SlideShare une entreprise Scribd logo
1  sur  48
1
Horizontal Alignment
CE 453 Lecture 16
CEE320
Winter2006
Horizontal
Alignment
2
Horizontal Alignment
1. Tangents
2. Curves
3. Transitions
Curves require superelevation (next lecture)
Reason for super: banking of curve, retard
sliding, allow more uniform speed, also
allow use of smaller radius curves (less
land)
3
Curve Types
1. Simple curves with spirals (why spirals)
2. Broken Back – two curves same direction
(avoid)
3. Compound curves: multiple curves connected
directly together (use with caution) go from
large radii to smaller radii and have R(large) <
1.5 R(small)
4. Reverse curves – two curves, opposite direction
(require separation typically for superelevation
attainment)
4
Highway plan and profile
5
Important Components of Simple
Circular Curve
 ∆ = deflection angle ( °),
 PC = point of curve
 D = curve degree (100 m/° or 100 ft /°),
 PT = point of tangent, L = curve length (m),
 PI = point of intersection
 R = radius of circular curve (m, ft),
 T = tangent length (m, ft),
 E = external distance (m, ft).
6
Important Components of Simple
Circular Curve
See: ftp://165.206.254.150/dotmain/design/dmanual/English/e02a-01.pdf
1. PC, PI, PT, E, M, and ∆
2. L = 2(π)R(∆)/360
3 T = R tan (∆/2)
Source: Iowa DOT
Design Manual
Direction of stationing
7
Horizontal Curve Calculations
R R
∆
∆/2
E
T T
∆/2
PC PT
PI
∆ = deflection angle ( °), PC = point of curve
D = curve degree (100 m/° or 100 ft /°), PT = point
of tangent, L = curve length (m), PI = point of
intersection
R = radius of circular curve (m, ft),
T = tangent length (m, ft),
E = external distance (m, ft).












−
∆
=
∆
=
∆
=
=
1
2
cos
1
2
tan
3.57
6.5729
RE
RT
R
L
R
D
8
CEE320
Winter2006
Horizontal Curve Fundamentals
R
T
PC PT
PI
M
E
R
Δ
Δ/2Δ/2
Δ/2
RR
D
π
π 000,18
180
100
=






=
2
tan
∆
=RT
D
RL
∆
=∆=
100
180
π
L
9
CEE320
Winter2006
Horizontal Curve Fundamentals






