Senior Project Manager withover 25 years’ experience of leading large scale projects encompassing complex engineering works
such as pipeline planning and construction. A degree qualified engineer with outstanding organisational and planning skills
and accustomed to dealing with every aspect of projects from budget preparation to the management of multiple sub-
contractors and multinational on-site staff. An energetic and highly motivated engineering professional now seeking a
challenging new role in the Middle East or the United States.
KEY SKILLS AND EXPERIENCE
Degree Qualified Engineer. Three years of experience of
managing every aspect of large- scale engineering works
as a Senior Engineer (Sr. Project Manager) with ARAMCO
in Saudi Arabia with emphasis as a Pipeline Engineer
(Project Manager).
Stakeholder Management. Excellent experience of
building & maintaining professional relationships with
stakeholders. Demonstrates integrity when dealing with
external suppliers, vendors, and sub- contractors.
Project Management. 23 years of as a Project Engineer
(Project Manager) in managing the full life cycle of
projects onshore and offshore. Expertise in project
planning, resourcing and controlling budgets of up to
$300 million.
Familiar withallaspect of projects, FEED, EPICandmore.
Well experienced in offshore/onshore Pipelines and
pipeline Rehabilitations.
Process Management. Monitors and controls all the
processes required in the organization, administration,
and co-ordination of projects to ensure delivery on
schedule, within budget. Workedwith designcontractors
on all pipeline projects design for over 15 years and
prepared the execution plans for all projects. Familiar
with design reviews and technical evaluation.
Leadership. Expertise in managing large teams of
engineering professionals, including other engineers,
surveyors, designers, sub-contractors and site workers.
Site Management. Advanced and practical knowledge
and experience of site planning and layout cost
estimating, scheduling, materials procurement, value
engineering, equipment selection & cost control.
Organization and Planning Skills.Above averageabilityto
organise and plan large and complex projects from
inception through commissioning with a meticulous
attention to detail. My objective is to Plan well and
consistently meet deadlines. Familiar with Mid-stream,
Upstream and Down-stream projects.
Professionally Qualified. A CertifiedProject Management
Professional (PMP); Degree in Mechanical Engineering
from the University of South Western Louisiana,
Lafayette, Louisiana. Complementedwith Master degree
in Business operation management.
SELECTED CAREER ACHIEVEMENTS
 Acting as a singlepoint of contact for all projects inthe unit. Managedover $ 500 MM mega projects, whichconsisted
of large civil andinfrastructure, structural, mechanical, instrumentationandpipeline projects inthe eastern province
of Saudi Arabia. Fluent in English & Arabic, demonstrated all the project management skills in construction methods
and familiar withall International codesandstandards. Excellent knowledge inproject scheduling practices, Primavera,
MS office and more. Very good experience in the cost estimation of projects and change management.
 Throughout the 20 years of experience in pipeline projects, I have managed to oversee the preparation and
management of FEED& EPICdocuments fromvisibilitystudyto Detaildesign, preparation of contract documents and
bid packages. Involvedinthe technical & commercial evaluationof bids from constructioncontractors. PreformedJob
Explanation meetings and resolved technical issues. Award of contract and construction management of vendors,
contractors and subcontractors. AppliedQA/QCof all aspect of projects andcomplied with allHSE requirements during
the design and construction phase of the projects.
 Managedthe Project budget bykeeping trackof all cost and invoices. Managedall negotiations with contractors and
changed orders during the execution of the projects. Coordinated all changes into the Change Management System
with the client and contract & construction engineers. Implemented constructability study on all projects during the
design phase. Responsible for all aspects of the projects up to and including commissioning phase.
 Promoted cost savings of all pipeline project for the onshore and offshore with value engineering methodology.
