SlideShare une entreprise Scribd logo
1  sur  41
PLC(Programminglogiccontrol)
contents
 Automation
 Types of Automation
 What is PLC ?
 Need of PLC
 PLC brands and software used
 Major component of PLC
 PLC operational sequence
 Programming language of PLC
 Ladder logic
 PLC timer/counter
 TON timer
 Timer bit concept
 Advantage And Disadvantage
 Application
Automation
 Automation is a basically the delegation of human
control function to technical equipment aimed toward
achieving .
 Higher productivity .
 Superior quality of end product .
 Efficient use of energy and raw materials .
 Improved safety in working conditions .
 Replace hard physical work .
 Can perform tasks beyond human capabilities .
TypesofAutomation
 BuildingAutomation
Example : lifts
 Scientific Automation
Example : rocket launching
 IndustrialAutomation
Example : Automated bottle filling Stations,
steel factories
 Office Automation
Example : printers , cctv
 LightAutomation
Example : street solar lightening
WhatisP
L
C?
PLC is a sold state industrial computer that performs
discrete and sequential function in a factory
environment .
Or
PLC is a industrial computer that monitor input , makes
decision based on it program and control output to
automatic a process or machine .
NeedofPLC
 PLC is needed so as to have the following tasks:
 To reduce human effort .
 To get the automation in the process.
 Controlling of equipments with just one click.
 To make the efficient use of digital electronics and
control system.
 In the high human effort industries, PLC may help to
get the reduction in manpower and wastage of raw
materials .
 To reduce complex circuitry of entire system .
PLCbrandsandsoftwareused
 Brand name
 Allen-Bradley
 Schneider
 Ceco electronics
 Siemens
 Omron
 Delta
Software used
RS logix 500
Zelio Soft
Ceco Client
Step7 Microwin
Cx Programming
Wpl Soft
MajorcomponentofPLC
components(input/output)
(1) Input modules
It take input and
convert signal from
sensor into logic signal
Example : switch ,
push button .
(2) output module
It convert control
instructions a signal
that can be used by
actuators .
Example : lamps , alarm .
(3) CPU (Central Processing Unit)
• It is the brain of PLC and govern the activities of the entire
. PLC system
• The CPU perform the SCAN CYCLE for PLC
• The CPU consists of the flowing blocks: Arithmetic LogicUnit
. (ALU) , internal memory of CPU , internal timer , counters
•(4) Memory
Memory is the component that stores information,programs
. and data in a PLC
(5) Power supply
Provides the voltage needed to run the primary PLC
. components
(6)Programming device
The programming terminal is used for programming thePLC
. and monitoring/sequencing PLCs operation
PLCoperationsequence
(1) Self test: testing of its own
hardware and software for
faults
(2) Input scan : if there are no
problems , PLC will copy all
the values in to memory .
(3) Logic solve/scan : using
inputs ,the ladder logic
program is solved once and
outputs are updated .
(4) Output scan : while solving
the output values are updated
only in memory when ladder
scan in done , the output will
be updated using temporary
values in memory .
ProgramminglanguageofPLC
 Most common language encountered in PLC are :
1. Ladder Logic
2. Functional blocking diagram
3. Sequential function chart etc.
Ladderlogic
 The ladder logic is the
oldest programming
language for PLC
 It is well to express
combinational logic
 The main ladder logic
symbol represent the
elements .
Ladderlogicforbasic gate
PLCtimer/counterfunction
TONtimer(timerondelay)
 Timer
Timer is basically used
add some delay in
programming circuit by
adding a particular time
to each circuit.
There are three types
TON and TOFF and
RTO .
Timerbitconcept
AdvantagesofPLC
 Reliability.
 Flexibility in programming and re-programming.
 Cost effective for controlling complex systems.
 Small physical size , shorter project time.
 High speed of operation.
 Ability to communicate to other computer system in the
plant.
 Easy to maintenance/troubleshooting.
 Reduced space.
 Energy saving.
DisadvantagesofPLC
 PLC device are proprietary it means that part or
software of one manufacturer can’t be used in
combination with part of another manufacturer.
 Initial cost are high.
 Unemployment rate increase.
 It is difficult to find error.
Applications
 Robots manufacturing and control.
 Food /Beverage processing.
 Machine tools.
 Materials handle.
 Conveyer system.
 Aerospace.
 Printing industry
 Textile industry
 Cleaning department etc.
S
C
A
D
A
(supervisory control and data acquisition)
content
 What is SCADA?
 Why SCADA used ?
 Brands of SCADA
 What is TAG
 Feature of SCADA
 Object Property
 Advantages of SCADA
 Disadvantages of SCADA
 Applications
 Program (Bottle filling)
WhatisS
C
A
D
A?
 SCADA is a “Supervisory Control and Data
Acquisition’’ real time industrial process control
systems used to centrally monitor and control remote
to local industrial equipment such as motors , valves
, pump , relays etc.
OR
 A SCADA system gather information(such aswhere
a leak on a pipeline occurred) and transfers the
