SlideShare une entreprise Scribd logo
1  sur  23
AUSTRALI
A
 Opening Introductions
 Alstom Corporate Overview
 Alstom Industrial Products
 Australian Fusegear Business
 GE Power Controls
Agenda
ALSTOM
the global specialist in
energy and transport
infrastructure
 Sales $37 Billion
 Employees 120,000
in 70 countries
Key Figures 2000/2001
A year of progress and transformationA year of progress and transformation
North
America
20%
Central &
South
America
7%
Africa &
Middle East
8%
Asia Pacific
15%
European
Union
45%
Rest of
Europe
5%
Sales by Region
Sales 2000/2001
Significant presence in the Asia-Pacific RegionSignificant presence in the Asia-Pacific Region
 N° 1 in turnkey power
plants
 N° 2 or N°3 in gas turbines
 Largest installed base:
650,000 MW
Power
Sales of
A$21 billion
20% Market Share Worldwide20% Market Share Worldwide
Transport
 N° 1 in:
Metro trains,
High Speed Trains,
Tilting trains,
EMU trains,
Double-Deck trains,
Train propulsion systems
 N° 2 in:
Signaling,
DMU trains
 Services: 25% of sales
Sales of
A$7.5 billion
18 % Market Share Worldwide18 % Market Share Worldwide
Marine
 N° 1 in cruise ships
 LNG carriers
OrderforQueen Mary 2
2,620 passengers
15 decks
1,483 cabins
1,253 crew members
30 knots
* share of cruise ship deliveries 1999 - 2002 based on number of cabins
Sales of
A$3 billion
32% Market Share Worldwide32% Market Share Worldwide
Transmission & Distribution
 N° 1 in:
High Voltage Switchgear
Energy Management Systems
 N° 2 in:
Protection and Control Systems
Turnkey Substations
Medium Voltage Equipment
13% Market Share Worldwide13% Market Share Worldwide
Sales of
A$4.8 billion
AUSTRALI
A
ALSTOM in Australia and
New Zealand
Group Technology Applied Locally
AUSTRALI
A
Order intake in Australia
436
524
742
774501
1508478
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1997 1998 1999 2000 2001
1275
1986(A$ Million)
(The upper red portions of the 2000 and 2001 graphs represent the contribution from ALSTOM Power)
AUSTRALI
A
Sales in Australia
488
497
558
620377
694506
0
200
400
600
800
1000
1200
1997 1998 1999 2000 2001
997
1200
(A$ Million)
(The upper red portions of the 2000 and 2001 graphs represent the contribution from ALSTOM Power)
AUSTRALI
A
Employees (As at March 2001)
TOTAL
New Zealand
1,080
Total: 3,702 people
TOTAL Australia 2,622 0
500
1000
1500
2000
2500
3000
1999 2000 2001
Empoyees Growth
Australia
New Zealand
AUSTRALI
A
ALSTOM Power - Gas & Steam
Taranaki Power Station
265 MW
Pelican Point
360 MW gas turbine
Collie Power Station
Steam Turbine Hall
Collie Power Station
330MW Coal Fired
AUSTRALI
A
ALSTOM Power - Industrial
Ladbroke Grove
40MW
Redbank Power Station
128MW
Murrin Murrin
Anaconda Nickel
Rocky Point
30MW
Bulwer Island
2x13MW
AUSTRALI
A
ALSTOM Power - Customer Service
Maitland Workshop
Refurbishment facility
Moonah Workshop Facility
AUSTRALI
A
New Hillside Trains, X’TRAPOLIS
29 x six-car sets
Transport
31 New Yarra Trams, CITADIS
Chullora Workshops
Joint Venture with Rail Infrastructure
Corporation
AUSTRALI
A
Contracting - Projects
Completed Projects:
• Sydney Harbour Tunnel
• North Bridge Tunnel, Perth
• Eastern Distributor, Sydney
Road Tunnels: Mechanical, Electrical Fitout and Control Systems
UnderConstruction:
• M5 East Freeway, Sydney
• Inner City Bypass, Brisbane
• Kwinana Bus Transitway, Perth
• Sydney Harbour Tunnel Upgrade
AUSTRALI
A
Distribution & Trading
Information Technology
• Entreprise Management Centre
• National Training Centre
• e-Business Solutions
AUSTRALI
A
T & D, Projects - Turnkey Systems
• Rowville 500 kV
Substation
• Armidale SVC
• Burrinjuck
• Molong Substation
• Transend/Creek Road
• Aurora/West Hobart
AUSTRALI
A
• Transformer Manufacture: 50% Export
• Protection & Control
• Low, Medium and High Voltage Switchgear
T & D - Products
AUSTRALI
A
Network Services
Substation & Transmission Maintenance
•Live Line Working
•OPGW installation
Maintaining one third of the
Victorian SPI Powernet
Network
AUSTRALI
A
Network Services
Telecommunications Services
Fibre Optic Lines Installation and Repair

