Jose A. Mora, Jr.
Brgy. Cogon, Baybay City, Leyte
E-mail add: mora.josejr@gmail.com
Mobile No.: +639369561923
CAREER SUMMARY
 Commissioning and start-up of refurbished 3 x 41 MW steam turbine generator,
auxiliary equipment and balance of plant facilities of Tongonan Geothermal Power
Plant with Siemens SPPA T3000 Profibus PA DCS control systems and GE multilin
numerical relay;
 Two years of experience as Rig Electrician on Onshore Cyber Rig.
 Passed the upgrading examinations for Professional Electrical Engineer (PEE).
 Commissioning and start-up of newly refurbished 2 x 55 MW steam turbine
generator, auxiliary equipment and balance of plant facilities of BACMAN
geothermal power plant with Yokogawa Field Bus DCS control system and Basler
Numerical Relay;
 Fourteen years in the operation / maintenance of 3 x 77.5MW geothermal power
plant.
 Four years in the installation and commissioning of electrical system and process
instrumentation and control for the Fluid Collection and Disposal System of 3x77.5
MWe and 4x30 MWe Geothermal Power Plants.
 One and a half years in the Electric Utility Distribution Line.
 Attended twelve days seminar on Design Practices in Industrial Electrical Systems
conducted by the Centre for Studies in Electrical Engineering Practices and Standards
(4 modules).
 Attended thirteen days seminar on protective relaying.
CORE COMPETENCIES
 Power systems study, short circuit calculation and protective relay coordination study
of steam turbine generator power plant;
 Proficient in determining protection relay settings for Turbo Generator, Generator
Step-up Transformer, Line protection, Medium and Low voltage motors;
 Knowledgeable to evaluate the different integrity test of power transformer and
synchronous generator unit, MV/LV motor, Switchgears and MV/LV circuit
breakers;
 Project implementation/installation, testing and commissioning of steam turbine
generator power plant and its balance of plant facilities;
 Operation of Steam-Turbine Generator power plant with DCS control systems.
PROFESSIONAL REGULATION COMMISSION
Professional Electrical Engineer
Date Passed: November 13, 2012
PRC ID No.: 003476
Registered Electrical Engineer
Date Passed: August 3, 1992
PRC ID No.: 0014884
EDUCATION
College University of Eastern Philippines
Catarman, N. Samar
1985 – 1986 BS Mechanical Engineering
Divine Word University
Tacloban City, Leyte
1986 – 1988 BS Electrical Engineering
Cebu Central Colleges (now University of Cebu)
Cebu City
1988 – 1991 BS Electrical Engineering
Graduated
WORK EXPERIENCE
Company : Energy Development Corp.
Position : Commissioning Engineer
Period : October 31, 2016 – Present
Project : Commissioning of 3 x 41 MWe Geothermal Power Plant
Duties and Responsibilities
 Evaluates site acceptance test of Oil- Immerse Power Transformer, Synchronous
Generator, OIP high voltage transformer bushing, MV/LV Motors, MV/LV switchgears
and Circuit Breakers, Protection Relays;
 Lead and organize on site Execution Team/Contractors Commissioning Team of
electrical equipment and balance of plant facilities;
 Review / Witness functional performance testing for all pre-commissioned systems.
 Lead the execution of functional performance testing per systems e.g., Transformer and
generator protections, synchronizing sytems and analyze systems performance using
testing instruments;
 Inspect and ensure all construction activities are completed prior to taking up the system
for commissioning;
 Ensure that all safety and precautionary requirements and procedures are followed during
the commissioning. Regularly contact discipline engineers and supervisors for solving
problems related to project execution work safely;
 Attend and participate in post construction meeting.
Company : National Drilling Company, UAE
Position : Chief Rig Electrician
Period : February 16, 2014 – July 3, 2016
Project : Operation/Maintenance of 3000hp Onshore Cyber Rig
Duties and Responsibilities
 Maintain properly to ensure optimum operation of Power Generation Units, PLC’s,
