SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
ISO 14001:2015
Significant
Changes and
what the Auditor
will look for.
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
3.3.2 documented information
A new term that replaces the words ‘documentation’ and ‘record’.
– Where the standard uses the phrase ‘retain documented
information as evidence of…’ it means records.
– Where the standard uses the phrase ‘maintained
documented information’ it means documentation other than
records.
If you have a procedure or a record currently in your system that
you feel you need or which meets the new requirements, don’t
throw it away!
3
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
4.1 Understanding the organization and its context
This is a new requirement. Although the text does not require a procedure or specific
documented information, the organisation will need to demonstrate that the
requirement has been carried out, and the outcome fed into other requirements of
the standard such as in clause 4.4 (the EMS) and 6.1. (Actions to address Risks &
Opportunities)
Techniques used may include PESTLE analysis, and SWOT analysis, and others
simpler method, it depends of the size & complexity of the organization.
Considerations are not solely limited to environmental factors, but should include
other business factors that could impact on the EMS.
Some organisations will have carried out dedicated climate change mitigation
studies – a good start, but it must cover all relevant issues.
Compliance may be achieved during a periodic review meeting, or via an on-going
process. Typically, the leadership of smaller organizations tends to be closer to their
activities, so they will have a much clearer idea as to the context in which the
organization operates, who their interested parties are and what they wish their EMS
to deliver.
4
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
4.2 Understanding the needs and expectations of interested
parties
This is a new requirement. The text does not require a procedure or
specific documented information; however, the organisation will
need to demonstrate that the requirement has been carried out,
and the outcome fed into the other requirements of the standard in
clauses 4.4 and 6.1.
Some process will be required for identifying needs and
expectations expressed by interested parties. Some organisations
may have well-established stakeholder management processes
while others may be less formalised. The process should be
appropriate, understood, and effective.
5
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
5.1 Leadership and commitment
Nine specific requirements are listed, and top management are accountable for
ensuring that they are performed, but responsibility may be delegated to others.
1) Leadership now has direct accountability for the system effectiveness and
cannot rely purely on delegated responsibility.
2) Perhaps the most fundamental new requirement is the second and the link with
‘strategic direction’. In other words, early consideration should be given to
implications on the EMS when making important business decisions such as
planning future strategy, resource planning, acquisitions and mergers, and
developing new products and services. Many organisations fail to do this, and
the result is that the EMS is not fully integrated into the organisation business
processes (3rd requirement).
3) Where the business has established processes (such as procurement), the
environmental procedure requirements should be integrated into business
processes.
4) Resources – such as financial, technical, time, infrastructure, expertise
6
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
5.1 Leadership and commitment Cont’d
5) Communicating – also see relevant associated clauses in square brackets
6) Outcomes – those specified in the policy and objectives
7) A range of persons may contribute to the effectiveness of the EMS (not just the
environmental manager if there is one).
8) Continual improvement - no interpretation needed
9) The ninth bullet point ‘supporting other relevant management roles’ is a change
in emphasis from reliance on one environmental representative. This is both
necessary and desirable because ISO 14001:2015 has greater implications for
other departments such as design and procurement.
Evidence will be required to demonstrate that top management meets each
requirement of this clause. However, again this clause does not require a procedure
or specified documentation.
In addition to carrying out a top management interview, an auditor will look for
evidence for some of these requirements have been considered alongside their
most relevant associated clause
7
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
6 Planning,
6.1 Actions to address risks and opportunities ,
6.1.1 General
This is a new requirement in ISO 14001:2015. It is also the first clause that
starts with the words “establish … a process”.
Some clients may struggle to understand the differences between aspects
identification, and risk and opportunities – the two are not mutually
exclusive, but risk and opportunities must be applied to more than just
