SlideShare une entreprise Scribd logo
1  sur  24
Télécharger pour lire hors ligne
Page 1 of 24
POST APPLIED FOR -
Any Mechanical / Oil & Gas/ Energy/ Power /Operations and maintenance,
WWTP project or industry
 Mechanical Engineer/Supervisor
 QA/QC Engineer/Supervisor
 NDT supervisor
 Operations and maintenance, Piping Fabrication, Construction,
waste water plane, steel structure, Mechanical , Piping Materials or
Plumbing Superintendant , supervisor or Engineer
CERTIFICATIONS
 Saudi ARAMCO SAP no: 70008511 As Piping QA/QC Inspector Saudi vitrified clay
 pipe company LTD Training conducted by Quality control department
(EN ISO 9001:2000)
 ASNT Level II – Radiographic Test(RT)
 ASNT Level II – Magnetic Particle Test(MPT)
 ASNT Level II – Dye Penetrant Test(DPT)
 OPITO Approved Basic offshore Induction and Emergency Training (BOSIET) Conducted by
YKK in Atyrau Kazakhstan.
EDUCATIONAL QUALIFICATIONS
Diploma in Mechanical Engineering BTEB, Bangladesh
KEY SKILL
 KEY SKILLS: Piping & Welding Inspection, Punch list and Hydro-Test coordinator ,
maintenance engineer, mechanical engineer, steel structural engineer, Radiographic
Interpretation
KAZI NAZMUL HAQUE
Isolux Corsan Bangladesh Ltd.
QA/QC Mechanical Engineer
E-mail:knhaquefg@yahoo.com
MOBILE: 008801913257553,
008801844000797 (COMP. MOBILE)
Page 2 of 24
Total years of Experience
15 years (oil & gas, power plant processing Industry and Levelling survey)
Overseas
Kingdom Saudi Arabic = 3.8 years
Republic of Kazakhstan = 1.9 years (offshore)
Abu Dhabi (UAE) = 1.8 years
Familiar with codes & Standards: ASME sec I, sec II, sec III, sec V, sec VIII, sec IX,
ANSI/ASME B31.1,B31.3,B31.4,B31.5,B31.8, ASTM CODE, AWS, API, Saudi Aramco and
International standards & codes for construction and Inspections.
Summary of Skills and Experience:
P&ID marking for test package preparation as per project designs Plan
Full knowledge with interpret the QCPs, ITPs, Project specifications, Materials, Oil
& Gas plants.
Implement/verify of ISO Standard Quality Management System.
Materials inspection & Review of material certificates and compliance as per project
specifications
Control and witness for the NDT.
Estimating material, construction, and labour costs, and project timescales
Involved in producing due diligence surveys
Liaising with local contractors
Load assessments of new and existing structures.
Giving PowerPoint presentations to managers and clients
Communicating with government agencies and local authorities
Evaluating, organizing & prioritizing work within the overall project schedule.
Preparing sketches, marking-up drawings and writing specifications etc
Liaising with architects, engineering technicians and IT staff.
Structural inspections/assessments and making appropriate recommendations
Page 3 of 24
Providing expert technical advice including structural reports, crack monitoring.
Witness & review the Mechanical destructive tests.
Utility piping systems
Wastewater sewers lines
Excavation and back filling
Textile mechanic (mechanical)
Internal and external coatings
Insulation purpose, type and thickness inspection
Valves installation inspection
Biocide and Ozone treatment inspection
Checking weld joint preparation, fit up, dimensional inspection and alignment
Review and familiarize with the project specifications, codes and standards
Visual inspections as per code requirement
Monitoring welding activities as per WPS
Conducting hydro test as per the requirement of Project
Conducting pneumatic test and Leak test as per requirement of Project
Line walk with client/PMC to achieve the Mechanical Completion Certificates
System wise line checking & raising punch, close coordination with sub-contractors
to arrange the required materials & equipment’s to complete the punches.
Prepare inspection reports and documentation as per client requirements.
Close coordination with other team members to short out the piping materials &
equipment’s and to clear the mutual punches.
Making daily progress reports & submitting to the Management.
Checking daily progress with Charge-hand & analysing the work to be complete on
time.
Page 4 of 24
EMPLOYMENT HISTORY:
01 September 2016 to until now
Employer : Isolux Corsan Bangladesh.