−
∆
= 1
2cos
1
RE





 ∆
−=
2
cos1RM
R
T
PC PT
PI
M
E
R
Δ
Δ/2Δ/2
Δ/2
L
10
Horizontal Curve Example
 Deflection angle of a 4º curve is 55º25’, PI at
station 245+97.04. Find length of curve,T, and
station of PT.
 D = 4º
 ∆ = 55º25’ = 55.417º
 D = _5729.58_ R = _5729.58_ = 1,432.4 ft
R 4
11
Horizontal Curve Example
 D = 4º
 ∆ = 55.417º
 R = 1,432.4 ft
 L = 2πR∆ = 2π(1,432.4 ft)(55.417º) =
1385.42ft
360 360
12
Horizontal Curve Example
 D = 4º
 ∆ = 55.417º
 R = 1,432.4 ft
 L = 1385.42 ft
 T = R tan ∆ = 1,432.4 ft tan (55.417) = 752.29 ft
2 2
13
Stationing Example
Stationing goes around horizontal curve.
For previous example, what is station of PT?
First calculate the station of the PC:
PI = 245+97.04
PC = PI – T
PC = 245+97.04 – 752.29 = 238+44.75
14
Stationing Example (cont)
PC = 238+44.75
L = 1385.42 ft
Station at PT = PC + L
PT = 238+44.75 + 1385.42 = 252+30.17
15
CEE320
Winter2006
Example 4
A horizontal curve is designed with a 1500 ft. radius. The tangent
length is 400 ft. and the PT station is 20+00. What are the PI and PC
stations?
16
CEE320
Winter2006
Solution
• Since we know R and T we can use
• T = R tan(delta/2) to get delta = 29.86 degrees
• D = 5729.6/R. Therefore D = 3.82
• L = 100(delta)/D = 100(29.86)/3.82 = 781 ft.
• PC = PT – L = 2000 – 781 = 12+18.2
• PI = PC +T = 12+18.2 + 400 = 16+18.2.
• Note: cannot find PI by subtracting T from PT!
17
Design of Horizontal Alignment
Determination of
 Minimum Radius
 Length of curve
 Computation of offsets from the tangents to
the curve to facilitate the setting out of
t6hye curve
18
Horizontal Curve design
 Design based on appropriate relationship
between design speed and curvature and
their relationship with side friction and
superelevation
 Turning the front wheels, side friction and
superelevation generate an acceleration
toward center of curvature (centripetal
acceleration)
19
Motion on Circular Curves
dt
dv
at =
R
v
an
2
=
20
βββ coscossin ns amWfW =+
ββββ cos
cos)(cossin
2
WR
v
g
W
WfW s =+
e== β
β
β
tan
cos
sin
gR
v
fe s
2
=+
Motion on
Circular
Curves
21
Vehicle Stability on Curves
where:
gR
v
fe s
2
=+
(ft/s),speeddesign=v
(-),tcoefficienfrictionside=sf
).ft/s(32onacceleratigravity 2
=g
(-),tionsupereleva=e
(ft),radius=R
Assumed
Design
speed
(mph)
Maximum
design
fs max
20 0.17
70 0.10
Must not be too short
(0.12)0.10-0.06max =e
22
Radius Calculation
Rmin
= ___V2
______
15(e + f)
Where:
Rmin is the minimum radius in feet
V = velocity (mph)
e = superelevation
f = friction (15 = gravity and unit conversion)
23
Radius Calculation
• Rmin
uses max e and max f (defined by AASHTO, DOT,
and graphed in Green Book) and design speed
• f is a function of speed, roadway surface, weather
condition, tire condition, and based on comfort – drivers
brake, make sudden lane changes, and change position
within a lane when acceleration around a curve becomes
“uncomfortable”
• AASHTO: 0.5 @ 20 mph with new tires and wet
pavement to 0.35 @ 60 mph
• f decreases as speed increases (less tire/pavement
contact)
24
Max e
 Controlled by 4 factors:
 Climate conditions (amount of ice and snow)
 Terrain (flat, rolling, mountainous)
 Type of area (rural or urban)
 Frequency of slow moving vehicles who
might be influenced by high superelevation
rates
25
Max e
 Highest in common use = 10%, 12% with no
ice and snow on low volume gravel-surfaced
roads
 8% is logical maximum to minimize slipping
by stopped vehicles, considering snow and
ice
 Iowa uses a maximum of 6% on new projects
 For consistency use a single rate within a
project or on a highway
26
Source: A
Policy on
Geometric
Design of
Highways and
Streets (The
Green Book).
Washington,
DC. American
Association of
State Highway
and
Transportation
Officials, 2001
4th
Ed.
27
Radius Calculation (Example)
Design radius example: assume a maximum e
of 8% and design speed of 60 mph, what is
the minimum radius?
fmax = 0.12 (from Green Book)
Rmin
= _____602
________________
15(0.08 + 0.12)
Rmin = 1200 feet
28
Radius Calculation (Example)
For emax = 4%? (urban situation)
Rmin
= _____602
________________
15(0.04 + 0.12)
Rmin = 1,500 feet
29
Radius Calculation (Example)
For emax = 2%? (rotated crown)
Rmin
= _____602