aspects.
Auditors will have to verify that the organization’s assessment is sufficiently
comprehensive and includes risks and opportunities related to aspects,
compliance obligations, context, and interested parties.
This clause specifically requires documented information to be
maintained.
8
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
6.1 Actions to address risks and opportunities,
6.1.2 Environmental aspects
Whilst this clause is almost the same text as in ISO 14001:2004 except that a
procedure is not required, but documented information must be maintained, and
addition of the key words “considering a life cycle perspective”.
Although this clause does not require either a procedure or a process, documented
information is required for the criteria used, aspects, impacts, and significant
impacts.
It is expected that some organizations will be more advanced in understanding their
life cycle impact than others. Also, some organizations (due to their size, influence,
and expertise) will have greater ability to influence life cycle aspects.
Organisations that do not carry out any design (such as subcontract metal
fabricators) will have less ability to include the environmental impact of the product.
These same organisations may also have their hands tied by the customer when it
comes to procurement of raw materials. It is therefore important to have a good
understanding of the organisation does when it comes to assessing this clause.
9
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
6.1 Actions to address risks and opportunities,
6.1.4 Planning action
This is a new clause for ISO 14001:2015, however, ISO 14001:2004 did
require significant aspects and legal and other requirements to be taken
into account when establishing the EMS. The addition is to plan to address
risks and opportunities, and also evaluate the effectiveness of these
actions.
Unfortunately (from an assessment point of view) this clause does not
require a documented plan. Nevertheless, the organisation will have to
demonstrate that the requirements have been carried out.
Typically a sampling approach will be used, asking for evidence that issues
from a) 1-3 have been actioned, and seeking evidence of the effectiveness
of these actions.
10
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
8.1 Operational planning and control
Operational control was previously clause 4.4.6 in ISO 14001:2004.
There is a new requirement for the organisation to ensure that
outsourced processes are controlled or influenced. The
organization will need to determine what control or influence they
have over outsourced process, an auditor will look at the way that
this has been addressed; measure to control or influence may
include: requesting and reviewing compliance and performance
information, specifying competency requirements, undertaking
supplier audits, and/or requiring third party certifications.
11
Changes and what an Auditor
will be looking for
IEMA Manchester Conference 2015
8.1 Operational planning and control Cont’d
There are more specific requirements in this clause for controlling significant aspects at the appropriate stage in their life
cycle: design and development, procurement, direct operational processes, delivery, use, and end-of-life.
Auditors will have to make an informed judgement as to whether the extent of the life cycle controls applied are sufficient to
meet the new requirements based on factors such as:
– the importance of the life cycle impacts of the client’s products and services
– the level of control and influence that the client has (up and down the supply chain)
– the level of knowledge, competence and resources
– improvement opportunities available
Design and development decisions can have a positive, or negative environmental impacts in areas such as:
– raw material selection: embodied energy and water, material efficiency, toxicity, and other upstream impacts
– product characteristics: such as energy and water efficiency in use, durability, weight, ease of maintenance,
modularity, functionality, biomimicry, and noise
– packaging characteristics: weight, type, toxicity, recyclability
– cleaner production techniques
– design for reuse, recovery, upcycling and recycling for example by facilitating easy disassembly, labelling
parts, avoiding mixing biological and non-biological (technical) materials
– Environmental procurement controls vary greatly across organisations and sectors from questionnaires, to
audits, to collaborative problem-solving workshops.
– Environmental product information may include information about correct installation, servicing and
maintenance to ensure maximum efficiency, to end-of-life disposal options or take-back schemes.
12
Tools that will be used by the
auditor
IEMA Manchester Conference 2015
Auditors will make much more use of the
definitions in section 3 of the standard and the
interpretative guidance given in the Annex.
Organization need to bear this in mind and
make use of these as well, ISO 14004 will be
published soon (early 2016) and will give further
guidance on implementation.
13
IEMA Manchester Conference 2015
Any further questions?
14

