Asset Intensive Industry Goals
To achieve
• Safe operations
• Profit and ROI
• Balance long/short decisions
• Sustainability
• Regulatory
To improve
• Improve uptime
• Asset longevity
• Safety and Risk Management
• Improve yield
• Cost control
Lloyd’s Register Energy - Offshore Europe 2015
WHY RBI?
The right insights, to make
the right decisions, to keep
assets “under control”
(operating within set
boundaries for business
performance, safety, and
compliance) at all times
Lloyd’s Register Energy - Offshore Europe 2015
 Reduce unplanned
downtime
 Reduce failures,
specifically HSE and
catastrophic ones
 Aging plant with
unknowns
 Balance long range
improvements with quick
wins
WHY RBI?
Lloyd’s Register Energy - Offshore Europe 2015
Challenges with existing Risk Approaches
Typically look backwards at failures vs. predicting and mitigating. Narrow
view. What you’re doing now, how do we get you to world class?
Lack engineering expertise in-house; start from scratch with reliability
models every time
Ability to close the loop between recommended actions and actual
performance
Lloyd’s Register Energy - Offshore Europe 2015
Challenges with existing Risk Approaches
Lloyd’s Register Energy - Offshore Europe 2015
Complianc
e Manager
Embedded within
Root
Cause
Analysis
Predictive
Modeling
Reliability
Centered
Maintenanc
e
Industry
Libraries
Lloyd’s Register Energy - Offshore Europe 2015
Introducing RBI
Embedded within
Why we’re a good fit and position to address these challeng
We’ve done
this before
• First to make integrated RBI system, often ahead of standards
• Existing RBI and APM Software (RBMI, strEAM+ and Optimizer)
• Innovative library approach accelerates time to value 50-80%
Lloyd’s Register Energy - Offshore Europe 2015
Publishing models to customers EAM
Internet
Customer A
(Maximo)
Customer B
(SAP)
Customer C
Standalone
LR
Library Manager
Publishing Models
• Version and manage models via meta data
• Model development takes weeks, not years
• Current Models include Fixed Equipment,
Pipe, Relief Devices, Instrumentation, subsea
jacketed structures, and rotating
• More models in the works
Lloyd’s Register Energy - Offshore Europe 2015
Stored in and performed in Maximo throughout asset life cycle
Design
In-Service
Construction
Decommission
Risk-Based
RBI
RCM
Optimize
Time-Based
Run to Fail
CM’s
PM’s
MOC
Spares
Plan
Work Order
Job Plan/
Details
Execute
Inspection
Maintenance
Telemetry
Analyze
Failure/RCA
NCR
Compliance
Trending
Condition-Based
Asset Management Strategy
Safety
Work pack
Improve
Maximo
LR Modules
Broadsword
FMEA
Libraries
SME
Lloyd’s Register Energy - Offshore Europe 2015
Risk provides a sustainable solution over time
Time
Risk
Acceptable Limits
Traditional Approach
The cost and effort to manage risk
increases significantly over time
Decrease effort/cost,
increasing knowledge
Plan
Do
Check
Update
Plan
Do
Check
Update
Lloyd’s Register Energy - Offshore Europe 2015
The Financial Case
EAM
RBI
Inspection
Management
RCM
As-Is
• Disparate Systems
• Costly Integration
• Redundant or Missing
information
• Not connecting workgroups
• Engineering knowledge
erosion
Lloyd’s Register Energy - Offshore Europe 2015
The Financial Case
Maximo
Analysis
Inspection
Management
RBI To-Be
• Leverage EAM investments
• Single Data Source
• Strategic and Tactical
decision making
• Right information to the right
person
• Knowledge retention
Lloyd’s Register Energy - Offshore Europe 2015
The Safety Case…..
What if you could
• Quantify your HSE risk…
• Predict failures…
• Focus resources…
• Continuous improvement…
• In your EAM system…
Lloyd’s Register Energy - Offshore Europe 2015
Demonstration of RBI, PM’s and Work Orders…..
Design
In-Service
Construction
Decommission
Risk-Based
RBI
RCM
Optimize
Time-Based
Run to Fail
CM’s
PM’s
MOC
Spares
Plan
Work Order
Job Plan/
Details
Execute
Inspection
Maintenance
Telemetry
Analyze
Failure/RCA
NCR
Compliance
Trending
Condition-Based
Asset Management Strategy
Safety
Work pack
Improve
Maximo
LR Modules
Broadsword
FMEA
Libraries
SME
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI embedded within Maximo
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI embedded within Maximo – Internal Corrosion
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI – Qualitative model
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI – Qualitative continued
Lloyd’s Register Energy - Offshore Europe 2015
Mitigating the risk (recommendations)
Auto calculation of due
dates (frequency + last
activity date)
Lloyd’s Register Energy - Offshore Europe 2015
Realizing the mitigations to work orders (PM’s in Maximo)
Lloyd’s Register Energy - Offshore Europe 2015
Summary
• Proven approach with preconfigured
models, though customers can
developer their own
Time to Value
• Predictive models
• Optimal life performance of the asset
Focus limited resources on
most important items
• Leverage existing EAM investments
• Reduce cost of ownership
Integrated processes that
generate maximum
Lloyd’s Register Energy - Offshore Europe 2015
Question and Answer
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Energy. 2015. A member of the Lloyd’s Register group.
Jarret Reeves
Asset Integrity Systems Product Manager
Lloyd’s Register Energy
T +1 281-649-2226
E jarret.reeves@lr.org
Working together
for a safer world