Profibus DP system, VFD’s, MCC’s, associated motors and instrumentation in the rig;
 Audit spare material to ensure availability of material during scheduled maintenance and
exigency.
 Initiate recommendation/update to the Rig Manager pertaining the status of rig electrical
and instrumentation equipments.
 Troubleshooting and repair of malfunctioned rig electrical equipments;
 Ensure that all equipment is properly used and maintained by the rig operating personnel
and when applicable, train crews in the proper handling of electrical equipment;
 Manage and oversee the utilization of electrical equipment;
 Conduct installation, functional testing of Top Drive, Drawworks, Mud Pumps, Iron
Roughneck, VFD, Intercom, Camera, Rig Sense, both prior to use and in particular after
rigging-up operations;
Company : Energy Development Corp.
Position : Power Plant Operations Engineer
Period : December 16, 1999 – February 12, 2014
Project : Operation/Maintenance of 3 x 77.5 MWe Geothermal Power Plant
Duties and Responsibilities
 Responsible for the operation and maintenance of protective relays, transformers,
generators, 230 kV switchyard equipments, 13.8/4.16/0.48 kV switchgears and motors;
 Carries out pre-commissioning, commissioning, start-up, and stop of 2x55MWe Bacman
Geothermal Power Plant;
 Review / audit the fault current analysis and protection relay settings to verify the
integrity of protection relays coordination settings;
 Participates in the root cause failure analysis of the electrical /instrumentation equipments
and make recommendations to mitigate and even eradicate the recurrence of the problem;
 Provides technical evaluation on electrical/instrumentation equipments to ensure the
reliability and enhance the electrical systems operational efficiency;
 Leads a team of electrical technician during the turnaround activities of the power plant
and 230 kV switchyard;
 Participates in the preparation of electrical specifications and scope of works for both
upgrading and turnaround projects;
 Identifies, proposes and evaluates testing and preventive measures to ensure the optimum
operating condition of the electrical systems;
 Evaluates test results of oil- immerse power transformer, OIP high voltage transformer
bushing, electrical motors, switchgears and protection relays;
 Monitors the progress of electrical system upgrade/enhancement projects and provide
recommendations to meet the project schedules and cost.
Company : PNOC - Energy Development Corp.
Position : Electrical/Instrumentation Field Engineer
Period : June 5, 1995 – June 30, 1999
Project : Fluid Collection and Disposal System for 3 x 77.5 and 4x 30
MWe Geothermal Power Plant
Duties and Responsibilities
 Conduct inspection on the installations done by the contractor to see to it that it complies
with the approved plans and specifications, conform with applicable industrial practice
and standards;
 Coordinate with the vendors and contractors in the testing and commissioning of
transformers, switchgears, as well as process instruments and controllers (PLC/DCS) of
steam collection and reinjection system of geothermal power plant;
 Write correspondence to the contractor and other discipline within the company;
 Attend technical coordination meeting with the contractor to discuss project program of
works and updates of the project;
 Review the proposed and as-built drawing of electrical systems and various
instrumentation drawing (i.e. P&ID, Logic and loop wiring diagrams);
 Prepare information/data needed by the higher management regarding the updates of the
project;
 Coordinate with other discipline concerning field installation to rid out conflict in the
implementation;
 Punch listing of units in accordance to design during pre-commissioning period;
 Prepare material take-off for electrical and instrumentation system project;
 Evaluate the one month look ahead work plan schedule submitted by the contractor.
Company : Northern Samar Electric Cooperative
Position : Staff Engineer