Contenu connexe

Tendances

ISO 14001 2015 7 requirements
ISO 14001 2015 7 requirementsISO 14001 2015 7 requirements
ISO 14001 2015 7 requirements
Nigel Leehane
 
Basic of Integrated Management System
Basic of Integrated Management SystemBasic of Integrated Management System
Basic of Integrated Management System
jamaluddin ma'ruf
 
MRC ISO 14001 Implementation
MRC ISO 14001 ImplementationMRC ISO 14001 Implementation
MRC ISO 14001 Implementation
Essam Al-Kahloot
 

Tendances (20)

An Integrated Management System Standard
An Integrated Management System StandardAn Integrated Management System Standard
An Integrated Management System Standard
 
ISO 14001:2015 Changes
ISO 14001:2015 ChangesISO 14001:2015 Changes
ISO 14001:2015 Changes
 
ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
 ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
 
Integrated management systems
Integrated management systemsIntegrated management systems
Integrated management systems
 
NQA - ISO 14001 Implementation Guide
NQA - ISO 14001 Implementation GuideNQA - ISO 14001 Implementation Guide
NQA - ISO 14001 Implementation Guide
 
Changes to ISO 14001 2015 in Plain Language
Changes to ISO 14001 2015 in Plain LanguageChanges to ISO 14001 2015 in Plain Language
Changes to ISO 14001 2015 in Plain Language
 
ISO 14001:2015 Awareness
ISO 14001:2015 AwarenessISO 14001:2015 Awareness
ISO 14001:2015 Awareness
 
(5) integrated management system (ims)
(5) integrated management system (ims)(5) integrated management system (ims)
(5) integrated management system (ims)
 
ISO 14001:2015 Revision Update Webinar
ISO 14001:2015 Revision Update WebinarISO 14001:2015 Revision Update Webinar
ISO 14001:2015 Revision Update Webinar
 
Benefits of Integrated Management Systems
Benefits of Integrated Management SystemsBenefits of Integrated Management Systems
Benefits of Integrated Management Systems
 
Annex SL Training for ISO 9001:2015. & ISO 14001:2015.
Annex SL Training for ISO 9001:2015. & ISO 14001:2015.Annex SL Training for ISO 9001:2015. & ISO 14001:2015.
Annex SL Training for ISO 9001:2015. & ISO 14001:2015.
 
ISO 14001 2015 7 requirements
ISO 14001 2015 7 requirementsISO 14001 2015 7 requirements
ISO 14001 2015 7 requirements
 
NQA ISO 14001 Implementation Guide
NQA ISO 14001 Implementation GuideNQA ISO 14001 Implementation Guide
NQA ISO 14001 Implementation Guide
 
Transitioning to 9001 and 14001 :2015 What our auditors will be looking for
Transitioning to 9001 and 14001 :2015 What our auditors will be looking forTransitioning to 9001 and 14001 :2015 What our auditors will be looking for
Transitioning to 9001 and 14001 :2015 What our auditors will be looking for
 
ISO 14001 Revision: Status and Transition
ISO 14001 Revision: Status and TransitionISO 14001 Revision: Status and Transition
ISO 14001 Revision: Status and Transition
 
Basic of Integrated Management System
Basic of Integrated Management SystemBasic of Integrated Management System
Basic of Integrated Management System
 
Auditing as a profession
Auditing as a professionAuditing as a profession
Auditing as a profession
 
MRC ISO 14001 Implementation
MRC ISO 14001 ImplementationMRC ISO 14001 Implementation
MRC ISO 14001 Implementation
 
Basics Of ISO 14001
Basics Of ISO 14001Basics Of ISO 14001
Basics Of ISO 14001
 
Integrated Management Systems
Integrated Management SystemsIntegrated Management Systems
Integrated Management Systems
 

En vedette

Speech & Presentations
Speech & PresentationsSpeech & Presentations
Speech & Presentations
Sahil Mahajan
 
Presentation on The Factors Affecting Auditor Independence of an External Aud...
Presentation on The Factors Affecting Auditor Independence of an External Aud...Presentation on The Factors Affecting Auditor Independence of an External Aud...
Presentation on The Factors Affecting Auditor Independence of an External Aud...
Mahfuza Mili
 
Presentation chapter 9
Presentation chapter 9Presentation chapter 9
Presentation chapter 9
Emran Habeeb
 
Auditor and Director Reports
Auditor and Director ReportsAuditor and Director Reports
Auditor and Director Reports
gourab27
 
Guida all'uso della norma uni en iso 9001 2008
Guida all'uso della norma uni en iso 9001 2008Guida all'uso della norma uni en iso 9001 2008
Guida all'uso della norma uni en iso 9001 2008
Pasquale Buongiovanni
 

En vedette (20)

ISO 14001:2015 managment system manual sample
ISO 14001:2015 managment system manual sample  ISO 14001:2015 managment system manual sample
ISO 14001:2015 managment system manual sample
 
ISO 14001:2015/2004 GAP analysis tool
ISO 14001:2015/2004 GAP analysis toolISO 14001:2015/2004 GAP analysis tool
ISO 14001:2015/2004 GAP analysis tool
 
