PROJECT PRESENTATION
By
Joyshankar Baidya
&
Israt Jahan Ripa
Department of Agricultural Construction &
Environmental Engineering
Sylhet Agricultural University, Sylhet
DEVELOPMENT OF A ROAD NETWORK
PLAN FOR SYLHET AGRICULTURAL
UNIVERSITY
Title of The Project
Supervisor: Dr. Md. Altaf
Hossain
Associate Professor and chairman,
Department of Agricultural Construction
and Environmental Engineering,
Sylhet Agricultural University, Sylhet
Introduction
A road is a way on land between two places that has
been paved or otherwise improved to allow travel by
foot or vehicles
The road network planning of a campus describes a
part of the University’s physical footprint
Road network planning of Sylhet Agricultural
University campuses has been a real challenge due to
its land limitation
 Existing road network is declining due to
construction of new infrastructure
Therefore it is now essential to reconstructed the
existing road according to standard
Objectives
 To know the existing road network facilities.
 To identify necessary aspects for improvement.
 To propose a suitable road network with existing
one.
1.
Secondary Sources
Primary Sources
Information
Collection
Reconnaissance survey
2.
Analysis of collected
information and data
AutoCAD
Sketch up
3.
Propose a reasonable road network plan
Methodology
Chain survey
Questionnaire survey
Results and
discussion
EXISTING ROAD NETWORK OF THE CAMPUS
Existing Road of Sylhet Agricultural University
Existing Road of Sylhet Agricultural University on 3D
map.
PROFILE OF THE EXISTING ROAD NETWORK
Road No. Length
(Feet)
Width
(Feet)
Condition Construction Materials
Road No-01 801 14 Existing Pucca
Road No-02 145 40 Existing Concrete
Road No-03 585 9 Existing Pucca and Concrete
Road No-04 480 12 Existing Pucca
Road No-05 430 9 Existing Brick soling
Road No-06 390 12 Existing Pucca
Road No-07 95 6 Existing Brick soling
Road No-08 170 6 Existing Brick soling
Road No-09 210 6 Existing Brick soling
Road No-10 330 6 Existing Brick soling
Road No-11 490 15 Existing Pucca
Road No-12 130 15 Existing Concrete and Brick
soling
Road No-13 165 9 Existing Brick soling
Road No-14 130 15 Existing Brick soling And
Concrete
PROFILE OF THE EXISTING ROADNETWORK
Road No. Length
(Feet)
Width
(Feet)
Condition Construction Materials
Road No-15 190 15 Existing Pucca
Road No-16 210 15 Existing Pucca
Road No-17 236 15 Existing Pucca
Road No-18 284 15 Existing Brick soling
Road No-19 634 20 Under construction Reinforcement concrete
Road No-20 115 9 Existing Brick soling
Road No-21 215 10 Existing Concrete and Brick soling
Road No-22 165 15 Existing Reinforcement concrete
Road No-23 305 15 Existing Concrete and Brick soling
Road No-24 215 10 Existing Pucca
Road No-25 110 10 Under construction Brick soling
Road No-26 130 10 Under construction Concrete
Road No-27 102 6 Existing Brick soling
Road No-28 195 10 Under construction Brick soling
ENTRANCE AND EXIT PATH(GATE) OF CAMPUS.
Number of gate Space(Feet) Description
Gate no. 1 15 This is the main gate which used to main entrance
and exit way of this campus.
Gate no. 2 15 This gate easy facilitate entrance and exit with
Baluchor Bazar
Gate no. 3 14 This is the gate which using entrance and exit of bus
and construction vehicles
Gate no. 4 10 Which used as entrance gate Professors and
Teachers and their vehicles
Gate no. 5 12 Which used as Vice-Chancellor
and Teachers as entrance and exit gate.
Gate no. 6 Open Its open space between the campus and Alurtol road
of movement for transportation vehicles of