Designation : QA/QC Engineer Mechanical
Project : Siddhirgonj 335 MW Combined Cycle Power Plant Project
Client : Electricity Generation Company Of Bangladesh Ltd.
General Duties & Responsibilities:
 Coordinate all site inspections with the site subcontractors
 Ensure that all inspection reports are accurate and that all attached documents are
current status
 Ensure all work is correctly prepared prior to any inspection being undertaken
 Review all inspection reports for compliance
 Assist the site QC manager in the organization, maintenance and control of the
quality system
 Prepare nonconformance reports to the QA manager and assist in developing
corrective actions
 Assist the QC manager and construction manager in resolving any discrepancies and
ambiguities
 Coordinate with the customers QC inspectors for the resolution of site problems
 Coordinate with the site subcontractors to ensure that communications exist and are
maintained
 Assist the site subcontractors in the resolution of drawing interpretation
 Attend the weekly QC meetings
 Review work procedures and method statements for compliance with good work
practices and the customers contract specializations
 The issuance of nonconformance reports in conjunction with the site QC manager
 The completion of QC site instructions and coordinate their closure The review of
inspection test packages during the course of construction activities
 Compliance with the site's health and safety regulations
 Review course and effects of welding defects and take remedial actions
 Coordination with the field subcontractors and the Third Party NDT Inspection
Company
Page 5 of 24
 Review of the radiographic film and all NDT reports on a daily basis
 Reviewing the inspection and testing methods and procedures for Radiographic, Dye
Penetrant, Magnetic Particle, and Ultrasonic inspections
 Witnessing of welder qualifications testing and procedures qualification testing
 Reviewing of the welding summery reports
 Checking the hydrostatic test packages for NDT compliance prior to testing
 Recording and listing of defective welds
 Monitor the control and issue of welding electrodes
 Actively monitor site radiation safety
 Review day to day applications for x-raying of welds
 Coordinate the issue of nonconformance reports through the site QC manager
 Compete site quality instructions to sub-contractors when required
01 November 2015 to 31 August 2016
Employer : Technice construction Company Ltd.
Designation : QA/QC Engineer
General Duties & Responsibilities:
 Implement and verify of ISO Standard Quality Management System.
 Estimating material, construction, and labour costs, and project timescales
 Liaising with local contractors
 Load assessments of new and existing structures.
 Communicating with government agencies and local authorities
 Evaluating, organizing & prioritizing work within the overall project schedule.
 Preparing sketches, marking-up drawings and writing specifications etc
 Liaising with architects, engineering technicians and IT staff.
Page 6 of 24
01 February 2016:
Project : Moheshkhali - Anowara Gas Transmission Pipeline Project
(30”ODx91Km) Section: B
Client : GAS TRANSMISSION COMPANY LIMITED (GTCL)
CONTRACTOR : TECHNICE CONSTRUCTION COMPANY LTD.
Project Duties & Responsibilities:
 Preparing Welding Procedure Specification (WPS) For Mainline ,Tie & Repair As per
API 1104, ASME Sec IX & GTCL Specification
 Preparing Procedure Qualification Record (PQR) & Welder Qualification Record (WQR)
base on Welding Procedure Specification (WPS )Mainline Works With Internal Clamp
and Tie in External clamp
 Materials ( API 5L Gr. X60 PSL 2 ) inspection & Review as per project specifications
 Monitoring welding activities as per WPS
 Prepare and submit daily welding report, Tie in report, weld joints Repair reports and
documentation as per client requirements.
 Monitoring all NDT activities , radiographic interpretation as per API 1104 and client
procedure
 Communicating with client, Sub-contractor, NDT techniques (crawler and gamma
ray ir-192 ) and local authorities
 Daily progress reports submitting ( sent by message or email ) to the company & client
Management
