SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
KAMBIZ NILAVARI page: 1-4
Mobile: +98(912)5442278
nilavari@iei-co.com
PERSONAL INFORMATION
No19, Taavon alley, Ahmadi Street, Kashani Avenue , Sadeghiyeh second
Tehran, Iran, postcode: 14818- 94811
+98- 09125442278
Nilavari@iei-co.com, kambiznilavari@yahoo.com
Date of birth: 1982/08/23| Nationality: Iranian
PREFERRED JOB
Technical / Commercial department, QC, Inspection activities and consultant
ELECTRICALS ENGINEERING PROFILE
An experienced “Electricals Engineer”, with a diverse background in, inspection, coordination, quality
control and design of electrical and mechanical in the field of industrial equipments.
EDUCATION
BSc, Electrical Science and Engineering, Azad University, 2000-2005
ACTIVITIES
Department head of railway transportation industries in IEI company from 2011 up to now.
Technical inspector and manager from 2008 up to now.
Industrial and Engineering Inspection Co of Iran. (IEI)
www.iei-co.com
KAMBIZ NILAVARI page: 2-4
Mobile: +98(912)5442278
nilavari@iei-co.com
WORK EXPERIENCES‐ SUMMARY 
From  To  Company  Job Title 
Project/Activity (Reference 
/Detail Attached) 
2008  2010  IEI  INSPECTOR  SAPCO& SAZEHGOSTAR  GROUP 
2010  2012  IEI  COORDINATOR  MAPNA  GROUP 
2012  2012  IEI‐CHINA BRANCH  INSPECTOR  NOORALREZA PROJECT IN CHINA 
2012  2013  IEI  COORDINATOR  RAILWAY PROJECTS 
2013  2016  IEI  HEAD OF RAILWAY PROJECTS  HEAD OF RAILWAY PROJECTS 
2016  2016  FARAB‐ IEI   INSPECTOR AND QC MAN  MASHAHD METRO IN CHANA 
2016 
Up 
to 
now 
IEI  HEAD OF RAILWAY PROJECTS  HEAD OF RAILWAY PROJECTS 
WORK EXPERIENCES‐ IN DETAIL
 Third party inspection during manufacturing, inclusive check of car body, bogie, welding,
painting, cabling. Mounting of all interior and exterior devices ( all panels, decoration, electrical
panels and devices, HVAC, brake system, wheel set and bogies, door systems, gangways, buffer
and couplers, battery chargers, ac and dc systems, PIS system and devices, PA system and
devices, piping system, under frame, lightening device and systems and ...) BOM or LOM and
calibration certificates for test equipments, dimensional check, documents review, test witness,
packing and marking in the china north railway company (CNR) for 60 sets passengers,
restaurant and power wan coaches for Noralreza co. (6 months. 2012)
 Coordination for inspection in railways company for Tehran, Isfahan, Tabriz, Mashhad, Shiraz
urban and sub urban co, QOM monorail, raja passenger railway co. IRIR co.(2011-2013)
 Doing inspection for TABRIZ URBAN RAILWAY CO equipments. ( power distribution panels,
Man/ Lan, passive and active systems, signalling and Scada and ...). 2012
 Inspection and Quality control of the industrial project in the different of industrial sector such as
Indamin shock absorber Co and Moje Nikan Co. That is one of the biggest electronic equipments
supplier for Sapco Co. (2005-2007)
 Coordinating of project especially in the field of electrical industries for Mapna Co. (2007-2009)
 Working with commercial documents such as Letter of credit, purchase order, Performa invoice,
and shipping documents...
 Familiar to relevant standards (UIC, IEC, IEEE, DIN, ISO, ISIRI,)
KAMBIZ NILAVARI page: 3-4
Mobile: +98(912)5442278
nilavari@iei-co.com
 Working with specialized power eng. software like as Calculux, Dialux , Etap, Nepelan,....I am
proficient in the general software like as: office 2007, operation systems (windows Me, XP,
seven, vista), and internet software.
