SlideShare une entreprise Scribd logo
1  sur  3
Kristopher C. Shirley
1026 Baytree Drive  Denham Springs, LA 70726  (225) 268-6947  krisshirley22@gmail.com
S U P E R V I S I O N , I N S P E C T I O N , P L A N N I N G
Supervisor/Inspector/Planner with a 9-year record of success overseeing all phases of multimillion-dollar
construction, infrastructure, superfund and environmental projects for government and private -sector
clients. Experience includes, piping construction and maintenance (turnarounds/shutdowns) including
planning and scheduling, pipe fabrication, demolition and piping installation in the field, and welding
inspection. Inspecting welds with hydro testing, VT, PT, and RT examinations. Backed by strong credentials
and a proven history of on-time, on-budget and high-quality project completions.
Key Skills
Refinery/Chemical Plant Inspection
Construction Leadership and Management
Residential, Commercial and Plant Construction
Experience
Stronghold Inspection Enid, Ok Novem ber 2014-Present
Pos ition: 3r d
Party Inspection over Maintenance/Fixed Planner
Res ponsibilities: Signing off completed work packages for all maintenance work. Verifying dye
checks, hydro, PMI reports, ferrite test, and X-rays. Building work packages in
Maxim o from work orders generated from operations. Reviewing packages for
ins pection documents for all other work that is planned.
Stronghold Inspection Enid, Ok September 2014-November 2014
Pos ition: 3r d
Party QA/QC
Res ponsibilities: Overs eeing inspections for Turnaround/outage work. Inspecting
flanges and witnessing torques. Reviewing packages for NDE requirements for
hydro completion on piping s pools.
TSS Turner. Plaquemine, La July 2013– September 2014
Pos ition: CWI
Res ponsibilities: Writing welding procedures, weld tracking, walking down packages, dye
checking, hydro testing, flange and bolt-up inspections, PMI, film interpretation,
helium testing, boroscoping pipe and equipment.
Real Educational Lafayette, La June 2013
Pos ition: CWI certified through AWS.
Turner Ind. Plaquemine, La December 2012 – July 2013
Pos ition: Draftsman
Res ponsibilities: Us ing P&ID’s to draw existing pipe systems into isometric drawings. Is o’s will
be us ed for fabrication and inspection reference for future projects.
Starcon Martinez, Ca. Augus t 2012- November 2012
Pos ition: General Foreman
Res ponsibilities: Served as general foreman; turnaround p lanning and scheduling, predown pipe
fabrication, verified all work s cope, material and s pecifications; responsible for
s cheduling all manpower for the work scope; m anaging approximately 20
em ployees; attending daily m eetings on schedule and enforcing the safety
culture of the client and Starcon.
Starcon Baytown, Texas April 2012- May 2012
Pos ition: Gulf Coast Fractionator Conoco Phillips
Res ponsibilities: Foreman
Predown- planning scheduling, fabrication of piping, responsible for scheduling
em ployees for scheduled work scope. Installation of small and large bore piping.
res ponsible for attending all meetings for the ongoing schedule and also
being a team m ember and enforcing the clients’ safety culture to all of our team.
Trans Fie ld Se rvices Salt Lake City, Utah Fe bruary 2012 – March 2012
Position: Construction Coordinator
Re sponsibilities: Se rved coordinator over the FC/FS ESP’s at Ke nnecott’s Sme lter.
Re moval of e ach chain belt conveyor and lower hopper section. Install
of ne w hopper sections, conveyors, and liner for the FS ESP Hopper.
All mate rials consisting of Hastelloy C276. Managing all scopes for
e ve ry contractor involved in the w ork of these 2 units.
Starcon Fairfield, CA November 2010 – February 2012
Position: General Foreman
Responsibilities: Served as a general foreman for turnaround work; fabricated pipe inside
fabrication shops and inside live units; verified all material, specs and work scope
for each job; planning and scheduling; responsible for manpower planning and
hiring; managed crews; performed work along the west coast in California and in
Washington.
J.V. Industrial Pasadena, TX October 2006 – November 2010
Position: Pipefitter/Foreman
Responsibilities: Served as a layout pipe fitter for turnaround work; fabricated pipe inside
fabrication shops and inside live units; managed crews of 8 fitters and 8 welders;
performed work along the west coast in California to areas in Louisiana.
Plant Performance Service Houston, TX January 2006 – October 2006
Position: Carpenter Forman
Responsibilities: Served as Carpenter Forman for construction of ramps and steps during trailer
installation for Hurricane Katrina; supervised 5 crews of 2 - 6 men each; worked
with safety to inform the use of tools that were specific to our job scope.
Tracy Shirley Builders Denham Springs, LA May 2000 – January 2006
Position: Carpenter
Responsibilities: General construction of residential and commercial building throughout Louisiana ;
framing, trim carpenter, roofing, and vinyl siding installation; assisted in
company and worker management; experienced in hands on operating of many
types of heavy equipment and power tools.
E D U C A T I O N
Dye Penetration II May 4, 2014
Radiographic Film Interpretation II March 9, 2014
AWS CWI June 1, 2013
Louisiana State University 2002 to 2004
Denham Springs High School 1999 to 2002
R E F E R E N C E S
Craig Williams Starcon (360)770-6556
Brian Domighini Starcon (949) 939-5382
John Curtis J.V. Industrial (678) 923-5999
Mike Zeek J.V. Industrial (310) 714-2857
Tracy Shirley Chevron (225)788-2955
John Abrams TSS (225)485-1138
Matt Thomas Stronghold (870)297-3410

