with no planning to achieve completion. At time of joining
tunneling lining works still to be completed was 8200 of10600
plus intake works and BOP.
Built team, developed and implemented project execution plan,
master schedule , risk assessment, developed execution
procedures for long distance pumping, quality management
system and rigorous reporting and evaluation regimes. Project
brought under control, concrete lining, intake works and BOP
90% completed and left to owners contractor to complete and
commission.
2010-2011 National Construction Manager
Ausco Modular Pty Ltd
Develop business-wide project management and controls
procedures/processes for delivery $50-150 million plus remote
infrastructure, township and village projects. Manage
construction all major projects. Bid manager major projects.
2008-2010 Owners Engineer / Owners Study Manager
CS EnergyKogan Creek CLFR Solar Power Project
Project had been moth balled until 750mw Kogan Ck Power
station commenced. With refinement Linear Fresnel Reflector
Technology CLFR became economically viable as add on
generated output optimizing use of 750 mw base station cooling
and turbine capacity. Study and recommendation to CS energy
board resulted decision to resurrect Kogan Creek Solar project.
2008 Project Director- Pre Mobilisation & Start-Up
United Resources Limited/Foster Wheeler/Woodside
$250 Million PLUTO LNG Project Mechanical & Gas Gen
Re-price revised bill of quantities and conditions of contract.
Prepare and obtain owners approval, FIDIC conditions of
contract, deliverables - SMP, EMP, Master Construction
Schedule, Organisation, Project Resourcing and Mobilisation
plans.
3
John Adams
2008 Study Director
Batanes Governor Power Generation Review
Review wind generation/ mini hydro option to replace aging oil
fired generator with wind turbine (<0.8 MW) and mini hydro
generator (1MW) Study included current/ future demand,
climatic evaluation and available generating and distribution
equipment .Lack of funds resulted in shelving of the project and
the refurbishment of oil fired generator. In terms of operating
cost advantage the proposal provided a cost effective and
efficient solution to the small islands power problems,
2008 Project Manager – Owners Representative
Asian Mineral Resources – Ban Phuc Nickel Project
$150 Million Nickel Mine and Concentrator – Vietnam
Design and construction of access declines, open stopes
tunnels, concentrator and infrastructure for 400K tpa in remote
north west Vietnam. FIDIC conditions for local and off-shore
contractors and procurement Sourced local supply, contractors,
procurement and refurbishment plant equipment on and off-
shore. Negotiate power supply. Project suspended due owners
funding difficulties.
2007 Project Director
United Resources- Dyno Nobel Limited
$100 Million Ammonia Plant - Mooranbah. Australia
Dismantle, pack, refurbish, erect existing ammonia plant from
Yazoo USA including replace all electrics to Aust Standards.
2006 –2007 Senior Project Manager/Owners Engineer
LXML Limited.
USD350 Million Copper/Gold Expansion, Sepon Laos
Complete DFS and engineering studies for 60,000 tpa upgrade
existing SX/EW copper plant located eastern Laos including
additional autoclave, oxygen plant upgrade/ crushing and
grinding circuits and debottle-neck existing 60ktpa plant.
2005-2006 Senior Project Director / Owners Engineer
CSR Sugar (Ethanol) Pty Limited – Sarina Ethanol
$127.6 million Distillery Expansion-32Mlpa – 64Mlpa
Identification new molecular sieve technology, procure,
fabricate, intergrate and install mol sieve plant. Plant fabricated
at offshore facility. One of few projects in Australia to complete
below budget and ahead of schedule 2005-2006.
4
John Adams
2004-2005 Senior Project Manager/ Owners Engineer
Newmont Gold Corporation - Ahafo Ghana West Africa
$495 million 7.5 Mtpa CIL Gold Project
Construction included HDPE over clay lined TSF, WSF, 154
klm HV transmission lines, substations, crushing/ grinding
circuits, elusion / CIL circuits, thickeners , tanks, gold-room.
Support infrastructure, water and sewerage treatment plants,
services, accom 450 staff 1200 local employees. 4 million +
man hours without lost time incident. FIDIC conditions of
contract.