Management ofproject risks andmitigations ofpotentialsavings during the course of Detail Designand construction.
 During the course of employment at ARAMCO heldresponsibilityfor negotiating contracts withnumerous third party
suppliers and vendors. Reviewed anoffer from a supplier for $25 million andrenegotiated a reductionof $10 million
on the original offer.
 Demonstrated excellent knowledge in technical advisory, inthe designandconstruction, mechanical equipment sizing,
vendor selection, material selectionandsourcingincludinggood knowledge incost estimation and change orders.
 Provided technical support to operation during the design and construction activities. Good knowledge in the
modification of the existingstatic androtating equipment, piping modification, equipment sizingsuchas valves. Familiar
with vendor selection, material procurement cycle and cost estimation and optimization.
 Intensive knowledge inMechanical Engineering tosupport operational requirements incapital projects for the offshore
systems andinplant equipment. Team leader for the mechanicalgroupby providing technical support to the staffand
operation.
 Good working knowledge in computer, suchas Microsoft, Excel, word documents, SAP, process flow measurements,
Stress analysis, CAESAR-II software, Auto pipe, Nozzle Pro., Code calculations and PV El ite.
CAREER OBJECTIVE:
Looking for a great long-term apprutuninty in the Oil & Gas, Energy, Petrochemicals, onshore and offshore pipelines,
Infrastructure and Manufacturing as a Project Manager, Engineering Manager or as a Design Manager to invest my long
experience in helping and achieving the company long terms goals.
2014- 2016 to Present
Project Manager (Petrochemicals)
 Current position is Engineering Project Manager with Fluor Arabia Limited (FAL)
 Working with S-Chem projects (Saudi Chevron Philips) on Jubail Industrial City
 Assisted Fluor in the Petrochemical industrial projects in Jubail area
 Worked as project manager with SADARA (Saudi Aramco & Dow Chemicals Co.) project
 Facilitated the site engineering issues for SADARA and coordinated with Houston Design office (Fluor)
 Assisted in the material procurement and selection, based on the field demand and requirements
 Supervised the construction activities and resolved outstanding issues with the client
2010 – 2014
Project Manager
Saudi ARAMCO, Upstream Projects Division/Pipeline Projects Department, Qatif, Saudi Arabia
 Chaired daily meetings with construction contractors to determine project status.
 Conducted walkthroughs on projects prior to completion and prepared final paperwork.
 Prepared detailed cost estimates for all upcoming new projects and contracts.
 Recruited additional staff in order to complete the scheduled workload.
 Saved the company almost $3 million by introducing a new reconciliation system.
 Recommended a critical item for an important engineering study resulting in savings of $1.5 million.
 Increased company revenue by 10% by securing more than 80% of bids quoted.
 Improved customer satisfaction ratings by 20% by implementing a new user friendly interface
2009 – 2010
Sr. Project Engineer (Design & Construction Project Manager)
Saudi ARAMCO, Upstream Projects Division/Pipeline Projects Department, Hawiyah, Saudi Arabia
 Oversaw the installationofseveraloil andwater wells from wellhead padto tie-inpoint upstreamof Gas Oil Separation
Plant (GOSP) in Hawiyah/Utmaniyah and Haradh areas.
 Managed all construction project activities (mechanical, electrical, instrumentation, and communication work)
including preparing contracts for well tie-ins, design packages preparation, cost estimates, technical troubleshooting,
materials procurement, technical specifications, walkthrough, and completing the final paperwork.
 Oversaw the activities of construction contractors andsite superintendents supervisinginstallationof CPfor wellheads
and pipeline installations.
 Completed all projects within schedule and under budget.
2003 – 2009
Lead Project Engineer (Design & Construction Project Manager)
SAUDI ARAMCO, Cross Country Pipeline Projects/Pipeline Projects Department, Dammam, Saudi Arabia
 Managed the visibility study, detail design, materials procurement and construction contract procurement for NGL
