STUDY REPORT ON
OFFSHORE PIPELINE ENGINEERING
BY
KAARTHIK SARAVANAN
Department of Mechanical Engineering
Velammal Engineering College, Chennai.
Study work done at McDermott, Middle East Inc. Dubai
as a part of Summer Internship from
19th
June – 28th
July 2016.
PREFACE:
The primary objective behind this report was to gain knowledge about
Pipeline Engineering in Offshore Industry. The report deals with
the basics of the ideas and techniques used in this field to help clarify
the approach towards it. I have tried to keep the report error free and
presented it to the best of my ability. Any suggestions for further
improvement of this work will be acknowledged.
All the images used in this report are taken from the net source
for easy understanding and reference.
ACKNOWLEDGEMENT:
I have great pleasure in presenting this report which has been done as a part of
Summer Internship at McDermott Inc. which finds it name among the world’s
top most oil field service companies.
The experience which I got in McDermott Industry was extremely valuable to
my career development. I am highly indebted to Mr. ManojKulshrestha,
Manager, Subsea Dept. for his constant supervision and advice throughout my
intern period. I’m very thankful to Mr. Harshad Phadnis, Pipeline Engineer
for taking time out to hear and guide me giving assignments during this project.
I express my gratitude sense to the whole McDermott Subsea Dept. staffs if I
didn’t mention here by their names who helped me to gather information in
various ways towards the project.
I would like to thank my parents too for their immense supportwithout which I
would not be able to compile this report.
Thank you all.
COMPANY PROFILE:
 McDermottInternational is a leading American EPCI(Engineering,
Procurement, Construction and Installation) company focused on
offshore oil and gas projects.
 It has its operating locations and fabrication yards in about 20 countries in
the Middle East, Atlantic and Asia Pacific regions.
 It has fabricated and installed various structures, laid pipelines and
exported facilities to Europe and Africa.
 It is a premier leader of the global offshore engineering and construction
industry through innovations and marine services while achieving the
highest industry performance in terms of safety, quality and ethics.
PIPELINE ENGINEERING:
INTRODUCTION:
The function of Pipeline Engineering is to apply the knowledge of
Engineering drawings will be implemented and using the data from it materials
will be purchased, fabricated and assembled into piping systems thus fulfilling
the process requirements.
Fluid flow Stress analysis
Material
properties
Engineering
specifications
Process
PIPELINE TRANSPORTATION:
 Pipelines are means of transportation of materials over long distances.
 Any chemically stable fluid substancecan be sent. (Eg: fuels)
PURPOSE OF OFFSHORE PIPELINES:
1.Export of offshore resources.
2.Flowlines totransferproducts fromplatforms toexportlines.
3.Water or chemical injectionflowlines
4.Pipeline bundles connecting subseamanifolds andwells.
Advantages of pipelines compared to other modes of
transportation (rail, truck, barges):
 Large volume transportation (high energy density)
 Can be laid through difficult conditions under water
 Low energy consumption and requires little maintenance
 Safe and environment friendly
 High reliability
 Negligible loss of productin transit.
Thus pipelines are the most convenient, economical and efficient
way of transporting oil, natural gas and refined products.
Working sectors of offshore industry:
Upstream: Exploration and Geological Surveys
Midstream:Transportation of resources
Downstream:Refining of resources
 Upstream: Searching for potential underwater crude oil and natural gas
fields by survey, seismic and drilling activities. Thus subsequently
operating the wells that can be recovered.
 Midstream: Setting up of offshore structures and pipelines to transport
the products obtained from the sites to the refineries followed by
downstream distributors.
 Downstream: Refining of the crude products and then processing it
followed by distribution. Thus marketing the derived products of crude
oil and gas.
OFFSHORE STRUCTURES:
 Offshore deals with the energy location and processes carried out at a
distance awayfrom shore.
 Basically it is about drilling of oil and gas reservoirs.
The various offshore structures are:
JacketsPlatforms
Riser
Tie-in
spool
UmbilicalValve skid
1. Platforms:
 Large structures either built on seabedor left floating with anchors or
wires depending on circumstances.
 Also known as rigs.
 Has facilities to drill well, provides all equipments for the oil and gas
processes and has oil storagesbeforeit is brought to onshore for refining
followed by transportations.
 Services for a very long period of years.
 Some major platform types depending on the operating depth are Fixed,
FPSO (Floating production, Storage and offloading system), Tension
leg, Jackup-rig, Semisubmersible and SPAR.
2. Jackets:
 Steel tubular structures supporting the platform deck.
 Rests on the seabed through piling.
 As a cage it protects the piping.
3. Riser:
 Pipelines developed for vertical transportation of materials from the
seabed(subsea oilwells)to production and drilling facilities above the
watersurface.
 Serves as a conduit (channel) betweenseafloorand facilities.
 Productionmaterials such as hydrocarbons, injection and controlfluids,
gas lifts are sent through it.
 Riser section closestto the seafloor is joined with a pipeline clamped to the
side of the facility and the next sections rise up the facility side to the top.
 While rising, various clamps (Hanger type is the major clamp) are
provided for withstanding weights, giving supports and arrest the
lateral movements.
4. Tie-in spool:
 Elements connecting the offshore pipelines to the Riser followed by other
facilities.
 Provides final connection after pipeline installation (Ties the pipeline to
the structure).
 Its design and shape depends on the distance to fit between the riser bend
and pipeline laydown point.
 Made flexible to allow the pipelines to expand during operational stages
because of temperature changes and thus the risers won’t be disturbed.
 Reduces forces inthe connectors to ensure safe transportation and avoid
leakages.
5. Valve skids:
 Subsea valves are used to governthe material flow through undersea
pipelines or other apparatus. They are designed to work in the marine
environment withstanding the pressure effects, corrosionand debris.
 The working of these valves is isolated and controlled by fluid modules
called valve skids.
 The actuationand recoveryresponse time of the valves is taken care by