Period : June 23, 1994 to May 31, 1995
Project : O/M Utility Distribution Line
Duties and Responsibilities
 Supervise the installation of 13.2 kV wood – pole distribution lines.
 Responsible in the preparation of needed materials based on the construction plan.
 Submit monthly accomplishment reports and other reports that are needed by the
management.
 Conduct ocular inspection on the wiring installations in the commercial and residential
establishments and make approval and disapproval based on the standard practices.
Company : Visayan Electric Company
Position : Cadet Engineer
Period : September 24, 1993 to March 23, 1994
Project : Distribution Transformer and Distribution Line Sizing
Duties and Responsibilities
 Transformer load monitoring to prevent it from overloading and transformer burns;
 Secondary line distribution designing to provide customer’s required voltage and to solve
low voltage problem;
 Secondary line distribution designing to reduce line losses.
SEMINARS AND TRAININGS ATTENDED
1. May 13 – 14, 2016 General Guidelines for the Design of Outdoor Medium
Voltage Transformer Substation for Electrical
Supply of Commercial/Institutional Building and
Industrial Plants
2. March 18-19, 2016 Electrical Power System Design for High Rise Building
Institute of Integrated Electrical Engineers
#41 Monte de Fiedad St., Cubao, Quezon City
3. February 8 -12, 2015 SIMATIC S7 Service Training 1
Siemens - UAE
4. November 3 – 28, 2014 Industrial Instrumentation and Calibration
Metrologyx Training & Assessment Center
(Industrial instrumentation & automation training systems)
Mandaue City, Philippines
www.metrologyx.com
5. February 18 – 20, 2014 Basic Offshore Safety Induction Emergency Training
Emirates Technical & Safety Development Center
Abu Dhabi, UAE
6. November 5-8, 2013 NFPA 70 (National Electrical Code)
Cebu City, Philippines
7. September 30 – October 4, 2013 Infrared Thermographic Testing -Level I
Philippine Nuclear Research Institute NDT laboratory and
Training Center
Diliman, Quezon City, Philippines
8. March 13-15, 2013 Safety Refresher Training
EDC Safety Management Department
9. March 5-7, 2012 NFPA 70E Standard for Electrical Safety in the
Workplace, 2012 Edition
10. July 27-28, 2011 Safework Permitting Refresher Training
EDC Safety Management Department
11. November 22-26, 2010 Protective Relaying Course
Delta Power Engineering & Consulting
12. October 28-30, 2009 Design Practices in Industrial Electrical Systems
(Module 4: Industrial Substations and Protection Systems )
CESEEPS International Association, Inc.
13. November 19-21, 2008 Design Practices in Industrial Electrical Systems
(Module 1. Low Voltage Systems and Applications in
Industries)
CESEEPS International Association, Inc.
14. November 26-28, 2008 Design Practices in Industrial Electrical Systems
(Module 2. Medium Voltage Systems and Applications in
Industries)
CESEEPS International Association, Inc.
15. September 6-8, 2006 Design Practices in Industrial Electrical Systems
(Module 3 Fault Calculations & Applications in
Industries )
CESEEPS International Association, Inc.
16. March 09-11, 2004 Basics and Use of Project Management Software
Energy Development Corporation
EDC Computer Training Room
17. February 7-11, 2000 Principles of Protective Relaying, Control and
Monitoring Seminar, ABB
18. January 7-9, 1997 Rotork Training on: IQ Electrical Actuators, Pakscan
Master station, Pakscan Two Wire Control System
ROTORK CONTROL (Singapore) PTE LTD
19. July 24-26, 1996 Control Valve Operation and Maintenance
TRIGON Mgt & Industrial Corporation
AFFILIATION
Life Member, Institute of Integrated Electrical Engineers of the Philippines.
CHARACTER REFERENCE
1. Edino Q. Inot 2. RONALD R. BERNARDO
Consultant Commissioning Engineer
Energy Development Corporation Energy Development Corporation
Ormoc Heights subd., Ormoc City Tongonan, Ormoc City, Phils
Mobile No. 09175787910 Mobile No. 09232743822
The undersigned certifies that the foregoing information is true and correct.
Jose A. Mora Jr.