2002-2004 Senior Projects Manager/Project Director/Owner’s Rep
AGILITY Management Pty Ltd–AGL Major Projects
$285 million 180 MW Hallet & 150 MW Somerton Power
Stations
11 frame 5 and 4 frame 6 gas fired turbine power stations,
include engineering, sub stations, controls, refurbishment used
turbines/generators, commission for local /unmanned
operations. .After taking over project widespread industrial
disputation ceased, Project completed to time & cost.
$ 42 million Paraburdoo Gas Compressor Station –
Goldfield Gas Pipeline
EPC Compressor station including Engineering, Construction
and Commissioning in line Solar 40 turbine. Project completed
6 weeks ahead of schedule.
$167 million Rollout Tasmanian Natural Gas Network
EPCM 11 Off-take stations, steel and PPE gas pipelines. Gas
distribution, metering and domestic connections.
Hallet Wind Farm Study to Board AGL - Study Director
Study Director evaluation and recommendation for development
of wind farm adjacent to 180Mw gas fired station. Study
examined interconnection and switching through Hallet, climate
/ environmental advantages and cost benefit. Due to change in
AGL executive management wind generation was deferred.
Mt Beauty Hydro Privatisation - Bid Manager
Due diligence and asset and operation evaluation (SKM
engineering advisors) .Board decision asking price was outside
of the considered value and likrely return on the investment.
5
John Adams
2001-2002 Senior Project Engineer
HALLIBURTON – KBR / NIZZA Contract
$207 million Queensland Alumina Calciner Project –
Upgrade and Expansion Infrastructure Works
Manage detail engineering, definitive estimates, writing
contracts, preparation tender packages, review and negotiation
subcontract and procurement packages .
2000-2001 Project Director / Contracts Manager
COOPERATIVA MURATORI CEMENTISTI CONSORTIUM
USD 447 million CBK Hydro Project 150Mw Expansion and
Refurbishment– Laguna. Philippines
Negotiate main contract to FIDIC, prepare negotiate back to
back subcontract agreements, administer all contracts,
subcontractor progress and claims. SOW – below ground
generator raise-bore shaft, refurbishment and install turbines
and generators, 3.8 klm x 3m diameter penstock and dam
construction.
1999 – 2000 Contracts Manager / Projects Director – Major Projects
STA CLARA INTERNATIONAL CORPORATION- Philippines
Commercial and Contracts Manager –contract management
all main projects to FIDIC and International forms of Contract.
Projects included US 40m Bakun Head race, US$40m Sta. Rita
and San Lorenzo Power Stations. US$56m CBK Hydro Power
Project, US$40 m NAIA Terminal 3 Project.
1997 – 1998 Project Director / Contracts Manager
BMW / EP ENGINEERING – Malaysia
US$340 MILLION KUALA LUMPUR INTERNATIONAL
AIRPORT - INFRASTRUCTURE.
Site development, all services, chilled water pipelines. Concrete
and flexible pavements for taxi ways, aprons and road works.
Engineering, catering, advanced cargo facilities, elevated roads
and walkways, fuel storage and distribution, 45MW co-gen
power station.
U$89 MILLION CARBON BLACK OFFSHORE/ONSHORE
PIPELINE PT. DICKSON MALAYSIA
Design, Construct and Commission 28 klm onshore and off
shore 14” product pipeline, plems. Scraper station and slug
catcher. .
6
John Adams
1995 – 1997 Senior Project Manager – Asia
TRANSFIELD INTERNATIONAL
US$137 MILLION BAKUN HYDRO PROJECT, PHILIPPINES
EPCM contract for 2x40Mw twin turbine run of river hydro
electric power plant consisting intake weir, 10.7km x 3.5m part
lined head race tunnel, 1.9km steel lined penstock tunnel
section, power station, switchyard, 29km transmission line. Role
included support to Pacific Hydro for feasibility and bank-ability
studies, land acquisition, power purchase agreement.
Transfield - project execution plan, letting of contracts, logistics
and commencement of construction works
Senior Project Manager and Start up Project Manager
US$182 MILLION OCEAN PLACE-HO CHI MINH CITY,
VIETNAM –Geo Technical Development and Execution
Twin tower mixed hotel and commercial project on silted river
estuary, Completed bored piles, diaphragm walls, raft
foundations, columns, site dewatering,
1995 Project Manager
WESTERN MINNING CORPORATION
US$129 MILLION GOLDFIELDS GAS CONVERSATION
PROJECT
5 X 40MW L6000 dual feed gas turbine power stations./ heat
