SlideShare une entreprise Scribd logo
1  sur  49
Capital Budgeting

         Decision
          Criteria
Capital Budgeting: the process of
      planning for purchases of long-
                          term assets.
• example:
Suppose our firm must decide whether to
  purchase a new plastic molding machine
  for $125,000. How do we decide?
• Will the machine be profitable?
• Will our firm earn a high rate of return
  on the investment?
Decision-making Criteria in
         Capital Budgeting


             How do we decide
                 if a capital
                investment
               project should
               be accepted or
                  rejected?
Decision-making Criteria in
              Capital Budgeting
• The Ideal Evaluation Method
  should:
a) include all cash flows that occur
  during the life of the project,
b) consider the time value of money,
c) incorporate the required rate of
  return on the project.
Payback Period
• How long will it take for the project
  to generate enough cash to pay for
  itself?
Payback Period
 • How long will it take for the project
   to generate enough cash to pay for
   itself?

(500)   150 150 150 150 150 150 150        150

 0      1    2   3    4   5    6    7       8
Payback Period
 • How long will it take for the project
   to generate enough cash to pay for
   itself?

(500)    150 150 150 150 150 150 150       150

 0        1   2    3    4   5   6      7    8

        Payback period = 3.33 years.
Payback Period

• Is a 3.33 year payback period good?
• Is it acceptable?
• Firms that use this method will compare
  the payback calculation to some
  standard set by the firm.
• If our senior management had set a cut-
  off of 5 years for projects like ours,
  what would be our decision?
• Accept the project.
Drawbacks of Payback Period

• Firm cutoffs are subjective.
• Does not consider time value of
  money.
• Does not consider any required
  rate of return.
• Does not consider all of the
  project’s cash flows.
Drawbacks of Payback Period

  • Does not consider all of the
    project’s cash flows.

(500)   150 150 150 150 150 (300)      0   0

 0       1   2   3    4    5       6   7   8

  • Consider this cash flow stream!
Drawbacks of Payback Period

  • Does not consider all of the
    project’s cash flows.

(500)   150 150 150 150 150 (300)           0   0

 0       1   2     3    4    5     6    7       8

  • This project is clearly unprofitable,
    but we would accept it based on a 4-
    year payback criterion!
Discounted Payback

• Discounts the cash flows at the firm’s
  required rate of return.
• Payback period is calculated using
  these discounted net cash flows.
Problems:
• Cutoffs are still subjective.
• Still does not examine all cash flows.
Discounted Payback
 (500)   250     250 250 250 250

    0     1      2   3    4        5
                      Discounted
Year Cash Flow       CF (14%)
0         -500       -500.00
1          250        219.30
Discounted Payback
 (500)   250     250 250 250 250

    0     1      2   3    4        5
                      Discounted
Year Cash Flow       CF (14%)
0         -500       -500.00
1          250        219.30   1 year
                      280.70
Discounted Payback
 (500)   250     250 250 250 250

    0     1      2   3    4        5
                      Discounted
Year Cash Flow       CF (14%)
0         -500       -500.00
1          250        219.30   1 year
                      280.70
2          250        192.37
Discounted Payback
 (500)   250     250 250 250 250

    0     1      2   3    4        5
                      Discounted
Year Cash Flow       CF (14%)
0         -500       -500.00
1          250        219.30   1 year
                      280.70
2          250        192.37   2 years
                       88.33
Discounted Payback
 (500)   250     250 250 250 250

    0     1      2   3    4        5
                      Discounted
Year Cash Flow       CF (14%)
0         -500       -500.00
1          250        219.30   1 year
                      280.70
2          250        192.37   2 years
                       88.33
3          250        168.74
Discounted Payback
 (500)   250     250 250 250 250

    0     1      2   3    4        5
                      Discounted
Year Cash Flow       CF (14%)
0         -500       -500.00
1          250        219.30   1 year
                      280.70
2          250        192.37   2 years
                       88.33
3          250        168.74   .52 years
Discounted Payback
 (500)   250   250 250 250 250

    0     1    2    3    4        5
                     Discounted
Year Cash Flow CF (14%)
       The Discounted
0         -500
             Payback-500.00
1          250       219.30   1 year
           is 2.52 years
                     280.70
2          250       192.37   2 years
                      88.33
3          250       168.74   .52 years
Other Methods

