SlideShare une entreprise Scribd logo
1  sur  4
U.S. Air Force White Paper Template
White Paper Body (limit to 1-2 pages)
Project Description/Objective: Provide a brief statement describing the specific product/technology
proposed,includingitscapabilities,usingclear,concise,laymanterms. Includeinformationhowthiseffort
will fulfill a stated Air Force need.
Approach: Provide abrief descriptionof the plannedapproachinachievingthe above state objective(s).
DoD CapabilityGap or Critical Need/FYNDAAThrust Area Addressed: Specific, short, and to the point.
Benefit to the Warfighter: Provide a brief statement describing the capabilities, results, and differences
offered by this technology to an operator.
Funding/Cost: Total cost of the proposed program
Program Plan:
a. Period of Performance: Include technical/reporting schedule.
b. Schedule:Include descriptionandmilestonesformajoractivities/effortsfortechnology/product
development.
c. Deliverables: Describe deliverables anticipated for the entire effort, including hardware and
software prototypesifproposed.Include anytechnical dataorcomputersoftware withassociated
Governmentlicense rights.Deliverablesshouldincludemonthlystatusreportsandafinal report.
d. Metrics/Measures of Success: Describe criteria to measure progress vs. stated goals, e.g.,
interoperabilityagainstanindustrystandard,opportunityforunit/system/lifecycle savings, etc.
e. Facilities/Equipment:Describefacilitiesand/orequipmentnecessarytoaccomplishthe proposed
effort.
f. Risk: Briefly describe anticipated risks and mitigation plan.
Proposed Transition Plan: Include any restrictions on Government use, release, or disclose of technical
data or computer software presenting transition difficulty or increased risk/cost to the Government.
Explain how the proposed solution will not preclude/hinder other component/module developers’
interface with,orotherwisedeveloping/replacing/upgradingotherpartsof the militarysystem/program.
Other Key Participants: Include name/email/phone number/complete address of key stakeholders and
focal pointsnotresidingwithinthe company,if any.Thesestakeholdersinclude organizationsoutsidethe
company relevant to the success of the effort described in this white paper.
Air Force Research Laboratory (AFRL) White Paper Template
White Paper (limited to 5 pages)
SectionA: Cover Page
 BAA Number
 Title of Program
 Name of Company
 BusinessSize
 Company’sCommercial andGovernmentEntity(CAGE) number
 Dun & Bradstreet(D&B) Data Universal NumberingSystem(DUNS) number
 ContractingPointof Contact (POC) withappropriate telephonenumber,fax number,andemail
address
 Technical POCwithappropriate telephone number,fax number,and email address
 Classifiedlevel atwhichcompanyiscleared
 Contactor addressforforwardingclassifiedmaterial (name,address,zipcode)
 Cognizantsecurityoffice (name,address,zipcode)
 Offeror’ssecurityofficer’sname andtelephone number
SectionB: Periodof Performance and Task Objectives
SectionC: Technical Summary and ProposedDeliverables
The technical portionof the white papershall includeadiscussionof the nature andscope of the
researchand the offeror’sproposedtechnical approach/solution.Itmayalsoinclude anyproposed
deliverables.Resumes,descriptionsof facilitiesandequipment,andaproposedStatementof Workare
not requiredatthispoint.
SectionD: Cost of Task (Rough Order of Magnitude (ROM))
The cost portionof the white papershall includeaROMcost estimate.Nodetailedprice orcostsupport
informationshouldbe forwarded;onlyatime-phasedbottomlinefigure shouldbe provided.
Air Force Office of Scientific Research (AFOSR) International White Paper Template
Project Title:
Principal Investigator:
Institution:
ProposedDuration (in months):
OBJECTIVE: Brieflydescribe the overall objective(s)of the proposedresearch.Whatdoyouhope to
accomplish?
SUMMARYOF APPROACH: Brieflydescribe how youplanto accomplishthe researchobjectives.
POTENTIAL IMPACT: Brieflydescribe whythe proposedresearchisimportantorhow itisnovel.Whatis
the expectedimpactonthe state of the art? How do you thinkitaddressesgapsor opportunitiesinthe
currentbody of knowledge?
RELEVANT REFERENCES: Please listuptothree referencesthatprovide additional backgroundas
needed.Provide linktoonline article,if possible.
TECHNOLOGYREADINESS LEVEL (TRL): Pre- andpost-fundingestimatedTRLs.
QUALIFICATIONSFOR PROPOSED RESEARCH: Please provideabrief descriptionof the proposer’s
qualifications,capabilities,relatedexperience,facilitiesortechniques,oracombinationof these factors
that are integral toachievingthe proposedresearchobjectives.
ATTACHMENT: Please indicate whetheratechnical supplementisattached(1-2pages).
COST: Approximate FundsNeeded($)
Air Force Technology Transfer Program Office White Paper Checklist
1) Name ofthe principal investigator/pointof contact:
a. Name and title (Dr.,Mr.,Mrs., Ms.)
b. E-mail address
c. Phone number(withareacode)
d. Companyname
e. Address
f. Numberof employees
g. General researchareas(listbriefly)
2) Title of the projectyou want helpdeveloping.
3) Provide a two or three paragraph executive summary(non-technical terms) aboutyour research
and your visionofa way forward.
4) Whohas the rights to use the technology?
a. Name,address,e-mail,phone number(Same,if same aspersonin#1)
b. List anyapplicable patentnumbers
c. List anyprovisional patents
d. List anyinventiondisclosures
e. List anytrade secrets,trademarksheld,etc.thatprotectthisinformation
5) What do you want the Air Force to helpyou do? Selectall that apply.
a. Developyourtechnology
b. Utilize AFtestfacilities
c. Assistance designing/constructingaprototype
d. Validationtestingof aprototype
e. Manufacturingassistance
f. LookingforAir Force technologytolicense (listaspecifictechnologyarea)
g. Assistance withlicensingyourtechnology
6) The TechnologyTransfer Program Office bylaw cannot provide funding.