Contenu connexe

Tendances

Planning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopPlanning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages Workshop
Life Cycle Engineering
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
Indranath Sinha
 
Incident Escalation process Presentation
Incident Escalation process PresentationIncident Escalation process Presentation
Incident Escalation process Presentation
Lukas Williamson
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
Simmy Sharma
 
Free help desk evaluation checklist
Free help desk evaluation checklistFree help desk evaluation checklist
Free help desk evaluation checklist
IITSW Company
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
PANKAJ TIKEKAR
 

Tendances (20)

Quality tools in JUST 2 HOURS !!
Quality tools in JUST 2 HOURS !!Quality tools in JUST 2 HOURS !!
Quality tools in JUST 2 HOURS !!
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best Practices
 
Mitigation Plan In Risk Management PowerPoint Presentation Slides
Mitigation Plan In Risk Management PowerPoint Presentation SlidesMitigation Plan In Risk Management PowerPoint Presentation Slides
Mitigation Plan In Risk Management PowerPoint Presentation Slides
 
A01 - Defining the Asset Hierarchy and Structure (MCU)
A01 - Defining the Asset Hierarchy and Structure (MCU)A01 - Defining the Asset Hierarchy and Structure (MCU)
A01 - Defining the Asset Hierarchy and Structure (MCU)
 
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
 
Problem Management
Problem ManagementProblem Management
Problem Management
 
Root Cause Analysis (RCA) Tools
Root Cause Analysis (RCA) ToolsRoot Cause Analysis (RCA) Tools
Root Cause Analysis (RCA) Tools
 
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle. Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
 
Problem Management Overview
Problem Management OverviewProblem Management Overview
Problem Management Overview
 
Planning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopPlanning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages Workshop
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
CMDB - Strategic Role in IT Services - Configuration Management Moves Front a...
CMDB - Strategic Role in IT Services - Configuration Management Moves Front a...CMDB - Strategic Role in IT Services - Configuration Management Moves Front a...
CMDB - Strategic Role in IT Services - Configuration Management Moves Front a...
 
ISO 19650 Information Management Process - Information Model Delivery (Episod...
ISO 19650 Information Management Process - Information Model Delivery (Episod...ISO 19650 Information Management Process - Information Model Delivery (Episod...
ISO 19650 Information Management Process - Information Model Delivery (Episod...
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
 
Change Control Process PowerPoint Presentation Slides
Change Control Process PowerPoint Presentation SlidesChange Control Process PowerPoint Presentation Slides
Change Control Process PowerPoint Presentation Slides
 
Incident Escalation process Presentation
Incident Escalation process PresentationIncident Escalation process Presentation
Incident Escalation process Presentation
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Free help desk evaluation checklist
Free help desk evaluation checklistFree help desk evaluation checklist
Free help desk evaluation checklist
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
APM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added ValueAPM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added Value
 