1) Net Present Value (NPV)
2) Profitability Index (PI)
3) Internal Rate of Return (IRR)

Each of these decision-making criteria:
• Examines all net cash flows,
• Considers the time value of money, and
• Considers the required rate of return.
Net Present Value

• NPV = the total PV of the annual net
  cash flows - the initial outlay.

            n

          Σ
                    FCFt
NPV =                          - IO
                   (1 + k) t
           t=1
Net Present Value


• Decision Rule:

• If NPV is positive, accept.
• If NPV is negative, reject.
NPV Example

• Suppose we are considering a capital
  investment that costs $250,000 and
  provides annual net cash flows of
  $100,000 for five years. The firm’s
  required rate of return is 15%.
NPV Example

      • Suppose we are considering a capital
        investment that costs $250,000 and
        provides annual net cash flows of
        $100,000 for five years. The firm’s
        required rate of return is 15%.

(250,000) 100,000 100,000 100,000 100,000 100,000

  0        1       2       3       4        5
Net Present Value (NPV)
NPV is just the PV of the annual cash
 flows minus the initial outflow.
Using TVM:
P/Y = 1 N = 5      I = 15
PMT = 100,000

   PV of cash flows = $335,216
   - Initial outflow: ($250,000)
   = Net PV             $85,216
Profitability Index
Profitability Index
         n

        Σ
               FCFt
NPV =                 t     - IO
              (1 + k)
        t=1
Profitability Index
          n

         Σ
                FCFt
NPV =                  t     - IO
               (1 + k)
         t=1

          n

         Σ
                 FCFt
PI   =                         IO
                (1 + k) t
         t=1
Profitability Index

• Decision Rule:

• If PI is greater than or equal
  to 1, accept.
• If PI is less than 1, reject.
Internal Rate of Return (IRR)

• IRR: the return on the firm’s
  invested capital. IRR is simply the
  rate of return that the firm earns on
  its capital budgeting projects.
Internal Rate of Return (IRR)
Internal Rate of Return (IRR)

         n

        Σ
               FCFt
NPV =                     - IO
              (1 + k) t
        t=1
Internal Rate of Return (IRR)

             n

        Σ
                  FCFt
NPV =                         - IO
                 (1 + k) t
         t=1

        n
               FCFt
IRR:
       Σ
       t=1
             (1 + IRR) t     = IO
Internal Rate of Return (IRR)

             n
                    FCFt
  IRR:
           Σt=1
                  (1 + IRR) t     = IO


• IRR is the rate of return that makes the
  PV of the cash flows equal to the initial
  outlay.
• This looks very similar to our Yield to
  Maturity formula for bonds. In fact, YTM
Calculating IRR

  • Looking again at our problem:
  • The IRR is the discount rate that
    makes the PV of the projected cash
    flows equal to the initial outlay.

(250,000) 100,000 100,000 100,000 100,000 100,000

  0        1       2       3       4        5
IRR with your Calculator


• IRR is easy to find with your
  financial calculator.
• Just enter the cash flows as you did
  with the NPV problem and solve for
  IRR.
• You should get IRR = 28.65%!
IRR
• Decision Rule:

• If IRR is greater than or equal to
  the required rate of return,
  accept.
• If IRR is less than the required
  rate of return, reject.
• IRR is a good decision-making tool as
  long as cash flows are conventional.
   (- + + + + +)
• Problem: If there are multiple sign
  changes in the cash flow stream, we
  could get multiple IRRs. (- + + - + +)
• IRR is a good decision-making tool as
   long as cash flows are conventional.
    (- + + + + +)
 • Problem: If there are multiple sign
   changes in the cash flow stream, we
   could get multiple IRRs. (- + + - + +)


(500)   200   100     (200)   400    300

 0      1       2       3      4       5
• IRR is a good decision-making tool as
   long as cash flows are conventional.
    (- + + + + +)
 • Problem: If there are multiple sign
   changes in the cash flow stream, we
   could get multiple IRRs. (- + + - + +)
        1
(500)       200   100   (200)   400   300