________________
15(0.02 + 0.12)
Rmin = 1,714 feet
30
Radius Calculation (Example)
For emax = -2%? (normal crown, adverse
direction)
Rmin
= _____602
________________
15(-0.02 + 0.12)
Rmin = 2,400 feet
Sight Distance for Horizontal
Curves
31
32
Sight Distance for Horizontal Curves
 Location of object along chord length that blocks
line of sight around the curve
 m = R(1 – cos [28.65 S])
R
Where:
m = line of sight
S = stopping sight distance
R = radius
33
Sight Obstruction on Horizontal
Curves
 Assume S is the SSD equal to chord AT
 Angle subtended at centre of circle by arc AT
is 2θ in degree then
 Total circumference perimeter (πR)
 S / πR = 2θ / 180
 S = 2R θπ / 180
 θ = S 180/ 2R π = 28.65 (S) / R
 R-M/R = cos θ
 M = R [1 – cos 28.65 (S) / R ]
θR
M
A T
B
T
O
O
θ
B
34
Line of sight is the chord
AT
Horizontal distance
traveled is arc AT, which
is SD.
SD is measured along
the centre line of inside
lane around the curve.
See the relationship
between radius of curve,
the degree of curve, SSD
and the middle ordinate
S
R
M
O
TA
35
Sight Distance Example
A horizontal curve with R = 800 ft is part of a 2-lane
highway with a posted speed limit of 35 mph.
What is the minimum distance that a large
billboard can be placed from the centerline of the
inside lane of the curve without reducing required
SSD? Assume p/r =2.5 and a = 11.2 ft/sec2
SSD = 1.47vt + _________v2
____
30(__a___ ± G)
32.2
36
Sight Distance Example
SSD = 1.47(35 mph)(2.5 sec) +
_____(35 mph)2
____ = 246 feet
30(__11.2___ ± 0)
32.2
37
Sight Distance Example
m = R(1 – cos [28.65 S])
R
m = 800 (1 – cos [28.65 {246}]) = 9.43 feet
800
(in radians not degrees)
38
Horizontal Curve Example
 Deflection angle of a 4º curve is 55º25’, PI at
station 245+97.04. Find length of curve,T, and
station of PT.
 D = 4º
 ∆ = 55º25’ = 55.417º
 D = _5729.58_ R = _5729.58_ = 1,432.4 ft
R 4
39
Horizontal Curve Example
 D = 4º
 ∆ = 55.417º
 R = 1,432.4 ft
 L = 2πR∆ = 2π(1,432.4 ft)(55.417º) =
1385.42ft
360 360
40
Horizontal Curve Example
 D = 4º
 ∆ = 55.417º
 R = 1,432.4 ft
 L = 1385.42 ft
 T = R tan ∆ = 1,432.4 ft tan (55.417) = 752.29 ft
2 2
41
Stationing Example
Stationing goes around horizontal curve.
For previous example, what is station of PT?
First calculate the station of the PC:
PI = 245+97.04
PC = PI – T
PC = 245+97.04 – 752.29 = 238+44.75
42
Stationing Example (cont)
PC = 238+44.75
L = 1385.42 ft
Station at PT = PC + L
PT = 238+44.75 + 1385.42 = 252+30.17
43
Suggested Steps in Horizontal
Design
1. Select tangents, PIs, and general curves making
sure you meet minimum radius criteria
2. Select specific curve radii/spiral and calculate
important points (see lab) using formula or table
(those needed for design, plans, and lab
requirements)
3. Station alignment (as curves are encountered)
4. Determine super and runoff for curves and put in
table (see next lecture for def.)
5. Add information to plans
44
HOMEWORK
 Your team is responsible for the design of
a small roadway project in Iowa. Your
individual task is to design a horizontal
curve to the right using an even value
radius slightly larger than the minimum
radius curve. Use a design speed of 55
mph and a superelevation rate of 4%.
Assume the PI has a station of 352+44.97;
the Δ (delta) of the curve is 35° 24’ 55”.
45
HOMEWORK
 Referring to the Iowa DOT Design
Manual you find guidance at
ftp://165.206.203.34/design/dmanual/02a-01.pd
on the design of horizontal curves.
46
HOMEWORK
Your assignment:
 Reading carefully the design guidance
with special attention to the items to be
included on the plans, calculate all of the
values to be shown on a plan set for this
curve. Be sure to calculate the stations of
the PC and PT in addition to the values
listed.
47
HOMEWORK
Your assignment:
 At this time do not concern yourself with
superelevation runoff; just use the design
speed and superelevation rate to determine
the minimum radius curve allowable. It
may help you to create a list of the items
to be included before doing your
calculations.
48
HOMEWORK
Your assignment:
 Now use a design speed of 60 mph and
the same 4% superelevation rate to
calculate the curve. Your PI station and Δ
will remain unchanged.