recovery units, lateral pipelines, metering & scraper stations.
Project completed 15 weeks ahead of schedule and below
budget.
1994 – 1995 Project Manager
Western Mining Corporation
DOM – UIE AUST PTY LTD
AU$6 MILLION SINTER FURNACE UP-GRADE
Replace No.3 sinter Furnace Kwinana Nickel Refinery. Install 6
x 6tph Sola Lindbergh furnaces, conveyors, and transfer
stations. Completed ahead of schedule and budget. On
commissioning, output exceeded design.
7
John Adams
1993 – 1994 Project Manager/Owners Representative
CAL – ENERGY CORPORATION – Leyte Philippines
US$308 MILLION 270 mw GOETHERMAL POWER STATION
3 X 90 mw generators, turbines. condensers, cooling towers,
sub station, high temperature pipelines Project completed 4
months ahead of schedule and below budget.
1992 -1993 Senior Project Manager
TRANSFIELD CONSTRUCTION PTY LTD
AUD44 MILLION DAMPIER PUBLIC WHARF EXTENSION
100m wharf extension, 5m widening access trestle. Project
completed 13 weeks ahead of schedule.
AUDS8.5 MILLION IRON ORE STACKER RECLAIMER
Install 800 tph 0 & K Bucket Wheel Stacker / Re-claimer,
upgrade 1.3 kms track & services. 1 klm ore conveyor tunnel.
AUD$15.4 MILLION DOMED STORAGE FACILITY,
GOOMALING
4 x 40m diameter reinforced concrete storage domes,
interconnecting grain handling equipment, receive and load out
systems. This project received Engineering Excellence Award –
Master Builders Association and Innovation in Engineering –
Institution of Engineers 1993.
AUD24 MILLION DAMPIER – PT HEADLAND GAS PIPELINE
Bid Manager 217 klm10” steel pipeline including meter and
scraper stations, major / minor creek and river crossings.
1989 – 1992 Senior Project Manager
EPT – FOCCHI J.V – Western Australia
US$187 MILLION TRAIN 3 LNG PROJECT N.W. SHELF
Construction / commissioning piping, vessels columns,
compressors, heat recovery units, 40 Mw power station, storage
tanks, LPG spheres & condensate tanks. 2600 employees.
Completed 5 months ahead schedule, significant increase
forecast profit , earned all Milestone Early Completion Bonuses.
8
John Adams
1989 Project Manager
WESTERN MINING CORPORATION
AU$35 MILLION LEINSTER-CRUSHER, CONCENTRATOR
UPGRADE
Civil, mechanical & electrical upgrade of mothballed nickel
town & concentrator following transfer assets to WMC and
discovery commercial gold grades.
1978 – 1989 INTERNATIONAL BANK FOR RECONSTRUCTION &
DEVELOPMENT & INTERNATIONAL FINANCE
CORPORATION
1987 – 1989 Project Director,
US$115 MILLION PLAISANCE – PT LOUIS HIGHWAY
MAURITIUS
134 kms dual carriage-way, 6 major bridges, 4 interchanges and
major river diversions. FIDIC / EPCM contract.
1985 – 1987 Project Manager / Area Manager
US$75 MILLION IPOH – KUALA LUMPUR TOLL WAY
63 klms. Dual carriageways, bridges, and interchanges.
1983 – 1985 Project Manager
US$150 MILLION COASTAL SHIPS & FISHING HARBOUR
ORISSA INDIA
250m land backed wharves, 2 x 80m jetties,, 500t slipway,
services, 40MW power station. Feasibility & funding studies.
1980 – 1983 Project Manager / Area Manager
US$90 MILLION PORT EXPANSION , SIERRA LEONE
2 x 150m berths, dredging, turning basins, mooring dolphins.
1978 – 1980 Project Manager
TOMMSON Plc – Nigeria US$88 MILLION CRUDE OIL LOAD
OUT FACULTY –PT HARCOURT
Offshore pipelines, mooring dolphins, plems, onshore meter/
launcher stations, oil storage tanks.
1976 – 1977 General Manager
INDIAN OCEAN SHIPYARDS PTY LTD – Western Australia
Commercialise small shipbuilding / repair yard. Introduced
unitised construction of tender, standby and trawlers to 40
metres.
9
John Adams
1974 – 1975 Project Engineer / Project Manager
MOUNTAIN STATE ENGINEERING CORPORATION
AU$27 million CENTRAL QLD CEMENT – LIME KILN
Fabrication, installation and commissioning lime complex.
completed 4months ahead of schedule and below budget.
1972 – 1974 Project Engineer
MOUNTAIN STATE ENGINEERING CORPORATION
AU$54 million WINDARRA NICKEL PROJECT
Engineer, procure, construction and commission remote desert
located nickel concentrator 40 mw diesel power station
1965 – 1972 CONTINENTAL OIL CORPORATION – Austin U.S.A.
Student Engineer, Project Engineer.
Exploration, production, construction of processing and refining
facilities. Continental Oil Scholarship 1965-1969. Vacation
employment at various exploration and production facilities. .

