Migration Projects
Poseidon Project


Relocation of 1,800 Partners across 5 buildings



Program Management of „Poseidon‟ Build Out
 Manage local front end data center build out
Manage back end data center ad DR location build out
 Corporate Real Estate build out of partner work area
Complete Hospital Move








Part of a $1B Hospital Build
Greenfield design and deployment
3,000 new workstations, 1,200 redeployed
Managed Vendor Relationships
Coordinated project activities with architects, construction
and various trade unions.
Data, Phone, Video, Cloud and Medical Systems Interface
ERCOT Project







Design and Build out of Energy Trading Market
Complete Project had a budget of $200 Million
Responsible for AEP‟s portion managing 138 people
Reported to Senior Management and U.S. Congress
Voted „Exchange of the Year‟ in 2013 and accounted for 60%
of all energy futures
Data Protection Initiative




Consolidation of 400 data backup sites
International coordination including AMEA and APAC
Managed 300 employees over 7 counties

SWITCH Deployment




Deployment of hardware, applications and infrastructure for
12,000 commercial employees
Managed a team of 12 managers and vendor relations
ABN Amro Data Center Consolidation






Program Manager for consolidation of 6 data centers into the
new headquarters being built in the West Loop
Coordinated activities with architects, construction and
various trade unions
Redeployment of 1,400 „Open System” servers and
supporting infrastructure
Options Clearing Corp Data Center Migration




Program Manager for relocation of Office complex and data
center from 440 S. LaSalle to 10 S. Wacker.
Coordinated activities with architects, construction and
various trade unions
Reported to C level management and the FTC

Options Clearing Corp Disaster Recovery Site Design
and Implementation


Project Manager for build out of the OCC‟s “Phoenix” site for BC and
DR
American Express Data Center Migration





Project Manager for build out of data mining center for
integration between Shearson Lehman Brothers – Asia and
the Tokyo Forex
Reported to US Management while working with native
staff
Translated Japanese technical requirements into English

Contenu connexe

Similaire à John Napier PMP, CSM Infrastructure Migration Projects

WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15William Lord
 
WilliamLord Project Manager Resume 1-18
WilliamLord Project Manager Resume 1-18WilliamLord Project Manager Resume 1-18
WilliamLord Project Manager Resume 1-18William Lord
 
Robert James Morrison Career Highlights And Achievements
Robert James Morrison Career Highlights And AchievementsRobert James Morrison Career Highlights And Achievements
Robert James Morrison Career Highlights And AchievementsRobert Morrison
 
Nigel Willis CV March 2015
Nigel Willis CV March 2015Nigel Willis CV March 2015
Nigel Willis CV March 2015Nigel Willis
 
A moore cv_functional_aus_100215
A moore cv_functional_aus_100215A moore cv_functional_aus_100215
A moore cv_functional_aus_100215Andy Moore
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16John Coffman PMP
 
William G Hull resume
William G Hull resumeWilliam G Hull resume
William G Hull resumeBill Hull
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and ProjectsCory Larsen
 
Romeo Frank 2011 V1
Romeo Frank 2011 V1Romeo Frank 2011 V1
Romeo Frank 2011 V1Frank Romeo
 
Resume - Jonas Mendiola
Resume - Jonas MendiolaResume - Jonas Mendiola
Resume - Jonas MendiolaJonas Mendiola
 
Gary Cowdrey CV 2015 v2.1
Gary Cowdrey CV 2015 v2.1Gary Cowdrey CV 2015 v2.1
Gary Cowdrey CV 2015 v2.1Gary Cowdrey
 
Li-Chia Chang 20150521
Li-Chia Chang 20150521Li-Chia Chang 20150521
Li-Chia Chang 20150521Li-Chia Chang
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16Robin White, PMP
 

Similaire à John Napier PMP, CSM Infrastructure Migration Projects (20)

WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15
 
JBJCV0816
JBJCV0816JBJCV0816
JBJCV0816
 
Carol Banville CV
Carol Banville CVCarol Banville CV
Carol Banville CV
 
Rgb resume 2016
Rgb resume 2016Rgb resume 2016
Rgb resume 2016
 
WilliamLord Project Manager Resume 1-18
WilliamLord Project Manager Resume 1-18WilliamLord Project Manager Resume 1-18
WilliamLord Project Manager Resume 1-18
 
ITES Case Study
ITES Case StudyITES Case Study
ITES Case Study
 
Robert James Morrison Career Highlights And Achievements
Robert James Morrison Career Highlights And AchievementsRobert James Morrison Career Highlights And Achievements
Robert James Morrison Career Highlights And Achievements
 
Nigel Willis CV March 2015
Nigel Willis CV March 2015Nigel Willis CV March 2015
Nigel Willis CV March 2015
 
JBJCV0315
JBJCV0315JBJCV0315
JBJCV0315
 
RBudlong Resume
RBudlong ResumeRBudlong Resume
RBudlong Resume
 
Mike najarian resume
Mike najarian resumeMike najarian resume
Mike najarian resume
 
A moore cv_functional_aus_100215
A moore cv_functional_aus_100215A moore cv_functional_aus_100215
A moore cv_functional_aus_100215
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
 
William G Hull resume
William G Hull resumeWilliam G Hull resume
William G Hull resume
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and Projects
 
Romeo Frank 2011 V1
Romeo Frank 2011 V1Romeo Frank 2011 V1
Romeo Frank 2011 V1
 
Resume - Jonas Mendiola
Resume - Jonas MendiolaResume - Jonas Mendiola
Resume - Jonas Mendiola
 
Gary Cowdrey CV 2015 v2.1
Gary Cowdrey CV 2015 v2.1Gary Cowdrey CV 2015 v2.1
Gary Cowdrey CV 2015 v2.1
 
Li-Chia Chang 20150521
Li-Chia Chang 20150521Li-Chia Chang 20150521
Li-Chia Chang 20150521
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16
 

Dernier

Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 

Dernier (20)

Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 

John Napier PMP, CSM Infrastructure Migration Projects

  • 2. Poseidon Project  Relocation of 1,800 Partners across 5 buildings  Program Management of „Poseidon‟ Build Out  Manage local front end data center build out Manage back end data center ad DR location build out  Corporate Real Estate build out of partner work area
  • 3. Complete Hospital Move       Part of a $1B Hospital Build Greenfield design and deployment 3,000 new workstations, 1,200 redeployed Managed Vendor Relationships Coordinated project activities with architects, construction and various trade unions. Data, Phone, Video, Cloud and Medical Systems Interface
  • 4. ERCOT Project      Design and Build out of Energy Trading Market Complete Project had a budget of $200 Million Responsible for AEP‟s portion managing 138 people Reported to Senior Management and U.S. Congress Voted „Exchange of the Year‟ in 2013 and accounted for 60% of all energy futures
  • 5. Data Protection Initiative    Consolidation of 400 data backup sites International coordination including AMEA and APAC Managed 300 employees over 7 counties SWITCH Deployment   Deployment of hardware, applications and infrastructure for 12,000 commercial employees Managed a team of 12 managers and vendor relations
  • 6. ABN Amro Data Center Consolidation    Program Manager for consolidation of 6 data centers into the new headquarters being built in the West Loop Coordinated activities with architects, construction and various trade unions Redeployment of 1,400 „Open System” servers and supporting infrastructure
  • 7. Options Clearing Corp Data Center Migration    Program Manager for relocation of Office complex and data center from 440 S. LaSalle to 10 S. Wacker. Coordinated activities with architects, construction and various trade unions Reported to C level management and the FTC Options Clearing Corp Disaster Recovery Site Design and Implementation  Project Manager for build out of the OCC‟s “Phoenix” site for BC and DR
  • 8. American Express Data Center Migration    Project Manager for build out of data mining center for integration between Shearson Lehman Brothers – Asia and the Tokyo Forex Reported to US Management while working with native staff Translated Japanese technical requirements into English