the valve skids.
6. Umbilical:
 Bundle ofcables andtubes put togethersurroundedby anoutersheath
that transfers power (hydraulic, electronic), fibre optic and electrical
signals, chemical and gas supply within a field (long distances) or from
topside to subsea.
 Provides a way to communicate with different subsea equipments on
the seabedand thus having control of it.
 Umbilical design varies with the projectrequirements.
 Subsea intervention umbilicals are also used for offshore drilling
activities.
OFFSHORE FLOWLINE LAYOUT:
PIPELINE DESIGN STAGES:
Requirement to transport product
Operator specific requirements
Codes,Standards and Specifications
Route selection
Geophysical and geotechnical surveys
Material grade selection
Wall thickness
Flowline protection( corrosion coatings )
Flowline installation
Flowline stress analysis
Optimum flowline Inner dia and wall thickness
DESIGN REQUIREMENTS:
 Wall thickness
 Material grade selection:
 Cathodic protection
 Suitability to product
 Route selection:
 Minimize flowline length
 Minimize flowline spands
 Minimize number of bends
 Maximum corridor width
 Flowline protection:
 Concrete coating
 Trenching / Burying
 Rockdumping
 Mattresses / Structures
 Flowline stress analysis:
 Hoop and longitudinal stress
 Span analysis and vortex shedding
 Stability and expansion analysis
 Buckling and crossing analysis
 Flowline installation analysis:
 Lay analysis
 Welding
 Propagation buckling
 Hydrostatic collapse
 Optimal design
Pipeline route selection:
The route should be selected based on the following parameters:
 Seabed topography
 Obstructions, debris and existing structures
 Marine activities
 Pipeline route radius
 Install ability
 Existing pipeline
 Select direct shortest route.
Surveys:
Surveys are conducted on the selected routes to be aware of the conditions
existing there and the soil characteristics so that the structures are safely
designed and built. It is necessary to investigate and evaluate the risks
thoroughly. The two types of surveys are:
1. Geophysical ( Seabed Bathymetry):
 Establishing topography
 Identification of significant seabedfeatures, obstructions and hazards
and determination of surface layer geometry (water depth) through
normal sample collectionand observation.
2. Geotechnical (Stratification):
 Geological characteristics ofdifferent soils and rocks found on site.
 Insitu and laboratory testings through boreholes to find the soil
parameters and affecting properties.
Pipeline material selection:
The pipeline material type can be rigid, flexible or composite. The material
selection process is based on the following:
 Identify corrosionthreats
 Define the corrosioncircuits
 Calculate the corrosionrate per year
 Calculate the Service Life Corrosion (SLC) based on design life
 Consider the materials options
 Carry out the Life Cycle Costing (LCC)
 Review the materials selection w.r.t design / operating / constructability
 Finally select the choice materials.
Types of pipe:
Low carbon
steel
Corrosion
resistant
Cladded
Coil tubing
Flexible hose
and pipe
The above pipelines are manufactured in different forms:
 Seamless( Manufactured without seams)
 SAW( Submerged arc welding)
 ERW( Electric resistance welded)
 HFIW( High frequency induction welding)
Pipeline Coatings:
The various types of coatings given to pipelines are:
 Corrosioncoatings
 Concrete weight coatings
 Insulation coatings
 Field joint coatings
Corrosion coatings:
Pipelines get corrodedas they are continuously exposedto sea atmosphere.
To prevent the corrosionand increase its service period, various corrosion
coatings are given. The commonly used corrosion coatings are
 Fusion bonded epoxy(FBE)
 3 layer polypropylene (3LPP)
 3 layer polyethylene (3LPE)
 Neoprene
Concrete weight coatings:
Pipelines will have impact due to the sea waves. To ensure the stability of
the pipe againstwave loads, concrete weight coatings are given to add
weight to the pipe thus making it stable in seabed.
Insulation coatings:
Insulation coatings are provided to keep the conveyed fluid warm. Pipeline
should be heated either by active or passive methods.
Active heating includes electric heating and circulating hot water.
Passive method consists of insulation coating, Burial and Additional cover.
Field joint coatings:
As offshore pipelines are welded together either in single or double joint
segments on the offshore vessel, there is a need for coating at the weld
locations for corrosioncontrol. These coatings are called field joint coatings.
The liquid applied materials used are:
 Epoxies
 Urethanes
 Heat shrinkable sleeves
 Fusion bonded epoxy.
Pipeline wall thickness:
Pipeline wall thickness is an important criteria to considered and calculated in
the pipeline design. It decides the pressure conditions undergone by the pipe.
The factors influenced by wall thickness are:
 Internal and external pressure ( Hydrotesting and Burst operations)
 Local buckling and propagation( loads imposed on the pipe bends
causing it to collapse at extreme conditions)
Stress analysis diagram
Buckled pipeline segment
Pipeline thermal expansion:
 Pipelines develop expansion and contractiondue to temperature
changes and pressure effects
 As they are laid on seabed, the friction interaction between pipeline and
soil will resist expansion.
 So the pipelines have to be spaced properly in such a way that there is an
enough allowance forthem to expand during operationalstages.
Pipeline On bottom stability:
Pipelines are subjected to wave impact and pressure due to water depth. This
analysis has to be done to ensure the Lateral and Verticalstability.
1. Lateral Stability:
 Assessed bytaking the Metoceandata into consideration.
 The three main wave parameters are the height, time period and current
speed(Significant and maximum case).
 These data are recorded for a period of 1, 10, 50 and 100yrs from which
the wave directionality nature and force can be found.
2. Vertical stability:
 It is calculated to determine the expectedsettlementof the pipeline.
 It has to be ensured that the pipeline is not lifting up and unstable due
to buoyancy.
 The settlement calculations are based on the ultimate bearing capacity.
Pipeline Crossings:
 In case of existing pipelines or other offshore structures, the new
pipelines have to be setup in such a way that it satisfies the allowance
criteria thus not disturbing the existing structure.
 The supports which are used to setup are called crossings.
 Crossings can be in the form of sleepers, weightblocks, bridges or
mattresses (forcables).
Pipeline Free span analysis:
 Free span is the segmentof the pipe which can be left unsupported as