information back to central site then alert the home
station that a leak occurred , carrying out necessary
analysis and control ,such as determining if the leak
is critical then displaying the information in a logical
and organized fashion.
WhyS
C
A
D
Aused?
 Saves time and money
 Less travelling for workers
 Reduces man power need
 Increase production and efficiency of a company
 Cost effective of power system
 Saves energy
 Reliable
 Supervisory control for particular system .
BrandsofS
C
A
D
A
 Company Name
 Wonderware
 Allen bradley
 Siemens
 GEFANUC
 KPIT(India)
Software Name
Intouch 10.1
RS view/Factory talk
Win CC
Cimplicity
Astra etc.
TAGs
 It is address of the memory location where data
being saved.
 We define a TAG in order to use it in the SCADA
software ( Intouch wonderware )
 Types of TAG
(1) Analog – stores simple on/off information
(2) String - stores numerical value
(3) Digital - stores alphanumeric characters.
 There are minimum 32 TAGs and maximum 64000
can be define in Intouch SCADA.
FeaturesOfS
C
A
D
A
(a) Dynamic process graphic
(b) Script
(c) Real time and Historical trend
(d) Alarm
(e) Security
(f) Recipe management
(g) Data base connectivity
(h) Device connectivity
(a)Dynamicprocessgraphic
 Using this features mimics developed in SCADA
software should resemble the mimic process .should
have good library of symbols so that you can
develop the mimic as per requirement.
 The status of equipment running/stopping can be
show using different colors/animation.
(b)script
 Script is the way of writing logic in SCADA software .
every SCADA software has its own instruction and
way of writing program.
 Using script one can develop complex application.
(c)Realtimeandhistoricaltrend
 This facility is used to represent the data in graphical
form
 This trend play important role in the process of
operation . if your batch fails or the plant trips you
can simply go to the historical trend data and do the
analysis . you can have better look of the parameters
through the trends.
 Real time data will plot the real-time value for fixed
period of time while have historical data historical
data stored value which can be viewed on demand
(d)Alarm
 Every plant needs of proper monitoring and control
of the process parameter .
 Alarm indicate to the operator when something goes
wrong .
 Generally alarm are implemanted by usually the
lamps or hooters in field but in SCADA it can be
represented by using animation.
 In SCADA generally four types of alarm are used ie
HI , HIHI ,LOW ,LOWLOW .
(e)Security
 Every SCADA software has various level of security
for securing the application by avoiding unauthorized
access .
 Depending upon the access level given the operator
/engineers is allowed to do task . In most of the cases
operator are allowed only to operate the plant while
the maintenance engineers can do the application
modification
(f)Recipemanagement
 In many cases we uses the same plant for
manufacturing the different product range . For
example an oil blending plant can manufacture
power oil ,transformer oil , auto-mobile oil .
 The recipe management is facility used for maintain
various recipe for different products and implement it
on the process
 The recipe can be stored in a single server and it can
be fetched by any client server from any area to run
the process.
(g)Databaseconnectivity
 In many plants , it is important to download the real-
time information . in this case the database
connectivity is must .
 Many SCADA software don't have their own
database . hence for storage and reporting they use
third party database like MS access .
 Wonderware InTouch provides a single view of all
your control and information resources .
(h)Deviceconnectivity
 Every control hardware has its own communication
protocol for communicating with different
hardware/software .some of the leading
communication protocol include Ethernet , DH485.
 The SCADA software needs device driver software
for communication with PLC or other control
hardware.
 More the driver software available better is the
device connectivity . most of the SCADA software
used in industry have connectivity with most of the
leading control system .
These properties are common to all symbol factory graphical
objects .
These properties are visible only when "break cell“ operation is
performed on symbol factory objects .
ObjectProperty
Advantages
 The computer can record and store a very large amount
of data .
 Data can be displayed at any time when user require .
 The SCADA system provides on board mechanicaland
graphical information .
 The SCADA system ability to operate critical situations.
 It provide alarm .
Disadvantages
 Network security risks
 Lack of trained personnel
 Initial cost is high
Applications
 Water resources monitoring
 Water chemistry monitoring
 Waste water monitoring
 Waste tank controls
 Wind tunnel controls
 Fuel oil handling system
 Petroleum pilot plant
 Plant monitoring and process control
 Nuclear plant full-scope simulators
 Electric power transmission controlling
 Metrological monitoring
Program(bottlefilling)
DEVENDRAPLC .pptx