Similaire à RBI Embedded within Maximo

IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
Pieter van Asten
 
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
ptulachan
 
Multi Model Performance Improvement
Multi Model Performance ImprovementMulti Model Performance Improvement
Multi Model Performance Improvement
George Brotbeck
 

Similaire à RBI Embedded within Maximo (20)

Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Ecosystems - Drive improvement from Holistic Insight
Ecosystems - Drive improvement from Holistic InsightEcosystems - Drive improvement from Holistic Insight
Ecosystems - Drive improvement from Holistic Insight
 
FacilitiesandAssetManagement.ppt
FacilitiesandAssetManagement.pptFacilitiesandAssetManagement.ppt
FacilitiesandAssetManagement.ppt
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
 
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
 
Multi Model Performance Improvement
Multi Model Performance ImprovementMulti Model Performance Improvement
Multi Model Performance Improvement
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
 
Data center insights summit 2015 disruptive force of clouds
Data center insights summit 2015   disruptive force of cloudsData center insights summit 2015   disruptive force of clouds
Data center insights summit 2015 disruptive force of clouds
 
Investment Accounting in the Cloud
Investment Accounting in the CloudInvestment Accounting in the Cloud
Investment Accounting in the Cloud
 
Oracle Cloud modernized Finance Process at CSL
Oracle Cloud modernized Finance Process at CSLOracle Cloud modernized Finance Process at CSL
Oracle Cloud modernized Finance Process at CSL
 
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...
 
BPM Application Infrastructure
BPM Application InfrastructureBPM Application Infrastructure
BPM Application Infrastructure
 
Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...
Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...
Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
MSS Business Integration Practice Ibm Web Sphere
MSS Business Integration Practice   Ibm Web SphereMSS Business Integration Practice   Ibm Web Sphere
MSS Business Integration Practice Ibm Web Sphere
 
A Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingA Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning Prototyping
 
The Science of Predictive Maintenance: IBM's Predictive Analytics Solution
The Science of Predictive Maintenance: IBM's Predictive Analytics SolutionThe Science of Predictive Maintenance: IBM's Predictive Analytics Solution
The Science of Predictive Maintenance: IBM's Predictive Analytics Solution
 
Management Consultancy Saudi Telecom Digital Transformation Design Thinking
Management Consultancy Saudi Telecom Digital Transformation Design ThinkingManagement Consultancy Saudi Telecom Digital Transformation Design Thinking
Management Consultancy Saudi Telecom Digital Transformation Design Thinking
 

Plus de Lloyd's Register Energy

Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy
 

Plus de Lloyd's Register Energy (20)

What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
Maximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environmentMaximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environment
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performance
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Bop reliability
Bop reliabilityBop reliability
Bop reliability
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throw
 