it can sustain the conditions on its own without supports.
 The analysis is performed to determine the maximum allowable free
span length and to assess whether the allowable free span length will be
exceededunder any load combinations.
Bottom roughness analysis:
 It is done to analyze the seabed profile ( tendency of being soft or
rough)
 The roughness of the locations along the pipeline route are found
considering the stress criteria.
 In general the analysis’s are performed on the following conditions:
 As laid ( Empty pipeline)
 Hydrotest ( Testing it by injecting water)
 Operating ( Actual working conditions )
Global Buckling design:
 As discussed earlier pipelines are subjected to buckling. A pipeline’s
capacity to withstand the lateral buckling without getting collapsed is
analyzed using Hobb’s analyticalmethod.
 It is a detailed FE (Finite element) analysis.
 The effective forces in a pipeline as a function of variations in design
pressure, operating temperature and seabedfriction shall be analyzed.
 After analysis mitigations will be implemented to controlbuckling.
Riser and Tie-in spool analysis:
 The grade of the line pipe, fabrication process, outside diameter,
nominal wall thickness, corrosionallowance, cladding, Specified
minimum yield strength (SMYS) and Specified minimum tensile
strength (SMTS)for the risers and spools are identified.
 Stress analysis of the riser and tie-in spoolis performed using
CAESAR (FEA software). Theanalysis gives the sufficient length
of the pipeline to avoid effects at the boundary or tie in locations.
 Under flexibility analysis riser clamps will also be designed based on
the forces acting on them at the jackets.Thus the clamps will be
located.
Cathodic protection design:
 It is a technique used to controlmetal corrosion bymaking it as the
cathode of electrolysis process.
 The cathodic metal is protected by a sacrificialanode metal which gets
corroded and protects the metal underneath it.
 Pipelines, risers and spools are protected by BraceletAnodes.
 Thus subseastructures are protected against external corrosionby the
combination of external corrosioncoatings andsacrificialbracelet
anode system.
Pipeline shore approach:
 Shore approachis where the pipeline crossesorreaches the coastal
line.
 Pipeline require additional protection at the shore.
 Open cut trenches will be given and pull heads will be installed.
Some of the other parameters taken into account are :
 Ambient sea water temperature conditions
 Properties such as density and kinematic viscosity
 Marine growth (accumulation of microorganisms, algae, plants or
animals on the subsea structures over years)
 Splash zone ( part between the dry zone and submerged zone which is
exposed to wave action )
 Hydrodynamic coefficients (drag, lift, inertia)
Design loads:
The various functional load cases are:
 Installation: Loads on the pipelines before installation or when the
pipeline is resting on the seabed without internal pressure and prior to
filling the pipelines for hydrotest. The pipeline is filled with air hence
density zero. They include :
 Gravity loads:Pipe weight, coating, buoyancy and attachments.
 Pressure loads : External pressure only
 Thermal loads: Zero thermal loads due to no temperature changes.
 Loads imposed on the pipelines due to transportation.
 Hydrotest : Testing the pipelines by water injection and subjected to
flow. The loads are:
 Gravity loads: Additionally water weight will be combined
 Pressure loads: Both external and internal out of which internal
correspondsto hydrostatic case.
 Thermal loads: Occurs due to watertemperature changes.
 Operational: Loads on the pipeline under normal operating
conditions includes all the above along with marine growth content and
settlement loads.
Piping fittings:
These are connectors usedto connectthe various components in a piping
system to regulate the fluid flow. The various fittings are:
 Flanges and gaskets
 Valves
 Bolts and nuts
 Elbows, reducers and pipe branch connectionsupports.
Thus it is the overview of an entire
pipeline design basis report .
 Flanges:
 Flanges are used to connectpipes, valves or pumps and other
equipments to form a piping system.
 It provides easyaccess forcleaning, inspectionor modification.
 Flanges are usually welded or screwed.
 Flanged joints are made by bolting two flanges togetherwith a gasket
in-between them to provide a seal. The commonly used flanges are:
 Weld neck flange
 Swivel flange
 Blind flange
Blind flange
 Gaskets:
 Gaskets are mechanical seals usually formed like a ring and used for
sealing of flange joints.
 In general, gaskets should not be reused.
 Valves:
 Valve is a device which regulates, directs or controls the flow of a
fluid by opening, closing or partially obstructing various passage
ways.
 The various valve types are:
 Gate valve
 Plug valve
 Ball valve
 Diaphragm valve
 Check valve
 Butterfly valve.
 Bolts and nuts:
 They are fasteners used to tighten and connect the piping components.
 Generally used are stud bolts with ceramic fluoropolymer coating and
corresponding hex nuts with tommy bore holes.
 Reducers:
 These are fittings used to connect the pipes of varying diameters.
Reducers
Codes and Standards:
The codes and standards from the following organizations as applicable to
pipeline engineering are incorporated for their reference. The most important
ones are:
 ASME ( American Societyof MechanicalEngineers )
 ASTM ( American Societyfor testing materials )
 ANSI ( American NationalStandardization Institute)
 API ( American Petroleum Institute )
 DNV ( Det Norske Veritas )
Thus the piping material selection and design basis will be done having the
codes and standards in mind for reference to follow. It should not be violatedor
optimized at any case.
What I learnt in McDermott?
I was exposed to the activities of the offshore industry. I got an idea about the
EPIC processes carried out by McDermott. I was made to work in a corporate
atmosphere where I had to take initiatives and get assignments from colleagues.
I learnt about how my Subsea Dept. is structured, functioning and the way in
which they are interconnected with the process,instrumentation, mechanical,
piping and structural departments.
I participated in two safety awareness walks in which I was taken to the
fabrication yards and was explained about how things work and especially the
safety measures taken to avoid risks and run job in a smoothway.
I also had a chance to visit Derrick Barge-27 and know its functioning
procedures.
I hereby thank McDermott for giving me this opportunity to work as an intern
and gain the work experience.
THANK YOU