construction materials
Gate no. 7 24 Used as entranc of New Veterinary Clinic
Gate no. 8 Open South side road of the campus that joining the road
no-5 and road no-6 to Alurtol road through it.
PROFILE OF THE EXISTING ROADNETWORK
Existing Gate with path line of the campus.
Distribution of people’s opinion on Proposed New Roads
List of Proposed New
Roads
According to
Location map
YES categories
YES NO Immediate Soon Later
1) Entrance Road in front of
New Gents Hall 100% 0% 50.0% 50.0% 0%
2) Cross Road between Ladies
Hall to Bus stand 85% 15% 47.0% 35.5% 17.5%
3) Road in front of Mosque
90% 10% 22.2% 72.2% 5.6%
4) Cross Road in front of
Fisheries Building Side 80% 20% 18.6% 56.4% 25.0%
5) Road Inside the Boundary
Wall 97% 3% 52.4% 36.7% 10.9%
6) Road beside Play Ground
95% 5% 47.5% 52.5% 0%
7)Cross Road & Bridge in front
Lake & AET Building 87% 13% 11.3% 83.3% 5.6%
8)Road between New Eco
Building & DVM Building 95% 5% 36.9% 58.1% 5%
Proposed New Roads
Entrance Road in front of New Gents Hall
Proposed Road (P.R-1) location on the 3D map
Distribution of people’s opinion on (P.R-1B)
Entrance Road in front of New Gents Hall
100%
0%
Required No Need
Requirement according to participants
0%
10%
20%
30%
40%
50%
60%
Immediate Soon Later
Requirement categories(Duration)
Percentage(%)
50% 50%
Cross Road between Ladies Hall to Bus
stand
Proposed Road(P.R-2) location on the 3D map.
Distribution of people’s opinion on Cross
Road between Ladies Hall to Bus stand
85%
15%
Requirment according
to participants
Required
No Need
0% 10% 20% 30% 40% 50%
Immediate
Soon
Later
47%
35.50%
17.50%
Duration
Percentage (%)
Road in front of Mosque
Proposed Road(P.R-3) location on the 3D map.
Response of Participants on Road in
front of Mosque
90%
10%
Requirement according
to participants
Required
No Need
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
Immediate Soon Later
22.2%
72.2%
5.6%
Percentage
(%)
Requirement Categories (Duration)
Cross Road in front of Fisheries Building Side
Proposed Road (P.R-4) location on the 3D map.
Requirement Categories (Duration)
Percentage
(%)
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Immediate Soon Later
18.6%
56.4%
25.0%
80%
20%
Requirment according
to participants
Required No Need
People’s opinion on Cross Road in front of
Fisheries Building Side
Road In-side the Boundary Wall
Proposed Road(P.R-5) location on the 3D map.
Distribution of people’s opinion on
Road In-side the Boundary wall
97%
3%
Required No Need
Requirement according to
participants
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Immediate Soon Later
52.4%
36.7%
10.9%
Duration
Percentage
(%)
Road beside Play Ground
Proposed Road(P.R-6) location on the 3D map
95%
5%
Required No Need
Requirement according to participants
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Immediate Soon Later
47.5%
52.5%
0%
Percentage
(%)
Duration
Distribution of people’s opinion on
Road beside Play Ground
Cross Road & Bridge in front Lake & AET Building
Proposed Road(P.R-7) location on the 3D map
87%
13%
Required No Need
Requirment according
11.3%
83.3%
5.6%
0.0% 20.0% 40.0% 60.0% 80.0% 100.0%
Immediate
Soon
Later
Duration
Percentage (%)
Distribution of people’s opinion on Cross Road
& Bridge in front Lake & AET Building
Road between New Economic Faculty Building & Old
Faculty of Veterinary and Animal Science Building
Proposed Road(P.R-8) location on the 3D map
95%
5%
Required No Need
Requirement according to participants
