Proposal
TITLE: In-service Operational Safety Review of 14th
Avenue
FROM: Justin Mishko – 856138
159 Columbia Drive
Hamilton ON L9C3Y7
DISCIPLINE: Civil (Transportation)
DATE: February 12, 2014
At the time, The Regional Municipality of York required an In-Service Operational
Safety Review of 14th Avenue, bound by Markham Road to the west and Ninth
Line to the east, in the Town of Markham. 14th Avenue is a minor arterial road
which serves as the primary link to several subdivisions as well as a golf course.
A number of issues and concerns brought forth by both residents and members
of local and regional council are the primary reasons for this review as a result of
a series of collisions that occurred on this section of roadway. The study area will
cover approximately 2100 metres of 14th Avenue including all signalized and
unsignalized intersections.
This review will examine the operational function of 14th Avenue from both a
design and safety perspective. The report will include an overview of the
geometric design of the roadway and applicable intersections; including vertical
and horizontal alignment design standards, cross section elements, intersection
design, pavement surface conditions and widths as well as pedestrian, bicycle
and transit facilities and functionality. These essential rudiments of a roadway will
be analyzed and conclusions and recommendations will be formulated to ensure
that the minimum design guidelines are met. The Geometric Design Guide for
Canadian Roads, Ontario Traffic Manual, and the Roadside Safety Manual will
be heavily relied on in determining any deficiencies of the roadway. The
recommendations provided will satisfy both short term and long term goals in
improving the functionality of 14th Avenue.
Based on a cursory review of the available collision history, drivers are failing to
negotiate a particular segment of this corridor which has resulted in eight single
motor vehicle collisions. Potential contributory factors of these collisions can
include the lack of pavement marking or roadside signage delineating the
horizontal alignment changes, degradation of the surface asphalt and/or
substandard design.
ii
Executive Summary
The residents of the Boxgrove community are primarily serviced by the east/west
arterial highway of 14th
Avenue. This 2100 meter road section consists of 7
intersections, 2 of which are controlled by traffic signals; and boarders the
Markham Green Golf Course where it crosses the Rouge River. With the opening
of a newly constructed north/south ‘by-pass’ route east of the study area, 14th
Avenue is experiencing higher than anticipated volumes.
Over the last five years, collision statistics, as well as political and public concern,
have highlighted potential deficiencies. These alleged problematic areas as well
as part of ongoing initiatives for corridor improvements, served as a catalyst for
an in-service operational safety review.
Available collision data provided by the Regional Municipality of York in
cooperation with York Region Police was analyzed to determine occurring trends
and patterns. Site investigations confirmed horizontal alignment issues as well as
other design and engineering shortages. These elements were addressed
satisfying a range of time length solutions.
It was identified that a portion of 14th
Avenue was initially constructed so that
there were several ‘kinks’ in the horizontal alignment. This design feature can
cause a driver’s expectations to not be met yielding an unsafe and hazardous
situation. The combination of vertical and horizontal curves approaching the
bridge spanning the Rouge River promotes a precarious situation in relation to
pedestrian safety as there is no barrier between the walkway across the bridge
and the travel portion of the roadway.
Several key aspects have been identified as being a potential contributing factor
to the cause of this review. To immediately satisfy a portion of the listed remedial
countermeasures, additional steps are to be completed to highlight the
characteristics of the roadway. To ensure a motorist’s expectations are met,
additional signage and delineation are required in the interim.
As a candidate for a bike way and multi-use pathway; capital works should be
scheduled accordingly to ensure that the Pedestrian and Cycling Master Plan’s
initiatives are included. Rehabilitation and reconstruction of 14th
Avenue can
complement initiatives to provide a multi-user friend roadway.
iii
Acknowledgements
Special thanks to the Regional Municipality of York, Transportation Services
Department for supplying the necessary data and services for this in-service
operational safety review. Also, thank you to Yvonne Kaczor P Eng., Traffic
Engineering and Road Safety, York Region and Zoran Postic, Manager, Traffic
Engineering and Road Safety, York Region for their continuing support and
guidance throughout the preparation of this report.
iv
Table of Contents
Proposal i
Executive Summary ii
Acknowledgments iii
Table of Contents iv
List of Figures vi
1.0 Introduction
1.1 Background 1
1.2 Purpose 1
1.3 Study Scope 1
1.4 Study Area 2
2.0 Data Collection
2.1 Collision History 3
2.2 Traffic Volumes 3
2.3 Speed Study 3
2.4 Field Investigation 4
3.0 Analysis
3.1 Existing Roadway 4
3.2 Traffic Volumes 7
3.3 Collisions 7
3.4 Potential Contributory Factors 9
3.5 Potential Countermeasures & Remedial Action 17
4.0 Conclusion 18
5.0 Recommendations 20
References 22
Appendix A
A1 Collision Diagram – Havelock Gate to Roxbury Street
A2 Collision Diagram – Roxbury Street to Boxwood Crescent West
A3 Collision Diagram – Boxwood Crescent West to Ninth Line
Appendix B
v
B1 TMC – 14th
Avenue @ Boxwood Crescent East
B3 TMC – 14th
Avenue @ Legacy Drive
B5 TMC – 14th
Avenue @ Roxbury Street
B7 ATR – Horstman Street to Markham Road
B7 ATR – Legacy Drive to Ninth Line
Appendix C
C1 York Region Proposed Cycling Network
Appendix D
D1 Speed Study: 60 km/h Posted Speed Limit
D2 Speed Study: 50 km/h Posted Speed Limit
vi
LIST OF FIGURES
Figure 1-1 Map of study area 2
Figure 2-1 Collected traffic data 3
Figure 2-2 Results of speed survey (Apr 25, 2007) 4
Figure 3-1 Typical view of a signalized intersection 6
Figure 3-2 Typical view of an unsignalized intersection 6
Figure 3-3 Typical midblock view 7
Figure 3-4 Annual average traffic volume on 14th
Avenue 7
Figure 3-5 Eastbound sight distance 11
Figure 3-6 Vehicle tire trace mark 12
Figure 3-7 Intersection warning sign 13
Figure 3-8 Uncontrolled access point – Roxbury Park 14
Figure 3-9 Westbound tire traces 15
Figure 3-10 One catch basin through curved portion of roadway 16
Figure 3-11 Potential remedial treatments 17
Figure 4-1 Wooden Post 21
1
1.0 INTRODUCTION
1.1 Background
As part of ongoing initiatives for corridor improvement, 14th
Avenue was identified
as a candidate for an In-Service Operational Safety Review. Concerns have
been brought forth by both members of Regional and Local Council, as well as
local area residents. A growing statistical trend specific to collision history is an
indicator that certain elements of the roadway could be insufficient or
substandard.
1.2 Purpose
This report will see that minimum design, operational and safety standards are
met or exceeded where necessary so that all road users are able to utilize 14th
Avenue in a safe and efficient manner. Problematic areas and identified
deficiencies of 14th
Avenue will be reviewed and the recommended
countermeasures will satisfy the needs of the short term and long term solutions.
1.3 Study Scope
This report will include an analysis of the geometric design of the roadway and
applicable intersections; including vertical and horizontal alignment design
standards, cross section elements, intersection design, pavement surface
conditions and widths all where applicable. Pedestrian, bicycle and transit
facilities will be examined to determine their functionality and relationship as they
relate to the Pedestrian and Cycling Master Plan.
2
1.4 Study Area
The study area consists of the 14th
Avenue corridor bound by Markham Road in
the west and Ninth Line in the east, in the Town of Markham. All signalized and
non-signalized intersections are within the scope of this study with the exception
of 14th
Avenue at Markham Road and 14th
Avenue at Ninth Line. The study area
is depicted below in Figure 1-1.
Figure 1-1: Map of Study Area
This report will examine the key engineering, design and operational
fundamentals of a safe and efficient roadway. Highlighted there within will include
3
actions to provide a multi-user friendly roadway through future design and
rehabilitation works.
2.0 DATA COLLECTION
2.1 Collision History
The collision analysis for the subject study area was based on motor vehicle
collision reports from January 1, 2003 to December 31, 2007 inclusive. Collision
diagrams were generated based on the available statistics. (Appendix A)
2.2 Traffic Volumes