Contenu connexe

Tendances

20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_AndrewAndrew Carline
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special ProjectsChalcroft Ltd
 
CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1Mark Fayle
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09arosental
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
McConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineMcConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineChris Swaine
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILECarlos Camino
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME shortDuane Pooley
 
Bruce E Wood Visual Resume 22June15
Bruce E Wood Visual Resume 22June15Bruce E Wood Visual Resume 22June15
Bruce E Wood Visual Resume 22June15BEWOOD
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
GUN-newsletter-2_270815_web
GUN-newsletter-2_270815_webGUN-newsletter-2_270815_web
GUN-newsletter-2_270815_webNitin Naik
 

Tendances (20)

20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_Andrew
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special Projects
 
CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
McConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineMcConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to Mine
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILE
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Bruce E Wood Visual Resume 22June15
Bruce E Wood Visual Resume 22June15Bruce E Wood Visual Resume 22June15
Bruce E Wood Visual Resume 22June15
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
NA
NANA
NA
 
CV Peter Heinzelmann
CV Peter HeinzelmannCV Peter Heinzelmann
CV Peter Heinzelmann
 
GUN-newsletter-2_270815_web
GUN-newsletter-2_270815_webGUN-newsletter-2_270815_web
GUN-newsletter-2_270815_web
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
RS Resume
RS ResumeRS Resume
RS Resume
 

En vedette

MENU KING BBQ ALACARTE - TPHCM
MENU KING BBQ ALACARTE - TPHCMMENU KING BBQ ALACARTE - TPHCM
MENU KING BBQ ALACARTE - TPHCMRedsunITIHCMC
 
#sitFRA - Improving the UX for your users - Where to start?
#sitFRA - Improving the UX for your users - Where to start?#sitFRA - Improving the UX for your users - Where to start?
#sitFRA - Improving the UX for your users - Where to start?Roel van den Berge
 
Artificial Intelligence in Travel
Artificial Intelligence in TravelArtificial Intelligence in Travel
Artificial Intelligence in TravelLarry Smith
 
CV Gertie Arts November 2015
CV Gertie Arts November 2015CV Gertie Arts November 2015
CV Gertie Arts November 2015Gertie H.P. Arts
 
III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...
III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...
III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...Gabriel Tovar Jimenez
 
10 Hyper Disruptive Business Models
10 Hyper Disruptive Business Models10 Hyper Disruptive Business Models
10 Hyper Disruptive Business ModelsScopernia
 

En vedette (8)

Where's my bag? #travel
Where's my bag? #travelWhere's my bag? #travel
Where's my bag? #travel
 
MENU KING BBQ ALACARTE - TPHCM
MENU KING BBQ ALACARTE - TPHCMMENU KING BBQ ALACARTE - TPHCM
MENU KING BBQ ALACARTE - TPHCM
 
#sitFRA - Improving the UX for your users - Where to start?
#sitFRA - Improving the UX for your users - Where to start?#sitFRA - Improving the UX for your users - Where to start?
#sitFRA - Improving the UX for your users - Where to start?
 