Data Mining 11-18-10
Data Mining 11-18-10Data Mining 11-18-10
Data Mining 11-18-10
 
Speech & Presentations
Speech & PresentationsSpeech & Presentations
Speech & Presentations
 
Rules on external_auditors
Rules on external_auditorsRules on external_auditors
Rules on external_auditors
 
Don't be afraid of auditors - Presentation
Don't be afraid of auditors - PresentationDon't be afraid of auditors - Presentation
Don't be afraid of auditors - Presentation
 
Presentation on The Factors Affecting Auditor Independence of an External Aud...
Presentation on The Factors Affecting Auditor Independence of an External Aud...Presentation on The Factors Affecting Auditor Independence of an External Aud...
Presentation on The Factors Affecting Auditor Independence of an External Aud...
 
Overview of iso 14001
Overview of iso 14001Overview of iso 14001
Overview of iso 14001
 
Presentation on auditors pdf
Presentation on auditors   pdfPresentation on auditors   pdf
Presentation on auditors pdf
 
AUDITOR PRESENTATION
AUDITOR PRESENTATIONAUDITOR PRESENTATION
AUDITOR PRESENTATION
 
Slide Presentation in Support of the IAASB’s New and Revised Auditor Reportin...
Slide Presentation in Support of the IAASB’s New and Revised Auditor Reportin...Slide Presentation in Support of the IAASB’s New and Revised Auditor Reportin...
Slide Presentation in Support of the IAASB’s New and Revised Auditor Reportin...
 
Presentation chapter 9
Presentation chapter 9Presentation chapter 9
Presentation chapter 9
 
Presentation on New Auditor Report
Presentation on New Auditor ReportPresentation on New Auditor Report
Presentation on New Auditor Report
 
Auditor and Director Reports
Auditor and Director ReportsAuditor and Director Reports
Auditor and Director Reports
 
Excel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolExcel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation tool
 
Guida all'uso della norma uni en iso 9001 2008
Guida all'uso della norma uni en iso 9001 2008Guida all'uso della norma uni en iso 9001 2008
Guida all'uso della norma uni en iso 9001 2008
 
External Audit
External AuditExternal Audit
External Audit
 
Audit Documentation Presentation
Audit Documentation PresentationAudit Documentation Presentation
Audit Documentation Presentation
 
The Future of Management ISO 9001:2015
The Future of Management ISO 9001:2015The Future of Management ISO 9001:2015
The Future of Management ISO 9001:2015
 
FDA GMP Training - The Quality Audit
FDA GMP Training - The Quality AuditFDA GMP Training - The Quality Audit
FDA GMP Training - The Quality Audit
 

Similaire à IEMA ISO14001 - External Auditors viewpoint

ISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docxISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docx
Sunil Arora
 
FINAL IMS PPT - Read-Only - Compatibility Mode.pdf
FINAL IMS PPT  -  Read-Only  -  Compatibility Mode.pdfFINAL IMS PPT  -  Read-Only  -  Compatibility Mode.pdf
FINAL IMS PPT - Read-Only - Compatibility Mode.pdf
KShah24
 
NQA ISO 50001:2018 energy management gap guide
NQA ISO 50001:2018 energy management gap guideNQA ISO 50001:2018 energy management gap guide
NQA ISO 50001:2018 energy management gap guide
NA Putra
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list for
GobiNava1
 

Similaire à IEMA ISO14001 - External Auditors viewpoint (20)

ISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docxISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docx
 
Addendum 1 to iso presentation
Addendum 1 to iso presentationAddendum 1 to iso presentation
Addendum 1 to iso presentation
 
3 ISO 14001-2015 EMS Awareness Training Material (Module 2).pdf
3 ISO 14001-2015 EMS Awareness Training Material (Module 2).pdf3 ISO 14001-2015 EMS Awareness Training Material (Module 2).pdf
3 ISO 14001-2015 EMS Awareness Training Material (Module 2).pdf
 
Upload iso 9001 2015 presentation
Upload iso 9001 2015 presentationUpload iso 9001 2015 presentation
Upload iso 9001 2015 presentation
 
FINAL IMS PPT - Read-Only - Compatibility Mode.pdf
FINAL IMS PPT  -  Read-Only  -  Compatibility Mode.pdfFINAL IMS PPT  -  Read-Only  -  Compatibility Mode.pdf
FINAL IMS PPT - Read-Only - Compatibility Mode.pdf
 