The available turning movement counts and automatic traffic recorder counts
were used in the analysis. A summary of the data used is shown in Figure 2-1.
Figure 2-1: Collected Traffic Data
LOCATION STUDY DATE
14th
Avenue @ Boxwood Crescent East TMC February 24, 2005
14th
Avenue @ Legacy Drive TMC June 26, 2007
14th
Ave @ Roxbury Street TMC February 24, 2005
14th
Ave east of Markham Road ATR November 2007
14th
Ave west of Ninth Line ATR December 2006
Traffic data is attached in Appendix B.
2.3 Speed Study
A speed survey targeting westbound vehicles approaching the intersection of 14th
Avenue west of Boxwood Crescent was conducted on April 25, 2007. The results
of the speed survey are shown in Figure 2-2.
4
Figure 2-2: Results of Speed Survey (April 25, 2007)
Posted Speed Limit 50 km/h
Sample Size 106
85th
Percentile 69.6 km/h
Maximum Speed 81 km/h
Minimum Speed 51 km/h
% Compliance 0.0 %
2.4 Field Investigation
Site investigations were completed during the morning and afternoon peak hours
as well as during the off-peak hours. Morning and afternoon peak field
investigations were completed on Wednesday July 23, 2008. The aim of these
investigations was to observe traffic in higher volume conditions when road user
frustration and conflicts between vehicles are more likely to occur. In order to
obtain more information about the environment, surrounding development and to
determine lower volume traffic characteristics, an off-peak field investigation was
completed on Thursday, July 24, 2008.
3.0 ANALYSIS
3.1 Existing Roadway
14th
Avenue is an arterial roadway that carries approximately 16,000 vehicles per
day, 3% of which are heavy trucks.
Between Markham Road and Havelock Gate, 14th
Avenue has a four lane cross
section. Between Havelock Gate and Ninth Line, 14th
Avenue has a two lane
cross section. Throughout the entire study area, there is no direct property
5
access onto 14th
Avenue with the exception of a rarely used Hydro One access
point.
The horizontal alignment of 14th
Avenue between a point approximately 500
meters west of Markham Road and Ninth Line is very curvilinear. There are
sidewalks on both sides of 14th
Avenue from Markham Road to Ninth Line. The
distance between the sidewalk and the roadway edge varies along the entire
section. At the bridge across the Rouge River there is no separation between the
pedestrian walkway and the edge of the road. Currently, there are no bike lanes
along this stretch of the roadway; however, York Region’s Pedestrian and
Cycling Master Plan does identify 14th
Avenue as a potential candidate for the
implementation of bike lanes and multi-use trails (Appendix C).
The intersection of 14th Avenue at Havelock Gate consists of an exclusive left
turn lane, a through lane and a shared through/right turn lane. Figure 3-1
illustrates a typical roadway cross-section at a signalized intersection in the study
area.
6
Figure 3-1: Typical View of a Signalized Intersection
The intersection of 14th
Avenue at Boxwood Crescent is unsignalized and
consists of one through lane and no auxiliary turn lanes as shown in Figure 3-2.
Figure 3-2: Typical View of an Unsignalized Intersection
7
A typical cross-section of 14th
Avenue between Havelock Gate and Ninth Line is
illustrated in Figure 3-3
Figure 3-3: Typical Midblock View
3.2 Traffic Volumes
The most recent traffic count for 14th
Avenue was completed on June 5, 2007,
between Legacy Drive and Ninth Line. (Figure 3-4)
Figure 3-4: Annual Average Traffic Volume on 14th
Avenue
As per the above data, the annual average daily traffic for 14th
Avenue is 13,420
vehicles per day in both eastbound and westbound directions combined.
8
3.3 Collisions
3.3.1 Overview
Between 2003 and 2007 a total of 15 reported collisions occurred within the
study area. All these collisions were classified as property damage only; none of
the collisions resulting in fatalities or injuries.
Of the 15 collisions that occurred, 7 were single vehicle collisions that took place
during wet weather conditions (rain or snow) as a result of the vehicle traveling
too fast for the conditions in relation to the horizontal curvature of the roadway.
These collisions occurred mostly in the off-peak periods when travel speeds are
generally higher.
A reduction in travel speeds on the study section of 14th
Avenue will decrease the
risk of “run-off the road” and “head-on” collisions as well as the risk of these
vehicles colliding with pedestrians using the pedestrian walkways.
Two collisions involved a vehicle colliding with a cyclist.
3.3.2 Collision Diagrams
The collision diagrams attached in Appendix A were prepared after investigating
copies of collision reporting forms as completed by York Region Police.
9
3.4 Development of Potential Contributory Factors
The following observations identify potential contributory factors for the
overrepresented single motor vehicle collisions along 14th
Avenue between Ninth
Line and Markham Road.
3.4.1 Operating Speed
The subject section of 14th
Avenue is located in the transition zone between
areas of urban and rural development, which typically has considerably different
operating speeds. The area east of Ninth Line is considered as open space and
is currently undeveloped; therefore drivers traveling eastbound east of Markham
Road might be prematurely changing into a ‘rural driving mode’. This false
perception is even more exaggerated due to the presence of a mature woodland
area located on the north side of 14th
Avenue. A similar situation has been noted
for westbound vehicles where drivers coming from a rural environment may not
have adjusted their speed for the urban area they are about to enter. Eastbound
and westbound speed studies show approaching speeds between 51 km/h and
81 km/h with an 85th
percentile speed approximately 70 km/h in the 50 km/h
residential zone.
The results of the speed study completed in December 2005 revealed 58% of
drivers complying with the posted speed limit of 60 km/h. In March 2006,
Regional Council recommended lowering the speed limit of 60 km/h to 50 km/h
throughout the subject portion of 14th
Avenue.
10
Based on the results of a speed study it is evident that the lowering of the speed
limit had no discernible impact on operating speeds. It is apparent that vehicles
do not conform to the posted speed limit of 50 km/h. Where it is desirable to have
at least 85% of drivers comply with the posted speed limit, the compliance with
the speed limit is 0%. The observed speeds could be considered significantly
high for a 2 lane urban arterial especially with the existing geometric
characteristics of the roadway.
Comparing the results of both speed studies, the speed compliance has dropped
from 58% to 0% after the speed limit reduction from 60 km/h to 50 km/h.
Therefore, an additional speed limit reduction is not recommended. The results of
the study are attached in Appendix D.
3.4.2 Sightline Restrictions
There is a potential sightline conflict for eastbound and westbound traffic due to
the presence of a combination of vertical and multiple horizontal curves as
illustrated in the Figure 3-5.
11
Figure 3-5: Eastbound Sight Distance
3.4.3 Geometry
Several field investigations revealed that the section of 14th
Avenue between
Markham Road and Ninth Line along the curved portions of the roadway have a
reverse cross fall that can cause vehicles to errant from the roadway while
negotiating the curve.
Additionally, on 14th
Avenue within the study section there are several horizontal
curves. These curves are short and have small deflection angles thereby creating
“kinks” in the roadway that could be a challenge to negotiate at high speeds,
especially in adverse weather conditions.
Approximately 280 meters west of Ninth Line on 14th
Avenue, there is a bridge
over the Rouge River. This bridge is situated on a horizontal curve and both
approaches to the bridge are on a downgrade. On the outside of the curve (i.e. of
12
the south side of 14th
Avenue), over the bridge, the pedestrian walkway is directly
adjacent to the roadway and is not protected by any form of barrier. The
combination of the horizontal and vertical alignment in this area increases the
risk that vehicles, driving at excessive speeds, could leave the traveled portion of
the roadway entering into the pedestrian walkway area. Figure 3-6 illustrates a
tire mark from an errant vehicle striking a tree.
Figure 3-6: Vehicle Tire Trace Mark
3.4.4 Signage
As shown in Figure 3-7, the limited visibility of a warning sign due to extensive
vegetation combined with its location could also be a contributing factor in single
motor vehicle collisions. The improper notification to the driver about the
presence of an intersection and possible vehicles violates driver’s expectancy.
Furthermore, this sign is alerting drivers to the presence of an approaching
intersection but not of the approaching horizontal curve.
13
Figure 3-7: Intersection Warning Sign
3.4.5 Uncontrolled Access Point