Contenu connexe

Tendances

Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...
Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...
Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...
Sigve Hamilton Aspelund
 
S G Atkinson Career Profile
S G Atkinson Career ProfileS G Atkinson Career Profile
S G Atkinson Career Profile
Spencer Atkinson
 

Tendances (20)

C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Chinmoy Pathak Choudhury_IOCL Internship report
Chinmoy Pathak Choudhury_IOCL Internship reportChinmoy Pathak Choudhury_IOCL Internship report
Chinmoy Pathak Choudhury_IOCL Internship report
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
Piping layout/ Subsea
Piping layout/ SubseaPiping layout/ Subsea
Piping layout/ Subsea
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
 
Ronald-Smith
Ronald-SmithRonald-Smith
Ronald-Smith
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas field
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020
 
Ship-Shape Simulation - ANSYS AQWA
Ship-Shape Simulation - ANSYS AQWAShip-Shape Simulation - ANSYS AQWA
Ship-Shape Simulation - ANSYS AQWA
 
Engineering Geologist
Engineering GeologistEngineering Geologist
Engineering Geologist
 
Under Ground water tank design including estimation and costing
Under Ground  water tank design including estimation and costingUnder Ground  water tank design including estimation and costing
Under Ground water tank design including estimation and costing
 
Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...
Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...
Managed pressure drilling systems. Multilateral wells. Coiled tubing underbal...
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
S G Atkinson Career Profile
S G Atkinson Career ProfileS G Atkinson Career Profile
S G Atkinson Career Profile
 
CV Romeo Costescu
CV Romeo CostescuCV Romeo Costescu
CV Romeo Costescu
 
Minor Project Report on Hydraulic Bridge
Minor Project Report on Hydraulic BridgeMinor Project Report on Hydraulic Bridge
Minor Project Report on Hydraulic Bridge
 