Contenu connexe

Similaire à DEVENDRAPLC .pptx

yogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptx
yogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptxyogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptx
yogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptx
SHAHEDShaikh13
 
Identify elements associated with the preparation of a programmable l.pdf
 Identify elements associated with the preparation of a programmable l.pdf Identify elements associated with the preparation of a programmable l.pdf
Identify elements associated with the preparation of a programmable l.pdf
akcopier1
 
industrialautomation-150113002434-conversion-gate01.pdf
industrialautomation-150113002434-conversion-gate01.pdfindustrialautomation-150113002434-conversion-gate01.pdf
industrialautomation-150113002434-conversion-gate01.pdf
Robin8015873726
 

Similaire à DEVENDRAPLC .pptx (20)

Industrial Automation (PLC, SCADA & HMI) by Nilesh Jha
Industrial Automation (PLC, SCADA & HMI) by Nilesh JhaIndustrial Automation (PLC, SCADA & HMI) by Nilesh Jha
Industrial Automation (PLC, SCADA & HMI) by Nilesh Jha
 
Power point presentation on Industrial Automation
Power point presentation on Industrial AutomationPower point presentation on Industrial Automation
Power point presentation on Industrial Automation
 
yogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptx
yogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptxyogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptx
yogesh zodge ( ARTIFICIAL INTELLIGANCE) (1).pptx
 
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
INDUSTRIAL AUTOMATION ( SHUBHAM KURDIYA)
 
PLC and SCADA summer training report- government engineering college ajmer
PLC and SCADA summer training report- government engineering college ajmerPLC and SCADA summer training report- government engineering college ajmer
PLC and SCADA summer training report- government engineering college ajmer
 
Industrial automation sustem
Industrial automation sustemIndustrial automation sustem
Industrial automation sustem
 
RAD Industrial Automation, Labs, and Instrumentation
RAD Industrial Automation, Labs, and InstrumentationRAD Industrial Automation, Labs, and Instrumentation
RAD Industrial Automation, Labs, and Instrumentation
 
Implementation of T-Junction Traffic Light Control System Using Simatic S7-20...
Implementation of T-Junction Traffic Light Control System Using Simatic S7-20...Implementation of T-Junction Traffic Light Control System Using Simatic S7-20...
Implementation of T-Junction Traffic Light Control System Using Simatic S7-20...
 