pipeline. Completedthe installation of 12 km X6” Fuel Gas Pipeline (NGL)along with allscraper traps, valve stationand
all communication and electrical work related to this pipeline projects. Completed the HAZOP study for the safety
procedure in handling these project safety requirements .
 Completed the installation of 100 km X 30” Ethane Gas pipeline from JuaiymahGas Plant to the Royal Commissionin
Jubail on schedule and under budget.
 Managed the successful completion of the 8 km X 8” Liquid propane (Refinery Processed NGL) pipeline from Ras
TanurahRefineryto JuaiymahGas Plant within the citylimits and urbanpopulated areas. Completedthe installation of
Shipper pumps for propane pipeline inside RTR refinery with associated piping, instrumentation and controls with a
budget of $100MM.
 Completed the conversion of AY-1($500MM in value) from (NGL) Pipeline to Crude Oil. This NGL pipeline is 1000 km
with 10 pump stations alongthe route. Completed the upgrade of all nine-pumpstation andassociatedscraper traps.
Completed the commissioning and testing for 42” crude pipeline on budget and ahead of schedule.
1998 – 2003
Project Engineer (Design & Construction)
Saudi ARAMCO, Upstream Project Division, Abqaiq, Saudi Arabia
• Co-ordinated the completion of installation of all wellhead piping, flow lines, trunk lines for several hundred oil
and water wells at Haradh GOSP-2 area.
• Managedandsupervised several In-Kingdom construction contractors for the installation of pipelines.
• Prepared change orders commissioning of new facilities.
• Facilitated installation of flow lines & trunk lines at Ain Dar, Abqaiq and Shedgum areas.
• Prepared cost estimates and ensured availability and procurement of necessary staff and materials.
• Managed several construction contractors while controlling costs and schedule
• Prepared all the design packages for these wells
1995 – 1998
Project Engineer (Design & Construction)
Saudi ARAMCO, Abqaiq Plants Projects, Abqaiq, Saudi Arabia
 Worked with the design consultant in the preparation of the design package for the installation of five (5) Air
Compressors in Abqaiq Plant.
 The Air compressors capacityconsisted of7500 CM/mint for each. Completedthe installationof four (4) motor driven
and one-turbine compressors.
 The design of these air compressors includedthe installationof coolingtowers, which consistedof centrifugal pumps,
heat exchangers, and all piping associated with it to cool the air compressors.
 Prepared the entire contract document and awarded the contract, the value of this project was $ 40MM.
 The purpose of these compressors is to supply utility air for all the instrumentation in this plant
1990 – 1995
Project Engineer (Design)
Saudi ARAMCO, Design Services Division, Abqaiq, Saudi Arabia
 Worked in the designservices division for five (5) years. Preparing in house design packages for our client (operation)
 Main task is do the required engineering work, such as hot-tap calculations as requested by our client
 Our design packages included all CAD drawings, materials allocation within the company stock or DC requisitions
preparation, scope of work and constructability study.
 All workrelatedto the design package waspreparedinhouse, from mechanical, electrical andcivil workandpresented
to the client in 30%, 60% and finally 90% design reviews.
EDUCATION AND QUALIFICATIONS:
1989 Mechanical Engineering Science Degree with Thermal & HVAC Option
University of South Western Louisiana, Lafayette, Louisiana
2008 Certified Project Management Professional (PMP)
Project Management Institute
Management
Courses
Completed the majority of Technical and Management Courses in house with Saudi Aramco
FURTHER PROFESSIONAL TRAINING
Value Engineering, Constructability Study, Project Management Courses, Project Cost Estimating, Stress Analysis Study, Health
and Life Support, H2S Safety Course, HAZOP and STOP programs, Safety in Construction, Supervisory Course (certificate),
Hydrogen Sulphide (H2S) Safety Orientation, First Aid Course, and Technical Business Writing. I am Familiar with all pipeline
engineering standards such as ASME B31.1, B31.3, B31.8, 49 CFR 192, API, NACE, ASTM, OSHA, DOT, NFPA and more. Familiar
with all types of engineering design drawing system such as P&ID, PFD and materials take-off.
ADDITIONAL INFORMATION
Nationality: Saudi National
References: Available on request