Artificial Intelligence in Travel
Artificial Intelligence in TravelArtificial Intelligence in Travel
Artificial Intelligence in Travel
 
CV Gertie Arts November 2015
CV Gertie Arts November 2015CV Gertie Arts November 2015
CV Gertie Arts November 2015
 
III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...
III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...
III Jornada Científica, Técnica y Comunitaria del Programa de Licenciatura en...
 
Chelimsky Forum on Evaluation Theory and Practice
Chelimsky Forum on Evaluation Theory and PracticeChelimsky Forum on Evaluation Theory and Practice
Chelimsky Forum on Evaluation Theory and Practice
 
10 Hyper Disruptive Business Models
10 Hyper Disruptive Business Models10 Hyper Disruptive Business Models
10 Hyper Disruptive Business Models
 

Similaire à JA CV 050915 (1) (1)

Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1RToet
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2RToet
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015Keith Vary
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVEben van Dyk
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 

Similaire à JA CV 050915 (1) (1) (20)

Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
jamespickering
jamespickeringjamespickering
jamespickering
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 

JA CV 050915 (1) (1)

  • 1. 1 CURRICULUM VITAE JOHN ADAMS EMPLOYMENT HISTORY 2007-Current John Adams & Associates Jacobs PhilippinesInc. 2014 – 2015 Project Manager TVI Unit 3. Optimisation/Conform Document. Aboitiz Power Develop conforming Technical Specification for unsolicited bid for additional 150 mw CFB generator from Unit 1 & 2 EPC ` contractor. Included coal pile and limestone processes. As owners clients representative focus on economy of scale and O&M efficiencies. 2014 – current Commercial Manager Bid & Pre construction Project Manager Construction Puyo Hydro Project – Ist Gen Power Member of bid team and tender negotiation group. Included negotiation for owners engineer for project, GBR & tunneling strategy, project execution plan. Contract for Owners Engineer Awarded 2014. 2012- 2013` Project Director Luzon Hydro Corporation – Aboitiz Power Philippines Bakun Hydro Power Headrace Tunnel Rehabilitation Project Project included intake works, generating units and head race tunnel. At time of appointment project was 6 months behind schedule. Contractor had no experience and little understanding of the work. Developed execution strategy and execution plan, long distance pump and concrete strategy for 3858 m pumped concrete placement. Completed ahead revised schedule. Long distance pumping of 3858m with 361m head is record for Asia.
  • 2. 2 John Adams 2010-2011 Recovery Manager / Project Manager / Head of Project Gati Infrastructure Ltd.- Sikkim India 101 MW Chuzachen RoR Hydro Electric Power Project-HRT Brought to project to complete tunneling/ concrete lining works and BOP that was plagued with poor leadership, non- performance of main contractor, no controls, no knowledge of long distance concrete pumping (2000 +metres) and in-ability to plan or progress works. Project was 2.5 yrs behind schedule with no planning to achieve completion. At time of joining tunneling lining works still to be completed was 8200 of10600 plus intake works and BOP. Built team, developed and implemented project execution plan, master schedule , risk assessment, developed execution procedures for long distance pumping, quality management system and rigorous reporting and evaluation regimes. Project brought under control, concrete lining, intake works and BOP 90% completed and left to owners contractor to complete and commission. 2010-2011 National Construction Manager Ausco Modular Pty Ltd Develop business-wide project management and controls procedures/processes for delivery $50-150 million plus remote infrastructure, township and village projects. Manage construction all major projects. Bid manager major projects. 