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Immediate Soon Later
36.9%
58.1%
5%
Duration
Percentage
(%)
Distribution of people’s opinion on Road between
New Economic Faculty Building & Old Faculty
Veterinary and Animal Science Building
Priority
Frequency of responses for the development of Road network
Entranc
e Road
in
front of
New
Gent’s
Hall
Cross
Road
between
Ladies
Hall to
Bus
stand
Road in
front of
Mosque
Cross
Road in
front of
Fisheries
Building
Side
Inside
Boundar
y Wall
Road
Road
beside
Play
Ground
Cross
Road &
Bridge in
front Lake
& AET
Faculty
Building
Road
between
New
Economic
Building &
Veterinary
Faculty
Building
1
2
3
0
137
138
0
0
110
83
41
41
55
179
14
27
41
124
55
55
140
98
29
8
124
137
0
35
27
200
13
35
95
151
13
15
Total 275 275 275 275 275 275 275 275
Priority for Road network development
A continuous scale values were set according to the priority as
follows:
No Need Later Soon Immediate
(No Priority) (3rd Priority ) (2nd Priority) (1st Priority)
0 1 2 3
After that the priority index were computed by the following formula:
Where, I= priority index such that 0 ≤ I ≤ 3
𝑆𝑖 = Scale value at ith priority.
𝑓𝑖 = Frequency of ith priority.
N = Total no. of observations = 𝑓𝑖
Planning tools for evaluation
𝑰 =
𝒔𝒊𝒇𝒊
𝑵
Priority Index for proposed New road.
Proposed New road Priority Index Rankings in order of priority
Entrance Road in front of
New Gents Hall 2.49
ɪ
Road beside Play Ground
2.45
ɪɪ
Inside Boundary Wall Road
2.34
ɪɪɪ
Road between New Eco
Building & DVM Building 2.19
ɪv
Cross Road between Ladies
Hall to Bus stand 1.96
v
Road in front of Mosque’s
1.95
vɪ
Cross Road & Bridge in
front Lake & AET Building 1.79
vɪɪ
Cross Road in front of
Fisheries Building Side 1.55
vɪɪɪ
Proposed Road location of the campus on 3D map
Conclusion
The design of campus road network is very complex due to no
land use plan for its proper development. Planning for roads
associated environmental effects are often based on
socioeconomic consideration.
A detailed map of land use pattern will be developed which
will be revealed all important features as well as existing
condition of the university area. By using the road network
map we selected the problems and needs of the study area
according to affordable standards and prioritization.
 Total existing road area is 3.12 acres which occupied 6.24% of
the study area.
 The eight proposed road which occupied 0.942 acre of the study
area.
Recommendations
Finally we try to suggest a reasonable road network for
the campus is the following way :
The first and second position in priority table are
‘Entrance road in front of new gent’s hall’ and ‘Road
beside playground’ respectively. But according to the
present security condition, Road inside boundary
wall should be constructed first which is in third
position.
Recommendations
Entrance road in front of New Gents hall is not
necessary due to this new hall is under
construction
Most of the pucca road is poor condition for
vehicles transportation due to those roads are used
for construction purposes which needed to
reconstructed.
Stuff quarter interconnecting roads and all other
brick soling roads are need to be developed
immediately according to standard.
 Adequate bicycle stand is required to fulfill
the parking demand.
 Finally, all the roads should be developed or
replaced by reinforcement concrete(RCC)
road because the RCC road more durable and
effective than the others.
Development of a road network plan for sylhet agricultural university