Contenu connexe

Tendances

Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Hossam Shafiq I
 
Sight Distance for horizontal curves
Sight Distance for horizontal curvesSight Distance for horizontal curves
Sight Distance for horizontal curvesLatif Hyder Wadho
 
Vertical Alignment in road design
Vertical Alignment in road designVertical Alignment in road design
Vertical Alignment in road designpresentationsinfo
 
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristicskamariya keyur
 
Design of vertical alignment
Design of vertical alignmentDesign of vertical alignment
Design of vertical alignmentWyman Words
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTUVATSAL PATEL
 
Traffic Flow Fundamentals
Traffic Flow FundamentalsTraffic Flow Fundamentals
Traffic Flow FundamentalsShaira Lucero
 
Chapter 3&amp;4
Chapter 3&amp;4Chapter 3&amp;4
Chapter 3&amp;4EWIT
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistanceHai Vo
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and SuperelevationMir Zafarullah
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 

Tendances (20)

Sight distance
Sight distanceSight distance
Sight distance
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)
 
Sight Distance for horizontal curves
Sight Distance for horizontal curvesSight Distance for horizontal curves
Sight Distance for horizontal curves
 
Vertical Alignment in road design
Vertical Alignment in road designVertical Alignment in road design
Vertical Alignment in road design
 
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
Design of vertical alignment
Design of vertical alignmentDesign of vertical alignment
Design of vertical alignment
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
 
Traffic Flow Fundamentals
Traffic Flow FundamentalsTraffic Flow Fundamentals
Traffic Flow Fundamentals
 
Chapter 3&amp;4
Chapter 3&amp;4Chapter 3&amp;4
Chapter 3&amp;4
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistance
 
Superelevation
SuperelevationSuperelevation
Superelevation
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Widening of curve
Widening of curveWidening of curve
Widening of curve
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 

Similaire à Horizontal alignment of Roads

18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.ppt18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.pptKKKL5
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxdarmadi ir,mm
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...Malyar Talash
 
2. Alinyemen Horizontal.ppt
2. Alinyemen Horizontal.ppt2. Alinyemen Horizontal.ppt
2. Alinyemen Horizontal.pptkhaidaralbadar
 
Alighnment & horizontal alignment of highway (transportation engineering)
Alighnment & horizontal alignment of highway (transportation engineering)Alighnment & horizontal alignment of highway (transportation engineering)
Alighnment & horizontal alignment of highway (transportation engineering)Civil Zone
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
hz alignment lec4.pdf
hz alignment lec4.pdfhz alignment lec4.pdf
hz alignment lec4.pdfamira525139
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignmentPiter Biswas
 
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesPlatoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesKaustav Mondal
 
Mba admission in india
Mba admission in indiaMba admission in india
Mba admission in indiaEdhole.com
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highwayssrinivas2036
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSheng Zhe
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Let's Tute
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6eSAT Publishing House
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
 

Similaire à Horizontal alignment of Roads (20)

18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.ppt18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.ppt
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
 
2. Alinyemen Horizontal.ppt
2. Alinyemen Horizontal.ppt2. Alinyemen Horizontal.ppt
2. Alinyemen Horizontal.ppt
 
Alighnment & horizontal alignment of highway (transportation engineering)
Alighnment & horizontal alignment of highway (transportation engineering)Alighnment & horizontal alignment of highway (transportation engineering)
Alighnment & horizontal alignment of highway (transportation engineering)
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
hz alignment lec4.pdf
hz alignment lec4.pdfhz alignment lec4.pdf
hz alignment lec4.pdf
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignment
 
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesPlatoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
 
Mba admission in india
Mba admission in indiaMba admission in india
Mba admission in india
 
Area & volume 2
Area & volume  2Area & volume  2
Area & volume 2
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Transportation engineering highway part
Transportation engineering highway partTransportation engineering highway part
Transportation engineering highway part
 
Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6
 
70148
70148 70148
70148
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
 

Plus de Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRWLatif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWLatif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papersLatif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testLatif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global languageLatif Hyder Wadho
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical EngineeringLatif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of pilesLatif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation EngineeringLatif Hyder Wadho
 