05 March 2015 to 15 June 2015
Employer : TUV Rheinland Bangladesh Pvt. Ltd.
Designation : Third party Inspector Mechanical
Project : SHAHJALAL Fertilizer Project Fenchuganj, Sylhet, Bangladesh
Client : Bangladesh Chemical IndustriesCorportaion (BCIC)
Duties & Responsibilities:
 Review of mill test report or certificates.
 Review of drawing, calculations, PQR, WPS, and PWHT
 Mechanical and technological testing of materials at the material manufacturer, mill
etc.
Page 7 of 24
 In-process inspection and onsite inspection of steel structures (e.g. construction of
large halls, bridges)
 Quality inspection of technical components, acceptance tests, performance tests
 Prepare inspection reports and documentation
 Safety and Health Protection Coordinator
 Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-
conforming items, and initiate corrective actions to prevent recurrence of
nonconformities.
 Inspection certificate of acceptance or compliance with code to be issued to vendor
 Close coordination with other team members to short out the piping materials &
equipment’s and to clear the mutual punches
05 September 2013 to 09 may 2014
Employer : GS NEOTEK
Contractor : DAEWOO E & C
Designation : QA/QC ENGINEER
Project : RUWAIS Refinery expansion project,(Storage tanks blending system unit)
Client : TAKREER EPC-4
Duties & Responsibilities:
 Test package prepared as per cline approval marking P&ID
 Review the test package, documentation ,ISO DWG,P&ID and NDT history sheet as per project
requirement
 Co-ordination the inspection, surveillance and testing requirements are done on behalf of the QC Section
Head with the Client (TAKREER)
 Prepared the documentation to meets the requirements of the Project Quality Plan
 Ensure that the documentation, Request for inspection (RFI), Checklists, test pack and surveillance meets
the requirements of the Project Quality Plan.
 Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming
items, and initiate corrective actions to prevent recurrence of nonconformities.
 Communicating with All department’s
04 August 2012 to 05 September 2013
Employer : GS NEOTEK
Contractor : G.S Engineering & construction
Page 8 of 24
Designation : QA/QC supervisor
Project : RUWAIS Refinery expansion project, (Alkylation unit & Olefins
Conversion unit) RRE 2
Client : TAKREER
Duties & Responsibilities:
 P&ID marking for test package preparation as per project designs Plan.
 Co-ordination the inspection, surveillance and testing requirements are done on behalf of the QC
Section Head with the Client (TAKREER)
 Prepared the documentation to meets the requirements of the Project Quality Plan
 Test package prepared as per cline approval marking P&ID
 Review the test package, documentation ,ISO DWG,P&ID and NDT history sheet as per project
requirement
 Ensure that the documentation, Notification for Inspection (N.I), Checklists, test pack and surveillance
meets the requirements of the Project Quality Plan.
16june-2010 to 05 may 2012
Employer : CONSOLIDATED CONTRACTORS COMPANY (CCC) W.L.L.
Designation : QC-Inspector (piping, steel structural, NDT, test packs)
Project : Hook- up pre commissioning assistance
(AGIP KCO-ENI Offshore Project)
Client : AGIP Kazakhstan north Caspian operating company (N.V.)
Atyrau, Republic of Kazakhstan
Duties & Responsibilities:
 To perform all types of piping, material, fabrication and erection inspection
 NDT Radiographic inspection
 steel structure inspection as per Inspection Test plan (ITP)
 Ensure that the documentation, Request for Inspection (RFI), Checklists, test pack and surveillance meets
the requirements of the Project Quality Plan.
 Equipment Inspection (RFI), Checklists and ensure the ITR meet the requirements of the Project Quality
Plan.
Page 9 of 24
 Ensure all activities carried out by subordinates are performed in accordance with company
or client safety rules – men working are wearing protective clothing and using required safety
equipments
16August 2007 to 16- june-2010
Employer : CONSOLIDATED CONTRACTORS COMPANY (CCC) W.L.L. KSA
Designation : QC-Inspector Piping (Approved By Saudi Aramco)
Present Position : Test pack & hydro test coordinator
Project : Khursaniyah Gas Plant Project