Contenu connexe

Tendances

30th Street Green Corridor
30th Street Green Corridor30th Street Green Corridor
30th Street Green CorridorLu Zhu
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront developmentmisschand
 
Urban structure, scale and grain, Joe Holyoak
Urban structure, scale and grain, Joe HolyoakUrban structure, scale and grain, Joe Holyoak
Urban structure, scale and grain, Joe HolyoakDesign South East
 
Streetscape presentation final 3.26.12
Streetscape presentation final 3.26.12Streetscape presentation final 3.26.12
Streetscape presentation final 3.26.12cityofevanston
 
Environmental Status and Water Resources of the Province of Cebu - March 2016
Environmental Status and Water Resources of the Province of Cebu - March 2016Environmental Status and Water Resources of the Province of Cebu - March 2016
Environmental Status and Water Resources of the Province of Cebu - March 2016Rehne Gibb Larena
 
Urban Planning and Settlements
Urban Planning and SettlementsUrban Planning and Settlements
Urban Planning and Settlementssorbi
 
Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture YuktaYogeesh1
 
Rourkela- How to see a city.
Rourkela- How to see a city.Rourkela- How to see a city.
Rourkela- How to see a city.Mithilesh Mandal
 
Navi mumbai development
Navi mumbai developmentNavi mumbai development
Navi mumbai developmentsmritigupta24
 
Plotted development vs flatted development
Plotted development vs flatted developmentPlotted development vs flatted development
Plotted development vs flatted developmentJIT KUMAR GUPTA
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish KumarNitish Kumar
 
Site analysis - Transit hub
Site analysis - Transit hubSite analysis - Transit hub
Site analysis - Transit hubnainadesh
 
CLARENCE ARTHUR PERRY (C A PERRY)
CLARENCE ARTHUR PERRY (C A PERRY)CLARENCE ARTHUR PERRY (C A PERRY)
CLARENCE ARTHUR PERRY (C A PERRY)ARCHITECTURE SCHOOL
 

Tendances (20)

Gopi Talav
Gopi Talav Gopi Talav
Gopi Talav
 
30th Street Green Corridor
30th Street Green Corridor30th Street Green Corridor
30th Street Green Corridor
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront development
 
Urban structure, scale and grain, Joe Holyoak
Urban structure, scale and grain, Joe HolyoakUrban structure, scale and grain, Joe Holyoak
Urban structure, scale and grain, Joe Holyoak
 
Streetscape presentation final 3.26.12
Streetscape presentation final 3.26.12Streetscape presentation final 3.26.12
Streetscape presentation final 3.26.12
 
Brasilia town planning
Brasilia town planningBrasilia town planning
Brasilia town planning
 
Environmental Status and Water Resources of the Province of Cebu - March 2016
Environmental Status and Water Resources of the Province of Cebu - March 2016Environmental Status and Water Resources of the Province of Cebu - March 2016
Environmental Status and Water Resources of the Province of Cebu - March 2016
 
Urban study
Urban studyUrban study
Urban study
 
Urban Planning and Settlements
Urban Planning and SettlementsUrban Planning and Settlements
Urban Planning and Settlements
 
patna city shape
patna city shape patna city shape
patna city shape
 
Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture
 
Rourkela- How to see a city.
Rourkela- How to see a city.Rourkela- How to see a city.
Rourkela- How to see a city.
 
Layout plan of housing
Layout plan of housingLayout plan of housing
Layout plan of housing
 
Navi mumbai development
Navi mumbai developmentNavi mumbai development
Navi mumbai development
 
Plotted development vs flatted development
Plotted development vs flatted developmentPlotted development vs flatted development
Plotted development vs flatted development
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish Kumar
 
Site analysis - Transit hub
Site analysis - Transit hubSite analysis - Transit hub
Site analysis - Transit hub
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
 
CLARENCE ARTHUR PERRY (C A PERRY)
CLARENCE ARTHUR PERRY (C A PERRY)CLARENCE ARTHUR PERRY (C A PERRY)
CLARENCE ARTHUR PERRY (C A PERRY)
 

Similaire à Development of a road network plan for sylhet agricultural university

Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentationfinkjosh
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernizationMsplcdYkee69
 
Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Malyar Talash
 
Road way condition survey presentation final
Road way condition survey presentation finalRoad way condition survey presentation final
Road way condition survey presentation finalStone Rayhan
 
Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Mayank Panchal
 
Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Khaza Ahmed Palash
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Fairfax County
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyapu roy
 
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...City of Fairfax, Va.
 
CapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaCapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaRobert Fohrenbach
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Fairfax County
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 

Similaire à Development of a road network plan for sylhet agricultural university (20)

Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentation
 
Wilma Dykeman Riverway Road Intersection Re-modernization
Wilma Dykeman Riverway  Road Intersection Re-modernizationWilma Dykeman Riverway  Road Intersection Re-modernization
Wilma Dykeman Riverway Road Intersection Re-modernization
 
Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)
 
Road way condition survey presentation final
Road way condition survey presentation finalRoad way condition survey presentation final
Road way condition survey presentation final
 
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011 Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
 
Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.
 
Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...
 
March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop March 9, 2021 BPAC Virtual Workshop
March 9, 2021 BPAC Virtual Workshop
 
CE460Final-2
CE460Final-2CE460Final-2
CE460Final-2
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018
 
WB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCPWB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCP
 
Presentration 2
Presentration 2Presentration 2
Presentration 2
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
Chain Bridge Road and Eaton Place Intersection Improvements presentation to C...
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
final-file
final-filefinal-file
final-file
 
CapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaCapstonePoster 36x48 Supernova
CapstonePoster 36x48 Supernova
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 

Dernier

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Dernier (20)

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Development of a road network plan for sylhet agricultural university

  • 1. PROJECT PRESENTATION By Joyshankar Baidya & Israt Jahan Ripa Department of Agricultural Construction & Environmental Engineering Sylhet Agricultural University, Sylhet
  • 2. DEVELOPMENT OF A ROAD NETWORK PLAN FOR SYLHET AGRICULTURAL UNIVERSITY Title of The Project Supervisor: Dr. Md. Altaf Hossain Associate Professor and chairman, Department of Agricultural Construction and Environmental Engineering, Sylhet Agricultural University, Sylhet
  • 3. Introduction A road is a way on land between two places that has been paved or otherwise improved to allow travel by foot or vehicles The road network planning of a campus describes a part of the University’s physical footprint
  • 4. Road network planning of Sylhet Agricultural University campuses has been a real challenge due to its land limitation  Existing road network is declining due to construction of new infrastructure Therefore it is now essential to reconstructed the existing road according to standard
  • 5. Objectives  To know the existing road network facilities.  To identify necessary aspects for improvement.  To propose a suitable road network with existing one.
  • 6. 1. Secondary Sources Primary Sources Information Collection Reconnaissance survey 2. Analysis of collected information and data AutoCAD Sketch up 3. Propose a reasonable road network plan Methodology Chain survey Questionnaire survey
  • 8. EXISTING ROAD NETWORK OF THE CAMPUS Existing Road of Sylhet Agricultural University
  • 9. Existing Road of Sylhet Agricultural University on 3D map.
  • 10. PROFILE OF THE EXISTING ROAD NETWORK Road No. Length (Feet) Width (Feet) Condition Construction Materials Road No-01 801 14 Existing Pucca Road No-02 145 40 Existing Concrete Road No-03 585 9 Existing Pucca and Concrete Road No-04 480 12 Existing Pucca Road No-05 430 9 Existing Brick soling Road No-06 390 12 Existing Pucca Road No-07 95 6 Existing Brick soling Road No-08 170 6 Existing Brick soling Road No-09 210 6 Existing Brick soling Road No-10 330 6 Existing Brick soling Road No-11 490 15 Existing Pucca Road No-12 130 15 Existing Concrete and Brick soling Road No-13 165 9 Existing Brick soling Road No-14 130 15 Existing Brick soling And Concrete