 0          1      2     3       4     5
• IRR is a good decision-making tool as
   long as cash flows are conventional.
    (- + + + + +)
 • Problem: If there are multiple sign
   changes in the cash flow stream, we
   could get multiple IRRs. (- + + - + +)
        1               2
(500)       200   100       (200)   400   300

 0          1      2         3       4     5
• IRR is a good decision-making tool as
   long as cash flows are conventional.
    (- + + + + +)
 • Problem: If there are multiple sign
   changes in the cash flow stream, we
   could get multiple IRRs. (- + + - + +)
        1               2           3
(500)       200   100       (200)       400   300

 0          1      2         3           4     5
Summary Problem

  •   Enter the cash flows only once.
  •   Find the IRR.
  •   Using a discount rate of 15%, find NPV.
  •   Add back IO and divide by IO to get PI.

(900)     300     400      400     500     600

 0         1        2       3       4       5
Summary Problem

     • IRR = 34.37%.
     • Using a discount rate of 15%,
        NPV = $510.52.
     • PI = 1.57.

(900)    300     400     400    500    600

 0         1      2       3      4      5
Modified Internal Rate of Return
                             (MIRR)
• IRR assumes that all cash flows are
  reinvested at the IRR.
• MIRR provides a rate of return
  measure that assumes cash flows are
  reinvested at the required rate of
  return.
MIRR Steps:
• Calculate the PV of the cash outflows.
  – Using the required rate of return.
• Calculate the FV of the cash inflows at
  the last year of the project’s time line.
  This is called the terminal value (TV).
  – Using the required rate of return.
• MIRR: the discount rate that equates
  the PV of the cash outflows with the PV
  of the terminal value, ie, that makes:
• PVoutflows = PVinflows
MIRR
  •   Using our time line and a 15% rate:
  •   PV outflows = (900)
  •   FV inflows (at the end of year 5) = 2,837.
  •   MIRR: FV = 2837, PV = (900), N = 5
  •   solve: I = 25.81%.



(900)     300      400      400      500      600

 0         1         2        3        4           5
MIRR
•   Using our time line and a 15% rate:
•   PV outflows = (900)
•   FV inflows (at the end of year 5) = 2,837.
•   MIRR: FV = 2837, PV = (900), N = 5
•   solve: I = 25.81%.
•   Conclusion: The project’s IRR of
    34.37%, assumes that cash flows are
    reinvested at 34.37%.
MIRR
• Using our time line and a 15% rate:
• PV outflows = (900)
• FV inflows (at the end of year 5) = 2,837.
• MIRR: FV = 2837, PV = (900), N = 5
• solve: I = 25.81%.
• Conclusion: The project’s IRR of
  34.37%, assumes that cash flows are
  reinvested at 34.37%.
• Assuming a reinvestment rate of 15%,
  the project’s MIRR is 25.81%.

Contenu connexe

Tendances

Time value of money
Time value of moneyTime value of money
Time value of moneyAmeen San
 
Corp finance topics
Corp finance topicsCorp finance topics
Corp finance topicsDavid Keck
 
Decision making criteria
Decision making criteriaDecision making criteria
Decision making criteriaDavid Keck
 
Making capital investment decisions
Making capital investment decisionsMaking capital investment decisions
Making capital investment decisionsRahmatia Azzindani
 
working capital ch solution financial management ....mohsin mumtaz
working capital ch solution financial management ....mohsin mumtazworking capital ch solution financial management ....mohsin mumtaz
working capital ch solution financial management ....mohsin mumtazmianmohsinmumtazshb
 
Accounting paper 3 structured question paper specimen marking scheme cambridg...
Accounting paper 3 structured question paper specimen marking scheme cambridg...Accounting paper 3 structured question paper specimen marking scheme cambridg...
Accounting paper 3 structured question paper specimen marking scheme cambridg...alproelearning
 
Managerial Finance Chapter 10 solutions by Gitman 14 Edition
Managerial Finance Chapter 10 solutions by Gitman 14 EditionManagerial Finance Chapter 10 solutions by Gitman 14 Edition
Managerial Finance Chapter 10 solutions by Gitman 14 EditionQaisar Mehar
 