Plus de Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Dernier

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 

Dernier (20)

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 

Horizontal alignment of Roads

  • 1. 1 Horizontal Alignment CE 453 Lecture 16 CEE320 Winter2006 Horizontal Alignment
  • 2. 2 Horizontal Alignment 1. Tangents 2. Curves 3. Transitions Curves require superelevation (next lecture) Reason for super: banking of curve, retard sliding, allow more uniform speed, also allow use of smaller radius curves (less land)
  • 3. 3 Curve Types 1. Simple curves with spirals (why spirals) 2. Broken Back – two curves same direction (avoid) 3. Compound curves: multiple curves connected directly together (use with caution) go from large radii to smaller radii and have R(large) < 1.5 R(small) 4. Reverse curves – two curves, opposite direction (require separation typically for superelevation attainment)
  • 5. 5 Important Components of Simple Circular Curve  ∆ = deflection angle ( °),  PC = point of curve  D = curve degree (100 m/° or 100 ft /°),  PT = point of tangent, L = curve length (m),  PI = point of intersection  R = radius of circular curve (m, ft),  T = tangent length (m, ft),  E = external distance (m, ft).
  • 6. 6 Important Components of Simple Circular Curve See: ftp://165.206.254.150/dotmain/design/dmanual/English/e02a-01.pdf 1. PC, PI, PT, E, M, and ∆ 2. L = 2(π)R(∆)/360 3 T = R tan (∆/2) Source: Iowa DOT Design Manual Direction of stationing
  • 7. 7 Horizontal Curve Calculations R R ∆ ∆/2 E T T ∆/2 PC PT PI ∆ = deflection angle ( °), PC = point of curve D = curve degree (100 m/° or 100 ft /°), PT = point of tangent, L = curve length (m), PI = point of intersection R = radius of circular curve (m, ft), T = tangent length (m, ft), E = external distance (m, ft).             − ∆ = ∆ = ∆ = = 1 2 cos 1 2 tan 3.57 6.5729 RE RT R L R D
  • 8. 8 CEE320 Winter2006 Horizontal Curve Fundamentals R T PC PT PI M E R Δ Δ/2Δ/2 Δ/2 RR D π π 000,18 180 100 =       = 2 tan ∆ =RT D RL ∆ =∆= 100 180 π L
  • 9. 9 CEE320 Winter2006 Horizontal Curve Fundamentals       − ∆ = 1 2cos 1 RE       ∆ −= 2 cos1RM R T PC PT PI M E R Δ Δ/2Δ/2 Δ/2 L
  • 10. 10 Horizontal Curve Example  Deflection angle of a 4º curve is 55º25’, PI at station 245+97.04. Find length of curve,T, and station of PT.  D = 4º  ∆ = 55º25’ = 55.417º  D = _5729.58_ R = _5729.58_ = 1,432.4 ft R 4
  • 11. 11 Horizontal Curve Example  D = 4º  ∆ = 55.417º  R = 1,432.4 ft  L = 2πR∆ = 2π(1,432.4 ft)(55.417º) = 1385.42ft 360 360
  • 12. 12 Horizontal Curve Example  D = 4º  ∆ = 55.417º  R = 1,432.4 ft  L = 1385.42 ft  T = R tan ∆ = 1,432.4 ft tan (55.417) = 752.29 ft 2 2
  • 13. 13 Stationing Example Stationing goes around horizontal curve. For previous example, what is station of PT? First calculate the station of the PC: PI = 245+97.04 PC = PI – T PC = 245+97.04 – 752.29 = 238+44.75
  • 14. 14 Stationing Example (cont) PC = 238+44.75 L = 1385.42 ft Station at PT = PC + L PT = 238+44.75 + 1385.42 = 252+30.17
  • 15. 15 CEE320 Winter2006 Example 4 A horizontal curve is designed with a 1500 ft. radius. The tangent length is 400 ft. and the PT station is 20+00. What are the PI and PC stations?
  • 16. 16 CEE320 Winter2006 Solution • Since we know R and T we can use • T = R tan(delta/2) to get delta = 29.86 degrees • D = 5729.6/R. Therefore D = 3.82 • L = 100(delta)/D = 100(29.86)/3.82 = 781 ft. • PC = PT – L = 2000 – 781 = 12+18.2 • PI = PC +T = 12+18.2 + 400 = 16+18.2. • Note: cannot find PI by subtracting T from PT!