Dernier

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 

RBI Embedded within Maximo

  • 1. Working together for a safer world RBI Embedded within Maximo Jarret Reeves - Asset Integrity Systems Product Manager How technology and innovation drive optimisation AND safety.
  • 2. Lloyd’s Register Energy - Offshore Europe 2015 Asset Intensive Industry Goals To achieve • Safe operations • Profit and ROI • Balance long/short decisions • Sustainability • Regulatory To improve • Improve uptime • Asset longevity • Safety and Risk Management • Improve yield • Cost control
  • 3. Lloyd’s Register Energy - Offshore Europe 2015 WHY RBI? The right insights, to make the right decisions, to keep assets “under control” (operating within set boundaries for business performance, safety, and compliance) at all times
  • 4. Lloyd’s Register Energy - Offshore Europe 2015  Reduce unplanned downtime  Reduce failures, specifically HSE and catastrophic ones  Aging plant with unknowns  Balance long range improvements with quick wins WHY RBI?
  • 5. Lloyd’s Register Energy - Offshore Europe 2015 Challenges with existing Risk Approaches Typically look backwards at failures vs. predicting and mitigating. Narrow view. What you’re doing now, how do we get you to world class? Lack engineering expertise in-house; start from scratch with reliability models every time Ability to close the loop between recommended actions and actual performance
  • 6. Lloyd’s Register Energy - Offshore Europe 2015 Challenges with existing Risk Approaches
  • 7. Lloyd’s Register Energy - Offshore Europe 2015 Complianc e Manager Embedded within Root Cause Analysis Predictive Modeling Reliability Centered Maintenanc e Industry Libraries
  • 8. Lloyd’s Register Energy - Offshore Europe 2015 Introducing RBI Embedded within
  • 9. Why we’re a good fit and position to address these challeng
  • 10. We’ve done this before • First to make integrated RBI system, often ahead of standards • Existing RBI and APM Software (RBMI, strEAM+ and Optimizer) • Innovative library approach accelerates time to value 50-80%
  • 11. Lloyd’s Register Energy - Offshore Europe 2015 Publishing models to customers EAM Internet Customer A (Maximo) Customer B (SAP) Customer C Standalone LR Library Manager Publishing Models • Version and manage models via meta data • Model development takes weeks, not years • Current Models include Fixed Equipment, Pipe, Relief Devices, Instrumentation, subsea jacketed structures, and rotating • More models in the works
  • 12. Lloyd’s Register Energy - Offshore Europe 2015 Stored in and performed in Maximo throughout asset life cycle Design In-Service Construction Decommission Risk-Based RBI RCM Optimize Time-Based Run to Fail CM’s PM’s MOC Spares Plan Work Order Job Plan/ Details Execute Inspection Maintenance Telemetry Analyze Failure/RCA NCR Compliance Trending Condition-Based Asset Management Strategy Safety Work pack Improve Maximo LR Modules Broadsword FMEA Libraries SME
  • 13. Lloyd’s Register Energy - Offshore Europe 2015 Risk provides a sustainable solution over time Time Risk Acceptable Limits Traditional Approach The cost and effort to manage risk increases significantly over time Decrease effort/cost, increasing knowledge Plan Do Check Update Plan Do Check Update
  • 14. Lloyd’s Register Energy - Offshore Europe 2015 The Financial Case EAM RBI Inspection Management RCM As-Is • Disparate Systems • Costly Integration • Redundant or Missing information • Not connecting workgroups • Engineering knowledge erosion
  • 15. Lloyd’s Register Energy - Offshore Europe 2015 The Financial Case Maximo Analysis Inspection Management RBI To-Be • Leverage EAM investments • Single Data Source • Strategic and Tactical decision making • Right information to the right person • Knowledge retention
  • 16. Lloyd’s Register Energy - Offshore Europe 2015 The Safety Case….. What if you could • Quantify your HSE risk… • Predict failures… • Focus resources… • Continuous improvement… • In your EAM system…
  • 17. Lloyd’s Register Energy - Offshore Europe 2015 Demonstration of RBI, PM’s and Work Orders….. Design In-Service Construction Decommission Risk-Based RBI RCM Optimize Time-Based Run to Fail CM’s PM’s MOC Spares Plan Work Order Job Plan/ Details Execute Inspection Maintenance Telemetry Analyze Failure/RCA NCR Compliance Trending Condition-Based Asset Management Strategy Safety Work pack Improve Maximo LR Modules Broadsword FMEA Libraries SME
  • 18. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI embedded within Maximo
  • 19. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI embedded within Maximo – Internal Corrosion
  • 20. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI – Qualitative model
  • 21. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI – Qualitative continued
  • 22. Lloyd’s Register Energy - Offshore Europe 2015 Mitigating the risk (recommendations) Auto calculation of due dates (frequency + last activity date)
  • 23. Lloyd’s Register Energy - Offshore Europe 2015 Realizing the mitigations to work orders (PM’s in Maximo)
  • 24. Lloyd’s Register Energy - Offshore Europe 2015 Summary • Proven approach with preconfigured models, though customers can developer their own Time to Value • Predictive models • Optimal life performance of the asset Focus limited resources on most important items • Leverage existing EAM investments • Reduce cost of ownership Integrated processes that generate maximum
  • 25. Lloyd’s Register Energy - Offshore Europe 2015 Question and Answer
  • 26. Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Energy. 2015. A member of the Lloyd’s Register group. Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Energy T +1 281-649-2226 E jarret.reeves@lr.org Working together for a safer world