Contenu connexe

Tendances

2012 11-15-high-vlaue-manufacturing-formula groupt
2012 11-15-high-vlaue-manufacturing-formula groupt2012 11-15-high-vlaue-manufacturing-formula groupt
2012 11-15-high-vlaue-manufacturing-formula grouptSirris
 
Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...
Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...
Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...UNIDO-LCT
 
101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tenderJean-Baptiste Segard
 
Understanding City Opportunities to Scale the EV Transition
Understanding City Opportunities to Scale the EV TransitionUnderstanding City Opportunities to Scale the EV Transition
Understanding City Opportunities to Scale the EV TransitionWorld Resources Institute (WRI)
 
Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...
Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...
Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...UNIDO-LCT
 
Power sector – Transmission and Distribution
Power sector – Transmission and DistributionPower sector – Transmission and Distribution
Power sector – Transmission and DistributionR Rohit Amalan
 
EPRI C&I ET Guide - FINAL
EPRI C&I ET Guide - FINALEPRI C&I ET Guide - FINAL
EPRI C&I ET Guide - FINALAndra Rogers
 
Amylin Sustainable Transportation Plan
Amylin Sustainable Transportation PlanAmylin Sustainable Transportation Plan
Amylin Sustainable Transportation Planbvernetti0324
 
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...IRJET Journal
 
Envisioneering - Leveraging Technology for Future Innovation final version
Envisioneering  - Leveraging Technology for Future Innovation final versionEnvisioneering  - Leveraging Technology for Future Innovation final version
Envisioneering - Leveraging Technology for Future Innovation final versionPaul Menig
 
IET Partner News - designing the future of electric racing
IET Partner News - designing the future of electric racingIET Partner News - designing the future of electric racing
IET Partner News - designing the future of electric racingJose Maria Lassaletta Fernandez
 
Zonar user conference 2013 v1
Zonar user conference 2013 v1Zonar user conference 2013 v1
Zonar user conference 2013 v1Paul Menig
 
Grinntech introduction
Grinntech introductionGrinntech introduction
Grinntech introductiongrinntech
 
JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH
JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH
JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH RushLane
 
Tummoc deck
Tummoc deckTummoc deck
Tummoc deckdeepap25
 
Avlite's Complete Solar Airfield
Avlite's Complete Solar Airfield Avlite's Complete Solar Airfield
Avlite's Complete Solar Airfield Kim Weeks
 
SSC Presentation
SSC PresentationSSC Presentation
SSC Presentationguest63c4e6
 
IRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated BusIRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated BusIRJET Journal
 

Tendances (20)

2012 11-15-high-vlaue-manufacturing-formula groupt
2012 11-15-high-vlaue-manufacturing-formula groupt2012 11-15-high-vlaue-manufacturing-formula groupt
2012 11-15-high-vlaue-manufacturing-formula groupt
 
Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...
Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...
Alpha dot unido_sustainable_transport_and_mobility_for_cities_workshop_gerhar...
 
101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender
 
Understanding City Opportunities to Scale the EV Transition
Understanding City Opportunities to Scale the EV TransitionUnderstanding City Opportunities to Scale the EV Transition
Understanding City Opportunities to Scale the EV Transition
 
Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...
Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...
Mellowcabs unido sustainable_transport_and_mobility_for_cities_workshop_neil_...
 
RXPE INDIA FACTORY NEWS
RXPE INDIA FACTORY NEWSRXPE INDIA FACTORY NEWS
RXPE INDIA FACTORY NEWS
 
Power sector – Transmission and Distribution
Power sector – Transmission and DistributionPower sector – Transmission and Distribution
Power sector – Transmission and Distribution
 
Az-Zour
Az-ZourAz-Zour
Az-Zour
 
EPRI C&I ET Guide - FINAL
EPRI C&I ET Guide - FINALEPRI C&I ET Guide - FINAL
EPRI C&I ET Guide - FINAL
 
Amylin Sustainable Transportation Plan
Amylin Sustainable Transportation PlanAmylin Sustainable Transportation Plan
Amylin Sustainable Transportation Plan
 
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
 
Envisioneering - Leveraging Technology for Future Innovation final version
Envisioneering  - Leveraging Technology for Future Innovation final versionEnvisioneering  - Leveraging Technology for Future Innovation final version
Envisioneering - Leveraging Technology for Future Innovation final version
 
IET Partner News - designing the future of electric racing
IET Partner News - designing the future of electric racingIET Partner News - designing the future of electric racing
IET Partner News - designing the future of electric racing
 
Zonar user conference 2013 v1
Zonar user conference 2013 v1Zonar user conference 2013 v1
Zonar user conference 2013 v1
 