Chapter 9.Risk and Managerial Options in Capital Budgeting
Chapter 9.Risk and Managerial Options in Capital BudgetingChapter 9.Risk and Managerial Options in Capital Budgeting
Chapter 9.Risk and Managerial Options in Capital BudgetingZahraMirzayeva
 
Capital budgeting task 1 23
Capital budgeting task 1 23Capital budgeting task 1 23
Capital budgeting task 1 23Amritesh Mishra
 
75985278 sample-questions-of-capital-budgeting
75985278 sample-questions-of-capital-budgeting75985278 sample-questions-of-capital-budgeting
75985278 sample-questions-of-capital-budgetingvarsha nihanth lade
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Virtual ULI
 
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...mianmohsinmumtazshb
 

Tendances (19)

Time value of money
Time value of moneyTime value of money
Time value of money
 
Kossan's Financial Evaluation
Kossan's Financial EvaluationKossan's Financial Evaluation
Kossan's Financial Evaluation
 
Cap budget
Cap budgetCap budget
Cap budget
 
Chap5
Chap5Chap5
Chap5
 
Corp finance topics
Corp finance topicsCorp finance topics
Corp finance topics
 
Decision making criteria
Decision making criteriaDecision making criteria
Decision making criteria
 
Making capital investment decisions
Making capital investment decisionsMaking capital investment decisions
Making capital investment decisions
 
Sfm
SfmSfm
Sfm
 
working capital ch solution financial management ....mohsin mumtaz
working capital ch solution financial management ....mohsin mumtazworking capital ch solution financial management ....mohsin mumtaz
working capital ch solution financial management ....mohsin mumtaz
 
Accounting paper 3 structured question paper specimen marking scheme cambridg...
Accounting paper 3 structured question paper specimen marking scheme cambridg...Accounting paper 3 structured question paper specimen marking scheme cambridg...
Accounting paper 3 structured question paper specimen marking scheme cambridg...
 
Managerial Finance Chapter 10 solutions by Gitman 14 Edition
Managerial Finance Chapter 10 solutions by Gitman 14 EditionManagerial Finance Chapter 10 solutions by Gitman 14 Edition
Managerial Finance Chapter 10 solutions by Gitman 14 Edition
 
Chapter 9.Risk and Managerial Options in Capital Budgeting
Chapter 9.Risk and Managerial Options in Capital BudgetingChapter 9.Risk and Managerial Options in Capital Budgeting
Chapter 9.Risk and Managerial Options in Capital Budgeting
 
Sums on fm
Sums on fmSums on fm
Sums on fm
 
Ratios Analysis
Ratios AnalysisRatios Analysis
Ratios Analysis
 
Capital budgeting task 1 23
Capital budgeting task 1 23Capital budgeting task 1 23
Capital budgeting task 1 23
 
CAPITAL BUDGETING TECHNIQUES
CAPITAL BUDGETING TECHNIQUESCAPITAL BUDGETING TECHNIQUES
CAPITAL BUDGETING TECHNIQUES
 
75985278 sample-questions-of-capital-budgeting
75985278 sample-questions-of-capital-budgeting75985278 sample-questions-of-capital-budgeting
75985278 sample-questions-of-capital-budgeting
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...
 
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
 

En vedette

capitial budgeting
capitial budgetingcapitial budgeting
capitial budgetingArun Kumar
 
Investment decisions / capital Budgeting
Investment decisions / capital BudgetingInvestment decisions / capital Budgeting
Investment decisions / capital BudgetingRaghav Jha
 
Capital budjeting & appraisal methods
Capital budjeting  & appraisal methodsCapital budjeting  & appraisal methods
Capital budjeting & appraisal methodsDhruv Dave
 
Capital budgeting ppt@ bec doms on finance
Capital budgeting ppt@ bec doms on financeCapital budgeting ppt@ bec doms on finance
Capital budgeting ppt@ bec doms on financeBabasab Patil
 
Capital budget
Capital budgetCapital budget
Capital budgetsuns88
 
Capital budgeting’ OF FINANCIAL MANAGEMENT
Capital budgeting’ OF FINANCIAL MANAGEMENTCapital budgeting’ OF FINANCIAL MANAGEMENT
Capital budgeting’ OF FINANCIAL MANAGEMENTVivek Chandraker
 