Contenu connexe

Tendances

Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATELRakesh patel
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan Dey
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Managementfirstgreen
 
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...AMI GE International
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15Karim Kamarudin
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner
 

Tendances (20)

bala.1
bala.1bala.1
bala.1
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Resume Y
Resume YResume Y
Resume Y
 
Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
 
Jameel 25-Feb-16
Jameel  25-Feb-16Jameel  25-Feb-16
Jameel 25-Feb-16
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016
 

En vedette

Wind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsWind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsTorben Haagh
 
Sales Presentation Show
Sales Presentation ShowSales Presentation Show
Sales Presentation ShowRobinDavis
 
FYP Report - Eoin Lees
FYP Report - Eoin LeesFYP Report - Eoin Lees
FYP Report - Eoin LeesEoin Lees
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...John Downs
 
Latest Research On Gears and Bearings
Latest Research On Gears and BearingsLatest Research On Gears and Bearings
Latest Research On Gears and BearingsNavneet Roy
 
Wind Turbine Report Final
Wind Turbine Report FinalWind Turbine Report Final
Wind Turbine Report FinalJames Goddings
 
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...Oleg Bosyi
 
Filter Making Machines By Kanwal Enterprises, Gurgaon
Filter Making Machines By Kanwal Enterprises, GurgaonFilter Making Machines By Kanwal Enterprises, Gurgaon
Filter Making Machines By Kanwal Enterprises, GurgaonIndiaMART InterMESH Limited
 
Offshore structures plate market
Offshore structures plate marketOffshore structures plate market
Offshore structures plate marketAndrey Deryugin
 
All-Weld Sales Presentation Show
All-Weld Sales Presentation ShowAll-Weld Sales Presentation Show
All-Weld Sales Presentation ShowS_Dunsmoor
 
Orbital2 Husum Slideshow
Orbital2 Husum SlideshowOrbital2 Husum Slideshow
Orbital2 Husum Slideshowfrank_cunliffe
 
SOURCES OF ENERGY POWER POINT
SOURCES OF ENERGY POWER POINTSOURCES OF ENERGY POWER POINT
SOURCES OF ENERGY POWER POINTSasi Palakkad
 
Hinduism Presentation
Hinduism PresentationHinduism Presentation
Hinduism Presentationerinlord
 
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemensSirris
 
Renewable resources
Renewable resourcesRenewable resources
Renewable resourcesSlenaCyrus
 

En vedette (18)

Wind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsWind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of Drivetrains
 
Sales Presentation Show
Sales Presentation ShowSales Presentation Show
Sales Presentation Show
 
FYP Report - Eoin Lees
FYP Report - Eoin LeesFYP Report - Eoin Lees
FYP Report - Eoin Lees
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
 
Latest Research On Gears and Bearings
Latest Research On Gears and BearingsLatest Research On Gears and Bearings
Latest Research On Gears and Bearings
 
Wind Turbine Report Final
Wind Turbine Report FinalWind Turbine Report Final
Wind Turbine Report Final
 
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
 
Filter Making Machines By Kanwal Enterprises, Gurgaon
Filter Making Machines By Kanwal Enterprises, GurgaonFilter Making Machines By Kanwal Enterprises, Gurgaon
Filter Making Machines By Kanwal Enterprises, Gurgaon
 
Offshore structures plate market
Offshore structures plate marketOffshore structures plate market
Offshore structures plate market
 
All-Weld Sales Presentation Show
All-Weld Sales Presentation ShowAll-Weld Sales Presentation Show
All-Weld Sales Presentation Show
 
Orbital2 Husum Slideshow
Orbital2 Husum SlideshowOrbital2 Husum Slideshow
Orbital2 Husum Slideshow
 
SOURCES OF ENERGY POWER POINT
SOURCES OF ENERGY POWER POINTSOURCES OF ENERGY POWER POINT
SOURCES OF ENERGY POWER POINT
 
Hinduism Presentation
Hinduism PresentationHinduism Presentation
Hinduism Presentation
 
Bme
BmeBme
Bme
 
5208 chap 09
5208 chap 095208 chap 09
5208 chap 09
 
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
2015 12-02-opti wind-dynamic-characterisation-gearboxes-siemens
 
wind power
 wind power wind power
wind power
 
Renewable resources
Renewable resourcesRenewable resources
Renewable resources
 

Similaire à JAM_RESUME

Similaire à JAM_RESUME (20)

CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
Resume
ResumeResume
Resume
 
Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
RHAlcantara CV
RHAlcantara CVRHAlcantara CV
RHAlcantara CV
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
JaxSmith Resume
JaxSmith  ResumeJaxSmith  Resume
JaxSmith Resume
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
Nagamalleswara rao cv
Nagamalleswara rao cvNagamalleswara rao cv
Nagamalleswara rao cv
 
MANUEL R
MANUEL RMANUEL R
MANUEL R
 
Mahmood Hasan Resume 2
Mahmood Hasan Resume 2Mahmood Hasan Resume 2
Mahmood Hasan Resume 2
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 

JAM_RESUME

  • 1. Jose A. Mora, Jr. Brgy. Cogon, Baybay City, Leyte E-mail add: mora.josejr@gmail.com Mobile No.: +639369561923 CAREER SUMMARY  Commissioning and start-up of refurbished 3 x 41 MW steam turbine generator, auxiliary equipment and balance of plant facilities of Tongonan Geothermal Power Plant with Siemens SPPA T3000 Profibus PA DCS control systems and GE multilin numerical relay;  Two years of experience as Rig Electrician on Onshore Cyber Rig.  Passed the upgrading examinations for Professional Electrical Engineer (PEE).  Commissioning and start-up of newly refurbished 2 x 55 MW steam turbine generator, auxiliary equipment and balance of plant facilities of BACMAN geothermal power plant with Yokogawa Field Bus DCS control system and Basler Numerical Relay;  Fourteen years in the operation / maintenance of 3 x 77.5MW geothermal power plant.  Four years in the installation and commissioning of electrical system and process instrumentation and control for the Fluid Collection and Disposal System of 3x77.5 MWe and 4x30 MWe Geothermal Power Plants.  One and a half years in the Electric Utility Distribution Line.  Attended twelve days seminar on Design Practices in Industrial Electrical Systems conducted by the Centre for Studies in Electrical Engineering Practices and Standards (4 modules).  Attended thirteen days seminar on protective relaying.
  • 2. CORE COMPETENCIES  Power systems study, short circuit calculation and protective relay coordination study of steam turbine generator power plant;  Proficient in determining protection relay settings for Turbo Generator, Generator Step-up Transformer, Line protection, Medium and Low voltage motors;  Knowledgeable to evaluate the different integrity test of power transformer and synchronous generator unit, MV/LV motor, Switchgears and MV/LV circuit breakers;  Project implementation/installation, testing and commissioning of steam turbine generator power plant and its balance of plant facilities;  Operation of Steam-Turbine Generator power plant with DCS control systems. PROFESSIONAL REGULATION COMMISSION Professional Electrical Engineer Date Passed: November 13, 2012 PRC ID No.: 003476 Registered Electrical Engineer Date Passed: August 3, 1992 PRC ID No.: 0014884 EDUCATION College University of Eastern Philippines Catarman, N. Samar 1985 – 1986 BS Mechanical Engineering Divine Word University Tacloban City, Leyte 1986 – 1988 BS Electrical Engineering Cebu Central Colleges (now University of Cebu) Cebu City 1988 – 1991 BS Electrical Engineering Graduated
  • 3. WORK EXPERIENCE Company : Energy Development Corp. Position : Commissioning Engineer Period : October 31, 2016 – Present Project : Commissioning of 3 x 41 MWe Geothermal Power Plant Duties and Responsibilities  Evaluates site acceptance test of Oil- Immerse Power Transformer, Synchronous Generator, OIP high voltage transformer bushing, MV/LV Motors, MV/LV switchgears and Circuit Breakers, Protection Relays;  Lead and organize on site Execution Team/Contractors Commissioning Team of electrical equipment and balance of plant facilities;  Review / Witness functional performance testing for all pre-commissioned systems.  