Roxbury Park is located on the north side of 14th
Avenue between Havelock Gate
and Ninth Line parallel to a residential development on the south side. During the
field investigation, two uncontrolled access points leading to the park were
noticed (Figure 3-8 shows one location). The unexpected presence of
pedestrians or cyclists crossing the road can increase the likelihood of a collision
with a motor vehicle and another road user.
14
Figure 3-8: Uncontrolled Access Point – Roxbury Park
3.4.6 Road Surface Friction
Of all the collisions which were reported from 2003 to 2007 respectively, 47% of
the collisions were classified as single motor vehicle and occurred during wet
weather conditions. Low skid resistance of the roadway could be one of the
reasons for vehicles losing control during wet weather conditions. During the field
investigation, skid marks were found on 14th
Avenue approximately 250 meters
beyond Roxbury Street. The placement of this skid mark indicated the vehicle
was traveling westbound at a speed which exceeded the maximum able to
negotiate the curve. Figure 3-9 illustrates the vehicle’s tire traces (skid marks)
thorough this curved portion of 14th
Avenue.
15
Figure 3-9: Westbound Tire Traces
3.4.7 Other Road Users: Cyclists
Currently there is no available data on cyclist volumes; however, the field
investigations found several cyclists (more than 5 within one hour period)
travelling along 14th
Avenue between Markham Road and Ninth Line. The
collision history revealed that within the last five years, 2 collisions occurred that
involved cyclists.
York Region’s Pedestrian and Cycling Master Plan identifies a bike lane on 14th
Avenue between Markham Road and Roxbury Street and a multi-use trail on 14th
Avenue between Roxbury Street and Ninth Line.
A multi-use trail is a facility that is entirely separated from the travelled portion of
the roadway and a bike lane is a facility located in the travelled portion of the
16
roadway and is designed for one way bicycle traffic. Additional details can be
found in Appendix C.
The existing width of a one-direction lane on 14th
Avenue is 3.75 meters
respectively. Based on the Pedestrian and Cycling Master Plan, the minimum
lane width to accommodate bike lanes is 5.0 meters; therefore, the current width
of the lane is insufficient to accommodate both vehicular and cyclist traffic.
3.4.8 Drainage
An insufficient number of catch basins were noticed on the south side of 14th
Avenue within the subject area, especially through the curved portions of the
roadway (figure 3-10). This can cause rain water to remain on the road surface
and pond in low lying horizontal and vertical portions of the road. A combination
of a reversed cross fall, excessive speed and water over the road surface could
be a possible cause of many of the collisions that occurred between 2003 and
2007.
Figure 3-10: One Catch Basin Through Curved Portion of Roadway
17
3.5 Potential Countermeasures and Remedial Action
Figure 3-11 presents several potential remedial treatments listing advantages
and disadvantages related to single motor vehicle collisions.
Figure 3-11: Potential Remedial Treatments
Countermeasure Benefits Disadvantages
Expected
Effectiveness
Increase number
of catch basins
along 14th
Avenue
§Improves drainage
of the road’s
surface
Eliminates vehicle
skidding and loss of
control
§Equipment and
installation cost
Medium
Pavement
micro-surfacing
§Prevent vehicles
from leaving the
travel portion of the
road by increasing
the friction of the
roadway
§Moderate
rehabilitation
cost
§Moderate traffic
disruption
High
Road
Reconstruction:
Widen and
eliminate reversed
cross fall
§Prevent vehicles
from losing control
and leaving the
travel portion of the
road
§Reduced single
motor vehicle
collisions
§Accommodate other
road users (cyclists)
and comply with the
Pedestrian and
Cycling Master Plan
§Significant
reconstruction
cost
§Environmental
concerns
specific to the
Rouge River
§Major disruption
to traffic flows
High
Refresh pavement
markings
§Improved road
delineation
§Highlight ‘winding
road’ characteristics
§Minor cost
§Minor traffic
disruption
Low
Trim vegetation &
tree branches
§Improved warning
sign visibility
§Maintenance
cost Low
Additional curve
warning signs and
§Improved roadway
delineation
§Signs and
installation
Low
18
chevrons along
curved portions of
the roadway
§Increased driver’s
expectancy
costs
§Minor traffic
disruption
Installation of
wooden pylons or
trees on the
boulevard along
the curved section
of the roadway
§Protects
pedestrians from
errant vehicles
§Enhanced
streetscaping
§Decreased
operating speed as
the road seems
visibly narrower
§Potential
roadside hazard
if unbreakable
Low
Road
Reconstruction &
Realignment:
Removing kinks
and providing
larger curves
§Prevent errant
vehicles from
leaving the travel
portion of the
roadway
§Reduced single
motor vehicle
collisions
§Allow vehicles to
travel at a more
appropriate speed
relating to the
nature of the
subject section of
14th
Avenue
§Significant
reconstruction
cost
§Environmental
concerns
specific to the
Rouge River
§Major disruption
to traffic flows
High
§Streetscaping
§Reduced operating
speed
§Implementation
and
maintenance
cost
Medium
4.0 CONCLUSION
Based on the conducted analysis, several key aspects have been identified as
being a potential contributing factor to the cause of this review. Prior to the
commencement of this review, it had been identified that collision trends
19
indicated a possible deficiency in the geometric design of a portion of 14th
Avenue, specific to the road section between Roxbury Street and Ninth Line.
To immediately satisfy a portion of the listed remedial countermeasures,
additional steps are to be completed to highlight the characteristics of the
roadway. To ensure a motorist’s expectations are met, additional signage and
delineation are required in the interim.
As earlier noted, this section of 14th
Avenue is a candidate for a bike way and
multi-use pathway; capital works should be scheduled accordingly to ensure that
the Pedestrian and Cycling Master Plan’s initiatives are included. At such time,
the rehabilitation and reconstruction of 14th
Avenue can complement York
Region’s initiatives to provide a multi-user friend roadway. Such initiatives can
include the addition and upgrading of pedestrian, bicycle and transit facilities, as
well as streetscaping and gateway treatments.
The introduction or enhancement of streetscaping features and gateway
treatments have proven to be effective to the voluntary compliance of posted
speed limits. Such roadside treatments also provide a barrier between the travel
portion of the roadway and pedestrian facilities (sidewalks and pathways).
As on overall assessment of the completed analysis, the application of several of
the listed remedial actions will serve to enhance this safe and multi-user friendly
roadway. These enhancements will help bring an integral part of York Region’s
Master Plan and Pedestrian and Cycling Master Plan to fruition by implementing
20
their key fundamentals; thus being that a Regional road will be able to serve a
multitude of users whilst promoting alternate modes of transportation.
5.0 RECOMMENDATIONS
Based on the above detailed assessment, the following remedial treatments are
recommended to address the collision issues for 14th
Avenue between Markham
Road and Ninth Line:
Short Term
§ Install additional curve warning signs with a flashing beacon as well as
chevrons through the curved portion of the roadway – specifically the road
sections immediately west of Roxbury Street and in the area of the bridge
crossing the Rough River.
§ Refresh all existing pavement markings and install 10cm thick edge lines
along 14th
Avenue between Roxbury Street and Ninth Line.
§ Trim any roadside vegetation that impairs a driver’s ability to see an
approaching warning sign or obstructs sightlines.
Mid Term
§ Pavement micro surfacing or the application of a high friction top coat.
§ Tree planting or the installation of wooden pylons. Figure 4-1 shows an
example of wooden pylons spaced six meters apart.
21
Figure 4-1: Wooden Post
Long Term
§ Roadway reconstruction: widening the travel portion and overall right-of-way;
allowance for and installation of bike ways, removing ‘kinked’ horizontal
curves and providing larger curves; eliminate reverse cross falls; install
additional catch basins.
§ Streetscaping to promote voluntary compliance with the speed limit.
22
REFERENCES
Transportation Association of Canada, Geometric Design Guide for Canadian
Roads, September 1999, Part 1, 1999 Edition
Transportation Association of Canada, Geometric Design Guide for Canadian
Roads, September 1999, Part 2, 1999 Edition
Ontario Ministry of Transportation, Ontario Traffic Manual – Book 6, July 2001
Regional Municipality of York, Pedestrian and Cycling Master Plan, April 2008
Regional Municipality of York, Transportation Master Plan, June 2002