Contenu connexe

Tendances (19)

2015 CV
2015 CV 2015 CV
2015 CV
 
07-12-2014m
07-12-2014m07-12-2014m
07-12-2014m
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
SSNair-CV-Latest-2016
SSNair-CV-Latest-2016SSNair-CV-Latest-2016
SSNair-CV-Latest-2016
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project Manager
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
Mansoor CV_0616
Mansoor CV_0616Mansoor CV_0616
Mansoor CV_0616
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Zain Ul Abideen_281116
Zain Ul Abideen_281116Zain Ul Abideen_281116
Zain Ul Abideen_281116
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016
 
CV Jadid iPms
CV Jadid  iPms CV Jadid  iPms
CV Jadid iPms
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Resume_Pramod
Resume_PramodResume_Pramod
Resume_Pramod
 

En vedette

Life begins at 130 Genesis 46-47
Life begins at 130 Genesis 46-47Life begins at 130 Genesis 46-47
Life begins at 130 Genesis 46-47Ed Sullivan
 
Shapelize - l'impression 3D : applications pro 2014
Shapelize - l'impression 3D : applications pro 2014Shapelize - l'impression 3D : applications pro 2014
Shapelize - l'impression 3D : applications pro 2014Pricitive
 
【あやこCafe資料】平成29年度予算審査特別委員会
【あやこCafe資料】平成29年度予算審査特別委員会【あやこCafe資料】平成29年度予算審査特別委員会
【あやこCafe資料】平成29年度予算審査特別委員会Ayako Suzuki
 
Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...
Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...
Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...Soraya Flores Carranza
 
безсполучникове складне речення
безсполучникове складне реченнябезсполучникове складне речення
безсполучникове складне реченняОлеся Браташ
 
Collaboration - результати опитування та контекст АППАУ
Collaboration - результати опитування та контекст АППАУCollaboration - результати опитування та контекст АППАУ
Collaboration - результати опитування та контекст АППАУAPPAU_Ukraine
 
Cuaderno de arranque usana
Cuaderno de arranque usanaCuaderno de arranque usana
Cuaderno de arranque usanafernando usana
 
Pengantar geometrik-jalan ppt
Pengantar geometrik-jalan pptPengantar geometrik-jalan ppt
Pengantar geometrik-jalan pptIskandar Kyoto
 

En vedette (14)

Caries
CariesCaries
Caries
 
DOCUMATION lance un triptyque site – blog – web TV inédit pour accompagner sa...
DOCUMATION lance un triptyque site – blog – web TV inédit pour accompagner sa...DOCUMATION lance un triptyque site – blog – web TV inédit pour accompagner sa...
DOCUMATION lance un triptyque site – blog – web TV inédit pour accompagner sa...
 
HRA Brochure
HRA BrochureHRA Brochure
HRA Brochure
 
Life begins at 130 Genesis 46-47
Life begins at 130 Genesis 46-47Life begins at 130 Genesis 46-47
Life begins at 130 Genesis 46-47
 
Shapelize - l'impression 3D : applications pro 2014
Shapelize - l'impression 3D : applications pro 2014Shapelize - l'impression 3D : applications pro 2014
Shapelize - l'impression 3D : applications pro 2014
 
【あやこCafe資料】平成29年度予算審査特別委員会
【あやこCafe資料】平成29年度予算審査特別委員会【あやこCafe資料】平成29年度予算審査特別委員会
【あやこCafe資料】平成29年度予算審査特別委員会
 
Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...
Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...
Da su voto a favor la diputada federal Soraya Flores Carranza, para que adult...
 
безсполучникове складне речення
безсполучникове складне реченнябезсполучникове складне речення
безсполучникове складне речення
 
Resume
ResumeResume
Resume
 
Geografía mundial
Geografía mundialGeografía mundial
Geografía mundial
 
Collaboration - результати опитування та контекст АППАУ
Collaboration - результати опитування та контекст АППАУCollaboration - результати опитування та контекст АППАУ
Collaboration - результати опитування та контекст АППАУ
 
Cuaderno de arranque usana
Cuaderno de arranque usanaCuaderno de arranque usana
Cuaderno de arranque usana
 
Pengantar geometrik-jalan ppt
Pengantar geometrik-jalan pptPengantar geometrik-jalan ppt
Pengantar geometrik-jalan ppt
 
Makna, tujuan dan metodologi memahami islam
Makna, tujuan dan metodologi memahami islamMakna, tujuan dan metodologi memahami islam
Makna, tujuan dan metodologi memahami islam
 