En vedette (11)

capitial budgeting
capitial budgetingcapitial budgeting
capitial budgeting
 
Investment decisions / capital Budgeting
Investment decisions / capital BudgetingInvestment decisions / capital Budgeting
Investment decisions / capital Budgeting
 
Fm chapter five
Fm chapter fiveFm chapter five
Fm chapter five
 
Ch 12
Ch 12Ch 12
Ch 12
 
Capital budjeting & appraisal methods
Capital budjeting  & appraisal methodsCapital budjeting  & appraisal methods
Capital budjeting & appraisal methods
 
Capital budgeting ppt@ bec doms on finance
Capital budgeting ppt@ bec doms on financeCapital budgeting ppt@ bec doms on finance
Capital budgeting ppt@ bec doms on finance
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budget
Capital budgetCapital budget
Capital budget
 
Capital budgeting’ OF FINANCIAL MANAGEMENT
Capital budgeting’ OF FINANCIAL MANAGEMENTCapital budgeting’ OF FINANCIAL MANAGEMENT
Capital budgeting’ OF FINANCIAL MANAGEMENT
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 

Similaire à Capital budgeting

capital budgeting decisions criteria
capital budgeting decisions criteriacapital budgeting decisions criteria
capital budgeting decisions criteriasatriachan24
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingankyta89
 
Lecture5 mba
Lecture5 mbaLecture5 mba
Lecture5 mbagldazo
 
Capital expenditure control
Capital expenditure controlCapital expenditure control
Capital expenditure controlSatish Bidgar
 
Capital budegting project and risk analysis
Capital budegting  project and risk analysisCapital budegting  project and risk analysis
Capital budegting project and risk analysissanthoshsanthuse
 
Project financial feasibility
Project financial feasibilityProject financial feasibility
Project financial feasibilityDr Naim R Kidwai
 
Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8Tinku Kumar
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingAmeen San
 
IEDC Real Estate Training Course Financial Feasibility - 2018
IEDC Real Estate Training Course Financial Feasibility - 2018IEDC Real Estate Training Course Financial Feasibility - 2018
IEDC Real Estate Training Course Financial Feasibility - 2018Economic Development Navigator
 
Chapter 4 CBT&D.pptx
Chapter 4 CBT&D.pptxChapter 4 CBT&D.pptx
Chapter 4 CBT&D.pptxSaif Uddin
 
capital budgeting process investment rules.pptx
capital budgeting process investment rules.pptxcapital budgeting process investment rules.pptx
capital budgeting process investment rules.pptxATEEQURRehman366058
 
Ch-11 Capital Budgeting.pdf
Ch-11 Capital Budgeting.pdfCh-11 Capital Budgeting.pdf
Ch-11 Capital Budgeting.pdfSunny429247
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteriaAKSHAYA0000
 

Similaire à Capital budgeting (20)

Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
capital budgeting decisions criteria
capital budgeting decisions criteriacapital budgeting decisions criteria
capital budgeting decisions criteria
 
Capital budgeting -2
Capital budgeting -2Capital budgeting -2
Capital budgeting -2
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Npv Irr
Npv IrrNpv Irr
Npv Irr
 
Lecture5 mba
Lecture5 mbaLecture5 mba
Lecture5 mba
 
Capital expenditure control
Capital expenditure controlCapital expenditure control
Capital expenditure control
 
Capital budegting project and risk analysis
Capital budegting  project and risk analysisCapital budegting  project and risk analysis
Capital budegting project and risk analysis
 
Project financial feasibility
Project financial feasibilityProject financial feasibility
Project financial feasibility
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
MBA fin mgt Lecture 5 inv appraisal.pptx
MBA fin mgt Lecture 5 inv appraisal.pptxMBA fin mgt Lecture 5 inv appraisal.pptx
MBA fin mgt Lecture 5 inv appraisal.pptx
 
Savi chapter8
Savi chapter8Savi chapter8
Savi chapter8
 
Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
IEDC Real Estate Training Course Financial Feasibility - 2018
IEDC Real Estate Training Course Financial Feasibility - 2018IEDC Real Estate Training Course Financial Feasibility - 2018
IEDC Real Estate Training Course Financial Feasibility - 2018
 
Chapter 4 CBT&D.pptx
Chapter 4 CBT&D.pptxChapter 4 CBT&D.pptx
Chapter 4 CBT&D.pptx
 