Identify elements associated with the preparation of a programmable l.pdf
 Identify elements associated with the preparation of a programmable l.pdf Identify elements associated with the preparation of a programmable l.pdf
Identify elements associated with the preparation of a programmable l.pdf
 
Chapter 4 plc programing(1) by m
Chapter 4 plc programing(1) by mChapter 4 plc programing(1) by m
Chapter 4 plc programing(1) by m
 
PLC SCADA
PLC SCADAPLC SCADA
PLC SCADA
 
Plc scada-140717081152-phpapp02
Plc scada-140717081152-phpapp02Plc scada-140717081152-phpapp02
Plc scada-140717081152-phpapp02
 
Whatisaplc
WhatisaplcWhatisaplc
Whatisaplc
 
01 introduction to_plc-pac_rev01_fa16
01 introduction to_plc-pac_rev01_fa1601 introduction to_plc-pac_rev01_fa16
01 introduction to_plc-pac_rev01_fa16
 
Programmable Logic Controllers
Programmable Logic ControllersProgrammable Logic Controllers
Programmable Logic Controllers
 
industrialautomation-150113002434-conversion-gate01.pdf
industrialautomation-150113002434-conversion-gate01.pdfindustrialautomation-150113002434-conversion-gate01.pdf
industrialautomation-150113002434-conversion-gate01.pdf
 
Plc scada(by ankit)2
Plc scada(by ankit)2Plc scada(by ankit)2
Plc scada(by ankit)2
 
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh ShekhawatPLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
PLC, DCS and PLC vs DCS Presentation by Jitender Singh Shekhawat
 
PLC programmable logic controller (MSME)
PLC programmable logic controller (MSME) PLC programmable logic controller (MSME)
PLC programmable logic controller (MSME)
 
PlantPAx Process
PlantPAx ProcessPlantPAx Process
PlantPAx Process
 

Plus de DEVENDRA SHRIVASH (7)

ELECTRONICS DEVENDRA SHRIVASH.pptx
ELECTRONICS DEVENDRA SHRIVASH.pptxELECTRONICS DEVENDRA SHRIVASH.pptx
ELECTRONICS DEVENDRA SHRIVASH.pptx
 
IOT DEVENDRA SHRIVASH.pptx
IOT DEVENDRA SHRIVASH.pptxIOT DEVENDRA SHRIVASH.pptx
IOT DEVENDRA SHRIVASH.pptx
 
AI & Robotics PPT For Schools Students.pptx
AI & Robotics PPT For Schools Students.pptxAI & Robotics PPT For Schools Students.pptx
AI & Robotics PPT For Schools Students.pptx
 
DEVENDRA SHRIVASH IOT.pptx
DEVENDRA SHRIVASH IOT.pptxDEVENDRA SHRIVASH IOT.pptx
DEVENDRA SHRIVASH IOT.pptx
 
DEVENDRA bluetooth home automation.pptx
DEVENDRA bluetooth home automation.pptxDEVENDRA bluetooth home automation.pptx
DEVENDRA bluetooth home automation.pptx
 
DEVENDRA SHRIVASH SOLAR POWER.ppt
DEVENDRA SHRIVASH SOLAR POWER.pptDEVENDRA SHRIVASH SOLAR POWER.ppt
DEVENDRA SHRIVASH SOLAR POWER.ppt
 
DEVENDRA SHRIVASH ROBOTICS .pptx
DEVENDRA SHRIVASH ROBOTICS .pptxDEVENDRA SHRIVASH ROBOTICS .pptx
DEVENDRA SHRIVASH ROBOTICS .pptx
 

Dernier

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Dernier (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 