NQA ISO 22000:2018 Transition Gap Guide
NQA ISO 22000:2018 Transition Gap GuideNQA ISO 22000:2018 Transition Gap Guide
NQA ISO 22000:2018 Transition Gap Guide
 
NQA ISO 22000 Food Safety Transition Gap Guide
NQA ISO 22000 Food Safety Transition Gap GuideNQA ISO 22000 Food Safety Transition Gap Guide
NQA ISO 22000 Food Safety Transition Gap Guide
 
Iso 14001 2015 transition & documentation training notes
Iso 14001 2015 transition & documentation training notesIso 14001 2015 transition & documentation training notes
Iso 14001 2015 transition & documentation training notes
 
Iso 14001 2015 transition & documentation training - swiss profile rfs 2i...
Iso 14001 2015 transition & documentation training - swiss profile rfs 2i...Iso 14001 2015 transition & documentation training - swiss profile rfs 2i...
Iso 14001 2015 transition & documentation training - swiss profile rfs 2i...
 
Transition to ISO 14001:2015
Transition to ISO 14001:2015Transition to ISO 14001:2015
Transition to ISO 14001:2015
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949
 
What do the changes to ISO14001 mean for business?
What do the changes to ISO14001 mean for business? What do the changes to ISO14001 mean for business?
What do the changes to ISO14001 mean for business?
 
Quick_Guide_to_ISO_55001_Requirements_fo.pptx
Quick_Guide_to_ISO_55001_Requirements_fo.pptxQuick_Guide_to_ISO_55001_Requirements_fo.pptx
Quick_Guide_to_ISO_55001_Requirements_fo.pptx
 
270. ISO 45001 Audit Report Checklist Template.docx
270. ISO 45001 Audit Report Checklist Template.docx270. ISO 45001 Audit Report Checklist Template.docx
270. ISO 45001 Audit Report Checklist Template.docx
 
Why Audit? What Is the Difference Between Regulatory Auditing and ISO 14001 o...
Why Audit? What Is the Difference Between Regulatory Auditing and ISO 14001 o...Why Audit? What Is the Difference Between Regulatory Auditing and ISO 14001 o...
Why Audit? What Is the Difference Between Regulatory Auditing and ISO 14001 o...
 
NQA Migration OHSAS to ISO 45001
NQA Migration OHSAS to ISO 45001NQA Migration OHSAS to ISO 45001
NQA Migration OHSAS to ISO 45001
 
NQA ISO 45001 Gap Guide
NQA ISO 45001 Gap GuideNQA ISO 45001 Gap Guide
NQA ISO 45001 Gap Guide
 
NQA ISO 50001:2018 energy management gap guide
NQA ISO 50001:2018 energy management gap guideNQA ISO 50001:2018 energy management gap guide
NQA ISO 50001:2018 energy management gap guide
 
New trends in the revised iso 9001:2015
New trends in the revised iso 9001:2015New trends in the revised iso 9001:2015
New trends in the revised iso 9001:2015
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list for
 

Plus de Lloyd's Register - Management Systems

LRQA: EMBRAER Case Study - Carbon Disclosure Project Verification Strategy
LRQA: EMBRAER Case Study - Carbon Disclosure Project Verification StrategyLRQA: EMBRAER Case Study - Carbon Disclosure Project Verification Strategy
LRQA: EMBRAER Case Study - Carbon Disclosure Project Verification Strategy
Lloyd's Register - Management Systems
 

Plus de Lloyd's Register - Management Systems (7)

Benefits of Third Party Certification
Benefits of Third Party CertificationBenefits of Third Party Certification
Benefits of Third Party Certification
 
Shared Responsibility Through Collaboration
Shared Responsibility Through CollaborationShared Responsibility Through Collaboration
Shared Responsibility Through Collaboration
 
Carbon Monitoring Reporting & Verification (MRV) - The LRQA Perspective
Carbon Monitoring Reporting & Verification (MRV) - The LRQA PerspectiveCarbon Monitoring Reporting & Verification (MRV) - The LRQA Perspective
Carbon Monitoring Reporting & Verification (MRV) - The LRQA Perspective
 