Grinntech introduction
Grinntech introductionGrinntech introduction
Grinntech introduction
 
JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH
JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH
JAGUAR LAND ROVER REVEALS PIONEERING LOW AND ZERO EMISSIONS POWERTRAIN RESEARCH
 
Tummoc deck
Tummoc deckTummoc deck
Tummoc deck
 
Avlite's Complete Solar Airfield
Avlite's Complete Solar Airfield Avlite's Complete Solar Airfield
Avlite's Complete Solar Airfield
 
SSC Presentation
SSC PresentationSSC Presentation
SSC Presentation
 
IRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated BusIRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated Bus
 

Similaire à Alstom Corporate Release

European Renewables Expansion
European Renewables ExpansionEuropean Renewables Expansion
European Renewables ExpansionStatkraft
 
Berlin Germany Summary 3 2010
Berlin Germany Summary 3 2010Berlin Germany Summary 3 2010
Berlin Germany Summary 3 2010JohnColm
 
Presentation (group)
Presentation (group)Presentation (group)
Presentation (group)Ankit Grover
 
2009 deep research report on china wind gear box industry
2009 deep research report on china wind gear box industry2009 deep research report on china wind gear box industry
2009 deep research report on china wind gear box industryqyresearch
 
In the wake of a tidal stream turbine
In the wake of a tidal stream turbineIn the wake of a tidal stream turbine
In the wake of a tidal stream turbineRobin Lovelace
 
Ieema your link to electricity
Ieema    your link to electricityIeema    your link to electricity
Ieema your link to electricityNvc Gowda
 
Eng silovie transformatori
Eng silovie transformatoriEng silovie transformatori
Eng silovie transformatoriKamalKhan822
 
present_noera.ppt
present_noera.pptpresent_noera.ppt
present_noera.ppthani481
 
2009 deep research report on cost and price of china wind power equipment
2009 deep research report on cost and price of china wind power equipment2009 deep research report on cost and price of china wind power equipment
2009 deep research report on cost and price of china wind power equipmentqyresearch
 
2007 research report on china wind power equipment industry
2007 research report on china wind power equipment industry2007 research report on china wind power equipment industry
2007 research report on china wind power equipment industryqyresearch
 
2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industry2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industrysmarter2011
 
European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...
European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...
European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...EWEA - European Wind Energy Association
 
Aprile Project Houston Powerpoint
Aprile Project Houston PowerpointAprile Project Houston Powerpoint
Aprile Project Houston PowerpointRony Betancourt
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaTransnet Port Terminals
 
Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?Alexander Wolski
 
Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07krishnan.R
 

Similaire à Alstom Corporate Release (20)

European Renewables Expansion
European Renewables ExpansionEuropean Renewables Expansion
European Renewables Expansion
 
Berlin Germany Summary 3 2010
Berlin Germany Summary 3 2010Berlin Germany Summary 3 2010
Berlin Germany Summary 3 2010
 
Presentation (group)
Presentation (group)Presentation (group)
Presentation (group)
 
2009 deep research report on china wind gear box industry
2009 deep research report on china wind gear box industry2009 deep research report on china wind gear box industry
2009 deep research report on china wind gear box industry
 
In the wake of a tidal stream turbine
In the wake of a tidal stream turbineIn the wake of a tidal stream turbine
In the wake of a tidal stream turbine
 
Ieema your link to electricity
Ieema    your link to electricityIeema    your link to electricity
Ieema your link to electricity
 
Eng silovie transformatori
Eng silovie transformatoriEng silovie transformatori
Eng silovie transformatori
 
present_noera.ppt
present_noera.pptpresent_noera.ppt
present_noera.ppt
 
Result presentation Q1 2015
Result presentation Q1 2015Result presentation Q1 2015
Result presentation Q1 2015
 
2009 deep research report on cost and price of china wind power equipment
2009 deep research report on cost and price of china wind power equipment2009 deep research report on cost and price of china wind power equipment
2009 deep research report on cost and price of china wind power equipment
 
2007 research report on china wind power equipment industry
2007 research report on china wind power equipment industry2007 research report on china wind power equipment industry
2007 research report on china wind power equipment industry
 
2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industry2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industry
 
European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...
European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...
European Offshore Wind Industry - Key Trends and Statistics, first half 2013 ...
 
Aprile Project Houston Powerpoint
Aprile Project Houston PowerpointAprile Project Houston Powerpoint
Aprile Project Houston Powerpoint
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
 
KEPCO's Demand Side Management Programs
KEPCO's Demand Side Management ProgramsKEPCO's Demand Side Management Programs
KEPCO's Demand Side Management Programs
 
Result presentation Q2 2014
Result presentation Q2 2014Result presentation Q2 2014
Result presentation Q2 2014
 
Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?
 