Client : Saudi Aramco
Contractor : Bechtel & Technip Joint Venture
Saudi Armco SAP # 70008511
Duties & Responsibilities
 To ensure the construction activities in compliance with Saudi Aramco Standards and other International
Codes and standards, such as ANSI/ASME, ASTM, API, etc.
 To perform all types of piping inspection as per Inspection and Test plan (ITP)
 Co-ordination, inspection and test requirements are done on behalf of the QC Section Head with the
Client (Saudi Aramco)
 Complete relevant forms and prepare Request for Inspection (RFI), Checklists, reports on inspections and
test undertaken for the conclusion in and inspection records.
 Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming items,
and initiate corrective actions to prevent recurrence of nonconformities.
 Ensure that the documentation, Request for Inspection (RFI), Checklists, test pack and surveillance meets
the requirements of the Project Quality Plan.
 Piping material inspection, fabrication and erection
 Final punch listing, Test packs preparation for Hydro testing inspection.
 Biocide and Ozone treatment inspection
 Reinstatement and Bolt Torque inspection
05 May2006 31July 2007
Employer : SINHA TEXTILE GROUP, SONARGAO, NARAYANGONJ
Position : Sub Assistant Engineer
Page 10 of 24
Department : Mechanical Department
Duties & Responsibilities:
 Maintenance of dyeing Machine, Hydro Extractor Machine, R.F Dryer Machine, Press Machine,
Soft winder Machine, Random winder machine, cranes etc.
 Operation of various machines and tools in workshop with safety
26JUNE 2005 to 28th June2006
Employer : waste water Electric al (W.W.E Malaysia)
Position : Forman
Project : Wastewater sewers line Project K.S.A
Contractor : Civil Works Company
Duties & Responsibilities:
 Excavation level, pipeline level check (by dumpy level)
 Pipe laying and fixing as per ISO
 Manhole inspection procedure as per drawing
 Manhole backdrop inspection as per drawing
 Presser testing pipelines (water and air) as per standard (SVCP Procedure).
 Equipment side safety and environment procedure
20thNovember 2001 to 1th September2003
Employer : Maintenance Assistant
Position : Colour Muster Yrn Dyeing Ltd.
Duties & Responsibilities:
 Inspection of all Pipelines and fabrication
 Maintenance of dyeing Machine, Hydro Extractor Machine, R.F Dryer Machine, Press Machine, Soft
winder Machine, Random winder machine, cranes etc.
 Utility pipelines
 Materials inspection
Page 11 of 24
Other Performances:
Strength
People orientation
Dynamic
Leadership and Organizing ability
Able to work under pressure
Language proficiency
English – Reading, Writing and Speaking
Bengali – Mother Tongue
Hindi – Speaking
Arabic – speaking
Training
Organization : Bangladesh industrial technical assistant centre
Professional training : fittings work welding process (GTAW, SMAW, TIG, and MIG) and visual inspection.
Duration : 11th
February, 2001 to 04th
April, 2001
Organization : Saudi vitrified clay pipe com. Ltd...
Professional training : clay pipe handling process,
Hydro testing procedures
Piping inspection procedures
Pipe laying and fixing procedures
Personal details:
Name : KAZI NAZMUL HAQUE
Father s name : Kazi abdul khaleque
Mother s name : Mrs. Feroza Begum
Date of Birth : 26th
April 1979 (Original)
Page 12 of 24
9th
November 1981 (as per certificate)
Nationality : Bangladeshi (By birth)
Religion : Islam
Marital status : Married
Height : 171 cm
Computer Knowledge: Operating System-Windows 98, 2000, XP & Vista etc.
Applications are MS Office, Internet, and E-mail etc.
Present address : Name : kazi nazmul haque
c/o : Kazi abdul khaleque
Village : Alakher char
Post office : Durgapur
Police station: kotwali
District : Comilla, Bangladesh
Confidence: As a QC supervisor with engineering background and with experience in various projects, I am highly
eager to have an opportunity to work with some world leading organizations. In that case, my career will be step
forwarded for my dynamism, honesty and sincerity.
Regards
KAZI NAZMUL HAQUE
THANK YOU
Page 13 of 24
Page 14 of 24
Page 15 of 24
Page 16 of 24
Page 17 of 24
Page 18 of 24
Page 19 of 24
Page 20 of 24
Page 21 of 24
Page 22 of 24
Page 23 of 24
Page 24 of 24

