1. Jose A. Mora, Jr.
Brgy. Cogon, Baybay City, Leyte
E-mail add: mora.josejr@gmail.com
Mobile No.: +639369561923
CAREER SUMMARY
Commissioning and start-up of refurbished 3 x 41 MW steam turbine generator,
auxiliary equipment and balance of plant facilities of Tongonan Geothermal Power
Plant with Siemens SPPA T3000 Profibus PA DCS control systems and GE multilin
numerical relay;
Two years of experience as Rig Electrician on Onshore Cyber Rig.
Passed the upgrading examinations for Professional Electrical Engineer (PEE).
Commissioning and start-up of newly refurbished 2 x 55 MW steam turbine
generator, auxiliary equipment and balance of plant facilities of BACMAN
geothermal power plant with Yokogawa Field Bus DCS control system and Basler
Numerical Relay;
Fourteen years in the operation / maintenance of 3 x 77.5MW geothermal power
plant.
Four years in the installation and commissioning of electrical system and process
instrumentation and control for the Fluid Collection and Disposal System of 3x77.5
MWe and 4x30 MWe Geothermal Power Plants.
One and a half years in the Electric Utility Distribution Line.
Attended twelve days seminar on Design Practices in Industrial Electrical Systems
conducted by the Centre for Studies in Electrical Engineering Practices and Standards
(4 modules).
Attended thirteen days seminar on protective relaying.
2. CORE COMPETENCIES
Power systems study, short circuit calculation and protective relay coordination study
of steam turbine generator power plant;
Proficient in determining protection relay settings for Turbo Generator, Generator
Step-up Transformer, Line protection, Medium and Low voltage motors;
Knowledgeable to evaluate the different integrity test of power transformer and
synchronous generator unit, MV/LV motor, Switchgears and MV/LV circuit
breakers;
Project implementation/installation, testing and commissioning of steam turbine
generator power plant and its balance of plant facilities;
Operation of Steam-Turbine Generator power plant with DCS control systems.
PROFESSIONAL REGULATION COMMISSION
Professional Electrical Engineer
Date Passed: November 13, 2012
PRC ID No.: 003476
Registered Electrical Engineer
Date Passed: August 3, 1992
PRC ID No.: 0014884
EDUCATION
College University of Eastern Philippines
Catarman, N. Samar
1985 – 1986 BS Mechanical Engineering
Divine Word University
Tacloban City, Leyte
1986 – 1988 BS Electrical Engineering
Cebu Central Colleges (now University of Cebu)
Cebu City
1988 – 1991 BS Electrical Engineering
Graduated
3. WORK EXPERIENCE
Company : Energy Development Corp.
Position : Commissioning Engineer
Period : October 31, 2016 – Present
Project : Commissioning of 3 x 41 MWe Geothermal Power Plant
Duties and Responsibilities
Evaluates site acceptance test of Oil- Immerse Power Transformer, Synchronous
Generator, OIP high voltage transformer bushing, MV/LV Motors, MV/LV switchgears
and Circuit Breakers, Protection Relays;
Lead and organize on site Execution Team/Contractors Commissioning Team of
electrical equipment and balance of plant facilities;
Review / Witness functional performance testing for all pre-commissioned systems.
Lead the execution of functional performance testing per systems e.g., Transformer and
generator protections, synchronizing sytems and analyze systems performance using
testing instruments;
Inspect and ensure all construction activities are completed prior to taking up the system
for commissioning;
Ensure that all safety and precautionary requirements and procedures are followed during
the commissioning. Regularly contact discipline engineers and supervisors for solving
problems related to project execution work safely;
Attend and participate in post construction meeting.
Company : National Drilling Company, UAE
Position : Chief Rig Electrician
Period : February 16, 2014 – July 3, 2016
Project : Operation/Maintenance of 3000hp Onshore Cyber Rig
Duties and Responsibilities
Maintain properly to ensure optimum operation of Power Generation Units, PLC’s,
Profibus DP system, VFD’s, MCC’s, associated motors and instrumentation in the rig;
Audit spare material to ensure availability of material during scheduled maintenance and
exigency.
Initiate recommendation/update to the Rig Manager pertaining the status of rig electrical
and instrumentation equipments.
4. Troubleshooting and repair of malfunctioned rig electrical equipments;
Ensure that all equipment is properly used and maintained by the rig operating personnel
and when applicable, train crews in the proper handling of electrical equipment;
Manage and oversee the utilization of electrical equipment;
Conduct installation, functional testing of Top Drive, Drawworks, Mud Pumps, Iron
Roughneck, VFD, Intercom, Camera, Rig Sense, both prior to use and in particular after
rigging-up operations;
Company : Energy Development Corp.
Position : Power Plant Operations Engineer
Period : December 16, 1999 – February 12, 2014
Project : Operation/Maintenance of 3 x 77.5 MWe Geothermal Power Plant
Duties and Responsibilities
Responsible for the operation and maintenance of protective relays, transformers,
generators, 230 kV switchyard equipments, 13.8/4.16/0.48 kV switchgears and motors;
Carries out pre-commissioning, commissioning, start-up, and stop of 2x55MWe Bacman
Geothermal Power Plant;
Review / audit the fault current analysis and protection relay settings to verify the
integrity of protection relays coordination settings;
Participates in the root cause failure analysis of the electrical /instrumentation equipments
and make recommendations to mitigate and even eradicate the recurrence of the problem;
Provides technical evaluation on electrical/instrumentation equipments to ensure the
reliability and enhance the electrical systems operational efficiency;
Leads a team of electrical technician during the turnaround activities of the power plant
and 230 kV switchyard;
Participates in the preparation of electrical specifications and scope of works for both
upgrading and turnaround projects;
Identifies, proposes and evaluates testing and preventive measures to ensure the optimum
operating condition of the electrical systems;
Evaluates test results of oil- immerse power transformer, OIP high voltage transformer
bushing, electrical motors, switchgears and protection relays;
Monitors the progress of electrical system upgrade/enhancement projects and provide
recommendations to meet the project schedules and cost.