Cb-1.pptx
Cb-1.pptxCb-1.pptx
Cb-1.pptx
 
capital budgeting process investment rules.pptx
capital budgeting process investment rules.pptxcapital budgeting process investment rules.pptx
capital budgeting process investment rules.pptx
 
Ch-11 Capital Budgeting.pdf
Ch-11 Capital Budgeting.pdfCh-11 Capital Budgeting.pdf
Ch-11 Capital Budgeting.pdf
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 

Plus de Kapil Chhabra (20)

Ifm forex markets-01[1].03.07
Ifm   forex markets-01[1].03.07Ifm   forex markets-01[1].03.07
Ifm forex markets-01[1].03.07
 
Ifm forex markets 13.2.07
Ifm   forex markets 13.2.07Ifm   forex markets 13.2.07
Ifm forex markets 13.2.07
 
Ifm derivatives 01[1].03.07
Ifm   derivatives 01[1].03.07Ifm   derivatives 01[1].03.07
Ifm derivatives 01[1].03.07
 
General insurance quiz
General insurance quizGeneral insurance quiz
General insurance quiz
 
Banking deliberations
Banking deliberationsBanking deliberations
Banking deliberations
 
Securitisatio
SecuritisatioSecuritisatio
Securitisatio
 
Retail finance
Retail financeRetail finance
Retail finance
 
Ratio
RatioRatio
Ratio
 
Nbfc ppt
Nbfc pptNbfc ppt
Nbfc ppt
 
Lbo presentation
Lbo presentationLbo presentation
Lbo presentation
 
Factoring ppt
Factoring pptFactoring ppt
Factoring ppt
 
Dabur case study
Dabur case studyDabur case study
Dabur case study
 
Cheques mp
Cheques mpCheques mp
Cheques mp
 
Banking mp
Banking mpBanking mp
Banking mp
 
Alm and hp
Alm and hpAlm and hp
Alm and hp
 
Session 4 financial markets background
Session 4 financial markets backgroundSession 4 financial markets background
Session 4 financial markets background
 
Place
PlacePlace
Place
 
Org change new
Org change newOrg change new
Org change new
 
New org culture
New org cultureNew org culture
New org culture
 
Leadership new
Leadership newLeadership new
Leadership new
 

Dernier

7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator OptionsVince Stanzione
 
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...Call Girls Mumbai
 
cost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxcost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxazadalisthp2020i
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfJinJiang6
 
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...priyasharma62062
 
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...priyasharma62062
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...robinsonayot
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfAdnet Communications
 
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.hyt3577
 
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Call Girls Mumbai
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationAdnet Communications
 
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...priyasharma62062
 
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...priyasharma62062
 
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...kajal
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...priyasharma62062
 
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...kajalverma014
 
Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...RaniT11
 
Webinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumWebinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumFinTech Belgium
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...jeffreytingson
 

Dernier (20)

7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options
 
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
 
cost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxcost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptx
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
 
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
In Sharjah ௵(+971)558539980 *_௵abortion pills now available.
 
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate Presentation
 
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
 
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
Virar Best Sex Call Girls Number-📞📞9833754194-Poorbi Nalasopara Housewife Cal...
 
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
 
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
Female Escorts Service in Hyderabad Starting with 5000/- for Savita Escorts S...
 
Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...
 
Webinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumWebinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech Belgium
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...
 