 Doing Statistical process control (SPC) and Measurement systems analysis (MSA) in the
different sub vendors of Sapco and Saipa Co.
 Doing inspection during manufacturing inclusive check of BOM or LOM and CALIBRATION
CERTIFICATES for test equipments, dimensional check, documents review, test witness,
packing and marking in the Indamin shock absorber Co and Moje Nikan Co.
 Inspection for Islamic republic of Iran Customs. (Visual and performance test for a
RELOCATABLE X-RAY INSPECTION SYSTEM) IN BASHMAGH, DOGHARON AND
BUSHEHR CUSTOMS.
 Third party inspection during manufacturing, inclusive check of car body, bogie, welding,
painting, cabling. Mounting of all interior and exterior devices ( all panels, decoration, electrical
panels and devices, HVAC, brake system, wheel set and bogies, door systems, gangways, buffer
and couplers, battery chargers, ac and dc systems, PIS system and devices, PA system and
devices, piping system, under frame, lightening device and systems and ...) BOM or LOM and
calibration certificates for test equipments, dimensional check, documents review, test witness,
packing and marking in the china north railway company (CNR) for 3 sets METRO CARS (15
coaches) for FARAB co. (3 months. 2016)
TRAINING
 Training courses in IEI.co, Sazeh Gostare Saipa.co and sapco.co for gaining inspection skills
and quality control management abilities like as.
 SPC (Statistical process control), CALIBRATION, MSA(Measuring system analysis)
 FMEA( Failure Mode and Effects Analysis)
 PROCESS AUDIT, PRODUCT AUDIT.
 POLIMER and SQFE, 8D, EFQM, 5S. IEI AND SAZEH GOSTAR SAIPA
PIPING ELEMENTS,(VALVES, FLANGE, 
GASKET, PIPE) 
16 OURS  IEI  2014 
API 6D & API 598  24 OURS  IEI  2014 
STANDARD OF ELECTRICAL 
ELEVATORS 
32 OURS  IEI  2014 
KAMBIZ NILAVARI page: 4-4
Mobile: +98(912)5442278
nilavari@iei-co.com
CALCUATION & DESIGNING OF 
ELECTRICAL ELEVATORS 
16 OURS  IEI  2014 
DRAFT SURVEY  24 OURS  IRAN MARTIME TRAINING INSTITUTE  2014 
ISO 17020  16 OURS  IEI  2011 
FAMILIARIZATION WITH SHIP 
CONSTRUCTION 
8 OURS  IRAN MARTIME TRAINING INSTITUTE  2014 
TYPE APPROVAL AND E‐MARK  16 OURS  IEI  2014 
PROCESS AUDIT‐ SQFE  8 OURS  IEI  2007 
8D & PROBLEM SOLVING  8 OURS  IEI  2007 
MEASURING SYSTEM ANALISIS  8 OURS  IEI  2007 
STATISTICAL PROCESS CONTROL  16 OURS  IEI  2007 
TYPE APPROVAL OF CNG   8 OURS  IEI  2010 
TYPE APPROVAL OF CNG 
ACCESSORIES 
8 OURS  IEI  2010 
Ultrasonic Test (UT)  64 OURS  GAMMA RAD  2014 
     Visual Test (VT)  64 OURS  IWI TRAINING CENTER  2015 
Penetration Test (PT)  27 OURS  IWI TRAINING CENTER  2015 
ISO 9001‐2008  16 OURS  BEHIN SANAT KHOBREH  2012 
HSE‐ ELEVATOR  10 OURS 
 CENTER OF TRAINING FOR  
OCCUPATIONAL FAFTY AND HEALTH 
2013 
HSE‐ ELECTRICAL  10 OURS 
CENTER OF TRAINING FOR  
OCCUPATIONAL FAFTY AND HEALTH 
// 
HSE‐ CRANES  10 OURS 
CENTER OF TRAINING FOR  
OCCUPATIONAL FAFTY AND HEALTH 
// 
HSE‐ BOILER AND PRESSURE VESEL  10 OURS 
CENTER OF TRAINING FOR  
OCCUPATIONAL FAFTY AND HEALTH 
// 
HSE‐ GENERAL  10 OURS 
CENTER OF TRAINING FOR  
OCCUPATIONAL FAFTY AND HEALTH 
// 
HSE‐ LIFTRUCK  10 OURS 
CENTER OF TRAINING FOR  
OCCUPATIONAL FAFTY AND HEALTH 
// 
FAMILIARIZATION WITH CALIBRATION  8OURS  IEI  2007 
LIQUID GAS TANKS  16 OURS  IEI  2013 
FAMILIARIZATION WITH SCALATOR  24 OURS  PARHAN JOOSH   2015 
Magnetic Particle Test (MT)  27 OURS  IWI TRAINING CENTER  2015 
Radiography Test Interpretation (RTI)  48 OURS  IWI TRAINING CENTER  2015 
Acquaintance with Type Approval of 
CNG ‐ECER 110,ISO 15500 
27 OURS  ISIRI  2015 