Contenu connexe

Tendances

BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
narasimha murthy
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Sangilimuthu Samiayyah
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
PRADIP SAHA,CEng MIGEM
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
REHAN MUMTAZ
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
Govinda Raman
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
MOHAMMAD JAMAL AKTAR
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Chandra ABS IV
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
Leonardo David
 

Tendances (20)

BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
resume piping
resume pipingresume piping
resume piping
 

Similaire à Kazi nazmul cv with all attachments

QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
NASEEB AHMAD
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
Madan Kumar
 
Resume 2015updated doc
Resume 2015updated docResume 2015updated doc
Resume 2015updated doc
Mark Ikonen
 
CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.doc
Nguyenvan Trang
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
Saif Ali
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATOR
Jobby Abraham
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
AKSHAY M
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
Imran Malik
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
Sathish Murugesan
 

Similaire à Kazi nazmul cv with all attachments (20)

QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
G Butler - CV 2016
G Butler - CV 2016G Butler - CV 2016
G Butler - CV 2016
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
Resume 2015updated doc
Resume 2015updated docResume 2015updated doc
Resume 2015updated doc
 
CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.doc
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATOR
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
resume & certificate yahoo
resume & certificate yahooresume & certificate yahoo
resume & certificate yahoo
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
QC
QCQC
QC
 
RESUME=
RESUME=RESUME=
RESUME=
 

Dernier

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 

Dernier (20)

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Kazi nazmul cv with all attachments