Capital budgeting

  • 1. Capital Budgeting Decision Criteria
  • 2. Capital Budgeting: the process of planning for purchases of long- term assets. • example: Suppose our firm must decide whether to purchase a new plastic molding machine for $125,000. How do we decide? • Will the machine be profitable? • Will our firm earn a high rate of return on the investment?
  • 3. Decision-making Criteria in Capital Budgeting How do we decide if a capital investment project should be accepted or rejected?
  • 4. Decision-making Criteria in Capital Budgeting • The Ideal Evaluation Method should: a) include all cash flows that occur during the life of the project, b) consider the time value of money, c) incorporate the required rate of return on the project.
  • 5. Payback Period • How long will it take for the project to generate enough cash to pay for itself?
  • 6. Payback Period • How long will it take for the project to generate enough cash to pay for itself? (500) 150 150 150 150 150 150 150 150 0 1 2 3 4 5 6 7 8
  • 7. Payback Period • How long will it take for the project to generate enough cash to pay for itself? (500) 150 150 150 150 150 150 150 150 0 1 2 3 4 5 6 7 8 Payback period = 3.33 years.
  • 8. Payback Period • Is a 3.33 year payback period good? • Is it acceptable? • Firms that use this method will compare the payback calculation to some standard set by the firm. • If our senior management had set a cut- off of 5 years for projects like ours, what would be our decision? • Accept the project.
  • 9. Drawbacks of Payback Period • Firm cutoffs are subjective. • Does not consider time value of money. • Does not consider any required rate of return. • Does not consider all of the project’s cash flows.
  • 10. Drawbacks of Payback Period • Does not consider all of the project’s cash flows. (500) 150 150 150 150 150 (300) 0 0 0 1 2 3 4 5 6 7 8 • Consider this cash flow stream!
  • 11. Drawbacks of Payback Period • Does not consider all of the project’s cash flows. (500) 150 150 150 150 150 (300) 0 0 0 1 2 3 4 5 6 7 8 • This project is clearly unprofitable, but we would accept it based on a 4- year payback criterion!
  • 12. Discounted Payback • Discounts the cash flows at the firm’s required rate of return. • Payback period is calculated using these discounted net cash flows. Problems: • Cutoffs are still subjective. • Still does not examine all cash flows.
  • 13. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) 0 -500 -500.00 1 250 219.30
  • 14. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) 0 -500 -500.00 1 250 219.30 1 year 280.70
  • 15. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) 0 -500 -500.00 1 250 219.30 1 year 280.70 2 250 192.37
  • 16. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) 0 -500 -500.00 1 250 219.30 1 year 280.70 2 250 192.37 2 years 88.33
  • 17. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) 0 -500 -500.00 1 250 219.30 1 year 280.70 2 250 192.37 2 years 88.33 3 250 168.74
  • 18. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) 0 -500 -500.00 1 250 219.30 1 year 280.70 2 250 192.37 2 years 88.33 3 250 168.74 .52 years
  • 19. Discounted Payback (500) 250 250 250 250 250 0 1 2 3 4 5 Discounted Year Cash Flow CF (14%) The Discounted 0 -500 Payback-500.00 1 250 219.30 1 year is 2.52 years 280.70 2 250 192.37 2 years 88.33 3 250 168.74 .52 years
  • 20. Other Methods 1) Net Present Value (NPV) 2) Profitability Index (PI) 3) Internal Rate of Return (IRR) Each of these decision-making criteria: • Examines all net cash flows, • Considers the time value of money, and • Considers the required rate of return.
  • 21. Net Present Value • NPV = the total PV of the annual net cash flows - the initial outlay. n Σ FCFt NPV = - IO (1 + k) t t=1
  • 22. Net Present Value • Decision Rule: • If NPV is positive, accept. • If NPV is negative, reject.
  • 23. NPV Example • Suppose we are considering a capital investment that costs $250,000 and provides annual net cash flows of $100,000 for five years. The firm’s required rate of return is 15%.
  • 24. NPV Example • Suppose we are considering a capital investment that costs $250,000 and provides annual net cash flows of $100,000 for five years. The firm’s required rate of return is 15%. (250,000) 100,000 100,000 100,000 100,000 100,000 0 1 2 3 4 5