Contenu connexe

Tendances

Tendances (20)

Allen Campbell_NR (003) - Copy
Allen Campbell_NR (003) - CopyAllen Campbell_NR (003) - Copy
Allen Campbell_NR (003) - Copy
 
SLM150045_draft SOQ
SLM150045_draft SOQSLM150045_draft SOQ
SLM150045_draft SOQ
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Resume Cm 2012
Resume Cm 2012Resume Cm 2012
Resume Cm 2012
 
Thomas Adair updated resume- Feb., 2014
Thomas Adair updated resume- Feb., 2014Thomas Adair updated resume- Feb., 2014
Thomas Adair updated resume- Feb., 2014
 
WIRC Scope of Qualifications pipeline
WIRC Scope of Qualifications pipelineWIRC Scope of Qualifications pipeline
WIRC Scope of Qualifications pipeline
 
Mark Graham CV Nov 2015
Mark Graham CV Nov 2015Mark Graham CV Nov 2015
Mark Graham CV Nov 2015
 
jamestownerresume (1)
jamestownerresume (1)jamestownerresume (1)
jamestownerresume (1)
 
joy S resume
joy S resumejoy S resume
joy S resume
 
cv-sammy
cv-sammycv-sammy
cv-sammy
 
FEDERICO MORTERA JR CV
FEDERICO MORTERA JR CVFEDERICO MORTERA JR CV
FEDERICO MORTERA JR CV
 
CV FAISAL
CV FAISALCV FAISAL
CV FAISAL
 
Paul R 2015
Paul R 2015Paul R 2015
Paul R 2015
 
CURRICULUM VITAE ,,,,,,
CURRICULUM    VITAE ,,,,,,CURRICULUM    VITAE ,,,,,,
CURRICULUM VITAE ,,,,,,
 
0 ranny ancero CV
0 ranny ancero CV0 ranny ancero CV
0 ranny ancero CV
 
Shane Covington - CV
 Shane Covington - CV Shane Covington - CV
Shane Covington - CV
 
Jeffrey Hash Resume
Jeffrey Hash ResumeJeffrey Hash Resume
Jeffrey Hash Resume
 
stephen canas CV-pipefitter_
stephen canas CV-pipefitter_stephen canas CV-pipefitter_
stephen canas CV-pipefitter_
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1
 

En vedette

How To Make Easter Your Biggest Giving Day Of The Year-Whiteboard Wednesday
How To Make Easter Your Biggest Giving Day Of The Year-Whiteboard WednesdayHow To Make Easter Your Biggest Giving Day Of The Year-Whiteboard Wednesday
How To Make Easter Your Biggest Giving Day Of The Year-Whiteboard WednesdayRocketAdmin
 