  • 1. Page 1 of 24 POST APPLIED FOR - Any Mechanical / Oil & Gas/ Energy/ Power /Operations and maintenance, WWTP project or industry  Mechanical Engineer/Supervisor  QA/QC Engineer/Supervisor  NDT supervisor  Operations and maintenance, Piping Fabrication, Construction, waste water plane, steel structure, Mechanical , Piping Materials or Plumbing Superintendant , supervisor or Engineer CERTIFICATIONS  Saudi ARAMCO SAP no: 70008511 As Piping QA/QC Inspector Saudi vitrified clay  pipe company LTD Training conducted by Quality control department (EN ISO 9001:2000)  ASNT Level II – Radiographic Test(RT)  ASNT Level II – Magnetic Particle Test(MPT)  ASNT Level II – Dye Penetrant Test(DPT)  OPITO Approved Basic offshore Induction and Emergency Training (BOSIET) Conducted by YKK in Atyrau Kazakhstan. EDUCATIONAL QUALIFICATIONS Diploma in Mechanical Engineering BTEB, Bangladesh KEY SKILL  KEY SKILLS: Piping & Welding Inspection, Punch list and Hydro-Test coordinator , maintenance engineer, mechanical engineer, steel structural engineer, Radiographic Interpretation KAZI NAZMUL HAQUE Isolux Corsan Bangladesh Ltd. QA/QC Mechanical Engineer E-mail:knhaquefg@yahoo.com MOBILE: 008801913257553, 008801844000797 (COMP. MOBILE)
  • 2. Page 2 of 24 Total years of Experience 15 years (oil & gas, power plant processing Industry and Levelling survey) Overseas Kingdom Saudi Arabic = 3.8 years Republic of Kazakhstan = 1.9 years (offshore) Abu Dhabi (UAE) = 1.8 years Familiar with codes & Standards: ASME sec I, sec II, sec III, sec V, sec VIII, sec IX, ANSI/ASME B31.1,B31.3,B31.4,B31.5,B31.8, ASTM CODE, AWS, API, Saudi Aramco and International standards & codes for construction and Inspections. Summary of Skills and Experience: P&ID marking for test package preparation as per project designs Plan Full knowledge with interpret the QCPs, ITPs, Project specifications, Materials, Oil & Gas plants. Implement/verify of ISO Standard Quality Management System. Materials inspection & Review of material certificates and compliance as per project specifications Control and witness for the NDT. Estimating material, construction, and labour costs, and project timescales Involved in producing due diligence surveys Liaising with local contractors Load assessments of new and existing structures. Giving PowerPoint presentations to managers and clients Communicating with government agencies and local authorities Evaluating, organizing & prioritizing work within the overall project schedule. Preparing sketches, marking-up drawings and writing specifications etc Liaising with architects, engineering technicians and IT staff. Structural inspections/assessments and making appropriate recommendations
  • 3. Page 3 of 24 Providing expert technical advice including structural reports, crack monitoring. Witness & review the Mechanical destructive tests. Utility piping systems Wastewater sewers lines Excavation and back filling Textile mechanic (mechanical) Internal and external coatings Insulation purpose, type and thickness inspection Valves installation inspection Biocide and Ozone treatment inspection Checking weld joint preparation, fit up, dimensional inspection and alignment Review and familiarize with the project specifications, codes and standards Visual inspections as per code requirement Monitoring welding activities as per WPS Conducting hydro test as per the requirement of Project Conducting pneumatic test and Leak test as per requirement of Project Line walk with client/PMC to achieve the Mechanical Completion Certificates System wise line checking & raising punch, close coordination with sub-contractors to arrange the required materials & equipment’s to complete the punches. Prepare inspection reports and documentation as per client requirements. Close coordination with other team members to short out the piping materials & equipment’s and to clear the mutual punches. Making daily progress reports & submitting to the Management. Checking daily progress with Charge-hand & analysing the work to be complete on time.
  • 4. Page 4 of 24 EMPLOYMENT HISTORY: 01 September 2016 to until now Employer : Isolux Corsan Bangladesh. Designation : QA/QC Engineer Mechanical Project : Siddhirgonj 335 MW Combined Cycle Power Plant Project Client : Electricity Generation Company Of Bangladesh Ltd. General Duties & Responsibilities:  Coordinate all site inspections with the site subcontractors  Ensure that all inspection reports are accurate and that all attached documents are current status  Ensure all work is correctly prepared prior to any inspection being undertaken  Review all inspection reports for compliance  Assist the site QC manager in the organization, maintenance and control of the quality system  Prepare nonconformance reports to the QA manager and assist in developing corrective actions  Assist the QC manager and construction manager in resolving any discrepancies and ambiguities  Coordinate with the customers QC inspectors for the resolution of site problems  Coordinate with the site subcontractors to ensure that communications exist and are maintained  Assist the site subcontractors in the resolution of drawing interpretation  Attend the weekly QC meetings  Review work procedures and method statements for compliance with good work practices and the customers contract specializations  The issuance of nonconformance reports in conjunction with the site QC manager  The completion of QC site instructions and coordinate their closure The review of inspection test packages during the course of construction activities  Compliance with the site's health and safety regulations  Review course and effects of welding defects and take remedial actions  Coordination with the field subcontractors and the Third Party NDT Inspection Company