Similaire à Khalid alismail new resume rev07

Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.Viad zalaf
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERKhaled mohamed
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain ProjectKhalid Hussain
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Nahiyoon
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineeramer kallas
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Resume - Masood Ahmad
Resume - Masood AhmadResume - Masood Ahmad
Resume - Masood AhmadMasood Ahmad
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5Ramiz Siddiq
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Dr Sabih Laham
 

Similaire à Khalid alismail new resume rev07 (20)

Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
 
Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior Infrastructure
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Jamal Oklah CV
Jamal Oklah CVJamal Oklah CV
Jamal Oklah CV
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Moath ahmad cv (1)
Moath ahmad cv (1)Moath ahmad cv (1)
Moath ahmad cv (1)
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Resume - Masood Ahmad
Resume - Masood AhmadResume - Masood Ahmad
Resume - Masood Ahmad
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015
 

Dernier

Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 

Dernier (20)

Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 

Khalid alismail new resume rev07

  • 1. Khalid M. Alismail (PMP) 4178 AL-DANAH, DHAHRAN, SAUDI ARABIA 34258 Email: Khalid.ismailm@gmail.com Mobile: +966504820798 Senior Project Manager withover 25 years’ experience of leading large scale projects encompassing complex engineering works such as pipeline planning and construction. A degree qualified engineer with outstanding organisational and planning skills and accustomed to dealing with every aspect of projects from budget preparation to the management of multiple sub- contractors and multinational on-site staff. An energetic and highly motivated engineering professional now seeking a challenging new role in the Middle East or the United States. KEY SKILLS AND EXPERIENCE Degree Qualified Engineer. Three years of experience of managing every aspect of large- scale engineering works as a Senior Engineer (Sr. Project Manager) with ARAMCO in Saudi Arabia with emphasis as a Pipeline Engineer (Project Manager). Stakeholder Management. Excellent experience of building & maintaining professional relationships with stakeholders. Demonstrates integrity when dealing with external suppliers, vendors, and sub- contractors. Project Management. 23 years of as a Project Engineer (Project Manager) in managing the full life cycle of projects onshore and offshore. Expertise in project planning, resourcing and controlling budgets of up to $300 million. Familiar withallaspect of projects, FEED, EPICandmore. Well experienced in offshore/onshore Pipelines and pipeline Rehabilitations. Process Management. Monitors and controls all the processes required in the organization, administration, and co-ordination of projects to ensure delivery on schedule, within budget. Workedwith designcontractors on all pipeline projects design for over 15 years and prepared the execution plans for all projects. Familiar with design reviews and technical evaluation. Leadership. Expertise in managing large teams of engineering professionals, including other engineers, surveyors, designers, sub-contractors and site workers. Site Management. Advanced and practical knowledge and experience of site planning and layout cost estimating, scheduling, materials procurement, value engineering, equipment selection & cost control. Organization and Planning Skills.Above averageabilityto organise and plan large and complex projects from inception through commissioning with a meticulous attention to detail. My objective is to Plan well and consistently meet deadlines. Familiar with Mid-stream, Upstream and Down-stream projects. Professionally Qualified. A CertifiedProject Management Professional (PMP); Degree in Mechanical Engineering from the University of South Western Louisiana, Lafayette, Louisiana. Complementedwith Master degree in Business operation management. SELECTED CAREER ACHIEVEMENTS  Acting as a singlepoint of contact for all projects inthe unit. Managedover $ 500 MM mega projects, whichconsisted of large civil andinfrastructure, structural, mechanical, instrumentationandpipeline projects inthe eastern province of Saudi Arabia. Fluent in English & Arabic, demonstrated all the project management skills in construction methods and familiar withall International codesandstandards. Excellent knowledge inproject scheduling practices, Primavera, MS office and more. Very good experience in the cost estimation of projects and change management.  