Contenu connexe

Tendances

IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111IKRAM ULLAH KHAN
 
Brochure of Seoul Metro 9
Brochure of Seoul Metro 9Brochure of Seoul Metro 9
Brochure of Seoul Metro 9simrc
 
CV OF SURESH RAMSURAN pdf
CV OF SURESH RAMSURAN pdfCV OF SURESH RAMSURAN pdf
CV OF SURESH RAMSURAN pdfBOBBY RAMSURAN
 
Ali's resume 06092016
Ali's resume 06092016Ali's resume 06092016
Ali's resume 06092016Aly Muhammad
 
Iftikhar Ahmed - Senior Service Engineer
Iftikhar Ahmed - Senior Service EngineerIftikhar Ahmed - Senior Service Engineer
Iftikhar Ahmed - Senior Service EngineerIftikhar Ahmed
 
Ici final project
Ici final projectIci final project
Ici final projectLee Jian Ru
 
khaled kamal 's cv 21
khaled kamal 's cv 21khaled kamal 's cv 21
khaled kamal 's cv 21khaled kamal
 

Tendances (13)

IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111
 
Metro project
Metro projectMetro project
Metro project
 
CV-G
CV-GCV-G
CV-G
 
Brochure of Seoul Metro 9
Brochure of Seoul Metro 9Brochure of Seoul Metro 9
Brochure of Seoul Metro 9
 
CV OF SURESH RAMSURAN pdf
CV OF SURESH RAMSURAN pdfCV OF SURESH RAMSURAN pdf
CV OF SURESH RAMSURAN pdf
 
Resume Peter Owsianyk
Resume Peter OwsianykResume Peter Owsianyk
Resume Peter Owsianyk
 
Ali's resume 06092016
Ali's resume 06092016Ali's resume 06092016
Ali's resume 06092016
 
Iftikhar Ahmed - Senior Service Engineer
Iftikhar Ahmed - Senior Service EngineerIftikhar Ahmed - Senior Service Engineer
Iftikhar Ahmed - Senior Service Engineer
 
Ici final project
Ici final projectIci final project
Ici final project
 
CV
CVCV
CV
 
Feasibility Report on autoshop
Feasibility Report on autoshopFeasibility Report on autoshop
Feasibility Report on autoshop
 
khaled kamal 's cv 21
khaled kamal 's cv 21khaled kamal 's cv 21
khaled kamal 's cv 21
 
R S
R SR S
R S
 

Similaire à NIlAVARI- CV

Kermanpour English resume
Kermanpour English resumeKermanpour English resume
Kermanpour English resumeAmin Kermanpour
 
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai
 
IBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - CopyIBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - Copyibrahim ramadan
 
English cv general
English cv  generalEnglish cv  general
English cv generalengay
 
Resume hadi allahyari 2017
Resume hadi allahyari 2017Resume hadi allahyari 2017
Resume hadi allahyari 2017Hadi Allahyari
 
