SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Miss Kewwaree Phuphar
205 Moo.9, Aoi-Noi, Muang District, Prachuapkririkhun, 77210
Tel.: 088 8491359(Thailand), +95 9799831098 (Myanmar)
Email: kewwaree.kip@gmail.com
Objective: To apply for Mechanical Engineer
Personal Details
Date of Birth: December 13, 1989 Age: 25 Marital Status: Single
Education
2008 – 2011 Bachelor of Engineer in the Field of Mechanical Engineering,
King Mongkut’s University of Technology Thonburi.
2005 – 2007 Certificate of Secondary Education, Prachuapwittayalai School.
Work Experiences
2012 - Present Mechanical Engineer, Power Unit Department,
Toyo-Thai Corporation Public Company Limited. (3 Years)
- Assign Engineer of Steam Turbine Generator Package,
STG CD30.100, MITSUI-ALSTOM.
Myanmar Power Generation Plant Project, Yangon Myanmar.
Project for Toyo-Thai Myanmar Corporation Public Company Limited.
Engineering;
Coordinate mechanical, instrument and electrical specification with
owner and supplier (Mitsui, Japan) and 3 times inspect equipment at
MES factory, Japan.
Construction;
Plan and control STG installation schedule to keep the required target.
Responsibility STG package installation with supervisor at Myanmar site
(1 year).
Commissioning;
Including with pre-commissioning stage. Plan and control STG
commissioning schedule. Responsibility STG commissioning to start STG
running (3 months).
- Centrifugal Pump Assign Engineer of P-379-11 CPVC Plant Project,
Thailand. Proposal for Sekisui Chemical CO., LTD.
Engineering; coordinate specification between owner and supplier.
Training
February 23-24, 2015 Operation and Maintenance Steam Turbine Generator Package, CD30.100.
2012 Basic Machinery Design Engineering.
September 22, 12 Machine Design.
September 15, 12 Centrifugal Pump Design and Selection.
September 8, 2012 Vibration Analysis.
June 23-24, 2012 The Basic Safety for New Comers and Company Management System.
Strength
Full responsibility and Always on time.
Special Skills
Good command of write and speak English.
Auto CAD (2D), Solid Work, MS Word, MS Excel, MS Outlook
References
References will be sent on request.

Contenu connexe

Similaire à Kewwaree.P Resume

Similaire à Kewwaree.P Resume (20)

Resume_KR_1_final_1
Resume_KR_1_final_1Resume_KR_1_final_1
Resume_KR_1_final_1
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
CV1 Simbu
CV1 SimbuCV1 Simbu
CV1 Simbu
 
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdfB.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26-1.pdf
 
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdfB.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
B.Tech_Hons._ME_with_specialization_in_Electric_Vehicles_SCHEME-2022-26.pdf
 
RESUME THADTHEP update 18-12-15
RESUME THADTHEP update 18-12-15RESUME THADTHEP update 18-12-15
RESUME THADTHEP update 18-12-15
 
CV_Cheong Ying Haw June2018
CV_Cheong Ying Haw June2018CV_Cheong Ying Haw June2018
CV_Cheong Ying Haw June2018
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
THE RESUME 3
THE RESUME 3THE RESUME 3
THE RESUME 3
 
Curriculum Vitae Update
Curriculum Vitae UpdateCurriculum Vitae Update
Curriculum Vitae Update
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
TAMAGHNA_CV
TAMAGHNA_CVTAMAGHNA_CV
TAMAGHNA_CV
 
Resume tanveer ahmed chowdhury
Resume tanveer ahmed chowdhuryResume tanveer ahmed chowdhury
Resume tanveer ahmed chowdhury
 
Romeo Idris Hutabarat (1)
Romeo Idris Hutabarat (1)Romeo Idris Hutabarat (1)
Romeo Idris Hutabarat (1)
 
Sureka-Resume
Sureka-ResumeSureka-Resume
Sureka-Resume
 
Profile MTE_(ThiLawar)
Profile MTE_(ThiLawar)Profile MTE_(ThiLawar)
Profile MTE_(ThiLawar)
 
GKR RESUME
GKR RESUMEGKR RESUME
GKR RESUME
 
RESUME zulkhairul intrument
RESUME zulkhairul intrumentRESUME zulkhairul intrument
RESUME zulkhairul intrument
 
Rajesh(MEP draftsman)
Rajesh(MEP draftsman)Rajesh(MEP draftsman)
Rajesh(MEP draftsman)
 
Mohamed-Hassan-CV (1)
Mohamed-Hassan-CV (1)Mohamed-Hassan-CV (1)
Mohamed-Hassan-CV (1)
 

Kewwaree.P Resume

  • 1. Miss Kewwaree Phuphar 205 Moo.9, Aoi-Noi, Muang District, Prachuapkririkhun, 77210 Tel.: 088 8491359(Thailand), +95 9799831098 (Myanmar) Email: kewwaree.kip@gmail.com Objective: To apply for Mechanical Engineer Personal Details Date of Birth: December 13, 1989 Age: 25 Marital Status: Single Education 2008 – 2011 Bachelor of Engineer in the Field of Mechanical Engineering, King Mongkut’s University of Technology Thonburi. 2005 – 2007 Certificate of Secondary Education, Prachuapwittayalai School. Work Experiences 2012 - Present Mechanical Engineer, Power Unit Department, Toyo-Thai Corporation Public Company Limited. (3 Years) - Assign Engineer of Steam Turbine Generator Package, STG CD30.100, MITSUI-ALSTOM. Myanmar Power Generation Plant Project, Yangon Myanmar. Project for Toyo-Thai Myanmar Corporation Public Company Limited. Engineering; Coordinate mechanical, instrument and electrical specification with owner and supplier (Mitsui, Japan) and 3 times inspect equipment at MES factory, Japan. Construction; Plan and control STG installation schedule to keep the required target. Responsibility STG package installation with supervisor at Myanmar site (1 year). Commissioning; Including with pre-commissioning stage. Plan and control STG commissioning schedule. Responsibility STG commissioning to start STG running (3 months). - Centrifugal Pump Assign Engineer of P-379-11 CPVC Plant Project, Thailand. Proposal for Sekisui Chemical CO., LTD. Engineering; coordinate specification between owner and supplier. Training February 23-24, 2015 Operation and Maintenance Steam Turbine Generator Package, CD30.100. 2012 Basic Machinery Design Engineering. September 22, 12 Machine Design. September 15, 12 Centrifugal Pump Design and Selection. September 8, 2012 Vibration Analysis. June 23-24, 2012 The Basic Safety for New Comers and Company Management System. Strength Full responsibility and Always on time. Special Skills Good command of write and speak English. Auto CAD (2D), Solid Work, MS Word, MS Excel, MS Outlook References References will be sent on request.