Lead the execution of functional performance testing per systems e.g., Transformer and generator protections, synchronizing sytems and analyze systems performance using testing instruments;  Inspect and ensure all construction activities are completed prior to taking up the system for commissioning;  Ensure that all safety and precautionary requirements and procedures are followed during the commissioning. Regularly contact discipline engineers and supervisors for solving problems related to project execution work safely;  Attend and participate in post construction meeting. Company : National Drilling Company, UAE Position : Chief Rig Electrician Period : February 16, 2014 – July 3, 2016 Project : Operation/Maintenance of 3000hp Onshore Cyber Rig Duties and Responsibilities  Maintain properly to ensure optimum operation of Power Generation Units, PLC’s, Profibus DP system, VFD’s, MCC’s, associated motors and instrumentation in the rig;  Audit spare material to ensure availability of material during scheduled maintenance and exigency.  Initiate recommendation/update to the Rig Manager pertaining the status of rig electrical and instrumentation equipments.
  • 4.  Troubleshooting and repair of malfunctioned rig electrical equipments;  Ensure that all equipment is properly used and maintained by the rig operating personnel and when applicable, train crews in the proper handling of electrical equipment;  Manage and oversee the utilization of electrical equipment;  Conduct installation, functional testing of Top Drive, Drawworks, Mud Pumps, Iron Roughneck, VFD, Intercom, Camera, Rig Sense, both prior to use and in particular after rigging-up operations; Company : Energy Development Corp. Position : Power Plant Operations Engineer Period : December 16, 1999 – February 12, 2014 Project : Operation/Maintenance of 3 x 77.5 MWe Geothermal Power Plant Duties and Responsibilities  Responsible for the operation and maintenance of protective relays, transformers, generators, 230 kV switchyard equipments, 13.8/4.16/0.48 kV switchgears and motors;  Carries out pre-commissioning, commissioning, start-up, and stop of 2x55MWe Bacman Geothermal Power Plant;  Review / audit the fault current analysis and protection relay settings to verify the integrity of protection relays coordination settings;  Participates in the root cause failure analysis of the electrical /instrumentation equipments and make recommendations to mitigate and even eradicate the recurrence of the problem;  Provides technical evaluation on electrical/instrumentation equipments to ensure the reliability and enhance the electrical systems operational efficiency;  Leads a team of electrical technician during the turnaround activities of the power plant and 230 kV switchyard;  Participates in the preparation of electrical specifications and scope of works for both upgrading and turnaround projects;  Identifies, proposes and evaluates testing and preventive measures to ensure the optimum operating condition of the electrical systems;  Evaluates test results of oil- immerse power transformer, OIP high voltage transformer bushing, electrical motors, switchgears and protection relays;  Monitors the progress of electrical system upgrade/enhancement projects and provide recommendations to meet the project schedules and cost.
  • 5. Company : PNOC - Energy Development Corp. Position : Electrical/Instrumentation Field Engineer Period : June 5, 1995 – June 30, 1999 Project : Fluid Collection and Disposal System for 3 x 77.5 and 4x 30 MWe Geothermal Power Plant Duties and Responsibilities  Conduct inspection on the installations done by the contractor to see to it that it complies with the approved plans and specifications, conform with applicable industrial practice and standards;  Coordinate with the vendors and contractors in the testing and commissioning of transformers, switchgears, as well as process instruments and controllers (PLC/DCS) of steam collection and reinjection system of geothermal power plant;  Write correspondence to the contractor and other discipline within the company;  Attend technical coordination meeting with the contractor to discuss project program of works and updates of the project;  Review the proposed and as-built drawing of electrical systems and various instrumentation drawing (i.e. P&ID, Logic and loop wiring diagrams);  Prepare information/data needed by the higher management regarding the updates of the project;  Coordinate with other discipline concerning field installation to rid out conflict in the implementation;  Punch listing of units in accordance to design during pre-commissioning period;  Prepare material take-off for electrical and instrumentation system project;  Evaluate the one month look ahead work plan schedule submitted by the contractor. Company : Northern Samar Electric Cooperative Position : Staff Engineer Period : June 23, 1994 to May 31, 1995 Project : O/M Utility Distribution Line Duties and Responsibilities  Supervise the installation of 13.2 kV wood – pole distribution lines.  Responsible in the preparation of needed materials based on the construction plan.