The Research Board Presentation (1) (1)
The Research Board Presentation (1) (1)The Research Board Presentation (1) (1)
The Research Board Presentation (1) (1)Roger Ehrenberg
 
How To Skyrocket Giving In Your Church This Summer
How To Skyrocket Giving In Your Church This SummerHow To Skyrocket Giving In Your Church This Summer
How To Skyrocket Giving In Your Church This SummerRocketAdmin
 
district cooperative bank 1
district cooperative bank 1district cooperative bank 1
district cooperative bank 1Nazia hassan
 
floating.windmill.x
floating.windmill.xfloating.windmill.x
floating.windmill.xChan-Hee Koh
 
From Bootstrapping to Venture Rounds: A Startup Case Study
From Bootstrapping to Venture Rounds: A Startup Case StudyFrom Bootstrapping to Venture Rounds: A Startup Case Study
From Bootstrapping to Venture Rounds: A Startup Case StudyRoger Ehrenberg
 
SOLOMON TOMMY - KAP UNICEF Rolling Research Presentation
SOLOMON TOMMY - KAP UNICEF Rolling Research PresentationSOLOMON TOMMY - KAP UNICEF Rolling Research Presentation
SOLOMON TOMMY - KAP UNICEF Rolling Research PresentationSolomon Sunday Tommy
 
Sticky statements (1)
Sticky statements (1)Sticky statements (1)
Sticky statements (1)RocketAdmin
 
The 4 Preaching Voices-How To Find Your Unique Preaching Voice
The 4 Preaching Voices-How To Find Your Unique Preaching VoiceThe 4 Preaching Voices-How To Find Your Unique Preaching Voice
The 4 Preaching Voices-How To Find Your Unique Preaching VoiceRocketAdmin
 
Portifolio Eduardo Damasceno RGB INGLES web_LinkedIn
Portifolio Eduardo Damasceno RGB INGLES web_LinkedInPortifolio Eduardo Damasceno RGB INGLES web_LinkedIn
Portifolio Eduardo Damasceno RGB INGLES web_LinkedInEduardo Damasceno ☁️
 
How to be a better storyteller whiteboard session
How to be a better storyteller whiteboard sessionHow to be a better storyteller whiteboard session
How to be a better storyteller whiteboard sessionRocketAdmin
 
Electricitate 01[1]
Electricitate 01[1]Electricitate 01[1]
Electricitate 01[1]pserge
 

En vedette (16)

Pillars of-hip-hop
Pillars of-hip-hopPillars of-hip-hop
Pillars of-hip-hop
 
boi impact vol 1 no 1 final (1)
boi impact vol 1 no 1 final (1)boi impact vol 1 no 1 final (1)
boi impact vol 1 no 1 final (1)
 
How To Make Easter Your Biggest Giving Day Of The Year-Whiteboard Wednesday
How To Make Easter Your Biggest Giving Day Of The Year-Whiteboard WednesdayHow To Make Easter Your Biggest Giving Day Of The Year-Whiteboard Wednesday
How To Make Easter Your Biggest Giving Day Of The Year-Whiteboard Wednesday
 
The Research Board Presentation (1) (1)
The Research Board Presentation (1) (1)The Research Board Presentation (1) (1)
The Research Board Presentation (1) (1)
 
How To Skyrocket Giving In Your Church This Summer
How To Skyrocket Giving In Your Church This SummerHow To Skyrocket Giving In Your Church This Summer
How To Skyrocket Giving In Your Church This Summer
 
district cooperative bank 1
district cooperative bank 1district cooperative bank 1
district cooperative bank 1
 
k-cycle.17
k-cycle.17k-cycle.17
k-cycle.17
 
floating.windmill.x
floating.windmill.xfloating.windmill.x
floating.windmill.x
 
From Bootstrapping to Venture Rounds: A Startup Case Study
From Bootstrapping to Venture Rounds: A Startup Case StudyFrom Bootstrapping to Venture Rounds: A Startup Case Study
From Bootstrapping to Venture Rounds: A Startup Case Study
 