LRQA ISO Standards Update - Integration as Standard? October 2013
LRQA ISO Standards Update - Integration as Standard?   October 2013LRQA ISO Standards Update - Integration as Standard?   October 2013
LRQA ISO Standards Update - Integration as Standard? October 2013
 
Future of ISO standards LRQA viewpoint
Future of ISO standards LRQA viewpointFuture of ISO standards LRQA viewpoint
Future of ISO standards LRQA viewpoint
 
Why third party audits are good for food safety
Why third party audits are good for food safetyWhy third party audits are good for food safety
Why third party audits are good for food safety
 
LRQA: EMBRAER Case Study - Carbon Disclosure Project Verification Strategy
LRQA: EMBRAER Case Study - Carbon Disclosure Project Verification StrategyLRQA: EMBRAER Case Study - Carbon Disclosure Project Verification Strategy
LRQA: EMBRAER Case Study - Carbon Disclosure Project Verification Strategy
 

Dernier

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 

Dernier (20)

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 

IEMA ISO14001 - External Auditors viewpoint

  • 1.
  • 2. ISO 14001:2015 Significant Changes and what the Auditor will look for.
  • 3. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 3.3.2 documented information A new term that replaces the words ‘documentation’ and ‘record’. – Where the standard uses the phrase ‘retain documented information as evidence of…’ it means records. – Where the standard uses the phrase ‘maintained documented information’ it means documentation other than records. If you have a procedure or a record currently in your system that you feel you need or which meets the new requirements, don’t throw it away! 3
  • 4. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 4.1 Understanding the organization and its context This is a new requirement. Although the text does not require a procedure or specific documented information, the organisation will need to demonstrate that the requirement has been carried out, and the outcome fed into other requirements of the standard such as in clause 4.4 (the EMS) and 6.1. (Actions to address Risks & Opportunities) Techniques used may include PESTLE analysis, and SWOT analysis, and others simpler method, it depends of the size & complexity of the organization. Considerations are not solely limited to environmental factors, but should include other business factors that could impact on the EMS. Some organisations will have carried out dedicated climate change mitigation studies – a good start, but it must cover all relevant issues. Compliance may be achieved during a periodic review meeting, or via an on-going process. Typically, the leadership of smaller organizations tends to be closer to their activities, so they will have a much clearer idea as to the context in which the organization operates, who their interested parties are and what they wish their EMS to deliver. 4
  • 5. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 4.2 Understanding the needs and expectations of interested parties This is a new requirement. The text does not require a procedure or specific documented information; however, the organisation will need to demonstrate that the requirement has been carried out, and the outcome fed into the other requirements of the standard in clauses 4.4 and 6.1. Some process will be required for identifying needs and expectations expressed by interested parties. Some organisations may have well-established stakeholder management processes while others may be less formalised. The process should be appropriate, understood, and effective. 5
  • 6. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 5.1 Leadership and commitment Nine specific requirements are listed, and top management are accountable for ensuring that they are performed, but responsibility may be delegated to others. 1) Leadership now has direct accountability for the system effectiveness and cannot rely purely on delegated responsibility. 2) Perhaps the most fundamental new requirement is the second and the link with ‘strategic direction’. In other words, early consideration should be given to implications on the EMS when making important business decisions such as planning future strategy, resource planning, acquisitions and mergers, and developing new products and services. Many organisations fail to do this, and the result is that the EMS is not fully integrated into the organisation business processes (3rd requirement). 3) Where the business has established processes (such as procurement), the environmental procedure requirements should be integrated into business processes. 4) Resources – such as financial, technical, time, infrastructure, expertise 6
  • 7. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 5.1 Leadership and commitment Cont’d 5) Communicating – also see relevant associated clauses in square brackets 6) Outcomes – those specified in the policy and objectives 7) A range of persons may contribute to the effectiveness of the EMS (not just the environmental manager if there is one). 8) Continual improvement - no interpretation needed 9) The ninth bullet point ‘supporting other relevant management roles’ is a change in emphasis from reliance on one environmental representative. This is both necessary and desirable because ISO 14001:2015 has greater implications for other departments such as design and procurement. Evidence will be required to demonstrate that top management meets each requirement of this clause. However, again this clause does not require a procedure or specified documentation. In addition to carrying out a top management interview, an auditor will look for evidence for some of these requirements have been considered alongside their most relevant associated clause 7