Throughout the 20 years of experience in pipeline projects, I have managed to oversee the preparation and management of FEED& EPICdocuments fromvisibilitystudyto Detaildesign, preparation of contract documents and bid packages. Involvedinthe technical & commercial evaluationof bids from constructioncontractors. PreformedJob Explanation meetings and resolved technical issues. Award of contract and construction management of vendors, contractors and subcontractors. AppliedQA/QCof all aspect of projects andcomplied with allHSE requirements during the design and construction phase of the projects.  Managedthe Project budget bykeeping trackof all cost and invoices. Managedall negotiations with contractors and changed orders during the execution of the projects. Coordinated all changes into the Change Management System with the client and contract & construction engineers. Implemented constructability study on all projects during the design phase. Responsible for all aspects of the projects up to and including commissioning phase.  Promoted cost savings of all pipeline project for the onshore and offshore with value engineering methodology. Management ofproject risks andmitigations ofpotentialsavings during the course of Detail Designand construction.  During the course of employment at ARAMCO heldresponsibilityfor negotiating contracts withnumerous third party suppliers and vendors. Reviewed anoffer from a supplier for $25 million andrenegotiated a reductionof $10 million on the original offer.  Demonstrated excellent knowledge in technical advisory, inthe designandconstruction, mechanical equipment sizing, vendor selection, material selectionandsourcingincludinggood knowledge incost estimation and change orders.
  • 2.  Provided technical support to operation during the design and construction activities. Good knowledge in the modification of the existingstatic androtating equipment, piping modification, equipment sizingsuchas valves. Familiar with vendor selection, material procurement cycle and cost estimation and optimization.  Intensive knowledge inMechanical Engineering tosupport operational requirements incapital projects for the offshore systems andinplant equipment. Team leader for the mechanicalgroupby providing technical support to the staffand operation.  Good working knowledge in computer, suchas Microsoft, Excel, word documents, SAP, process flow measurements, Stress analysis, CAESAR-II software, Auto pipe, Nozzle Pro., Code calculations and PV El ite. CAREER OBJECTIVE: Looking for a great long-term apprutuninty in the Oil & Gas, Energy, Petrochemicals, onshore and offshore pipelines, Infrastructure and Manufacturing as a Project Manager, Engineering Manager or as a Design Manager to invest my long experience in helping and achieving the company long terms goals. 2014- 2016 to Present Project Manager (Petrochemicals)  Current position is Engineering Project Manager with Fluor Arabia Limited (FAL)  Working with S-Chem projects (Saudi Chevron Philips) on Jubail Industrial City  Assisted Fluor in the Petrochemical industrial projects in Jubail area  Worked as project manager with SADARA (Saudi Aramco & Dow Chemicals Co.) project  Facilitated the site engineering issues for SADARA and coordinated with Houston Design office (Fluor)  Assisted in the material procurement and selection, based on the field demand and requirements  Supervised the construction activities and resolved outstanding issues with the client 2010 – 2014 Project Manager Saudi ARAMCO, Upstream Projects Division/Pipeline Projects Department, Qatif, Saudi Arabia  Chaired daily meetings with construction contractors to determine project status.  Conducted walkthroughs on projects prior to completion and prepared final paperwork.  Prepared detailed cost estimates for all upcoming new projects and contracts.  Recruited additional staff in order to complete the scheduled workload.  Saved the company almost $3 million by introducing a new reconciliation system.  Recommended a critical item for an important engineering study resulting in savings of $1.5 million.  Increased company revenue by 10% by securing more than 80% of bids quoted.  Improved customer satisfaction ratings by 20% by implementing a new user friendly interface 2009 – 2010 Sr. Project Engineer (Design & Construction Project Manager) Saudi ARAMCO, Upstream Projects Division/Pipeline Projects Department, Hawiyah, Saudi Arabia  Oversaw the installationofseveraloil andwater wells from wellhead padto tie-inpoint upstreamof Gas Oil Separation Plant (GOSP) in Hawiyah/Utmaniyah and Haradh areas.  Managed all construction project activities (mechanical, electrical, instrumentation, and communication work) including preparing contracts for well tie-ins, design packages preparation, cost estimates, technical troubleshooting, materials procurement, technical specifications, walkthrough, and completing the final paperwork.  