SOLOMON TOMMY - KAP UNICEF Rolling Research Presentation
SOLOMON TOMMY - KAP UNICEF Rolling Research PresentationSOLOMON TOMMY - KAP UNICEF Rolling Research Presentation
SOLOMON TOMMY - KAP UNICEF Rolling Research Presentation
 
Sticky statements (1)
Sticky statements (1)Sticky statements (1)
Sticky statements (1)
 
The 4 Preaching Voices-How To Find Your Unique Preaching Voice
The 4 Preaching Voices-How To Find Your Unique Preaching VoiceThe 4 Preaching Voices-How To Find Your Unique Preaching Voice
The 4 Preaching Voices-How To Find Your Unique Preaching Voice
 
Portifolio Eduardo Damasceno RGB INGLES web_LinkedIn
Portifolio Eduardo Damasceno RGB INGLES web_LinkedInPortifolio Eduardo Damasceno RGB INGLES web_LinkedIn
Portifolio Eduardo Damasceno RGB INGLES web_LinkedIn
 
How to be a better storyteller whiteboard session
How to be a better storyteller whiteboard sessionHow to be a better storyteller whiteboard session
How to be a better storyteller whiteboard session
 
Arp 2015
Arp 2015Arp 2015
Arp 2015
 
Electricitate 01[1]
Electricitate 01[1]Electricitate 01[1]
Electricitate 01[1]
 

Similaire à kshirleyresume1

Similaire à kshirleyresume1 (20)

CV 3
CV 3CV 3
CV 3
 
WILLIAM HILDING RESUME
WILLIAM HILDING RESUMEWILLIAM HILDING RESUME
WILLIAM HILDING RESUME
 
Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16
 
Distefano_Marc_resume
Distefano_Marc_resumeDistefano_Marc_resume
Distefano_Marc_resume
 
Hagy Resume (New)
Hagy Resume (New)Hagy Resume (New)
Hagy Resume (New)
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
 
Troy Ens Resume
Troy Ens ResumeTroy Ens Resume
Troy Ens Resume
 
Ben-Coleman II
Ben-Coleman IIBen-Coleman II
Ben-Coleman II
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
 
Steve Clark CV 2015
Steve Clark CV 2015Steve Clark CV 2015
Steve Clark CV 2015
 
gene-malboeuf-resume.1
gene-malboeuf-resume.1gene-malboeuf-resume.1
gene-malboeuf-resume.1
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
gene-malboeuf-resume
gene-malboeuf-resumegene-malboeuf-resume
gene-malboeuf-resume
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 
Resume
ResumeResume
Resume
 