Contenu connexe

Tendances

PM Project-Charter.pptx
PM Project-Charter.pptxPM Project-Charter.pptx
PM Project-Charter.pptxNimra zaman
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project ProposalGhulam Qadir
 
MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouCA Technologies
 
EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...
EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...
EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...EUDAT
 
Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6Abdul Basit
 
Ch1 language design issue
Ch1 language design issueCh1 language design issue
Ch1 language design issueJigisha Pandya
 
How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010Ong-Art Sanpinit
 
Software Project Management: Project Planning
Software Project Management: Project PlanningSoftware Project Management: Project Planning
Software Project Management: Project PlanningMinhas Kamal
 
Basis of Estimate Processes
Basis of Estimate ProcessesBasis of Estimate Processes
Basis of Estimate ProcessesGlen Alleman
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope ManagementAhmed Alageed
 
Software Defect Prediction on Unlabeled Datasets
Software Defect Prediction on Unlabeled DatasetsSoftware Defect Prediction on Unlabeled Datasets
Software Defect Prediction on Unlabeled DatasetsSung Kim
 
ISO/IEC 42010 Recommended Practice for Architectural description
ISO/IEC 42010 Recommended Practice for Architectural descriptionISO/IEC 42010 Recommended Practice for Architectural description
ISO/IEC 42010 Recommended Practice for Architectural descriptionHongseok Lee
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paperMuhammad Umar
 
A Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid EngagementA Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid EngagementiBoss Tech Solution
 

Tendances (16)

PM Project-Charter.pptx
PM Project-Charter.pptxPM Project-Charter.pptx
PM Project-Charter.pptx
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project Proposal
 
MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for You
 
EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...
EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...
EUDAT & OpenAIRE Webinar: How to write a Data Management Plan - July 14, 2016...
 
Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6
 
Ch1 language design issue
Ch1 language design issueCh1 language design issue
Ch1 language design issue
 
MS Project
MS Project MS Project
MS Project
 
How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010
 
Software Project Management: Project Planning
Software Project Management: Project PlanningSoftware Project Management: Project Planning
Software Project Management: Project Planning
 
Basis of Estimate Processes
Basis of Estimate ProcessesBasis of Estimate Processes
Basis of Estimate Processes
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Software Defect Prediction on Unlabeled Datasets
Software Defect Prediction on Unlabeled DatasetsSoftware Defect Prediction on Unlabeled Datasets
Software Defect Prediction on Unlabeled Datasets
 
Statement of-work
Statement of-workStatement of-work
Statement of-work
 
ISO/IEC 42010 Recommended Practice for Architectural description
ISO/IEC 42010 Recommended Practice for Architectural descriptionISO/IEC 42010 Recommended Practice for Architectural description
ISO/IEC 42010 Recommended Practice for Architectural description
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paper
 
A Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid EngagementA Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid Engagement
 

Similaire à U.S. Air Force White Paper Templates

Proposal format
Proposal formatProposal format
Proposal formatAnand Nca
 
Generic White Paper Template
Generic White Paper TemplateGeneric White Paper Template
Generic White Paper TemplateKirtly Day
 