En vedette (6)

Estructuras de almacenamiento
Estructuras de almacenamientoEstructuras de almacenamiento
Estructuras de almacenamiento
 
Johnathan Broady Resume
Johnathan Broady ResumeJohnathan Broady Resume
Johnathan Broady Resume
 
1 клас
1 клас1 клас
1 клас
 
NPV
NPVNPV
NPV
 
Barbaros
BarbarosBarbaros
Barbaros
 
CV__2006_Moniek_van_den_Akker
CV__2006_Moniek_van_den_AkkerCV__2006_Moniek_van_den_Akker
CV__2006_Moniek_van_den_Akker
 

Similaire à Report

CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
daniel cobar
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
robinking277
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
Emeka Ngwobia
 
Remotely Operated Vehicles (ROVs), A Subsea Enabler
Remotely Operated Vehicles (ROVs), A Subsea EnablerRemotely Operated Vehicles (ROVs), A Subsea Enabler
Remotely Operated Vehicles (ROVs), A Subsea Enabler
Ahmed Abo Bakr
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control system
Amit Nitharwal
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016
Tony Martini
 

Similaire à Report (20)

Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
Hafeeda. v
Hafeeda. vHafeeda. v
Hafeeda. v
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
 
Chinmoy Pathak Choudhury_LTV Internship report
Chinmoy Pathak Choudhury_LTV Internship reportChinmoy Pathak Choudhury_LTV Internship report
Chinmoy Pathak Choudhury_LTV Internship report
 
Pipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineeringPipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineering
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Remotely Operated Vehicles (ROVs), A Subsea Enabler
Remotely Operated Vehicles (ROVs), A Subsea EnablerRemotely Operated Vehicles (ROVs), A Subsea Enabler
Remotely Operated Vehicles (ROVs), A Subsea Enabler
 
Paul details 2014today
Paul details 2014todayPaul details 2014today
Paul details 2014today
 
Roy Shilling
Roy ShillingRoy Shilling
Roy Shilling
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control system
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016
 
Oil & Gas Disciplines
Oil & Gas DisciplinesOil & Gas Disciplines
Oil & Gas Disciplines
 