2008-2010 Owners Engineer / Owners Study Manager CS EnergyKogan Creek CLFR Solar Power Project Project had been moth balled until 750mw Kogan Ck Power station commenced. With refinement Linear Fresnel Reflector Technology CLFR became economically viable as add on generated output optimizing use of 750 mw base station cooling and turbine capacity. Study and recommendation to CS energy board resulted decision to resurrect Kogan Creek Solar project. 2008 Project Director- Pre Mobilisation & Start-Up United Resources Limited/Foster Wheeler/Woodside $250 Million PLUTO LNG Project Mechanical & Gas Gen Re-price revised bill of quantities and conditions of contract. Prepare and obtain owners approval, FIDIC conditions of contract, deliverables - SMP, EMP, Master Construction Schedule, Organisation, Project Resourcing and Mobilisation plans.
  • 3. 3 John Adams 2008 Study Director Batanes Governor Power Generation Review Review wind generation/ mini hydro option to replace aging oil fired generator with wind turbine (<0.8 MW) and mini hydro generator (1MW) Study included current/ future demand, climatic evaluation and available generating and distribution equipment .Lack of funds resulted in shelving of the project and the refurbishment of oil fired generator. In terms of operating cost advantage the proposal provided a cost effective and efficient solution to the small islands power problems, 2008 Project Manager – Owners Representative Asian Mineral Resources – Ban Phuc Nickel Project $150 Million Nickel Mine and Concentrator – Vietnam Design and construction of access declines, open stopes tunnels, concentrator and infrastructure for 400K tpa in remote north west Vietnam. FIDIC conditions for local and off-shore contractors and procurement Sourced local supply, contractors, procurement and refurbishment plant equipment on and off- shore. Negotiate power supply. Project suspended due owners funding difficulties. 2007 Project Director United Resources- Dyno Nobel Limited $100 Million Ammonia Plant - Mooranbah. Australia Dismantle, pack, refurbish, erect existing ammonia plant from Yazoo USA including replace all electrics to Aust Standards. 2006 –2007 Senior Project Manager/Owners Engineer LXML Limited. USD350 Million Copper/Gold Expansion, Sepon Laos Complete DFS and engineering studies for 60,000 tpa upgrade existing SX/EW copper plant located eastern Laos including additional autoclave, oxygen plant upgrade/ crushing and grinding circuits and debottle-neck existing 60ktpa plant. 2005-2006 Senior Project Director / Owners Engineer CSR Sugar (Ethanol) Pty Limited – Sarina Ethanol $127.6 million Distillery Expansion-32Mlpa – 64Mlpa Identification new molecular sieve technology, procure, fabricate, intergrate and install mol sieve plant. Plant fabricated at offshore facility. One of few projects in Australia to complete below budget and ahead of schedule 2005-2006.
  • 4. 4 John Adams 2004-2005 Senior Project Manager/ Owners Engineer Newmont Gold Corporation - Ahafo Ghana West Africa $495 million 7.5 Mtpa CIL Gold Project Construction included HDPE over clay lined TSF, WSF, 154 klm HV transmission lines, substations, crushing/ grinding circuits, elusion / CIL circuits, thickeners , tanks, gold-room. Support infrastructure, water and sewerage treatment plants, services, accom 450 staff 1200 local employees. 4 million + man hours without lost time incident. FIDIC conditions of contract. 