Ali Takhtipour- CV-SEP2016
Ali Takhtipour- CV-SEP2016Ali Takhtipour- CV-SEP2016
Ali Takhtipour- CV-SEP2016Ali Takhtipour
 
CV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusCV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusYounus Mohamed
 
Ali Takhtipour- CV- July2016
Ali Takhtipour- CV- July2016Ali Takhtipour- CV- July2016
Ali Takhtipour- CV- July2016Ali Takhtipour
 
Biographical Information for Dr. Saad Mahmood Ali1
Biographical Information for Dr. Saad Mahmood Ali1Biographical Information for Dr. Saad Mahmood Ali1
Biographical Information for Dr. Saad Mahmood Ali1Dr. Saad Mahmood Ali
 
Resume _Anant Jain_16
Resume _Anant Jain_16Resume _Anant Jain_16
Resume _Anant Jain_16Anant Jain
 

Similaire à NIlAVARI- CV (20)

Hem-Singh-Rajodiya-Vtech
Hem-Singh-Rajodiya-VtechHem-Singh-Rajodiya-Vtech
Hem-Singh-Rajodiya-Vtech
 
Kermanpour English resume
Kermanpour English resumeKermanpour English resume
Kermanpour English resume
 
CV udayan
CV  udayan CV  udayan
CV udayan
 
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
 
IBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - CopyIBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - Copy
 
English cv general
English cv  generalEnglish cv  general
English cv general
 
SOWDAIYAN RESUME NEW
SOWDAIYAN RESUME NEWSOWDAIYAN RESUME NEW
SOWDAIYAN RESUME NEW
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
arvind_resume_new (1)
arvind_resume_new (1)arvind_resume_new (1)
arvind_resume_new (1)
 
Resume hadi allahyari 2017
Resume hadi allahyari 2017Resume hadi allahyari 2017
Resume hadi allahyari 2017
 
Samani Resume Nov 2020
Samani Resume Nov 2020Samani Resume Nov 2020
Samani Resume Nov 2020
 
Ali Takhtipour- CV-SEP2016
Ali Takhtipour- CV-SEP2016Ali Takhtipour- CV-SEP2016
Ali Takhtipour- CV-SEP2016
 
CV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusCV-Mohamed Shafi Younus
CV-Mohamed Shafi Younus
 
Ali Takhtipour- CV- July2016
Ali Takhtipour- CV- July2016Ali Takhtipour- CV- July2016
Ali Takhtipour- CV- July2016
 
Biographical Information for Dr. Saad Mahmood Ali1
Biographical Information for Dr. Saad Mahmood Ali1Biographical Information for Dr. Saad Mahmood Ali1
Biographical Information for Dr. Saad Mahmood Ali1
 
Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
 
cv.mep15
cv.mep15cv.mep15
cv.mep15
 
Afzaal_DM
Afzaal_DMAfzaal_DM
Afzaal_DM
 
Resume _Anant Jain_16
Resume _Anant Jain_16Resume _Anant Jain_16
Resume _Anant Jain_16
 