  • 5. Page 5 of 24  Review of the radiographic film and all NDT reports on a daily basis  Reviewing the inspection and testing methods and procedures for Radiographic, Dye Penetrant, Magnetic Particle, and Ultrasonic inspections  Witnessing of welder qualifications testing and procedures qualification testing  Reviewing of the welding summery reports  Checking the hydrostatic test packages for NDT compliance prior to testing  Recording and listing of defective welds  Monitor the control and issue of welding electrodes  Actively monitor site radiation safety  Review day to day applications for x-raying of welds  Coordinate the issue of nonconformance reports through the site QC manager  Compete site quality instructions to sub-contractors when required 01 November 2015 to 31 August 2016 Employer : Technice construction Company Ltd. Designation : QA/QC Engineer General Duties & Responsibilities:  Implement and verify of ISO Standard Quality Management System.  Estimating material, construction, and labour costs, and project timescales  Liaising with local contractors  Load assessments of new and existing structures.  Communicating with government agencies and local authorities  Evaluating, organizing & prioritizing work within the overall project schedule.  Preparing sketches, marking-up drawings and writing specifications etc  Liaising with architects, engineering technicians and IT staff.
  • 6. Page 6 of 24 01 February 2016: Project : Moheshkhali - Anowara Gas Transmission Pipeline Project (30”ODx91Km) Section: B Client : GAS TRANSMISSION COMPANY LIMITED (GTCL) CONTRACTOR : TECHNICE CONSTRUCTION COMPANY LTD. Project Duties & Responsibilities:  Preparing Welding Procedure Specification (WPS) For Mainline ,Tie & Repair As per API 1104, ASME Sec IX & GTCL Specification  Preparing Procedure Qualification Record (PQR) & Welder Qualification Record (WQR) base on Welding Procedure Specification (WPS )Mainline Works With Internal Clamp and Tie in External clamp  Materials ( API 5L Gr. X60 PSL 2 ) inspection & Review as per project specifications  Monitoring welding activities as per WPS  Prepare and submit daily welding report, Tie in report, weld joints Repair reports and documentation as per client requirements.  Monitoring all NDT activities , radiographic interpretation as per API 1104 and client procedure  Communicating with client, Sub-contractor, NDT techniques (crawler and gamma ray ir-192 ) and local authorities  Daily progress reports submitting ( sent by message or email ) to the company & client Management 05 March 2015 to 15 June 2015 Employer : TUV Rheinland Bangladesh Pvt. Ltd. Designation : Third party Inspector Mechanical Project : SHAHJALAL Fertilizer Project Fenchuganj, Sylhet, Bangladesh Client : Bangladesh Chemical IndustriesCorportaion (BCIC) Duties & Responsibilities:  Review of mill test report or certificates.  Review of drawing, calculations, PQR, WPS, and PWHT  Mechanical and technological testing of materials at the material manufacturer, mill etc.
  • 7. Page 7 of 24  In-process inspection and onsite inspection of steel structures (e.g. construction of large halls, bridges)  Quality inspection of technical components, acceptance tests, performance tests  Prepare inspection reports and documentation  Safety and Health Protection Coordinator  Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non- conforming items, and initiate corrective actions to prevent recurrence of nonconformities.  Inspection certificate of acceptance or compliance with code to be issued to vendor  Close coordination with other team members to short out the piping materials & equipment’s and to clear the mutual punches 05 September 2013 to 09 may 2014 Employer : GS NEOTEK Contractor : DAEWOO E & C Designation : QA/QC ENGINEER Project : RUWAIS Refinery expansion project,(Storage tanks blending system unit) Client : TAKREER EPC-4 Duties & Responsibilities:  Test package prepared as per cline approval marking P&ID  Review the test package, documentation ,ISO DWG,P&ID and NDT history sheet as per project requirement  Co-ordination the inspection, surveillance and testing requirements are done on behalf of the QC Section Head with the Client (TAKREER)  Prepared the documentation to meets the requirements of the Project Quality Plan  Ensure that the documentation, Request for inspection (RFI), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan.  Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming items, and initiate corrective actions to prevent recurrence of nonconformities.  Communicating with All department’s 04 August 2012 to 05 September 2013 Employer : GS NEOTEK Contractor : G.S Engineering & construction