2002-2004 Senior Projects Manager/Project Director/Owner’s Rep AGILITY Management Pty Ltd–AGL Major Projects $285 million 180 MW Hallet & 150 MW Somerton Power Stations 11 frame 5 and 4 frame 6 gas fired turbine power stations, include engineering, sub stations, controls, refurbishment used turbines/generators, commission for local /unmanned operations. .After taking over project widespread industrial disputation ceased, Project completed to time & cost. $ 42 million Paraburdoo Gas Compressor Station – Goldfield Gas Pipeline EPC Compressor station including Engineering, Construction and Commissioning in line Solar 40 turbine. Project completed 6 weeks ahead of schedule. $167 million Rollout Tasmanian Natural Gas Network EPCM 11 Off-take stations, steel and PPE gas pipelines. Gas distribution, metering and domestic connections. Hallet Wind Farm Study to Board AGL - Study Director Study Director evaluation and recommendation for development of wind farm adjacent to 180Mw gas fired station. Study examined interconnection and switching through Hallet, climate / environmental advantages and cost benefit. Due to change in AGL executive management wind generation was deferred. Mt Beauty Hydro Privatisation - Bid Manager Due diligence and asset and operation evaluation (SKM engineering advisors) .Board decision asking price was outside of the considered value and likrely return on the investment.
  • 5. 5 John Adams 2001-2002 Senior Project Engineer HALLIBURTON – KBR / NIZZA Contract $207 million Queensland Alumina Calciner Project – Upgrade and Expansion Infrastructure Works Manage detail engineering, definitive estimates, writing contracts, preparation tender packages, review and negotiation subcontract and procurement packages . 2000-2001 Project Director / Contracts Manager COOPERATIVA MURATORI CEMENTISTI CONSORTIUM USD 447 million CBK Hydro Project 150Mw Expansion and Refurbishment– Laguna. Philippines Negotiate main contract to FIDIC, prepare negotiate back to back subcontract agreements, administer all contracts, subcontractor progress and claims. SOW – below ground generator raise-bore shaft, refurbishment and install turbines and generators, 3.8 klm x 3m diameter penstock and dam construction. 1999 – 2000 Contracts Manager / Projects Director – Major Projects STA CLARA INTERNATIONAL CORPORATION- Philippines Commercial and Contracts Manager –contract management all main projects to FIDIC and International forms of Contract. Projects included US 40m Bakun Head race, US$40m Sta. Rita and San Lorenzo Power Stations. US$56m CBK Hydro Power Project, US$40 m NAIA Terminal 3 Project. 1997 – 1998 Project Director / Contracts Manager BMW / EP ENGINEERING – Malaysia US$340 MILLION KUALA LUMPUR INTERNATIONAL AIRPORT - INFRASTRUCTURE. Site development, all services, chilled water pipelines. Concrete and flexible pavements for taxi ways, aprons and road works. Engineering, catering, advanced cargo facilities, elevated roads and walkways, fuel storage and distribution, 45MW co-gen power station. U$89 MILLION CARBON BLACK OFFSHORE/ONSHORE PIPELINE PT. DICKSON MALAYSIA Design, Construct and Commission 28 klm onshore and off shore 14” product pipeline, plems. Scraper station and slug catcher. .
  • 6. 6 John Adams 1995 – 1997 Senior Project Manager – Asia TRANSFIELD INTERNATIONAL US$137 MILLION BAKUN HYDRO PROJECT, PHILIPPINES EPCM contract for 2x40Mw twin turbine run of river hydro electric power plant consisting intake weir, 10.7km x 3.5m part lined head race tunnel, 1.9km steel lined penstock tunnel section, power station, switchyard, 29km transmission line. Role included support to Pacific Hydro for feasibility and bank-ability studies, land acquisition, power purchase agreement. Transfield - project execution plan, letting of contracts, logistics and commencement of construction works Senior Project Manager and Start up Project Manager US$182 MILLION OCEAN PLACE-HO CHI MINH CITY, VIETNAM –Geo Technical Development and Execution Twin tower mixed hotel and commercial project on silted river estuary, Completed bored piles, diaphragm walls, raft foundations, columns, site dewatering, 1995 Project Manager WESTERN MINNING CORPORATION US$129 MILLION GOLDFIELDS GAS CONVERSATION PROJECT 5 X 40MW L6000 dual feed gas turbine power stations./ heat recovery units, lateral pipelines, metering & scraper stations. Project completed 15 weeks ahead of schedule and below budget. 1994 – 1995 Project Manager Western Mining Corporation DOM – UIE AUST PTY LTD AU$6 MILLION SINTER FURNACE UP-GRADE Replace No.3 sinter Furnace Kwinana Nickel Refinery. Install 6 x 6tph Sola Lindbergh furnaces, conveyors, and transfer stations. Completed ahead of schedule and budget. On commissioning, output exceeded design.