  • 17. 17 Design of Horizontal Alignment Determination of  Minimum Radius  Length of curve  Computation of offsets from the tangents to the curve to facilitate the setting out of t6hye curve
  • 18. 18 Horizontal Curve design  Design based on appropriate relationship between design speed and curvature and their relationship with side friction and superelevation  Turning the front wheels, side friction and superelevation generate an acceleration toward center of curvature (centripetal acceleration)
  • 19. 19 Motion on Circular Curves dt dv at = R v an 2 =
  • 20. 20 βββ coscossin ns amWfW =+ ββββ cos cos)(cossin 2 WR v g W WfW s =+ e== β β β tan cos sin gR v fe s 2 =+ Motion on Circular Curves
  • 21. 21 Vehicle Stability on Curves where: gR v fe s 2 =+ (ft/s),speeddesign=v (-),tcoefficienfrictionside=sf ).ft/s(32onacceleratigravity 2 =g (-),tionsupereleva=e (ft),radius=R Assumed Design speed (mph) Maximum design fs max 20 0.17 70 0.10 Must not be too short (0.12)0.10-0.06max =e
  • 22. 22 Radius Calculation Rmin = ___V2 ______ 15(e + f) Where: Rmin is the minimum radius in feet V = velocity (mph) e = superelevation f = friction (15 = gravity and unit conversion)
  • 23. 23 Radius Calculation • Rmin uses max e and max f (defined by AASHTO, DOT, and graphed in Green Book) and design speed • f is a function of speed, roadway surface, weather condition, tire condition, and based on comfort – drivers brake, make sudden lane changes, and change position within a lane when acceleration around a curve becomes “uncomfortable” • AASHTO: 0.5 @ 20 mph with new tires and wet pavement to 0.35 @ 60 mph • f decreases as speed increases (less tire/pavement contact)
  • 24. 24 Max e  Controlled by 4 factors:  Climate conditions (amount of ice and snow)  Terrain (flat, rolling, mountainous)  Type of area (rural or urban)  Frequency of slow moving vehicles who might be influenced by high superelevation rates
  • 25. 25 Max e  Highest in common use = 10%, 12% with no ice and snow on low volume gravel-surfaced roads  8% is logical maximum to minimize slipping by stopped vehicles, considering snow and ice  Iowa uses a maximum of 6% on new projects  For consistency use a single rate within a project or on a highway
  • 26. 26 Source: A Policy on Geometric Design of Highways and Streets (The Green Book). Washington, DC. American Association of State Highway and Transportation Officials, 2001 4th Ed.
  • 27. 27 Radius Calculation (Example) Design radius example: assume a maximum e of 8% and design speed of 60 mph, what is the minimum radius? fmax = 0.12 (from Green Book) Rmin = _____602 ________________ 15(0.08 + 0.12) Rmin = 1200 feet
  • 28. 28 Radius Calculation (Example) For emax = 4%? (urban situation) Rmin = _____602 ________________ 15(0.04 + 0.12) Rmin = 1,500 feet
  • 29. 29 Radius Calculation (Example) For emax = 2%? (rotated crown) Rmin = _____602 ________________ 15(0.02 + 0.12) Rmin = 1,714 feet
  • 30. 30 Radius Calculation (Example) For emax = -2%? (normal crown, adverse direction) Rmin = _____602 ________________ 15(-0.02 + 0.12) Rmin = 2,400 feet
  • 31. Sight Distance for Horizontal Curves 31
  • 32. 32 Sight Distance for Horizontal Curves  Location of object along chord length that blocks line of sight around the curve  m = R(1 – cos [28.65 S]) R Where: m = line of sight S = stopping sight distance R = radius
  • 33. 33 Sight Obstruction on Horizontal Curves  Assume S is the SSD equal to chord AT  Angle subtended at centre of circle by arc AT is 2θ in degree then  Total circumference perimeter (πR)  S / πR = 2θ / 180  S = 2R θπ / 180  θ = S 180/ 2R π = 28.65 (S) / R  R-M/R = cos θ  M = R [1 – cos 28.65 (S) / R ] θR M A T B T O O θ B