DEVENDRAPLC .pptx

  • 2. contents  Automation  Types of Automation  What is PLC ?  Need of PLC  PLC brands and software used  Major component of PLC  PLC operational sequence  Programming language of PLC  Ladder logic  PLC timer/counter  TON timer  Timer bit concept  Advantage And Disadvantage  Application
  • 3. Automation  Automation is a basically the delegation of human control function to technical equipment aimed toward achieving .  Higher productivity .  Superior quality of end product .  Efficient use of energy and raw materials .  Improved safety in working conditions .  Replace hard physical work .  Can perform tasks beyond human capabilities .
  • 4. TypesofAutomation  BuildingAutomation Example : lifts  Scientific Automation Example : rocket launching  IndustrialAutomation Example : Automated bottle filling Stations, steel factories  Office Automation Example : printers , cctv  LightAutomation Example : street solar lightening
  • 5. WhatisP L C? PLC is a sold state industrial computer that performs discrete and sequential function in a factory environment . Or PLC is a industrial computer that monitor input , makes decision based on it program and control output to automatic a process or machine .
  • 6. NeedofPLC  PLC is needed so as to have the following tasks:  To reduce human effort .  To get the automation in the process.  Controlling of equipments with just one click.  To make the efficient use of digital electronics and control system.  In the high human effort industries, PLC may help to get the reduction in manpower and wastage of raw materials .  To reduce complex circuitry of entire system .
  • 7. PLCbrandsandsoftwareused  Brand name  Allen-Bradley  Schneider  Ceco electronics  Siemens  Omron  Delta Software used RS logix 500 Zelio Soft Ceco Client Step7 Microwin Cx Programming Wpl Soft
  • 9. components(input/output) (1) Input modules It take input and convert signal from sensor into logic signal Example : switch , push button . (2) output module It convert control instructions a signal that can be used by actuators . Example : lamps , alarm .
  • 10. (3) CPU (Central Processing Unit) • It is the brain of PLC and govern the activities of the entire . PLC system • The CPU perform the SCAN CYCLE for PLC • The CPU consists of the flowing blocks: Arithmetic LogicUnit . (ALU) , internal memory of CPU , internal timer , counters •(4) Memory Memory is the component that stores information,programs . and data in a PLC (5) Power supply Provides the voltage needed to run the primary PLC . components (6)Programming device The programming terminal is used for programming thePLC . and monitoring/sequencing PLCs operation
  • 11. PLCoperationsequence (1) Self test: testing of its own hardware and software for faults (2) Input scan : if there are no problems , PLC will copy all the values in to memory . (3) Logic solve/scan : using inputs ,the ladder logic program is solved once and outputs are updated . (4) Output scan : while solving the output values are updated only in memory when ladder scan in done , the output will be updated using temporary values in memory .
  • 12. ProgramminglanguageofPLC  Most common language encountered in PLC are : 1. Ladder Logic 2. Functional blocking diagram 3. Sequential function chart etc.
  • 13. Ladderlogic  The ladder logic is the oldest programming language for PLC  It is well to express combinational logic  The main ladder logic symbol represent the elements .
  • 16. TONtimer(timerondelay)  Timer Timer is basically used add some delay in programming circuit by adding a particular time to each circuit. There are three types TON and TOFF and RTO .
  • 18. AdvantagesofPLC  Reliability.  Flexibility in programming and re-programming.  Cost effective for controlling complex systems.  Small physical size , shorter project time.  High speed of operation.  Ability to communicate to other computer system in the plant.  Easy to maintenance/troubleshooting.  Reduced space.  Energy saving.
  • 19. DisadvantagesofPLC  PLC device are proprietary it means that part or software of one manufacturer can’t be used in combination with part of another manufacturer.  Initial cost are high.  Unemployment rate increase.  It is difficult to find error.
  • 20. Applications  Robots manufacturing and control.  Food /Beverage processing.  Machine tools.  Materials handle.  Conveyer system.  Aerospace.  Printing industry  Textile industry  Cleaning department etc.
  • 22. content  What is SCADA?  Why SCADA used ?  Brands of SCADA  What is TAG  Feature of SCADA  Object Property  Advantages of SCADA  Disadvantages of SCADA  Applications  Program (Bottle filling)
  • 23. WhatisS C A D A?  SCADA is a “Supervisory Control and Data Acquisition’’ real time industrial process control systems used to centrally monitor and control remote to local industrial equipment such as motors , valves , pump , relays etc. OR  A SCADA system gather information(such aswhere a leak on a pipeline occurred) and transfers the information back to central site then alert the home station that a leak occurred , carrying out necessary analysis and control ,such as determining if the leak is critical then displaying the information in a logical and organized fashion.