  • 7. 7 John Adams 1993 – 1994 Project Manager/Owners Representative CAL – ENERGY CORPORATION – Leyte Philippines US$308 MILLION 270 mw GOETHERMAL POWER STATION 3 X 90 mw generators, turbines. condensers, cooling towers, sub station, high temperature pipelines Project completed 4 months ahead of schedule and below budget. 1992 -1993 Senior Project Manager TRANSFIELD CONSTRUCTION PTY LTD AUD44 MILLION DAMPIER PUBLIC WHARF EXTENSION 100m wharf extension, 5m widening access trestle. Project completed 13 weeks ahead of schedule. AUDS8.5 MILLION IRON ORE STACKER RECLAIMER Install 800 tph 0 & K Bucket Wheel Stacker / Re-claimer, upgrade 1.3 kms track & services. 1 klm ore conveyor tunnel. AUD$15.4 MILLION DOMED STORAGE FACILITY, GOOMALING 4 x 40m diameter reinforced concrete storage domes, interconnecting grain handling equipment, receive and load out systems. This project received Engineering Excellence Award – Master Builders Association and Innovation in Engineering – Institution of Engineers 1993. AUD24 MILLION DAMPIER – PT HEADLAND GAS PIPELINE Bid Manager 217 klm10” steel pipeline including meter and scraper stations, major / minor creek and river crossings. 1989 – 1992 Senior Project Manager EPT – FOCCHI J.V – Western Australia US$187 MILLION TRAIN 3 LNG PROJECT N.W. SHELF Construction / commissioning piping, vessels columns, compressors, heat recovery units, 40 Mw power station, storage tanks, LPG spheres & condensate tanks. 2600 employees. Completed 5 months ahead schedule, significant increase forecast profit , earned all Milestone Early Completion Bonuses.
  • 8. 8 John Adams 1989 Project Manager WESTERN MINING CORPORATION AU$35 MILLION LEINSTER-CRUSHER, CONCENTRATOR UPGRADE Civil, mechanical & electrical upgrade of mothballed nickel town & concentrator following transfer assets to WMC and discovery commercial gold grades. 1978 – 1989 INTERNATIONAL BANK FOR RECONSTRUCTION & DEVELOPMENT & INTERNATIONAL FINANCE CORPORATION 1987 – 1989 Project Director, US$115 MILLION PLAISANCE – PT LOUIS HIGHWAY MAURITIUS 134 kms dual carriage-way, 6 major bridges, 4 interchanges and major river diversions. FIDIC / EPCM contract. 1985 – 1987 Project Manager / Area Manager US$75 MILLION IPOH – KUALA LUMPUR TOLL WAY 63 klms. Dual carriageways, bridges, and interchanges. 1983 – 1985 Project Manager US$150 MILLION COASTAL SHIPS & FISHING HARBOUR ORISSA INDIA 250m land backed wharves, 2 x 80m jetties,, 500t slipway, services, 40MW power station. Feasibility & funding studies. 1980 – 1983 Project Manager / Area Manager US$90 MILLION PORT EXPANSION , SIERRA LEONE 2 x 150m berths, dredging, turning basins, mooring dolphins. 1978 – 1980 Project Manager TOMMSON Plc – Nigeria US$88 MILLION CRUDE OIL LOAD OUT FACULTY –PT HARCOURT Offshore pipelines, mooring dolphins, plems, onshore meter/ launcher stations, oil storage tanks. 1976 – 1977 General Manager INDIAN OCEAN SHIPYARDS PTY LTD – Western Australia Commercialise small shipbuilding / repair yard. Introduced unitised construction of tender, standby and trawlers to 40 metres.
  • 9. 9 John Adams 1974 – 1975 Project Engineer / Project Manager MOUNTAIN STATE ENGINEERING CORPORATION AU$27 million CENTRAL QLD CEMENT – LIME KILN Fabrication, installation and commissioning lime complex. completed 4months ahead of schedule and below budget. 1972 – 1974 Project Engineer MOUNTAIN STATE ENGINEERING CORPORATION AU$54 million WINDARRA NICKEL PROJECT Engineer, procure, construction and commission remote desert located nickel concentrator 40 mw diesel power station 1965 – 1972 CONTINENTAL OIL CORPORATION – Austin U.S.A. Student Engineer, Project Engineer. Exploration, production, construction of processing and refining facilities. Continental Oil Scholarship 1965-1969. Vacation employment at various exploration and production facilities. .