5. Company : PNOC - Energy Development Corp.
Position : Electrical/Instrumentation Field Engineer
Period : June 5, 1995 – June 30, 1999
Project : Fluid Collection and Disposal System for 3 x 77.5 and 4x 30
MWe Geothermal Power Plant
Duties and Responsibilities
Conduct inspection on the installations done by the contractor to see to it that it complies
with the approved plans and specifications, conform with applicable industrial practice
and standards;
Coordinate with the vendors and contractors in the testing and commissioning of
transformers, switchgears, as well as process instruments and controllers (PLC/DCS) of
steam collection and reinjection system of geothermal power plant;
Write correspondence to the contractor and other discipline within the company;
Attend technical coordination meeting with the contractor to discuss project program of
works and updates of the project;
Review the proposed and as-built drawing of electrical systems and various
instrumentation drawing (i.e. P&ID, Logic and loop wiring diagrams);
Prepare information/data needed by the higher management regarding the updates of the
project;
Coordinate with other discipline concerning field installation to rid out conflict in the
implementation;
Punch listing of units in accordance to design during pre-commissioning period;
Prepare material take-off for electrical and instrumentation system project;
Evaluate the one month look ahead work plan schedule submitted by the contractor.
Company : Northern Samar Electric Cooperative
Position : Staff Engineer
Period : June 23, 1994 to May 31, 1995
Project : O/M Utility Distribution Line
Duties and Responsibilities
Supervise the installation of 13.2 kV wood – pole distribution lines.
Responsible in the preparation of needed materials based on the construction plan.
6. Submit monthly accomplishment reports and other reports that are needed by the
management.
Conduct ocular inspection on the wiring installations in the commercial and residential
establishments and make approval and disapproval based on the standard practices.
Company : Visayan Electric Company
Position : Cadet Engineer
Period : September 24, 1993 to March 23, 1994
Project : Distribution Transformer and Distribution Line Sizing
Duties and Responsibilities
Transformer load monitoring to prevent it from overloading and transformer burns;
Secondary line distribution designing to provide customer’s required voltage and to solve
low voltage problem;
Secondary line distribution designing to reduce line losses.
SEMINARS AND TRAININGS ATTENDED
1. May 13 – 14, 2016 General Guidelines for the Design of Outdoor Medium
Voltage Transformer Substation for Electrical
Supply of Commercial/Institutional Building and
Industrial Plants
2. March 18-19, 2016 Electrical Power System Design for High Rise Building
Institute of Integrated Electrical Engineers
#41 Monte de Fiedad St., Cubao, Quezon City
3. February 8 -12, 2015 SIMATIC S7 Service Training 1
Siemens - UAE
4. November 3 – 28, 2014 Industrial Instrumentation and Calibration
Metrologyx Training & Assessment Center
(Industrial instrumentation & automation training systems)
Mandaue City, Philippines
www.metrologyx.com
5. February 18 – 20, 2014 Basic Offshore Safety Induction Emergency Training
Emirates Technical & Safety Development Center
Abu Dhabi, UAE
7. 6. November 5-8, 2013 NFPA 70 (National Electrical Code)
Cebu City, Philippines
7. September 30 – October 4, 2013 Infrared Thermographic Testing -Level I
Philippine Nuclear Research Institute NDT laboratory and
Training Center
Diliman, Quezon City, Philippines
8. March 13-15, 2013 Safety Refresher Training
EDC Safety Management Department
9. March 5-7, 2012 NFPA 70E Standard for Electrical Safety in the
Workplace, 2012 Edition
10. July 27-28, 2011 Safework Permitting Refresher Training
EDC Safety Management Department
11. November 22-26, 2010 Protective Relaying Course
Delta Power Engineering & Consulting
12. October 28-30, 2009 Design Practices in Industrial Electrical Systems
(Module 4: Industrial Substations and Protection Systems )
CESEEPS International Association, Inc.
13. November 19-21, 2008 Design Practices in Industrial Electrical Systems
(Module 1. Low Voltage Systems and Applications in
Industries)
CESEEPS International Association, Inc.
14. November 26-28, 2008 Design Practices in Industrial Electrical Systems
(Module 2. Medium Voltage Systems and Applications in
Industries)
CESEEPS International Association, Inc.
15. September 6-8, 2006 Design Practices in Industrial Electrical Systems
(Module 3 Fault Calculations & Applications in
Industries )
CESEEPS International Association, Inc.
16. March 09-11, 2004 Basics and Use of Project Management Software
Energy Development Corporation
EDC Computer Training Room
17. February 7-11, 2000 Principles of Protective Relaying, Control and
Monitoring Seminar, ABB
8. 18. January 7-9, 1997 Rotork Training on: IQ Electrical Actuators, Pakscan
Master station, Pakscan Two Wire Control System
ROTORK CONTROL (Singapore) PTE LTD
19. July 24-26, 1996 Control Valve Operation and Maintenance
TRIGON Mgt & Industrial Corporation
AFFILIATION
Life Member, Institute of Integrated Electrical Engineers of the Philippines.
CHARACTER REFERENCE
1. Edino Q. Inot 2. RONALD R. BERNARDO
Consultant Commissioning Engineer
Energy Development Corporation Energy Development Corporation
Ormoc Heights subd., Ormoc City Tongonan, Ormoc City, Phils
Mobile No. 09175787910 Mobile No. 09232743822
The undersigned certifies that the foregoing information is true and correct.
Jose A. Mora Jr.