  • 6.  Submit monthly accomplishment reports and other reports that are needed by the management.  Conduct ocular inspection on the wiring installations in the commercial and residential establishments and make approval and disapproval based on the standard practices. Company : Visayan Electric Company Position : Cadet Engineer Period : September 24, 1993 to March 23, 1994 Project : Distribution Transformer and Distribution Line Sizing Duties and Responsibilities  Transformer load monitoring to prevent it from overloading and transformer burns;  Secondary line distribution designing to provide customer’s required voltage and to solve low voltage problem;  Secondary line distribution designing to reduce line losses. SEMINARS AND TRAININGS ATTENDED 1. May 13 – 14, 2016 General Guidelines for the Design of Outdoor Medium Voltage Transformer Substation for Electrical Supply of Commercial/Institutional Building and Industrial Plants 2. March 18-19, 2016 Electrical Power System Design for High Rise Building Institute of Integrated Electrical Engineers #41 Monte de Fiedad St., Cubao, Quezon City 3. February 8 -12, 2015 SIMATIC S7 Service Training 1 Siemens - UAE 4. November 3 – 28, 2014 Industrial Instrumentation and Calibration Metrologyx Training & Assessment Center (Industrial instrumentation & automation training systems) Mandaue City, Philippines www.metrologyx.com 5. February 18 – 20, 2014 Basic Offshore Safety Induction Emergency Training Emirates Technical & Safety Development Center Abu Dhabi, UAE
  • 7. 6. November 5-8, 2013 NFPA 70 (National Electrical Code) Cebu City, Philippines 7. September 30 – October 4, 2013 Infrared Thermographic Testing -Level I Philippine Nuclear Research Institute NDT laboratory and Training Center Diliman, Quezon City, Philippines 8. March 13-15, 2013 Safety Refresher Training EDC Safety Management Department 9. March 5-7, 2012 NFPA 70E Standard for Electrical Safety in the Workplace, 2012 Edition 10. July 27-28, 2011 Safework Permitting Refresher Training EDC Safety Management Department 11. November 22-26, 2010 Protective Relaying Course Delta Power Engineering & Consulting 12. October 28-30, 2009 Design Practices in Industrial Electrical Systems (Module 4: Industrial Substations and Protection Systems ) CESEEPS International Association, Inc. 13. November 19-21, 2008 Design Practices in Industrial Electrical Systems (Module 1. Low Voltage Systems and Applications in Industries) CESEEPS International Association, Inc. 14. November 26-28, 2008 Design Practices in Industrial Electrical Systems (Module 2. Medium Voltage Systems and Applications in Industries) CESEEPS International Association, Inc. 15. September 6-8, 2006 Design Practices in Industrial Electrical Systems (Module 3 Fault Calculations & Applications in Industries ) CESEEPS International Association, Inc. 16. March 09-11, 2004 Basics and Use of Project Management Software Energy Development Corporation EDC Computer Training Room 17. February 7-11, 2000 Principles of Protective Relaying, Control and Monitoring Seminar, ABB
  • 8. 18. January 7-9, 1997 Rotork Training on: IQ Electrical Actuators, Pakscan Master station, Pakscan Two Wire Control System ROTORK CONTROL (Singapore) PTE LTD 19. July 24-26, 1996 Control Valve Operation and Maintenance TRIGON Mgt & Industrial Corporation AFFILIATION Life Member, Institute of Integrated Electrical Engineers of the Philippines. CHARACTER REFERENCE 1. Edino Q. Inot 2. RONALD R. BERNARDO Consultant Commissioning Engineer Energy Development Corporation Energy Development Corporation Ormoc Heights subd., Ormoc City Tongonan, Ormoc City, Phils Mobile No. 09175787910 Mobile No. 09232743822 The undersigned certifies that the foregoing information is true and correct. Jose A. Mora Jr.