Oversaw the activities of construction contractors andsite superintendents supervisinginstallationof CPfor wellheads and pipeline installations.  Completed all projects within schedule and under budget. 2003 – 2009 Lead Project Engineer (Design & Construction Project Manager) SAUDI ARAMCO, Cross Country Pipeline Projects/Pipeline Projects Department, Dammam, Saudi Arabia  Managed the visibility study, detail design, materials procurement and construction contract procurement for NGL pipeline. Completedthe installation of 12 km X6” Fuel Gas Pipeline (NGL)along with allscraper traps, valve stationand all communication and electrical work related to this pipeline projects. Completed the HAZOP study for the safety procedure in handling these project safety requirements .  Completed the installation of 100 km X 30” Ethane Gas pipeline from JuaiymahGas Plant to the Royal Commissionin Jubail on schedule and under budget.  Managed the successful completion of the 8 km X 8” Liquid propane (Refinery Processed NGL) pipeline from Ras TanurahRefineryto JuaiymahGas Plant within the citylimits and urbanpopulated areas. Completedthe installation of
  • 3. Shipper pumps for propane pipeline inside RTR refinery with associated piping, instrumentation and controls with a budget of $100MM.  Completed the conversion of AY-1($500MM in value) from (NGL) Pipeline to Crude Oil. This NGL pipeline is 1000 km with 10 pump stations alongthe route. Completed the upgrade of all nine-pumpstation andassociatedscraper traps. Completed the commissioning and testing for 42” crude pipeline on budget and ahead of schedule. 1998 – 2003 Project Engineer (Design & Construction) Saudi ARAMCO, Upstream Project Division, Abqaiq, Saudi Arabia • Co-ordinated the completion of installation of all wellhead piping, flow lines, trunk lines for several hundred oil and water wells at Haradh GOSP-2 area. • Managedandsupervised several In-Kingdom construction contractors for the installation of pipelines. • Prepared change orders commissioning of new facilities. • Facilitated installation of flow lines & trunk lines at Ain Dar, Abqaiq and Shedgum areas. • Prepared cost estimates and ensured availability and procurement of necessary staff and materials. • Managed several construction contractors while controlling costs and schedule • Prepared all the design packages for these wells 1995 – 1998 Project Engineer (Design & Construction) Saudi ARAMCO, Abqaiq Plants Projects, Abqaiq, Saudi Arabia  Worked with the design consultant in the preparation of the design package for the installation of five (5) Air Compressors in Abqaiq Plant.  The Air compressors capacityconsisted of7500 CM/mint for each. Completedthe installationof four (4) motor driven and one-turbine compressors.  The design of these air compressors includedthe installationof coolingtowers, which consistedof centrifugal pumps, heat exchangers, and all piping associated with it to cool the air compressors.  Prepared the entire contract document and awarded the contract, the value of this project was $ 40MM.  The purpose of these compressors is to supply utility air for all the instrumentation in this plant 1990 – 1995 Project Engineer (Design) Saudi ARAMCO, Design Services Division, Abqaiq, Saudi Arabia  Worked in the designservices division for five (5) years. Preparing in house design packages for our client (operation)  Main task is do the required engineering work, such as hot-tap calculations as requested by our client  Our design packages included all CAD drawings, materials allocation within the company stock or DC requisitions preparation, scope of work and constructability study.  All workrelatedto the design package waspreparedinhouse, from mechanical, electrical andcivil workandpresented to the client in 30%, 60% and finally 90% design reviews. EDUCATION AND QUALIFICATIONS: 1989 Mechanical Engineering Science Degree with Thermal & HVAC Option University of South Western Louisiana, Lafayette, Louisiana 2008 Certified Project Management Professional (PMP) Project Management Institute Management Courses Completed the majority of Technical and Management Courses in house with Saudi Aramco FURTHER PROFESSIONAL TRAINING Value Engineering, Constructability Study, Project Management Courses, Project Cost Estimating, Stress Analysis Study, Health and Life Support, H2S Safety Course, HAZOP and STOP programs, Safety in Construction, Supervisory Course (certificate), Hydrogen Sulphide (H2S) Safety Orientation, First Aid Course, and Technical Business Writing. I am Familiar with all pipeline engineering standards such as ASME B31.1, B31.3, B31.8, 49 CFR 192, API, NACE, ASTM, OSHA, DOT, NFPA and more. Familiar with all types of engineering design drawing system such as P&ID, PFD and materials take-off. ADDITIONAL INFORMATION Nationality: Saudi National References: Available on request