  • 25. Net Present Value (NPV) NPV is just the PV of the annual cash flows minus the initial outflow. Using TVM: P/Y = 1 N = 5 I = 15 PMT = 100,000 PV of cash flows = $335,216 - Initial outflow: ($250,000) = Net PV $85,216
  • 27. Profitability Index n Σ FCFt NPV = t - IO (1 + k) t=1
  • 28. Profitability Index n Σ FCFt NPV = t - IO (1 + k) t=1 n Σ FCFt PI = IO (1 + k) t t=1
  • 29. Profitability Index • Decision Rule: • If PI is greater than or equal to 1, accept. • If PI is less than 1, reject.
  • 30. Internal Rate of Return (IRR) • IRR: the return on the firm’s invested capital. IRR is simply the rate of return that the firm earns on its capital budgeting projects.
  • 31. Internal Rate of Return (IRR)
  • 32. Internal Rate of Return (IRR) n Σ FCFt NPV = - IO (1 + k) t t=1
  • 33. Internal Rate of Return (IRR) n Σ FCFt NPV = - IO (1 + k) t t=1 n FCFt IRR: Σ t=1 (1 + IRR) t = IO
  • 34. Internal Rate of Return (IRR) n FCFt IRR: Σt=1 (1 + IRR) t = IO • IRR is the rate of return that makes the PV of the cash flows equal to the initial outlay. • This looks very similar to our Yield to Maturity formula for bonds. In fact, YTM
  • 35. Calculating IRR • Looking again at our problem: • The IRR is the discount rate that makes the PV of the projected cash flows equal to the initial outlay. (250,000) 100,000 100,000 100,000 100,000 100,000 0 1 2 3 4 5
  • 36. IRR with your Calculator • IRR is easy to find with your financial calculator. • Just enter the cash flows as you did with the NPV problem and solve for IRR. • You should get IRR = 28.65%!
  • 37. IRR • Decision Rule: • If IRR is greater than or equal to the required rate of return, accept. • If IRR is less than the required rate of return, reject.
  • 38. • IRR is a good decision-making tool as long as cash flows are conventional. (- + + + + +) • Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. (- + + - + +)
  • 39. • IRR is a good decision-making tool as long as cash flows are conventional. (- + + + + +) • Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. (- + + - + +) (500) 200 100 (200) 400 300 0 1 2 3 4 5
  • 40. • IRR is a good decision-making tool as long as cash flows are conventional. (- + + + + +) • Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. (- + + - + +) 1 (500) 200 100 (200) 400 300 0 1 2 3 4 5
  • 41. • IRR is a good decision-making tool as long as cash flows are conventional. (- + + + + +) • Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. (- + + - + +) 1 2 (500) 200 100 (200) 400 300 0 1 2 3 4 5
  • 42. • IRR is a good decision-making tool as long as cash flows are conventional. (- + + + + +) • Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. (- + + - + +) 1 2 3 (500) 200 100 (200) 400 300 0 1 2 3 4 5
  • 43. Summary Problem • Enter the cash flows only once. • Find the IRR. • Using a discount rate of 15%, find NPV. • Add back IO and divide by IO to get PI. (900) 300 400 400 500 600 0 1 2 3 4 5
  • 44. Summary Problem • IRR = 34.37%. • Using a discount rate of 15%, NPV = $510.52. • PI = 1.57. (900) 300 400 400 500 600 0 1 2 3 4 5
  • 45. Modified Internal Rate of Return (MIRR) • IRR assumes that all cash flows are reinvested at the IRR. • MIRR provides a rate of return measure that assumes cash flows are reinvested at the required rate of return.
  • 46. MIRR Steps: • Calculate the PV of the cash outflows. – Using the required rate of return. • Calculate the FV of the cash inflows at the last year of the project’s time line. This is called the terminal value (TV). – Using the required rate of return. • MIRR: the discount rate that equates the PV of the cash outflows with the PV of the terminal value, ie, that makes: • PVoutflows = PVinflows
  • 47. MIRR • Using our time line and a 15% rate: • PV outflows = (900) • FV inflows (at the end of year 5) = 2,837. • MIRR: FV = 2837, PV = (900), N = 5 • solve: I = 25.81%. (900) 300 400 400 500 600 0 1 2 3 4 5
  • 48. MIRR • Using our time line and a 15% rate: • PV outflows = (900) • FV inflows (at the end of year 5) = 2,837. • MIRR: FV = 2837, PV = (900), N = 5 • solve: I = 25.81%. • Conclusion: The project’s IRR of 34.37%, assumes that cash flows are reinvested at 34.37%.
  • 49. MIRR • Using our time line and a 15% rate: • PV outflows = (900) • FV inflows (at the end of year 5) = 2,837. • MIRR: FV = 2837, PV = (900), N = 5 • solve: I = 25.81%. • Conclusion: The project’s IRR of 34.37%, assumes that cash flows are reinvested at 34.37%. • Assuming a reinvestment rate of 15%, the project’s MIRR is 25.81%.