Contenu connexe

Tendances

Tendances (20)

Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classification
 
Unit 5
Unit 5Unit 5
Unit 5
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineering
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Unit 4
Unit 4Unit 4
Unit 4
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Ot3425662590
Ot3425662590Ot3425662590
Ot3425662590
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
Soapstone Connector Environmental Assessment Public Hearing: Nov. 8, 2017
 
Highway Projects
Highway Projects Highway Projects
Highway Projects
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summary
 
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
 

En vedette

Resumo ecossistemas fatores bioticos abio
Resumo ecossistemas fatores bioticos abioResumo ecossistemas fatores bioticos abio
Resumo ecossistemas fatores bioticos abio
Stéphanie Lima
 

En vedette (17)

Carte complete gb 17.02.17
Carte complete gb 17.02.17Carte complete gb 17.02.17
Carte complete gb 17.02.17
 
Actividad uno
Actividad unoActividad uno
Actividad uno
 
Resumo ecossistemas fatores bioticos abio
Resumo ecossistemas fatores bioticos abioResumo ecossistemas fatores bioticos abio
Resumo ecossistemas fatores bioticos abio
 
《長照服務法》── 長照資源發展的根本大法
《長照服務法》── 長照資源發展的根本大法《長照服務法》── 長照資源發展的根本大法
《長照服務法》── 長照資源發展的根本大法
 
Carte complete fr 17.02.17
Carte complete fr 17.02.17Carte complete fr 17.02.17
Carte complete fr 17.02.17
 
Actividad leyes y normativa
Actividad leyes y normativaActividad leyes y normativa
Actividad leyes y normativa
 
MINISTERIO JUVENIL ASOCENTRO
MINISTERIO JUVENIL ASOCENTROMINISTERIO JUVENIL ASOCENTRO
MINISTERIO JUVENIL ASOCENTRO
 
Leaping the Barriers to Perfect Cash Forecating
Leaping the Barriers to Perfect Cash ForecatingLeaping the Barriers to Perfect Cash Forecating
Leaping the Barriers to Perfect Cash Forecating
 
Go. Why it goes
Go. Why it goesGo. Why it goes
Go. Why it goes
 
Ask the Expert: The Hazardous Waste Generator Improvements Rule
Ask the Expert: The Hazardous Waste Generator Improvements RuleAsk the Expert: The Hazardous Waste Generator Improvements Rule
Ask the Expert: The Hazardous Waste Generator Improvements Rule
 
ARTIFICIAL INTELLIGENCE: The Future of Business.
 ARTIFICIAL INTELLIGENCE: The Future of Business.  ARTIFICIAL INTELLIGENCE: The Future of Business.
ARTIFICIAL INTELLIGENCE: The Future of Business.
 