  • 11. PROFILE OF THE EXISTING ROADNETWORK Road No. Length (Feet) Width (Feet) Condition Construction Materials Road No-15 190 15 Existing Pucca Road No-16 210 15 Existing Pucca Road No-17 236 15 Existing Pucca Road No-18 284 15 Existing Brick soling Road No-19 634 20 Under construction Reinforcement concrete Road No-20 115 9 Existing Brick soling Road No-21 215 10 Existing Concrete and Brick soling Road No-22 165 15 Existing Reinforcement concrete Road No-23 305 15 Existing Concrete and Brick soling Road No-24 215 10 Existing Pucca Road No-25 110 10 Under construction Brick soling Road No-26 130 10 Under construction Concrete Road No-27 102 6 Existing Brick soling Road No-28 195 10 Under construction Brick soling
  • 12. ENTRANCE AND EXIT PATH(GATE) OF CAMPUS. Number of gate Space(Feet) Description Gate no. 1 15 This is the main gate which used to main entrance and exit way of this campus. Gate no. 2 15 This gate easy facilitate entrance and exit with Baluchor Bazar Gate no. 3 14 This is the gate which using entrance and exit of bus and construction vehicles Gate no. 4 10 Which used as entrance gate Professors and Teachers and their vehicles Gate no. 5 12 Which used as Vice-Chancellor and Teachers as entrance and exit gate. Gate no. 6 Open Its open space between the campus and Alurtol road of movement for transportation vehicles of construction materials Gate no. 7 24 Used as entranc of New Veterinary Clinic Gate no. 8 Open South side road of the campus that joining the road no-5 and road no-6 to Alurtol road through it.
  • 13. PROFILE OF THE EXISTING ROADNETWORK Existing Gate with path line of the campus.
  • 14. Distribution of people’s opinion on Proposed New Roads List of Proposed New Roads According to Location map YES categories YES NO Immediate Soon Later 1) Entrance Road in front of New Gents Hall 100% 0% 50.0% 50.0% 0% 2) Cross Road between Ladies Hall to Bus stand 85% 15% 47.0% 35.5% 17.5% 3) Road in front of Mosque 90% 10% 22.2% 72.2% 5.6% 4) Cross Road in front of Fisheries Building Side 80% 20% 18.6% 56.4% 25.0% 5) Road Inside the Boundary Wall 97% 3% 52.4% 36.7% 10.9% 6) Road beside Play Ground 95% 5% 47.5% 52.5% 0% 7)Cross Road & Bridge in front Lake & AET Building 87% 13% 11.3% 83.3% 5.6% 8)Road between New Eco Building & DVM Building 95% 5% 36.9% 58.1% 5%
  • 15. Proposed New Roads Entrance Road in front of New Gents Hall Proposed Road (P.R-1) location on the 3D map
  • 16. Distribution of people’s opinion on (P.R-1B) Entrance Road in front of New Gents Hall 100% 0% Required No Need Requirement according to participants 0% 10% 20% 30% 40% 50% 60% Immediate Soon Later Requirement categories(Duration) Percentage(%) 50% 50%
  • 17. Cross Road between Ladies Hall to Bus stand Proposed Road(P.R-2) location on the 3D map.
  • 18. Distribution of people’s opinion on Cross Road between Ladies Hall to Bus stand 85% 15% Requirment according to participants Required No Need 0% 10% 20% 30% 40% 50% Immediate Soon Later 47% 35.50% 17.50% Duration Percentage (%)
  • 19. Road in front of Mosque Proposed Road(P.R-3) location on the 3D map.
  • 20. Response of Participants on Road in front of Mosque 90% 10% Requirement according to participants Required No Need 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% Immediate Soon Later 22.2% 72.2% 5.6% Percentage (%) Requirement Categories (Duration)
  • 21. Cross Road in front of Fisheries Building Side Proposed Road (P.R-4) location on the 3D map.
  • 22. Requirement Categories (Duration) Percentage (%) 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% Immediate Soon Later 18.6% 56.4% 25.0% 80% 20% Requirment according to participants Required No Need People’s opinion on Cross Road in front of Fisheries Building Side
  • 23. Road In-side the Boundary Wall Proposed Road(P.R-5) location on the 3D map.
  • 24. Distribution of people’s opinion on Road In-side the Boundary wall 97% 3% Required No Need Requirement according to participants 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% Immediate Soon Later 52.4% 36.7% 10.9% Duration Percentage (%)
  • 25. Road beside Play Ground Proposed Road(P.R-6) location on the 3D map