Report

  • 1. STUDY REPORT ON OFFSHORE PIPELINE ENGINEERING BY KAARTHIK SARAVANAN Department of Mechanical Engineering Velammal Engineering College, Chennai. Study work done at McDermott, Middle East Inc. Dubai as a part of Summer Internship from 19th June – 28th July 2016.
  • 2. PREFACE: The primary objective behind this report was to gain knowledge about Pipeline Engineering in Offshore Industry. The report deals with the basics of the ideas and techniques used in this field to help clarify the approach towards it. I have tried to keep the report error free and presented it to the best of my ability. Any suggestions for further improvement of this work will be acknowledged. All the images used in this report are taken from the net source for easy understanding and reference.
  • 3. ACKNOWLEDGEMENT: I have great pleasure in presenting this report which has been done as a part of Summer Internship at McDermott Inc. which finds it name among the world’s top most oil field service companies. The experience which I got in McDermott Industry was extremely valuable to my career development. I am highly indebted to Mr. ManojKulshrestha, Manager, Subsea Dept. for his constant supervision and advice throughout my intern period. I’m very thankful to Mr. Harshad Phadnis, Pipeline Engineer for taking time out to hear and guide me giving assignments during this project. I express my gratitude sense to the whole McDermott Subsea Dept. staffs if I didn’t mention here by their names who helped me to gather information in various ways towards the project. I would like to thank my parents too for their immense supportwithout which I would not be able to compile this report. Thank you all.
  • 4. COMPANY PROFILE:  McDermottInternational is a leading American EPCI(Engineering, Procurement, Construction and Installation) company focused on offshore oil and gas projects.  It has its operating locations and fabrication yards in about 20 countries in the Middle East, Atlantic and Asia Pacific regions.  It has fabricated and installed various structures, laid pipelines and exported facilities to Europe and Africa.  It is a premier leader of the global offshore engineering and construction industry through innovations and marine services while achieving the highest industry performance in terms of safety, quality and ethics.
  • 5. PIPELINE ENGINEERING: INTRODUCTION: The function of Pipeline Engineering is to apply the knowledge of Engineering drawings will be implemented and using the data from it materials will be purchased, fabricated and assembled into piping systems thus fulfilling the process requirements. Fluid flow Stress analysis Material properties Engineering specifications Process
  • 6. PIPELINE TRANSPORTATION:  Pipelines are means of transportation of materials over long distances.  Any chemically stable fluid substancecan be sent. (Eg: fuels) PURPOSE OF OFFSHORE PIPELINES: 1.Export of offshore resources. 2.Flowlines totransferproducts fromplatforms toexportlines. 3.Water or chemical injectionflowlines 4.Pipeline bundles connecting subseamanifolds andwells.
  • 7. Advantages of pipelines compared to other modes of transportation (rail, truck, barges):  Large volume transportation (high energy density)  Can be laid through difficult conditions under water  Low energy consumption and requires little maintenance  Safe and environment friendly  High reliability  Negligible loss of productin transit. Thus pipelines are the most convenient, economical and efficient way of transporting oil, natural gas and refined products. Working sectors of offshore industry: Upstream: Exploration and Geological Surveys Midstream:Transportation of resources Downstream:Refining of resources
  • 8.  Upstream: Searching for potential underwater crude oil and natural gas fields by survey, seismic and drilling activities. Thus subsequently operating the wells that can be recovered.  Midstream: Setting up of offshore structures and pipelines to transport the products obtained from the sites to the refineries followed by downstream distributors.  Downstream: Refining of the crude products and then processing it followed by distribution. Thus marketing the derived products of crude oil and gas.
  • 9. OFFSHORE STRUCTURES:  Offshore deals with the energy location and processes carried out at a distance awayfrom shore.  Basically it is about drilling of oil and gas reservoirs. The various offshore structures are: JacketsPlatforms Riser Tie-in spool UmbilicalValve skid
  • 10. 1. Platforms:  Large structures either built on seabedor left floating with anchors or wires depending on circumstances.  Also known as rigs.  Has facilities to drill well, provides all equipments for the oil and gas processes and has oil storagesbeforeit is brought to onshore for refining followed by transportations.  Services for a very long period of years.  Some major platform types depending on the operating depth are Fixed, FPSO (Floating production, Storage and offloading system), Tension leg, Jackup-rig, Semisubmersible and SPAR.
  • 11. 2. Jackets:  Steel tubular structures supporting the platform deck.  Rests on the seabed through piling.  As a cage it protects the piping.
  • 12. 3. Riser:  Pipelines developed for vertical transportation of materials from the seabed(subsea oilwells)to production and drilling facilities above the watersurface.  Serves as a conduit (channel) betweenseafloorand facilities.  Productionmaterials such as hydrocarbons, injection and controlfluids, gas lifts are sent through it.  Riser section closestto the seafloor is joined with a pipeline clamped to the side of the facility and the next sections rise up the facility side to the top.  While rising, various clamps (Hanger type is the major clamp) are provided for withstanding weights, giving supports and arrest the lateral movements.
  • 13. 4. Tie-in spool:  Elements connecting the offshore pipelines to the Riser followed by other facilities.  Provides final connection after pipeline installation (Ties the pipeline to the structure).  Its design and shape depends on the distance to fit between the riser bend and pipeline laydown point.  Made flexible to allow the pipelines to expand during operational stages because of temperature changes and thus the risers won’t be disturbed.  Reduces forces inthe connectors to ensure safe transportation and avoid leakages.
  • 14. 5. Valve skids:  Subsea valves are used to governthe material flow through undersea pipelines or other apparatus. They are designed to work in the marine environment withstanding the pressure effects, corrosionand debris.  The working of these valves is isolated and controlled by fluid modules called valve skids.  The actuationand recoveryresponse time of the valves is taken care by the valve skids.