Internet y sus problemas
Internet y sus problemasInternet y sus problemas
Internet y sus problemas
 
Staff Report
Staff ReportStaff Report
Staff Report
 
خلاقیت در نقاشی کودک
خلاقیت در نقاشی کودکخلاقیت در نقاشی کودک
خلاقیت در نقاشی کودک
 
Presentation de la france
Presentation de la francePresentation de la france
Presentation de la france
 
Conheça me - rafael alves cordeiro
Conheça me - rafael alves cordeiroConheça me - rafael alves cordeiro
Conheça me - rafael alves cordeiro
 
Bulletin 2 17-17
Bulletin 2 17-17Bulletin 2 17-17
Bulletin 2 17-17
 

Similaire à Technical Report

I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
absnakcac
 
Final Report (Intersection Improvement Project)
Final Report (Intersection Improvement Project)Final Report (Intersection Improvement Project)
Final Report (Intersection Improvement Project)
Josia Tannos, EIT
 
Final Report, Hi7
Final Report, Hi7Final Report, Hi7
Final Report, Hi7
Mike White
 
Chapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalChapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-final
Adriana Abramovich
 
CapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaCapstonePoster 36x48 Supernova
CapstonePoster 36x48 Supernova
Robert Fohrenbach
 
Alex Iljin Paper for 2011 AITPM Conference
Alex Iljin Paper for 2011 AITPM ConferenceAlex Iljin Paper for 2011 AITPM Conference
Alex Iljin Paper for 2011 AITPM Conference
Alex Iljin
 
1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf
ShivamKumar423966
 

Similaire à Technical Report (20)

I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
 
Final Report (Intersection Improvement Project)
Final Report (Intersection Improvement Project)Final Report (Intersection Improvement Project)
Final Report (Intersection Improvement Project)
 
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011 Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
 
Final Report, Hi7
Final Report, Hi7Final Report, Hi7
Final Report, Hi7
 
North quarter vision study
North quarter vision studyNorth quarter vision study
North quarter vision study
 
Chapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalChapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-final
 
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
Center City Connector Executive Summary
Center City Connector Executive SummaryCenter City Connector Executive Summary
Center City Connector Executive Summary
 
CapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaCapstonePoster 36x48 Supernova
CapstonePoster 36x48 Supernova
 
Alex Iljin Paper for 2011 AITPM Conference
Alex Iljin Paper for 2011 AITPM ConferenceAlex Iljin Paper for 2011 AITPM Conference
Alex Iljin Paper for 2011 AITPM Conference
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
convert_255356
convert_255356convert_255356
convert_255356
 
Formate_for_PPT[1][1].pptx
Formate_for_PPT[1][1].pptxFormate_for_PPT[1][1].pptx
Formate_for_PPT[1][1].pptx
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
03. Highway Planning and highway components.pptx
03. Highway Planning and highway components.pptx03. Highway Planning and highway components.pptx
03. Highway Planning and highway components.pptx
 
1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf1_Highway Engg-Ch.1 Introduction_full.pdf
1_Highway Engg-Ch.1 Introduction_full.pdf
 
A1A Greenways Ideas and Opportunities Study Part 2
A1A Greenways Ideas and Opportunities Study Part 2A1A Greenways Ideas and Opportunities Study Part 2
A1A Greenways Ideas and Opportunities Study Part 2
 
RTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical DataRTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical Data
 
IRJET- Comprehensive Geometric and Pavement Design of Kabaya Road, Rwanda
IRJET- Comprehensive Geometric and Pavement Design of Kabaya Road, RwandaIRJET- Comprehensive Geometric and Pavement Design of Kabaya Road, Rwanda
IRJET- Comprehensive Geometric and Pavement Design of Kabaya Road, Rwanda
 

Dernier

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Dernier (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Technical Report