  • 8. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 6 Planning, 6.1 Actions to address risks and opportunities , 6.1.1 General This is a new requirement in ISO 14001:2015. It is also the first clause that starts with the words “establish … a process”. Some clients may struggle to understand the differences between aspects identification, and risk and opportunities – the two are not mutually exclusive, but risk and opportunities must be applied to more than just aspects. Auditors will have to verify that the organization’s assessment is sufficiently comprehensive and includes risks and opportunities related to aspects, compliance obligations, context, and interested parties. This clause specifically requires documented information to be maintained. 8
  • 9. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 6.1 Actions to address risks and opportunities, 6.1.2 Environmental aspects Whilst this clause is almost the same text as in ISO 14001:2004 except that a procedure is not required, but documented information must be maintained, and addition of the key words “considering a life cycle perspective”. Although this clause does not require either a procedure or a process, documented information is required for the criteria used, aspects, impacts, and significant impacts. It is expected that some organizations will be more advanced in understanding their life cycle impact than others. Also, some organizations (due to their size, influence, and expertise) will have greater ability to influence life cycle aspects. Organisations that do not carry out any design (such as subcontract metal fabricators) will have less ability to include the environmental impact of the product. These same organisations may also have their hands tied by the customer when it comes to procurement of raw materials. It is therefore important to have a good understanding of the organisation does when it comes to assessing this clause. 9
  • 10. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 6.1 Actions to address risks and opportunities, 6.1.4 Planning action This is a new clause for ISO 14001:2015, however, ISO 14001:2004 did require significant aspects and legal and other requirements to be taken into account when establishing the EMS. The addition is to plan to address risks and opportunities, and also evaluate the effectiveness of these actions. Unfortunately (from an assessment point of view) this clause does not require a documented plan. Nevertheless, the organisation will have to demonstrate that the requirements have been carried out. Typically a sampling approach will be used, asking for evidence that issues from a) 1-3 have been actioned, and seeking evidence of the effectiveness of these actions. 10
  • 11. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 8.1 Operational planning and control Operational control was previously clause 4.4.6 in ISO 14001:2004. There is a new requirement for the organisation to ensure that outsourced processes are controlled or influenced. The organization will need to determine what control or influence they have over outsourced process, an auditor will look at the way that this has been addressed; measure to control or influence may include: requesting and reviewing compliance and performance information, specifying competency requirements, undertaking supplier audits, and/or requiring third party certifications. 11
  • 12. Changes and what an Auditor will be looking for IEMA Manchester Conference 2015 8.1 Operational planning and control Cont’d There are more specific requirements in this clause for controlling significant aspects at the appropriate stage in their life cycle: design and development, procurement, direct operational processes, delivery, use, and end-of-life. Auditors will have to make an informed judgement as to whether the extent of the life cycle controls applied are sufficient to meet the new requirements based on factors such as: – the importance of the life cycle impacts of the client’s products and services – the level of control and influence that the client has (up and down the supply chain) – the level of knowledge, competence and resources – improvement opportunities available Design and development decisions can have a positive, or negative environmental impacts in areas such as: – raw material selection: embodied energy and water, material efficiency, toxicity, and other upstream impacts – product characteristics: such as energy and water efficiency in use, durability, weight, ease of maintenance, modularity, functionality, biomimicry, and noise – packaging characteristics: weight, type, toxicity, recyclability – cleaner production techniques – design for reuse, recovery, upcycling and recycling for example by facilitating easy disassembly, labelling parts, avoiding mixing biological and non-biological (technical) materials – Environmental procurement controls vary greatly across organisations and sectors from questionnaires, to audits, to collaborative problem-solving workshops. – Environmental product information may include information about correct installation, servicing and maintenance to ensure maximum efficiency, to end-of-life disposal options or take-back schemes. 12
  • 13. Tools that will be used by the auditor IEMA Manchester Conference 2015 Auditors will make much more use of the definitions in section 3 of the standard and the interpretative guidance given in the Annex. Organization need to bear this in mind and make use of these as well, ISO 14004 will be published soon (early 2016) and will give further guidance on implementation. 13
  • 14. IEMA Manchester Conference 2015 Any further questions? 14