  • 24. WhyS C A D Aused?  Saves time and money  Less travelling for workers  Reduces man power need  Increase production and efficiency of a company  Cost effective of power system  Saves energy  Reliable  Supervisory control for particular system .
  • 25. BrandsofS C A D A  Company Name  Wonderware  Allen bradley  Siemens  GEFANUC  KPIT(India) Software Name Intouch 10.1 RS view/Factory talk Win CC Cimplicity Astra etc.
  • 26. TAGs  It is address of the memory location where data being saved.  We define a TAG in order to use it in the SCADA software ( Intouch wonderware )  Types of TAG (1) Analog – stores simple on/off information (2) String - stores numerical value (3) Digital - stores alphanumeric characters.  There are minimum 32 TAGs and maximum 64000 can be define in Intouch SCADA.
  • 27. FeaturesOfS C A D A (a) Dynamic process graphic (b) Script (c) Real time and Historical trend (d) Alarm (e) Security (f) Recipe management (g) Data base connectivity (h) Device connectivity
  • 28. (a)Dynamicprocessgraphic  Using this features mimics developed in SCADA software should resemble the mimic process .should have good library of symbols so that you can develop the mimic as per requirement.  The status of equipment running/stopping can be show using different colors/animation.
  • 29. (b)script  Script is the way of writing logic in SCADA software . every SCADA software has its own instruction and way of writing program.  Using script one can develop complex application.
  • 30. (c)Realtimeandhistoricaltrend  This facility is used to represent the data in graphical form  This trend play important role in the process of operation . if your batch fails or the plant trips you can simply go to the historical trend data and do the analysis . you can have better look of the parameters through the trends.  Real time data will plot the real-time value for fixed period of time while have historical data historical data stored value which can be viewed on demand
  • 31. (d)Alarm  Every plant needs of proper monitoring and control of the process parameter .  Alarm indicate to the operator when something goes wrong .  Generally alarm are implemanted by usually the lamps or hooters in field but in SCADA it can be represented by using animation.  In SCADA generally four types of alarm are used ie HI , HIHI ,LOW ,LOWLOW .
  • 32. (e)Security  Every SCADA software has various level of security for securing the application by avoiding unauthorized access .  Depending upon the access level given the operator /engineers is allowed to do task . In most of the cases operator are allowed only to operate the plant while the maintenance engineers can do the application modification
  • 33. (f)Recipemanagement  In many cases we uses the same plant for manufacturing the different product range . For example an oil blending plant can manufacture power oil ,transformer oil , auto-mobile oil .  The recipe management is facility used for maintain various recipe for different products and implement it on the process  The recipe can be stored in a single server and it can be fetched by any client server from any area to run the process.
  • 34. (g)Databaseconnectivity  In many plants , it is important to download the real- time information . in this case the database connectivity is must .  Many SCADA software don't have their own database . hence for storage and reporting they use third party database like MS access .  Wonderware InTouch provides a single view of all your control and information resources .
  • 35. (h)Deviceconnectivity  Every control hardware has its own communication protocol for communicating with different hardware/software .some of the leading communication protocol include Ethernet , DH485.  The SCADA software needs device driver software for communication with PLC or other control hardware.  More the driver software available better is the device connectivity . most of the SCADA software used in industry have connectivity with most of the leading control system .
  • 36. These properties are common to all symbol factory graphical objects . These properties are visible only when "break cell“ operation is performed on symbol factory objects . ObjectProperty
  • 37. Advantages  The computer can record and store a very large amount of data .  Data can be displayed at any time when user require .  The SCADA system provides on board mechanicaland graphical information .  The SCADA system ability to operate critical situations.  It provide alarm .
  • 38. Disadvantages  Network security risks  Lack of trained personnel  Initial cost is high
  • 39. Applications  Water resources monitoring  Water chemistry monitoring  Waste water monitoring  Waste tank controls  Wind tunnel controls  Fuel oil handling system  Petroleum pilot plant  Plant monitoring and process control  Nuclear plant full-scope simulators  Electric power transmission controlling  Metrological monitoring