  • 1. i Proposal TITLE: In-service Operational Safety Review of 14th Avenue FROM: Justin Mishko – 856138 159 Columbia Drive Hamilton ON L9C3Y7 DISCIPLINE: Civil (Transportation) DATE: February 12, 2014 At the time, The Regional Municipality of York required an In-Service Operational Safety Review of 14th Avenue, bound by Markham Road to the west and Ninth Line to the east, in the Town of Markham. 14th Avenue is a minor arterial road which serves as the primary link to several subdivisions as well as a golf course. A number of issues and concerns brought forth by both residents and members of local and regional council are the primary reasons for this review as a result of a series of collisions that occurred on this section of roadway. The study area will cover approximately 2100 metres of 14th Avenue including all signalized and unsignalized intersections. This review will examine the operational function of 14th Avenue from both a design and safety perspective. The report will include an overview of the geometric design of the roadway and applicable intersections; including vertical and horizontal alignment design standards, cross section elements, intersection design, pavement surface conditions and widths as well as pedestrian, bicycle and transit facilities and functionality. These essential rudiments of a roadway will be analyzed and conclusions and recommendations will be formulated to ensure that the minimum design guidelines are met. The Geometric Design Guide for Canadian Roads, Ontario Traffic Manual, and the Roadside Safety Manual will be heavily relied on in determining any deficiencies of the roadway. The recommendations provided will satisfy both short term and long term goals in improving the functionality of 14th Avenue. Based on a cursory review of the available collision history, drivers are failing to negotiate a particular segment of this corridor which has resulted in eight single motor vehicle collisions. Potential contributory factors of these collisions can include the lack of pavement marking or roadside signage delineating the horizontal alignment changes, degradation of the surface asphalt and/or substandard design.
  • 2. ii Executive Summary The residents of the Boxgrove community are primarily serviced by the east/west arterial highway of 14th Avenue. This 2100 meter road section consists of 7 intersections, 2 of which are controlled by traffic signals; and boarders the Markham Green Golf Course where it crosses the Rouge River. With the opening of a newly constructed north/south ‘by-pass’ route east of the study area, 14th Avenue is experiencing higher than anticipated volumes. Over the last five years, collision statistics, as well as political and public concern, have highlighted potential deficiencies. These alleged problematic areas as well as part of ongoing initiatives for corridor improvements, served as a catalyst for an in-service operational safety review. Available collision data provided by the Regional Municipality of York in cooperation with York Region Police was analyzed to determine occurring trends and patterns. Site investigations confirmed horizontal alignment issues as well as other design and engineering shortages. These elements were addressed satisfying a range of time length solutions. It was identified that a portion of 14th Avenue was initially constructed so that there were several ‘kinks’ in the horizontal alignment. This design feature can cause a driver’s expectations to not be met yielding an unsafe and hazardous situation. The combination of vertical and horizontal curves approaching the bridge spanning the Rouge River promotes a precarious situation in relation to pedestrian safety as there is no barrier between the walkway across the bridge and the travel portion of the roadway. Several key aspects have been identified as being a potential contributing factor to the cause of this review. To immediately satisfy a portion of the listed remedial countermeasures, additional steps are to be completed to highlight the characteristics of the roadway. To ensure a motorist’s expectations are met, additional signage and delineation are required in the interim. As a candidate for a bike way and multi-use pathway; capital works should be scheduled accordingly to ensure that the Pedestrian and Cycling Master Plan’s initiatives are included. Rehabilitation and reconstruction of 14th Avenue can complement initiatives to provide a multi-user friend roadway.
  • 3. iii Acknowledgements Special thanks to the Regional Municipality of York, Transportation Services Department for supplying the necessary data and services for this in-service operational safety review. Also, thank you to Yvonne Kaczor P Eng., Traffic Engineering and Road Safety, York Region and Zoran Postic, Manager, Traffic Engineering and Road Safety, York Region for their continuing support and guidance throughout the preparation of this report.
  • 4. iv Table of Contents Proposal i Executive Summary ii Acknowledgments iii Table of Contents iv List of Figures vi 1.0 Introduction 1.1 Background 1 1.2 Purpose 1 1.3 Study Scope 1 1.4 Study Area 2 2.0 Data Collection 2.1 Collision History 3 2.2 Traffic Volumes 3 2.3 Speed Study 3 2.4 Field Investigation 4 3.0 Analysis 3.1 Existing Roadway 4 3.2 Traffic Volumes 7 3.3 Collisions 7 3.4 Potential Contributory Factors 9 3.5 Potential Countermeasures & Remedial Action 17 4.0 Conclusion 18 5.0 Recommendations 20 References 22 Appendix A A1 Collision Diagram – Havelock Gate to Roxbury Street A2 Collision Diagram – Roxbury Street to Boxwood Crescent West A3 Collision Diagram – Boxwood Crescent West to Ninth Line Appendix B
  • 5. v B1 TMC – 14th Avenue @ Boxwood Crescent East B3 TMC – 14th Avenue @ Legacy Drive B5 TMC – 14th Avenue @ Roxbury Street B7 ATR – Horstman Street to Markham Road B7 ATR – Legacy Drive to Ninth Line Appendix C C1 York Region Proposed Cycling Network Appendix D D1 Speed Study: 60 km/h Posted Speed Limit D2 Speed Study: 50 km/h Posted Speed Limit
  • 6. vi LIST OF FIGURES Figure 1-1 Map of study area 2 Figure 2-1 Collected traffic data 3 Figure 2-2 Results of speed survey (Apr 25, 2007) 4 Figure 3-1 Typical view of a signalized intersection 6 Figure 3-2 Typical view of an unsignalized intersection 6 Figure 3-3 Typical midblock view 7 Figure 3-4 Annual average traffic volume on 14th Avenue 7 Figure 3-5 Eastbound sight distance 11 Figure 3-6 Vehicle tire trace mark 12 Figure 3-7 Intersection warning sign 13 Figure 3-8 Uncontrolled access point – Roxbury Park 14 Figure 3-9 Westbound tire traces 15 Figure 3-10 One catch basin through curved portion of roadway 16 Figure 3-11 Potential remedial treatments 17 Figure 4-1 Wooden Post 21
  • 7. 1 1.0 INTRODUCTION 1.1 Background As part of ongoing initiatives for corridor improvement, 14th Avenue was identified as a candidate for an In-Service Operational Safety Review. Concerns have been brought forth by both members of Regional and Local Council, as well as local area residents. A growing statistical trend specific to collision history is an indicator that certain elements of the roadway could be insufficient or substandard. 1.2 Purpose This report will see that minimum design, operational and safety standards are met or exceeded where necessary so that all road users are able to utilize 14th Avenue in a safe and efficient manner. Problematic areas and identified deficiencies of 14th Avenue will be reviewed and the recommended countermeasures will satisfy the needs of the short term and long term solutions. 1.3 Study Scope This report will include an analysis of the geometric design of the roadway and applicable intersections; including vertical and horizontal alignment design standards, cross section elements, intersection design, pavement surface conditions and widths all where applicable. Pedestrian, bicycle and transit facilities will be examined to determine their functionality and relationship as they relate to the Pedestrian and Cycling Master Plan.
  • 8. 2 1.4 Study Area The study area consists of the 14th Avenue corridor bound by Markham Road in the west and Ninth Line in the east, in the Town of Markham. All signalized and non-signalized intersections are within the scope of this study with the exception of 14th Avenue at Markham Road and 14th Avenue at Ninth Line. The study area is depicted below in Figure 1-1. Figure 1-1: Map of Study Area This report will examine the key engineering, design and operational fundamentals of a safe and efficient roadway. Highlighted there within will include