  • 15. 6. Umbilical:  Bundle ofcables andtubes put togethersurroundedby anoutersheath that transfers power (hydraulic, electronic), fibre optic and electrical signals, chemical and gas supply within a field (long distances) or from topside to subsea.  Provides a way to communicate with different subsea equipments on the seabedand thus having control of it.  Umbilical design varies with the projectrequirements.  Subsea intervention umbilicals are also used for offshore drilling activities.
  • 17. PIPELINE DESIGN STAGES: Requirement to transport product Operator specific requirements Codes,Standards and Specifications Route selection Geophysical and geotechnical surveys Material grade selection Wall thickness Flowline protection( corrosion coatings ) Flowline installation Flowline stress analysis Optimum flowline Inner dia and wall thickness
  • 18. DESIGN REQUIREMENTS:  Wall thickness  Material grade selection:  Cathodic protection  Suitability to product  Route selection:  Minimize flowline length  Minimize flowline spands  Minimize number of bends  Maximum corridor width  Flowline protection:  Concrete coating  Trenching / Burying  Rockdumping  Mattresses / Structures  Flowline stress analysis:  Hoop and longitudinal stress  Span analysis and vortex shedding  Stability and expansion analysis  Buckling and crossing analysis
  • 19.  Flowline installation analysis:  Lay analysis  Welding  Propagation buckling  Hydrostatic collapse  Optimal design Pipeline route selection: The route should be selected based on the following parameters:  Seabed topography  Obstructions, debris and existing structures  Marine activities  Pipeline route radius  Install ability  Existing pipeline  Select direct shortest route.
  • 20. Surveys: Surveys are conducted on the selected routes to be aware of the conditions existing there and the soil characteristics so that the structures are safely designed and built. It is necessary to investigate and evaluate the risks thoroughly. The two types of surveys are: 1. Geophysical ( Seabed Bathymetry):  Establishing topography  Identification of significant seabedfeatures, obstructions and hazards and determination of surface layer geometry (water depth) through normal sample collectionand observation. 2. Geotechnical (Stratification):  Geological characteristics ofdifferent soils and rocks found on site.  Insitu and laboratory testings through boreholes to find the soil parameters and affecting properties.
  • 21. Pipeline material selection: The pipeline material type can be rigid, flexible or composite. The material selection process is based on the following:  Identify corrosionthreats  Define the corrosioncircuits  Calculate the corrosionrate per year  Calculate the Service Life Corrosion (SLC) based on design life  Consider the materials options  Carry out the Life Cycle Costing (LCC)  Review the materials selection w.r.t design / operating / constructability  Finally select the choice materials. Types of pipe: Low carbon steel Corrosion resistant Cladded Coil tubing Flexible hose and pipe
  • 22. The above pipelines are manufactured in different forms:  Seamless( Manufactured without seams)  SAW( Submerged arc welding)  ERW( Electric resistance welded)  HFIW( High frequency induction welding) Pipeline Coatings: The various types of coatings given to pipelines are:  Corrosioncoatings  Concrete weight coatings  Insulation coatings  Field joint coatings
  • 23. Corrosion coatings: Pipelines get corrodedas they are continuously exposedto sea atmosphere. To prevent the corrosionand increase its service period, various corrosion coatings are given. The commonly used corrosion coatings are  Fusion bonded epoxy(FBE)  3 layer polypropylene (3LPP)  3 layer polyethylene (3LPE)  Neoprene Concrete weight coatings: Pipelines will have impact due to the sea waves. To ensure the stability of the pipe againstwave loads, concrete weight coatings are given to add weight to the pipe thus making it stable in seabed.
  • 24. Insulation coatings: Insulation coatings are provided to keep the conveyed fluid warm. Pipeline should be heated either by active or passive methods. Active heating includes electric heating and circulating hot water. Passive method consists of insulation coating, Burial and Additional cover. Field joint coatings: As offshore pipelines are welded together either in single or double joint segments on the offshore vessel, there is a need for coating at the weld locations for corrosioncontrol. These coatings are called field joint coatings. The liquid applied materials used are:  Epoxies  Urethanes  Heat shrinkable sleeves  Fusion bonded epoxy.
  • 25. Pipeline wall thickness: Pipeline wall thickness is an important criteria to considered and calculated in the pipeline design. It decides the pressure conditions undergone by the pipe. The factors influenced by wall thickness are:  Internal and external pressure ( Hydrotesting and Burst operations)  Local buckling and propagation( loads imposed on the pipe bends causing it to collapse at extreme conditions)
  • 27. Pipeline thermal expansion:  Pipelines develop expansion and contractiondue to temperature changes and pressure effects  As they are laid on seabed, the friction interaction between pipeline and soil will resist expansion.  So the pipelines have to be spaced properly in such a way that there is an enough allowance forthem to expand during operationalstages.
  • 28. Pipeline On bottom stability: Pipelines are subjected to wave impact and pressure due to water depth. This analysis has to be done to ensure the Lateral and Verticalstability. 1. Lateral Stability:  Assessed bytaking the Metoceandata into consideration.  The three main wave parameters are the height, time period and current speed(Significant and maximum case).  These data are recorded for a period of 1, 10, 50 and 100yrs from which the wave directionality nature and force can be found. 2. Vertical stability:  It is calculated to determine the expectedsettlementof the pipeline.  It has to be ensured that the pipeline is not lifting up and unstable due to buoyancy.  The settlement calculations are based on the ultimate bearing capacity.
  • 29. Pipeline Crossings:  In case of existing pipelines or other offshore structures, the new pipelines have to be setup in such a way that it satisfies the allowance criteria thus not disturbing the existing structure.  The supports which are used to setup are called crossings.  Crossings can be in the form of sleepers, weightblocks, bridges or mattresses (forcables).
  • 30.