  • 26. 95% 5% Required No Need Requirement according to participants 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% Immediate Soon Later 47.5% 52.5% 0% Percentage (%) Duration Distribution of people’s opinion on Road beside Play Ground
  • 27. Cross Road & Bridge in front Lake & AET Building Proposed Road(P.R-7) location on the 3D map
  • 28. 87% 13% Required No Need Requirment according 11.3% 83.3% 5.6% 0.0% 20.0% 40.0% 60.0% 80.0% 100.0% Immediate Soon Later Duration Percentage (%) Distribution of people’s opinion on Cross Road & Bridge in front Lake & AET Building
  • 29. Road between New Economic Faculty Building & Old Faculty of Veterinary and Animal Science Building Proposed Road(P.R-8) location on the 3D map
  • 30. 95% 5% Required No Need Requirement according to participants 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% Immediate Soon Later 36.9% 58.1% 5% Duration Percentage (%) Distribution of people’s opinion on Road between New Economic Faculty Building & Old Faculty Veterinary and Animal Science Building
  • 31. Priority Frequency of responses for the development of Road network Entranc e Road in front of New Gent’s Hall Cross Road between Ladies Hall to Bus stand Road in front of Mosque Cross Road in front of Fisheries Building Side Inside Boundar y Wall Road Road beside Play Ground Cross Road & Bridge in front Lake & AET Faculty Building Road between New Economic Building & Veterinary Faculty Building 1 2 3 0 137 138 0 0 110 83 41 41 55 179 14 27 41 124 55 55 140 98 29 8 124 137 0 35 27 200 13 35 95 151 13 15 Total 275 275 275 275 275 275 275 275 Priority for Road network development
  • 32. A continuous scale values were set according to the priority as follows: No Need Later Soon Immediate (No Priority) (3rd Priority ) (2nd Priority) (1st Priority) 0 1 2 3 After that the priority index were computed by the following formula: Where, I= priority index such that 0 ≤ I ≤ 3 𝑆𝑖 = Scale value at ith priority. 𝑓𝑖 = Frequency of ith priority. N = Total no. of observations = 𝑓𝑖 Planning tools for evaluation 𝑰 = 𝒔𝒊𝒇𝒊 𝑵
  • 33. Priority Index for proposed New road. Proposed New road Priority Index Rankings in order of priority Entrance Road in front of New Gents Hall 2.49 ɪ Road beside Play Ground 2.45 ɪɪ Inside Boundary Wall Road 2.34 ɪɪɪ Road between New Eco Building & DVM Building 2.19 ɪv Cross Road between Ladies Hall to Bus stand 1.96 v Road in front of Mosque’s 1.95 vɪ Cross Road & Bridge in front Lake & AET Building 1.79 vɪɪ Cross Road in front of Fisheries Building Side 1.55 vɪɪɪ
  • 34. Proposed Road location of the campus on 3D map
  • 35. Conclusion The design of campus road network is very complex due to no land use plan for its proper development. Planning for roads associated environmental effects are often based on socioeconomic consideration. A detailed map of land use pattern will be developed which will be revealed all important features as well as existing condition of the university area. By using the road network map we selected the problems and needs of the study area according to affordable standards and prioritization.  Total existing road area is 3.12 acres which occupied 6.24% of the study area.  The eight proposed road which occupied 0.942 acre of the study area.
  • 36. Recommendations Finally we try to suggest a reasonable road network for the campus is the following way : The first and second position in priority table are ‘Entrance road in front of new gent’s hall’ and ‘Road beside playground’ respectively. But according to the present security condition, Road inside boundary wall should be constructed first which is in third position.
  • 37. Recommendations Entrance road in front of New Gents hall is not necessary due to this new hall is under construction Most of the pucca road is poor condition for vehicles transportation due to those roads are used for construction purposes which needed to reconstructed. Stuff quarter interconnecting roads and all other brick soling roads are need to be developed immediately according to standard.
  • 38.  Adequate bicycle stand is required to fulfill the parking demand.  Finally, all the roads should be developed or replaced by reinforcement concrete(RCC) road because the RCC road more durable and effective than the others.