  • 9. 3 actions to provide a multi-user friendly roadway through future design and rehabilitation works. 2.0 DATA COLLECTION 2.1 Collision History The collision analysis for the subject study area was based on motor vehicle collision reports from January 1, 2003 to December 31, 2007 inclusive. Collision diagrams were generated based on the available statistics. (Appendix A) 2.2 Traffic Volumes The available turning movement counts and automatic traffic recorder counts were used in the analysis. A summary of the data used is shown in Figure 2-1. Figure 2-1: Collected Traffic Data LOCATION STUDY DATE 14th Avenue @ Boxwood Crescent East TMC February 24, 2005 14th Avenue @ Legacy Drive TMC June 26, 2007 14th Ave @ Roxbury Street TMC February 24, 2005 14th Ave east of Markham Road ATR November 2007 14th Ave west of Ninth Line ATR December 2006 Traffic data is attached in Appendix B. 2.3 Speed Study A speed survey targeting westbound vehicles approaching the intersection of 14th Avenue west of Boxwood Crescent was conducted on April 25, 2007. The results of the speed survey are shown in Figure 2-2.
  • 10. 4 Figure 2-2: Results of Speed Survey (April 25, 2007) Posted Speed Limit 50 km/h Sample Size 106 85th Percentile 69.6 km/h Maximum Speed 81 km/h Minimum Speed 51 km/h % Compliance 0.0 % 2.4 Field Investigation Site investigations were completed during the morning and afternoon peak hours as well as during the off-peak hours. Morning and afternoon peak field investigations were completed on Wednesday July 23, 2008. The aim of these investigations was to observe traffic in higher volume conditions when road user frustration and conflicts between vehicles are more likely to occur. In order to obtain more information about the environment, surrounding development and to determine lower volume traffic characteristics, an off-peak field investigation was completed on Thursday, July 24, 2008. 3.0 ANALYSIS 3.1 Existing Roadway 14th Avenue is an arterial roadway that carries approximately 16,000 vehicles per day, 3% of which are heavy trucks. Between Markham Road and Havelock Gate, 14th Avenue has a four lane cross section. Between Havelock Gate and Ninth Line, 14th Avenue has a two lane cross section. Throughout the entire study area, there is no direct property
  • 11. 5 access onto 14th Avenue with the exception of a rarely used Hydro One access point. The horizontal alignment of 14th Avenue between a point approximately 500 meters west of Markham Road and Ninth Line is very curvilinear. There are sidewalks on both sides of 14th Avenue from Markham Road to Ninth Line. The distance between the sidewalk and the roadway edge varies along the entire section. At the bridge across the Rouge River there is no separation between the pedestrian walkway and the edge of the road. Currently, there are no bike lanes along this stretch of the roadway; however, York Region’s Pedestrian and Cycling Master Plan does identify 14th Avenue as a potential candidate for the implementation of bike lanes and multi-use trails (Appendix C). The intersection of 14th Avenue at Havelock Gate consists of an exclusive left turn lane, a through lane and a shared through/right turn lane. Figure 3-1 illustrates a typical roadway cross-section at a signalized intersection in the study area.
  • 12. 6 Figure 3-1: Typical View of a Signalized Intersection The intersection of 14th Avenue at Boxwood Crescent is unsignalized and consists of one through lane and no auxiliary turn lanes as shown in Figure 3-2. Figure 3-2: Typical View of an Unsignalized Intersection
  • 13. 7 A typical cross-section of 14th Avenue between Havelock Gate and Ninth Line is illustrated in Figure 3-3 Figure 3-3: Typical Midblock View 3.2 Traffic Volumes The most recent traffic count for 14th Avenue was completed on June 5, 2007, between Legacy Drive and Ninth Line. (Figure 3-4) Figure 3-4: Annual Average Traffic Volume on 14th Avenue As per the above data, the annual average daily traffic for 14th Avenue is 13,420 vehicles per day in both eastbound and westbound directions combined.
  • 14. 8 3.3 Collisions 3.3.1 Overview Between 2003 and 2007 a total of 15 reported collisions occurred within the study area. All these collisions were classified as property damage only; none of the collisions resulting in fatalities or injuries. Of the 15 collisions that occurred, 7 were single vehicle collisions that took place during wet weather conditions (rain or snow) as a result of the vehicle traveling too fast for the conditions in relation to the horizontal curvature of the roadway. These collisions occurred mostly in the off-peak periods when travel speeds are generally higher. A reduction in travel speeds on the study section of 14th Avenue will decrease the risk of “run-off the road” and “head-on” collisions as well as the risk of these vehicles colliding with pedestrians using the pedestrian walkways. Two collisions involved a vehicle colliding with a cyclist. 3.3.2 Collision Diagrams The collision diagrams attached in Appendix A were prepared after investigating copies of collision reporting forms as completed by York Region Police.
  • 15. 9 3.4 Development of Potential Contributory Factors The following observations identify potential contributory factors for the overrepresented single motor vehicle collisions along 14th Avenue between Ninth Line and Markham Road. 3.4.1 Operating Speed The subject section of 14th Avenue is located in the transition zone between areas of urban and rural development, which typically has considerably different operating speeds. The area east of Ninth Line is considered as open space and is currently undeveloped; therefore drivers traveling eastbound east of Markham Road might be prematurely changing into a ‘rural driving mode’. This false perception is even more exaggerated due to the presence of a mature woodland area located on the north side of 14th Avenue. A similar situation has been noted for westbound vehicles where drivers coming from a rural environment may not have adjusted their speed for the urban area they are about to enter. Eastbound and westbound speed studies show approaching speeds between 51 km/h and 81 km/h with an 85th percentile speed approximately 70 km/h in the 50 km/h residential zone. The results of the speed study completed in December 2005 revealed 58% of drivers complying with the posted speed limit of 60 km/h. In March 2006, Regional Council recommended lowering the speed limit of 60 km/h to 50 km/h throughout the subject portion of 14th Avenue.
  • 16. 10 Based on the results of a speed study it is evident that the lowering of the speed limit had no discernible impact on operating speeds. It is apparent that vehicles do not conform to the posted speed limit of 50 km/h. Where it is desirable to have at least 85% of drivers comply with the posted speed limit, the compliance with the speed limit is 0%. The observed speeds could be considered significantly high for a 2 lane urban arterial especially with the existing geometric characteristics of the roadway. Comparing the results of both speed studies, the speed compliance has dropped from 58% to 0% after the speed limit reduction from 60 km/h to 50 km/h. Therefore, an additional speed limit reduction is not recommended. The results of the study are attached in Appendix D. 3.4.2 Sightline Restrictions There is a potential sightline conflict for eastbound and westbound traffic due to the presence of a combination of vertical and multiple horizontal curves as illustrated in the Figure 3-5.
  • 17. 11 Figure 3-5: Eastbound Sight Distance 3.4.3 Geometry Several field investigations revealed that the section of 14th Avenue between Markham Road and Ninth Line along the curved portions of the roadway have a reverse cross fall that can cause vehicles to errant from the roadway while negotiating the curve. Additionally, on 14th Avenue within the study section there are several horizontal curves. These curves are short and have small deflection angles thereby creating “kinks” in the roadway that could be a challenge to negotiate at high speeds, especially in adverse weather conditions. Approximately 280 meters west of Ninth Line on 14th Avenue, there is a bridge over the Rouge River. This bridge is situated on a horizontal curve and both approaches to the bridge are on a downgrade. On the outside of the curve (i.e. of
  • 18. 12 the south side of 14th Avenue), over the bridge, the pedestrian walkway is directly adjacent to the roadway and is not protected by any form of barrier. The combination of the horizontal and vertical alignment in this area increases the risk that vehicles, driving at excessive speeds, could leave the traveled portion of the roadway entering into the pedestrian walkway area. Figure 3-6 illustrates a tire mark from an errant vehicle striking a tree. Figure 3-6: Vehicle Tire Trace Mark 3.4.4 Signage As shown in Figure 3-7, the limited visibility of a warning sign due to extensive vegetation combined with its location could also be a contributing factor in single motor vehicle collisions. The improper notification to the driver about the presence of an intersection and possible vehicles violates driver’s expectancy. Furthermore, this sign is alerting drivers to the presence of an approaching intersection but not of the approaching horizontal curve.