Ali Esmail ElShazly
Ali Esmail ElShazlyAli Esmail ElShazly
Ali Esmail ElShazly
 

NIlAVARI- CV

  • 1. KAMBIZ NILAVARI page: 1-4 Mobile: +98(912)5442278 nilavari@iei-co.com PERSONAL INFORMATION No19, Taavon alley, Ahmadi Street, Kashani Avenue , Sadeghiyeh second Tehran, Iran, postcode: 14818- 94811 +98- 09125442278 Nilavari@iei-co.com, kambiznilavari@yahoo.com Date of birth: 1982/08/23| Nationality: Iranian PREFERRED JOB Technical / Commercial department, QC, Inspection activities and consultant ELECTRICALS ENGINEERING PROFILE An experienced “Electricals Engineer”, with a diverse background in, inspection, coordination, quality control and design of electrical and mechanical in the field of industrial equipments. EDUCATION BSc, Electrical Science and Engineering, Azad University, 2000-2005 ACTIVITIES Department head of railway transportation industries in IEI company from 2011 up to now. Technical inspector and manager from 2008 up to now. Industrial and Engineering Inspection Co of Iran. (IEI) www.iei-co.com
  • 2. KAMBIZ NILAVARI page: 2-4 Mobile: +98(912)5442278 nilavari@iei-co.com WORK EXPERIENCES‐ SUMMARY  From  To  Company  Job Title  Project/Activity (Reference  /Detail Attached)  2008  2010  IEI  INSPECTOR  SAPCO& SAZEHGOSTAR  GROUP  2010  2012  IEI  COORDINATOR  MAPNA  GROUP  2012  2012  IEI‐CHINA BRANCH  INSPECTOR  NOORALREZA PROJECT IN CHINA  2012  2013  IEI  COORDINATOR  RAILWAY PROJECTS  2013  2016  IEI  HEAD OF RAILWAY PROJECTS  HEAD OF RAILWAY PROJECTS  2016  2016  FARAB‐ IEI   INSPECTOR AND QC MAN  MASHAHD METRO IN CHANA  2016  Up  to  now  IEI  HEAD OF RAILWAY PROJECTS  HEAD OF RAILWAY PROJECTS  WORK EXPERIENCES‐ IN DETAIL  Third party inspection during manufacturing, inclusive check of car body, bogie, welding, painting, cabling. Mounting of all interior and exterior devices ( all panels, decoration, electrical panels and devices, HVAC, brake system, wheel set and bogies, door systems, gangways, buffer and couplers, battery chargers, ac and dc systems, PIS system and devices, PA system and devices, piping system, under frame, lightening device and systems and ...) BOM or LOM and calibration certificates for test equipments, dimensional check, documents review, test witness, packing and marking in the china north railway company (CNR) for 60 sets passengers, restaurant and power wan coaches for Noralreza co. (6 months. 2012)  Coordination for inspection in railways company for Tehran, Isfahan, Tabriz, Mashhad, Shiraz urban and sub urban co, QOM monorail, raja passenger railway co. IRIR co.(2011-2013)  Doing inspection for TABRIZ URBAN RAILWAY CO equipments. ( power distribution panels, Man/ Lan, passive and active systems, signalling and Scada and ...). 2012  Inspection and Quality control of the industrial project in the different of industrial sector such as Indamin shock absorber Co and Moje Nikan Co. That is one of the biggest electronic equipments supplier for Sapco Co. (2005-2007)  Coordinating of project especially in the field of electrical industries for Mapna Co. (2007-2009)  Working with commercial documents such as Letter of credit, purchase order, Performa invoice, and shipping documents...  Familiar to relevant standards (UIC, IEC, IEEE, DIN, ISO, ISIRI,)
