  1. PROGRAMME EVALUATION REVIEW TECHNIQUE(PERT) PRESENTED BY Ms.T.NIVYA.,M.Sc.,B,Ed 21BDP24 SEC - A
  2. INTRODUCTION • PERT was developed in the late 1950 by the US Navy submarine missile programme and was applied in 1958. • PERT shows the time taken by each component of project & the total time required for its completion. • PERT breaks down the project into events, activity& lays down their proper sequence relationship & duration in the form of network. • PERT is a technique of representing project plan in network. • This is represented in a graphic form known as network diagram.
  3. DEFINITION The programme or project evaluation and review technique commonly abbreviated as PERT, is a statistical tool, used in project management, which was designed to analyse and represent the tasks involved in completing a given project & to illustrate the flow of events in a project.
  4. TYPES • There are two types of network diagram, Activity On Arrow(AOA): In the first variant the duration is denoted on arrow connecting diagram nodes, such diagram type called AOA. Activity On Node (AON): In such diagram the information about the task duration is denoted in the diagram node & each task is represented in the form of rectangle with definite set of fields.
  5. NEED OF PERT Prediction of deliverables Planning resource requirement Controlling resource allocation Internal programme review Performance evaluation Uniform wide acceptance Reduction in cost Saving time Determination of activities Elimination of risk in complex activities Flexibility Evaluation of alternatives Useful effective control Useful decision making Useful research work
  6. PROCESS PERT Planning involve the following steps:
  7. 1. Identity Activities & Events: • The activities are tasks require to complete the project. • The events marking the beginning & end of one or more activities. • It is helpful to list the tasks in a table that in later steps can be expanded to include on sequence is duration.