1) What can you identify about the rhetorical situation of this vi.docx
1) What can you identify about the rhetorical situation of this vi.docx1) What can you identify about the rhetorical situation of this vi.docx
1) What can you identify about the rhetorical situation of this vi.docxSONU61709
 
Case Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxCase Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxMaxytjClarkf
 
Ch5 technical feasibility study
Ch5 technical feasibility studyCh5 technical feasibility study
Ch5 technical feasibility studyAbd ELRahman ALFar
 
Assignment Brief 10.4
Assignment Brief 10.4Assignment Brief 10.4
Assignment Brief 10.4NeilOw87
 
A Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology AssessmentA Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology Assessmentjbci
 
Bamberger Corp. Completed Denver Expansion Project 1 P .docx
Bamberger Corp.  Completed Denver Expansion Project 1  P .docxBamberger Corp.  Completed Denver Expansion Project 1  P .docx
Bamberger Corp. Completed Denver Expansion Project 1 P .docxikirkton
 
Bba601 technology management
Bba601 technology managementBba601 technology management
Bba601 technology managementsmumbahelp
 
Bba601 technology management
Bba601 technology managementBba601 technology management
Bba601 technology managementsmumbahelp
 
A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...
A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...
A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...Chandrashekar Sundaresan
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfromuloac
 

Similaire à U.S. Air Force White Paper Templates (20)

Proposal format
Proposal formatProposal format
Proposal format
 
Generic White Paper Template
Generic White Paper TemplateGeneric White Paper Template
Generic White Paper Template
 
1) What can you identify about the rhetorical situation of this vi.docx
1) What can you identify about the rhetorical situation of this vi.docx1) What can you identify about the rhetorical situation of this vi.docx
1) What can you identify about the rhetorical situation of this vi.docx
 
Case Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxCase Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docx
 
Ch5 technical feasibility study
Ch5 technical feasibility studyCh5 technical feasibility study
Ch5 technical feasibility study
 
RESUME ORIG
RESUME ORIGRESUME ORIG
RESUME ORIG
 
Resource plan-template-1.2
Resource plan-template-1.2Resource plan-template-1.2
Resource plan-template-1.2
 
Assignment Brief 10.4
Assignment Brief 10.4Assignment Brief 10.4
Assignment Brief 10.4
 
A Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology AssessmentA Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology Assessment
 
Project
ProjectProject
Project
 
Ajit Singh_CV
Ajit Singh_CVAjit Singh_CV
Ajit Singh_CV
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
FDSA Thor Design Study Stage 1.pdf
FDSA Thor Design Study Stage 1.pdfFDSA Thor Design Study Stage 1.pdf
FDSA Thor Design Study Stage 1.pdf
 
Spec
SpecSpec
Spec
 
Bamberger Corp. Completed Denver Expansion Project 1 P .docx
Bamberger Corp.  Completed Denver Expansion Project 1  P .docxBamberger Corp.  Completed Denver Expansion Project 1  P .docx
Bamberger Corp. Completed Denver Expansion Project 1 P .docx
 
Bba601 technology management
Bba601 technology managementBba601 technology management
Bba601 technology management
 
Bba601 technology management
Bba601 technology managementBba601 technology management
Bba601 technology management
 
Amt format
Amt formatAmt format
Amt format
 
A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...
A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...
A Methodology for Parametric Production Planning in Preliminary Aircraft Desi...
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdf
 

Dernier

Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Dernier (20)

Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

U.S. Air Force White Paper Templates

  • 1. U.S. Air Force White Paper Template White Paper Body (limit to 1-2 pages) Project Description/Objective: Provide a brief statement describing the specific product/technology proposed,includingitscapabilities,usingclear,concise,laymanterms. Includeinformationhowthiseffort will fulfill a stated Air Force need. Approach: Provide abrief descriptionof the plannedapproachinachievingthe above state objective(s). DoD CapabilityGap or Critical Need/FYNDAAThrust Area Addressed: Specific, short, and to the point. Benefit to the Warfighter: Provide a brief statement describing the capabilities, results, and differences offered by this technology to an operator. Funding/Cost: Total cost of the proposed program Program Plan: a. Period of Performance: Include technical/reporting schedule. b. Schedule:Include descriptionandmilestonesformajoractivities/effortsfortechnology/product development. c. Deliverables: Describe deliverables anticipated for the entire effort, including hardware and software prototypesifproposed.Include anytechnical dataorcomputersoftware withassociated Governmentlicense rights.Deliverablesshouldincludemonthlystatusreportsandafinal report. d. Metrics/Measures of Success: Describe criteria to measure progress vs. stated goals, e.g., interoperabilityagainstanindustrystandard,opportunityforunit/system/lifecycle savings, etc. e. Facilities/Equipment:Describefacilitiesand/orequipmentnecessarytoaccomplishthe proposed effort. f. Risk: Briefly describe anticipated risks and mitigation plan. Proposed Transition Plan: Include any restrictions on Government use, release, or disclose of technical data or computer software presenting transition difficulty or increased risk/cost to the Government. Explain how the proposed solution will not preclude/hinder other component/module developers’ interface with,orotherwisedeveloping/replacing/upgradingotherpartsof the militarysystem/program. Other Key Participants: Include name/email/phone number/complete address of key stakeholders and focal pointsnotresidingwithinthe company,if any.Thesestakeholdersinclude organizationsoutsidethe company relevant to the success of the effort described in this white paper.
  • 2. Air Force Research Laboratory (AFRL) White Paper Template White Paper (limited to 5 pages) SectionA: Cover Page  BAA Number  Title of Program  Name of Company  BusinessSize  Company’sCommercial andGovernmentEntity(CAGE) number  Dun & Bradstreet(D&B) Data Universal NumberingSystem(DUNS) number  ContractingPointof Contact (POC) withappropriate telephonenumber,fax number,andemail address  Technical POCwithappropriate telephone number,fax number,and email address  Classifiedlevel atwhichcompanyiscleared  Contactor addressforforwardingclassifiedmaterial (name,address,zipcode)  Cognizantsecurityoffice (name,address,zipcode)  Offeror’ssecurityofficer’sname andtelephone number SectionB: Periodof Performance and Task Objectives SectionC: Technical Summary and ProposedDeliverables The technical portionof the white papershall includeadiscussionof the nature andscope of the researchand the offeror’sproposedtechnical approach/solution.Itmayalsoinclude anyproposed deliverables.Resumes,descriptionsof facilitiesandequipment,andaproposedStatementof Workare not requiredatthispoint. SectionD: Cost of Task (Rough Order of Magnitude (ROM)) The cost portionof the white papershall includeaROMcost estimate.Nodetailedprice orcostsupport informationshouldbe forwarded;onlyatime-phasedbottomlinefigure shouldbe provided.
  • 3. Air Force Office of Scientific Research (AFOSR) International White Paper Template Project Title: Principal Investigator: Institution: ProposedDuration (in months): OBJECTIVE: Brieflydescribe the overall objective(s)of the proposedresearch.Whatdoyouhope to accomplish? SUMMARYOF APPROACH: Brieflydescribe how youplanto accomplishthe researchobjectives. POTENTIAL IMPACT: Brieflydescribe whythe proposedresearchisimportantorhow itisnovel.Whatis the expectedimpactonthe state of the art? How do you thinkitaddressesgapsor opportunitiesinthe currentbody of knowledge? RELEVANT REFERENCES: Please listuptothree referencesthatprovide additional backgroundas needed.Provide linktoonline article,if possible. TECHNOLOGYREADINESS LEVEL (TRL): Pre- andpost-fundingestimatedTRLs. QUALIFICATIONSFOR PROPOSED RESEARCH: Please provideabrief descriptionof the proposer’s qualifications,capabilities,relatedexperience,facilitiesortechniques,oracombinationof these factors that are integral toachievingthe proposedresearchobjectives. ATTACHMENT: Please indicate whetheratechnical supplementisattached(1-2pages). COST: Approximate FundsNeeded($)
  • 4. Air Force Technology Transfer Program Office White Paper Checklist 1) Name ofthe principal investigator/pointof contact: a. Name and title (Dr.,Mr.,Mrs., Ms.) b. E-mail address c. Phone number(withareacode) d. Companyname e. Address f. Numberof employees g. General researchareas(listbriefly) 2) Title of the projectyou want helpdeveloping. 3) Provide a two or three paragraph executive summary(non-technical terms) aboutyour research and your visionofa way forward. 4) Whohas the rights to use the technology? a. Name,address,e-mail,phone number(Same,if same aspersonin#1) b. List anyapplicable patentnumbers c. List anyprovisional patents d. List anyinventiondisclosures e. List anytrade secrets,trademarksheld,etc.thatprotectthisinformation 5) What do you want the Air Force to helpyou do? Selectall that apply. a. Developyourtechnology b. Utilize AFtestfacilities c. Assistance designing/constructingaprototype d. Validationtestingof aprototype e. Manufacturingassistance f. LookingforAir Force technologytolicense (listaspecifictechnologyarea) g. Assistance withlicensingyourtechnology 6) The TechnologyTransfer Program Office bylaw cannot provide funding.