kshirleyresume1

  • 1. Kristopher C. Shirley 1026 Baytree Drive  Denham Springs, LA 70726  (225) 268-6947  krisshirley22@gmail.com S U P E R V I S I O N , I N S P E C T I O N , P L A N N I N G Supervisor/Inspector/Planner with a 9-year record of success overseeing all phases of multimillion-dollar construction, infrastructure, superfund and environmental projects for government and private -sector clients. Experience includes, piping construction and maintenance (turnarounds/shutdowns) including planning and scheduling, pipe fabrication, demolition and piping installation in the field, and welding inspection. Inspecting welds with hydro testing, VT, PT, and RT examinations. Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions. Key Skills Refinery/Chemical Plant Inspection Construction Leadership and Management Residential, Commercial and Plant Construction Experience Stronghold Inspection Enid, Ok Novem ber 2014-Present Pos ition: 3r d Party Inspection over Maintenance/Fixed Planner Res ponsibilities: Signing off completed work packages for all maintenance work. Verifying dye checks, hydro, PMI reports, ferrite test, and X-rays. Building work packages in Maxim o from work orders generated from operations. Reviewing packages for ins pection documents for all other work that is planned. Stronghold Inspection Enid, Ok September 2014-November 2014 Pos ition: 3r d Party QA/QC Res ponsibilities: Overs eeing inspections for Turnaround/outage work. Inspecting flanges and witnessing torques. Reviewing packages for NDE requirements for hydro completion on piping s pools. TSS Turner. Plaquemine, La July 2013– September 2014 Pos ition: CWI Res ponsibilities: Writing welding procedures, weld tracking, walking down packages, dye checking, hydro testing, flange and bolt-up inspections, PMI, film interpretation, helium testing, boroscoping pipe and equipment. Real Educational Lafayette, La June 2013 Pos ition: CWI certified through AWS. Turner Ind. Plaquemine, La December 2012 – July 2013 Pos ition: Draftsman Res ponsibilities: Us ing P&ID’s to draw existing pipe systems into isometric drawings. Is o’s will be us ed for fabrication and inspection reference for future projects. Starcon Martinez, Ca. Augus t 2012- November 2012 Pos ition: General Foreman Res ponsibilities: Served as general foreman; turnaround p lanning and scheduling, predown pipe fabrication, verified all work s cope, material and s pecifications; responsible for s cheduling all manpower for the work scope; m anaging approximately 20 em ployees; attending daily m eetings on schedule and enforcing the safety culture of the client and Starcon.
  • 2. Starcon Baytown, Texas April 2012- May 2012 Pos ition: Gulf Coast Fractionator Conoco Phillips Res ponsibilities: Foreman Predown- planning scheduling, fabrication of piping, responsible for scheduling em ployees for scheduled work scope. Installation of small and large bore piping. res ponsible for attending all meetings for the ongoing schedule and also being a team m ember and enforcing the clients’ safety culture to all of our team. Trans Fie ld Se rvices Salt Lake City, Utah Fe bruary 2012 – March 2012 Position: Construction Coordinator Re sponsibilities: Se rved coordinator over the FC/FS ESP’s at Ke nnecott’s Sme lter. Re moval of e ach chain belt conveyor and lower hopper section. Install of ne w hopper sections, conveyors, and liner for the FS ESP Hopper. All mate rials consisting of Hastelloy C276. Managing all scopes for e ve ry contractor involved in the w ork of these 2 units. Starcon Fairfield, CA November 2010 – February 2012 Position: General Foreman Responsibilities: Served as a general foreman for turnaround work; fabricated pipe inside fabrication shops and inside live units; verified all material, specs and work scope for each job; planning and scheduling; responsible for manpower planning and hiring; managed crews; performed work along the west coast in California and in Washington. J.V. Industrial Pasadena, TX October 2006 – November 2010 Position: Pipefitter/Foreman Responsibilities: Served as a layout pipe fitter for turnaround work; fabricated pipe inside fabrication shops and inside live units; managed crews of 8 fitters and 8 welders; performed work along the west coast in California to areas in Louisiana. Plant Performance Service Houston, TX January 2006 – October 2006 Position: Carpenter Forman Responsibilities: Served as Carpenter Forman for construction of ramps and steps during trailer installation for Hurricane Katrina; supervised 5 crews of 2 - 6 men each; worked with safety to inform the use of tools that were specific to our job scope. Tracy Shirley Builders Denham Springs, LA May 2000 – January 2006 Position: Carpenter Responsibilities: General construction of residential and commercial building throughout Louisiana ; framing, trim carpenter, roofing, and vinyl siding installation; assisted in company and worker management; experienced in hands on operating of many types of heavy equipment and power tools.
  • 3. E D U C A T I O N Dye Penetration II May 4, 2014 Radiographic Film Interpretation II March 9, 2014 AWS CWI June 1, 2013 Louisiana State University 2002 to 2004 Denham Springs High School 1999 to 2002 R E F E R E N C E S Craig Williams Starcon (360)770-6556 Brian Domighini Starcon (949) 939-5382 John Curtis J.V. Industrial (678) 923-5999 Mike Zeek J.V. Industrial (310) 714-2857 Tracy Shirley Chevron (225)788-2955 John Abrams TSS (225)485-1138 Matt Thomas Stronghold (870)297-3410