  • 31. Pipeline Free span analysis:  Free span is the segmentof the pipe which can be left unsupported as it can sustain the conditions on its own without supports.  The analysis is performed to determine the maximum allowable free span length and to assess whether the allowable free span length will be exceededunder any load combinations.
  • 32. Bottom roughness analysis:  It is done to analyze the seabed profile ( tendency of being soft or rough)  The roughness of the locations along the pipeline route are found considering the stress criteria.  In general the analysis’s are performed on the following conditions:  As laid ( Empty pipeline)  Hydrotest ( Testing it by injecting water)  Operating ( Actual working conditions )
  • 33. Global Buckling design:  As discussed earlier pipelines are subjected to buckling. A pipeline’s capacity to withstand the lateral buckling without getting collapsed is analyzed using Hobb’s analyticalmethod.  It is a detailed FE (Finite element) analysis.  The effective forces in a pipeline as a function of variations in design pressure, operating temperature and seabedfriction shall be analyzed.  After analysis mitigations will be implemented to controlbuckling.
  • 34. Riser and Tie-in spool analysis:  The grade of the line pipe, fabrication process, outside diameter, nominal wall thickness, corrosionallowance, cladding, Specified minimum yield strength (SMYS) and Specified minimum tensile strength (SMTS)for the risers and spools are identified.  Stress analysis of the riser and tie-in spoolis performed using CAESAR (FEA software). Theanalysis gives the sufficient length of the pipeline to avoid effects at the boundary or tie in locations.  Under flexibility analysis riser clamps will also be designed based on the forces acting on them at the jackets.Thus the clamps will be located. Cathodic protection design:  It is a technique used to controlmetal corrosion bymaking it as the cathode of electrolysis process.  The cathodic metal is protected by a sacrificialanode metal which gets corroded and protects the metal underneath it.  Pipelines, risers and spools are protected by BraceletAnodes.  Thus subseastructures are protected against external corrosionby the combination of external corrosioncoatings andsacrificialbracelet anode system.
  • 35.
  • 36. Pipeline shore approach:  Shore approachis where the pipeline crossesorreaches the coastal line.  Pipeline require additional protection at the shore.  Open cut trenches will be given and pull heads will be installed.
  • 37. Some of the other parameters taken into account are :  Ambient sea water temperature conditions  Properties such as density and kinematic viscosity  Marine growth (accumulation of microorganisms, algae, plants or animals on the subsea structures over years)  Splash zone ( part between the dry zone and submerged zone which is exposed to wave action )  Hydrodynamic coefficients (drag, lift, inertia) Design loads: The various functional load cases are:  Installation: Loads on the pipelines before installation or when the pipeline is resting on the seabed without internal pressure and prior to filling the pipelines for hydrotest. The pipeline is filled with air hence density zero. They include :  Gravity loads:Pipe weight, coating, buoyancy and attachments.  Pressure loads : External pressure only  Thermal loads: Zero thermal loads due to no temperature changes.  Loads imposed on the pipelines due to transportation.
  • 38.  Hydrotest : Testing the pipelines by water injection and subjected to flow. The loads are:  Gravity loads: Additionally water weight will be combined  Pressure loads: Both external and internal out of which internal correspondsto hydrostatic case.  Thermal loads: Occurs due to watertemperature changes.  Operational: Loads on the pipeline under normal operating conditions includes all the above along with marine growth content and settlement loads. Piping fittings: These are connectors usedto connectthe various components in a piping system to regulate the fluid flow. The various fittings are:  Flanges and gaskets  Valves  Bolts and nuts  Elbows, reducers and pipe branch connectionsupports. Thus it is the overview of an entire pipeline design basis report .
  • 39.  Flanges:  Flanges are used to connectpipes, valves or pumps and other equipments to form a piping system.  It provides easyaccess forcleaning, inspectionor modification.  Flanges are usually welded or screwed.  Flanged joints are made by bolting two flanges togetherwith a gasket in-between them to provide a seal. The commonly used flanges are:  Weld neck flange  Swivel flange  Blind flange
  • 41.  Gaskets:  Gaskets are mechanical seals usually formed like a ring and used for sealing of flange joints.  In general, gaskets should not be reused.
  • 42.  Valves:  Valve is a device which regulates, directs or controls the flow of a fluid by opening, closing or partially obstructing various passage ways.  The various valve types are:  Gate valve  Plug valve  Ball valve  Diaphragm valve  Check valve  Butterfly valve.
  • 43.  Bolts and nuts:  They are fasteners used to tighten and connect the piping components.  Generally used are stud bolts with ceramic fluoropolymer coating and corresponding hex nuts with tommy bore holes.  Reducers:  These are fittings used to connect the pipes of varying diameters.
  • 44. Reducers Codes and Standards: The codes and standards from the following organizations as applicable to pipeline engineering are incorporated for their reference. The most important ones are:  ASME ( American Societyof MechanicalEngineers )  ASTM ( American Societyfor testing materials )  ANSI ( American NationalStandardization Institute)  API ( American Petroleum Institute )  DNV ( Det Norske Veritas ) Thus the piping material selection and design basis will be done having the codes and standards in mind for reference to follow. It should not be violatedor optimized at any case.
  • 45. What I learnt in McDermott? I was exposed to the activities of the offshore industry. I got an idea about the EPIC processes carried out by McDermott. I was made to work in a corporate atmosphere where I had to take initiatives and get assignments from colleagues. I learnt about how my Subsea Dept. is structured, functioning and the way in which they are interconnected with the process,instrumentation, mechanical, piping and structural departments. I participated in two safety awareness walks in which I was taken to the fabrication yards and was explained about how things work and especially the safety measures taken to avoid risks and run job in a smoothway. I also had a chance to visit Derrick Barge-27 and know its functioning procedures. I hereby thank McDermott for giving me this opportunity to work as an intern and gain the work experience. THANK YOU