  • 8. Page 8 of 24 Designation : QA/QC supervisor Project : RUWAIS Refinery expansion project, (Alkylation unit & Olefins Conversion unit) RRE 2 Client : TAKREER Duties & Responsibilities:  P&ID marking for test package preparation as per project designs Plan.  Co-ordination the inspection, surveillance and testing requirements are done on behalf of the QC Section Head with the Client (TAKREER)  Prepared the documentation to meets the requirements of the Project Quality Plan  Test package prepared as per cline approval marking P&ID  Review the test package, documentation ,ISO DWG,P&ID and NDT history sheet as per project requirement  Ensure that the documentation, Notification for Inspection (N.I), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan. 16june-2010 to 05 may 2012 Employer : CONSOLIDATED CONTRACTORS COMPANY (CCC) W.L.L. Designation : QC-Inspector (piping, steel structural, NDT, test packs) Project : Hook- up pre commissioning assistance (AGIP KCO-ENI Offshore Project) Client : AGIP Kazakhstan north Caspian operating company (N.V.) Atyrau, Republic of Kazakhstan Duties & Responsibilities:  To perform all types of piping, material, fabrication and erection inspection  NDT Radiographic inspection  steel structure inspection as per Inspection Test plan (ITP)  Ensure that the documentation, Request for Inspection (RFI), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan.  Equipment Inspection (RFI), Checklists and ensure the ITR meet the requirements of the Project Quality Plan.
  • 9. Page 9 of 24  Ensure all activities carried out by subordinates are performed in accordance with company or client safety rules – men working are wearing protective clothing and using required safety equipments 16August 2007 to 16- june-2010 Employer : CONSOLIDATED CONTRACTORS COMPANY (CCC) W.L.L. KSA Designation : QC-Inspector Piping (Approved By Saudi Aramco) Present Position : Test pack & hydro test coordinator Project : Khursaniyah Gas Plant Project Client : Saudi Aramco Contractor : Bechtel & Technip Joint Venture Saudi Armco SAP # 70008511 Duties & Responsibilities  To ensure the construction activities in compliance with Saudi Aramco Standards and other International Codes and standards, such as ANSI/ASME, ASTM, API, etc.  To perform all types of piping inspection as per Inspection and Test plan (ITP)  Co-ordination, inspection and test requirements are done on behalf of the QC Section Head with the Client (Saudi Aramco)  Complete relevant forms and prepare Request for Inspection (RFI), Checklists, reports on inspections and test undertaken for the conclusion in and inspection records.  Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming items, and initiate corrective actions to prevent recurrence of nonconformities.  Ensure that the documentation, Request for Inspection (RFI), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan.  Piping material inspection, fabrication and erection  Final punch listing, Test packs preparation for Hydro testing inspection.  Biocide and Ozone treatment inspection  Reinstatement and Bolt Torque inspection 05 May2006 31July 2007 Employer : SINHA TEXTILE GROUP, SONARGAO, NARAYANGONJ Position : Sub Assistant Engineer
  • 10. Page 10 of 24 Department : Mechanical Department Duties & Responsibilities:  Maintenance of dyeing Machine, Hydro Extractor Machine, R.F Dryer Machine, Press Machine, Soft winder Machine, Random winder machine, cranes etc.  Operation of various machines and tools in workshop with safety 26JUNE 2005 to 28th June2006 Employer : waste water Electric al (W.W.E Malaysia) Position : Forman Project : Wastewater sewers line Project K.S.A Contractor : Civil Works Company Duties & Responsibilities:  Excavation level, pipeline level check (by dumpy level)  Pipe laying and fixing as per ISO  Manhole inspection procedure as per drawing  Manhole backdrop inspection as per drawing  Presser testing pipelines (water and air) as per standard (SVCP Procedure).  Equipment side safety and environment procedure 20thNovember 2001 to 1th September2003 Employer : Maintenance Assistant Position : Colour Muster Yrn Dyeing Ltd. Duties & Responsibilities:  Inspection of all Pipelines and fabrication  Maintenance of dyeing Machine, Hydro Extractor Machine, R.F Dryer Machine, Press Machine, Soft winder Machine, Random winder machine, cranes etc.  Utility pipelines  Materials inspection
  • 11. Page 11 of 24 Other Performances: Strength People orientation Dynamic Leadership and Organizing ability Able to work under pressure Language proficiency English – Reading, Writing and Speaking Bengali – Mother Tongue Hindi – Speaking Arabic – speaking Training Organization : Bangladesh industrial technical assistant centre Professional training : fittings work welding process (GTAW, SMAW, TIG, and MIG) and visual inspection. Duration : 11th February, 2001 to 04th April, 2001 Organization : Saudi vitrified clay pipe com. Ltd... Professional training : clay pipe handling process, Hydro testing procedures Piping inspection procedures Pipe laying and fixing procedures Personal details: Name : KAZI NAZMUL HAQUE Father s name : Kazi abdul khaleque Mother s name : Mrs. Feroza Begum Date of Birth : 26th April 1979 (Original)
  • 12. Page 12 of 24 9th November 1981 (as per certificate) Nationality : Bangladeshi (By birth) Religion : Islam Marital status : Married Height : 171 cm Computer Knowledge: Operating System-Windows 98, 2000, XP & Vista etc. Applications are MS Office, Internet, and E-mail etc. Present address : Name : kazi nazmul haque c/o : Kazi abdul khaleque Village : Alakher char Post office : Durgapur Police station: kotwali District : Comilla, Bangladesh Confidence: As a QC supervisor with engineering background and with experience in various projects, I am highly eager to have an opportunity to work with some world leading organizations. In that case, my career will be step forwarded for my dynamism, honesty and sincerity. Regards KAZI NAZMUL HAQUE THANK YOU