Test
TestTest
Test
 
Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07
 

Alstom Corporate Release

  • 2.  Opening Introductions  Alstom Corporate Overview  Alstom Industrial Products  Australian Fusegear Business  GE Power Controls Agenda
  • 3. ALSTOM the global specialist in energy and transport infrastructure
  • 4.  Sales $37 Billion  Employees 120,000 in 70 countries Key Figures 2000/2001 A year of progress and transformationA year of progress and transformation
  • 5. North America 20% Central & South America 7% Africa & Middle East 8% Asia Pacific 15% European Union 45% Rest of Europe 5% Sales by Region Sales 2000/2001 Significant presence in the Asia-Pacific RegionSignificant presence in the Asia-Pacific Region
  • 6.  N° 1 in turnkey power plants  N° 2 or N°3 in gas turbines  Largest installed base: 650,000 MW Power Sales of A$21 billion 20% Market Share Worldwide20% Market Share Worldwide
  • 7. Transport  N° 1 in: Metro trains, High Speed Trains, Tilting trains, EMU trains, Double-Deck trains, Train propulsion systems  N° 2 in: Signaling, DMU trains  Services: 25% of sales Sales of A$7.5 billion 18 % Market Share Worldwide18 % Market Share Worldwide
  • 8. Marine  N° 1 in cruise ships  LNG carriers OrderforQueen Mary 2 2,620 passengers 15 decks 1,483 cabins 1,253 crew members 30 knots * share of cruise ship deliveries 1999 - 2002 based on number of cabins Sales of A$3 billion 32% Market Share Worldwide32% Market Share Worldwide
  • 9. Transmission & Distribution  N° 1 in: High Voltage Switchgear Energy Management Systems  N° 2 in: Protection and Control Systems Turnkey Substations Medium Voltage Equipment 13% Market Share Worldwide13% Market Share Worldwide Sales of A$4.8 billion
  • 10. AUSTRALI A ALSTOM in Australia and New Zealand Group Technology Applied Locally
  • 11. AUSTRALI A Order intake in Australia 436 524 742 774501 1508478 0 200 400 600 800 1000 1200 1400 1600 1800 2000 1997 1998 1999 2000 2001 1275 1986(A$ Million) (The upper red portions of the 2000 and 2001 graphs represent the contribution from ALSTOM Power)
  • 12. AUSTRALI A Sales in Australia 488 497 558 620377 694506 0 200 400 600 800 1000 1200 1997 1998 1999 2000 2001 997 1200 (A$ Million) (The upper red portions of the 2000 and 2001 graphs represent the contribution from ALSTOM Power)
  • 13. AUSTRALI A Employees (As at March 2001) TOTAL New Zealand 1,080 Total: 3,702 people TOTAL Australia 2,622 0 500 1000 1500 2000 2500 3000 1999 2000 2001 Empoyees Growth Australia New Zealand
  • 14. AUSTRALI A ALSTOM Power - Gas & Steam Taranaki Power Station 265 MW Pelican Point 360 MW gas turbine Collie Power Station Steam Turbine Hall Collie Power Station 330MW Coal Fired
  • 15. AUSTRALI A ALSTOM Power - Industrial Ladbroke Grove 40MW Redbank Power Station 128MW Murrin Murrin Anaconda Nickel Rocky Point 30MW Bulwer Island 2x13MW
  • 16. AUSTRALI A ALSTOM Power - Customer Service Maitland Workshop Refurbishment facility Moonah Workshop Facility
  • 17. AUSTRALI A New Hillside Trains, X’TRAPOLIS 29 x six-car sets Transport 31 New Yarra Trams, CITADIS Chullora Workshops Joint Venture with Rail Infrastructure Corporation
  • 18. AUSTRALI A Contracting - Projects Completed Projects: • Sydney Harbour Tunnel • North Bridge Tunnel, Perth • Eastern Distributor, Sydney Road Tunnels: Mechanical, Electrical Fitout and Control Systems UnderConstruction: • M5 East Freeway, Sydney • Inner City Bypass, Brisbane • Kwinana Bus Transitway, Perth • Sydney Harbour Tunnel Upgrade
  • 19. AUSTRALI A Distribution & Trading Information Technology • Entreprise Management Centre • National Training Centre • e-Business Solutions
  • 20. AUSTRALI A T & D, Projects - Turnkey Systems • Rowville 500 kV Substation • Armidale SVC • Burrinjuck • Molong Substation • Transend/Creek Road • Aurora/West Hobart
  • 21. AUSTRALI A • Transformer Manufacture: 50% Export • Protection & Control • Low, Medium and High Voltage Switchgear T & D - Products
  • 22. AUSTRALI A Network Services Substation & Transmission Maintenance •Live Line Working •OPGW installation Maintaining one third of the Victorian SPI Powernet Network