  • 34. 34 Line of sight is the chord AT Horizontal distance traveled is arc AT, which is SD. SD is measured along the centre line of inside lane around the curve. See the relationship between radius of curve, the degree of curve, SSD and the middle ordinate S R M O TA
  • 35. 35 Sight Distance Example A horizontal curve with R = 800 ft is part of a 2-lane highway with a posted speed limit of 35 mph. What is the minimum distance that a large billboard can be placed from the centerline of the inside lane of the curve without reducing required SSD? Assume p/r =2.5 and a = 11.2 ft/sec2 SSD = 1.47vt + _________v2 ____ 30(__a___ ± G) 32.2
  • 36. 36 Sight Distance Example SSD = 1.47(35 mph)(2.5 sec) + _____(35 mph)2 ____ = 246 feet 30(__11.2___ ± 0) 32.2
  • 37. 37 Sight Distance Example m = R(1 – cos [28.65 S]) R m = 800 (1 – cos [28.65 {246}]) = 9.43 feet 800 (in radians not degrees)
  • 38. 38 Horizontal Curve Example  Deflection angle of a 4º curve is 55º25’, PI at station 245+97.04. Find length of curve,T, and station of PT.  D = 4º  ∆ = 55º25’ = 55.417º  D = _5729.58_ R = _5729.58_ = 1,432.4 ft R 4
  • 39. 39 Horizontal Curve Example  D = 4º  ∆ = 55.417º  R = 1,432.4 ft  L = 2πR∆ = 2π(1,432.4 ft)(55.417º) = 1385.42ft 360 360
  • 40. 40 Horizontal Curve Example  D = 4º  ∆ = 55.417º  R = 1,432.4 ft  L = 1385.42 ft  T = R tan ∆ = 1,432.4 ft tan (55.417) = 752.29 ft 2 2
  • 41. 41 Stationing Example Stationing goes around horizontal curve. For previous example, what is station of PT? First calculate the station of the PC: PI = 245+97.04 PC = PI – T PC = 245+97.04 – 752.29 = 238+44.75
  • 42. 42 Stationing Example (cont) PC = 238+44.75 L = 1385.42 ft Station at PT = PC + L PT = 238+44.75 + 1385.42 = 252+30.17
  • 43. 43 Suggested Steps in Horizontal Design 1. Select tangents, PIs, and general curves making sure you meet minimum radius criteria 2. Select specific curve radii/spiral and calculate important points (see lab) using formula or table (those needed for design, plans, and lab requirements) 3. Station alignment (as curves are encountered) 4. Determine super and runoff for curves and put in table (see next lecture for def.) 5. Add information to plans
  • 44. 44 HOMEWORK  Your team is responsible for the design of a small roadway project in Iowa. Your individual task is to design a horizontal curve to the right using an even value radius slightly larger than the minimum radius curve. Use a design speed of 55 mph and a superelevation rate of 4%. Assume the PI has a station of 352+44.97; the Δ (delta) of the curve is 35° 24’ 55”.
  • 45. 45 HOMEWORK  Referring to the Iowa DOT Design Manual you find guidance at ftp://165.206.203.34/design/dmanual/02a-01.pd on the design of horizontal curves.
  • 46. 46 HOMEWORK Your assignment:  Reading carefully the design guidance with special attention to the items to be included on the plans, calculate all of the values to be shown on a plan set for this curve. Be sure to calculate the stations of the PC and PT in addition to the values listed.
  • 47. 47 HOMEWORK Your assignment:  At this time do not concern yourself with superelevation runoff; just use the design speed and superelevation rate to determine the minimum radius curve allowable. It may help you to create a list of the items to be included before doing your calculations.
  • 48. 48 HOMEWORK Your assignment:  Now use a design speed of 60 mph and the same 4% superelevation rate to calculate the curve. Your PI station and Δ will remain unchanged.