  • 19. 13 Figure 3-7: Intersection Warning Sign 3.4.5 Uncontrolled Access Point Roxbury Park is located on the north side of 14th Avenue between Havelock Gate and Ninth Line parallel to a residential development on the south side. During the field investigation, two uncontrolled access points leading to the park were noticed (Figure 3-8 shows one location). The unexpected presence of pedestrians or cyclists crossing the road can increase the likelihood of a collision with a motor vehicle and another road user.
  • 20. 14 Figure 3-8: Uncontrolled Access Point – Roxbury Park 3.4.6 Road Surface Friction Of all the collisions which were reported from 2003 to 2007 respectively, 47% of the collisions were classified as single motor vehicle and occurred during wet weather conditions. Low skid resistance of the roadway could be one of the reasons for vehicles losing control during wet weather conditions. During the field investigation, skid marks were found on 14th Avenue approximately 250 meters beyond Roxbury Street. The placement of this skid mark indicated the vehicle was traveling westbound at a speed which exceeded the maximum able to negotiate the curve. Figure 3-9 illustrates the vehicle’s tire traces (skid marks) thorough this curved portion of 14th Avenue.
  • 21. 15 Figure 3-9: Westbound Tire Traces 3.4.7 Other Road Users: Cyclists Currently there is no available data on cyclist volumes; however, the field investigations found several cyclists (more than 5 within one hour period) travelling along 14th Avenue between Markham Road and Ninth Line. The collision history revealed that within the last five years, 2 collisions occurred that involved cyclists. York Region’s Pedestrian and Cycling Master Plan identifies a bike lane on 14th Avenue between Markham Road and Roxbury Street and a multi-use trail on 14th Avenue between Roxbury Street and Ninth Line. A multi-use trail is a facility that is entirely separated from the travelled portion of the roadway and a bike lane is a facility located in the travelled portion of the
  • 22. 16 roadway and is designed for one way bicycle traffic. Additional details can be found in Appendix C. The existing width of a one-direction lane on 14th Avenue is 3.75 meters respectively. Based on the Pedestrian and Cycling Master Plan, the minimum lane width to accommodate bike lanes is 5.0 meters; therefore, the current width of the lane is insufficient to accommodate both vehicular and cyclist traffic. 3.4.8 Drainage An insufficient number of catch basins were noticed on the south side of 14th Avenue within the subject area, especially through the curved portions of the roadway (figure 3-10). This can cause rain water to remain on the road surface and pond in low lying horizontal and vertical portions of the road. A combination of a reversed cross fall, excessive speed and water over the road surface could be a possible cause of many of the collisions that occurred between 2003 and 2007. Figure 3-10: One Catch Basin Through Curved Portion of Roadway
  • 23. 17 3.5 Potential Countermeasures and Remedial Action Figure 3-11 presents several potential remedial treatments listing advantages and disadvantages related to single motor vehicle collisions. Figure 3-11: Potential Remedial Treatments Countermeasure Benefits Disadvantages Expected Effectiveness Increase number of catch basins along 14th Avenue §Improves drainage of the road’s surface Eliminates vehicle skidding and loss of control §Equipment and installation cost Medium Pavement micro-surfacing §Prevent vehicles from leaving the travel portion of the road by increasing the friction of the roadway §Moderate rehabilitation cost §Moderate traffic disruption High Road Reconstruction: Widen and eliminate reversed cross fall §Prevent vehicles from losing control and leaving the travel portion of the road §Reduced single motor vehicle collisions §Accommodate other road users (cyclists) and comply with the Pedestrian and Cycling Master Plan §Significant reconstruction cost §Environmental concerns specific to the Rouge River §Major disruption to traffic flows High Refresh pavement markings §Improved road delineation §Highlight ‘winding road’ characteristics §Minor cost §Minor traffic disruption Low Trim vegetation & tree branches §Improved warning sign visibility §Maintenance cost Low Additional curve warning signs and §Improved roadway delineation §Signs and installation Low
  • 24. 18 chevrons along curved portions of the roadway §Increased driver’s expectancy costs §Minor traffic disruption Installation of wooden pylons or trees on the boulevard along the curved section of the roadway §Protects pedestrians from errant vehicles §Enhanced streetscaping §Decreased operating speed as the road seems visibly narrower §Potential roadside hazard if unbreakable Low Road Reconstruction & Realignment: Removing kinks and providing larger curves §Prevent errant vehicles from leaving the travel portion of the roadway §Reduced single motor vehicle collisions §Allow vehicles to travel at a more appropriate speed relating to the nature of the subject section of 14th Avenue §Significant reconstruction cost §Environmental concerns specific to the Rouge River §Major disruption to traffic flows High §Streetscaping §Reduced operating speed §Implementation and maintenance cost Medium 4.0 CONCLUSION Based on the conducted analysis, several key aspects have been identified as being a potential contributing factor to the cause of this review. Prior to the commencement of this review, it had been identified that collision trends
  • 25. 19 indicated a possible deficiency in the geometric design of a portion of 14th Avenue, specific to the road section between Roxbury Street and Ninth Line. To immediately satisfy a portion of the listed remedial countermeasures, additional steps are to be completed to highlight the characteristics of the roadway. To ensure a motorist’s expectations are met, additional signage and delineation are required in the interim. As earlier noted, this section of 14th Avenue is a candidate for a bike way and multi-use pathway; capital works should be scheduled accordingly to ensure that the Pedestrian and Cycling Master Plan’s initiatives are included. At such time, the rehabilitation and reconstruction of 14th Avenue can complement York Region’s initiatives to provide a multi-user friend roadway. Such initiatives can include the addition and upgrading of pedestrian, bicycle and transit facilities, as well as streetscaping and gateway treatments. The introduction or enhancement of streetscaping features and gateway treatments have proven to be effective to the voluntary compliance of posted speed limits. Such roadside treatments also provide a barrier between the travel portion of the roadway and pedestrian facilities (sidewalks and pathways). As on overall assessment of the completed analysis, the application of several of the listed remedial actions will serve to enhance this safe and multi-user friendly roadway. These enhancements will help bring an integral part of York Region’s Master Plan and Pedestrian and Cycling Master Plan to fruition by implementing
  • 26. 20 their key fundamentals; thus being that a Regional road will be able to serve a multitude of users whilst promoting alternate modes of transportation. 5.0 RECOMMENDATIONS Based on the above detailed assessment, the following remedial treatments are recommended to address the collision issues for 14th Avenue between Markham Road and Ninth Line: Short Term § Install additional curve warning signs with a flashing beacon as well as chevrons through the curved portion of the roadway – specifically the road sections immediately west of Roxbury Street and in the area of the bridge crossing the Rough River. § Refresh all existing pavement markings and install 10cm thick edge lines along 14th Avenue between Roxbury Street and Ninth Line. § Trim any roadside vegetation that impairs a driver’s ability to see an approaching warning sign or obstructs sightlines. Mid Term § Pavement micro surfacing or the application of a high friction top coat. § Tree planting or the installation of wooden pylons. Figure 4-1 shows an example of wooden pylons spaced six meters apart.
  • 27. 21 Figure 4-1: Wooden Post Long Term § Roadway reconstruction: widening the travel portion and overall right-of-way; allowance for and installation of bike ways, removing ‘kinked’ horizontal curves and providing larger curves; eliminate reverse cross falls; install additional catch basins. § Streetscaping to promote voluntary compliance with the speed limit.
  • 28. 22 REFERENCES Transportation Association of Canada, Geometric Design Guide for Canadian Roads, September 1999, Part 1, 1999 Edition Transportation Association of Canada, Geometric Design Guide for Canadian Roads, September 1999, Part 2, 1999 Edition Ontario Ministry of Transportation, Ontario Traffic Manual – Book 6, July 2001 Regional Municipality of York, Pedestrian and Cycling Master Plan, April 2008 Regional Municipality of York, Transportation Master Plan, June 2002