  • 3. KAMBIZ NILAVARI page: 3-4 Mobile: +98(912)5442278 nilavari@iei-co.com  Working with specialized power eng. software like as Calculux, Dialux , Etap, Nepelan,....I am proficient in the general software like as: office 2007, operation systems (windows Me, XP, seven, vista), and internet software.  Doing Statistical process control (SPC) and Measurement systems analysis (MSA) in the different sub vendors of Sapco and Saipa Co.  Doing inspection during manufacturing inclusive check of BOM or LOM and CALIBRATION CERTIFICATES for test equipments, dimensional check, documents review, test witness, packing and marking in the Indamin shock absorber Co and Moje Nikan Co.  Inspection for Islamic republic of Iran Customs. (Visual and performance test for a RELOCATABLE X-RAY INSPECTION SYSTEM) IN BASHMAGH, DOGHARON AND BUSHEHR CUSTOMS.  Third party inspection during manufacturing, inclusive check of car body, bogie, welding, painting, cabling. Mounting of all interior and exterior devices ( all panels, decoration, electrical panels and devices, HVAC, brake system, wheel set and bogies, door systems, gangways, buffer and couplers, battery chargers, ac and dc systems, PIS system and devices, PA system and devices, piping system, under frame, lightening device and systems and ...) BOM or LOM and calibration certificates for test equipments, dimensional check, documents review, test witness, packing and marking in the china north railway company (CNR) for 3 sets METRO CARS (15 coaches) for FARAB co. (3 months. 2016) TRAINING  Training courses in IEI.co, Sazeh Gostare Saipa.co and sapco.co for gaining inspection skills and quality control management abilities like as.  SPC (Statistical process control), CALIBRATION, MSA(Measuring system analysis)  FMEA( Failure Mode and Effects Analysis)  PROCESS AUDIT, PRODUCT AUDIT.  POLIMER and SQFE, 8D, EFQM, 5S. IEI AND SAZEH GOSTAR SAIPA PIPING ELEMENTS,(VALVES, FLANGE,  GASKET, PIPE)  16 OURS  IEI  2014  API 6D & API 598  24 OURS  IEI  2014  STANDARD OF ELECTRICAL  ELEVATORS  32 OURS  IEI  2014 
  • 4. KAMBIZ NILAVARI page: 4-4 Mobile: +98(912)5442278 nilavari@iei-co.com CALCUATION & DESIGNING OF  ELECTRICAL ELEVATORS  16 OURS  IEI  2014  DRAFT SURVEY  24 OURS  IRAN MARTIME TRAINING INSTITUTE  2014  ISO 17020  16 OURS  IEI  2011  FAMILIARIZATION WITH SHIP  CONSTRUCTION  8 OURS  IRAN MARTIME TRAINING INSTITUTE  2014  TYPE APPROVAL AND E‐MARK  16 OURS  IEI  2014  PROCESS AUDIT‐ SQFE  8 OURS  IEI  2007  8D & PROBLEM SOLVING  8 OURS  IEI  2007  MEASURING SYSTEM ANALISIS  8 OURS  IEI  2007  STATISTICAL PROCESS CONTROL  16 OURS  IEI  2007  TYPE APPROVAL OF CNG   8 OURS  IEI  2010  TYPE APPROVAL OF CNG  ACCESSORIES  8 OURS  IEI  2010  Ultrasonic Test (UT)  64 OURS  GAMMA RAD  2014       Visual Test (VT)  64 OURS  IWI TRAINING CENTER  2015  Penetration Test (PT)  27 OURS  IWI TRAINING CENTER  2015  ISO 9001‐2008  16 OURS  BEHIN SANAT KHOBREH  2012  HSE‐ ELEVATOR  10 OURS   CENTER OF TRAINING FOR   OCCUPATIONAL FAFTY AND HEALTH  2013  HSE‐ ELECTRICAL  10 OURS  CENTER OF TRAINING FOR   OCCUPATIONAL FAFTY AND HEALTH  //  HSE‐ CRANES  10 OURS  CENTER OF TRAINING FOR   OCCUPATIONAL FAFTY AND HEALTH  //  HSE‐ BOILER AND PRESSURE VESEL  10 OURS  CENTER OF TRAINING FOR   OCCUPATIONAL FAFTY AND HEALTH  //  HSE‐ GENERAL  10 OURS  CENTER OF TRAINING FOR   OCCUPATIONAL FAFTY AND HEALTH  //  HSE‐ LIFTRUCK  10 OURS  CENTER OF TRAINING FOR   OCCUPATIONAL FAFTY AND HEALTH  //  FAMILIARIZATION WITH CALIBRATION  8OURS  IEI  2007  LIQUID GAS TANKS  16 OURS  IEI  2013  FAMILIARIZATION WITH SCALATOR  24 OURS  PARHAN JOOSH   2015  Magnetic Particle Test (MT)  27 OURS  IWI TRAINING CENTER  2015  Radiography Test Interpretation (RTI)  48 OURS  IWI TRAINING CENTER  2015  Acquaintance with Type Approval of  CNG ‐ECER 110,ISO 15500  27 OURS  ISIRI  2015