Design of Waffle Slab (without beams) by Direct Design Method
32 32 32
C1 C2 C3 C4
32
C5 C6 C7 C8
32
C9 C10 C11 C12
32
C13 C14 C15 C16
Building Plan
Assume S = (32 + x/2) , Building spans = (S, S, S) by (S, S, S)
Building Height = 4@10 = 40
Loads: LL = 40 psf, FF = 20 psf, RW = 20 psf [i.e., (40 + x/2), (20 + x/4), (20 + x/4) psf]
Material Properties: f c = 3 ksi, fs = 20 ksi [i.e., f c = (3 + x/20) ksi, fs = (20 + x/4) ksi
(S1) (S1)
(S1) (S1)
(S2) (S2)
16.5 16 16 16.5
B1 B3
B4 B5
B6 B7
B8 B9
B10 B12
16.5
16
16
16.5
16
16
16 16
(S3)
(S2)
(S2)
B2
B11
Design of Slabs and Ribs
Slabs
Assuming 10 square pans per slab; i.e., (3.2 3.2 ) c/c and (2.7 2.7 ) clear spans (with 6 ribs)
Slab thickness = 2.5 Self weight = 2.5 150/12 = 31.25 psf
Total load on slab, w = 31.25 + 20 + 20 + 40 = 111.25 psf = 0.111 ksf
Maximum Moment for an edge-supported (2.7 2.7 ) slab with Support condition Case 2
M( )
max = 0.045 wL2
= 0.045 0.111 (2.7)2
= 0.0365 k /
Modulus of rupture = 5 fc = 5 (3/1000) = 0.274 ksi; i.e., Allowable tensile stress = 0.274/2 = 0.137 ksi
Ssect = bh2
/6 0.0365 = h2
/6 0.137 hreq = (0.0365 6/0.137) = 1.26
Slab thickness, h = 2.5 is OK; i.e. d = 2 As(Temp) = 0.0025 bh = 0.0025 12 2.5 = 0.075 in2
/ft
Use appropriate wire mesh to provide the required As(Temp); i.e., 1/8 -wire diameter (2 2 ) mesh
Ribs
Maximum clear span = 31 ; Slab without edge beam and fy = 40 ksi
Slab thickness = Ln(0.8 + fy/200)/33 = 31 (0.8 + 40/200) 12/33 = 11.27
Assume 18 thickness; i.e., 13.5 below slab, with bw = 6
Average thickness without column head = 18 {(2.7 2.7) 15.5}/(3.2 3.2) = 6.97
If column head covers (5 5 = 25) square pans, average thickness of slab
= 6.97 + {25 (2.7 2.7) 15.5}/(32 32) = 9.72
Assuming the entire slab thickness to be = 9.72
Self weight = 9.72 150/12 = 121.5 psf
Total load on slab = 121.5 + 20 + 20 + 40 201.5 psf = 0.202 ksf
For design, n = 9, k = 0.378, j = 0.874, R = 0.223 ksi
d = 18 1.5 = 16.5 ; As = M/fsjd = M 12/(20 0.874 16.5) = M/24.04
Moment capacity Mc(max) = Rbd2
= 0.223 1 16.52
= 60.70 k / , or 30.35 k /rib
Also, As(Temp) = 0.0025 bt = 0.0025 12 18 = 0.54 in2
/ ; or 0.27 in2
/rib
Punching shear force in slab 0.202 {322
(16 + 2/12)2
} = 153.71 k
and in column head 0.202 {322
(12/12 + 16.5/12)2
} = 205.25 k
Stresses are = 153.71/(4(16 12 + 2) 2) = 0.099 ksi and = 205.25/(4(12 + 16.5) 16.5) = 0.109 ksi
Allowable punching shear stress, punch = 2 fc = 2 (3/1000) = 0.110 ksi OK for punching shear
Panels in the Long and Short Direction
Panel 1 (and all other panels)
Width of Panel = 16.5
No edge beam along panel length; 1 = 0, for all slabs
Also no transverse beam t = 0, for all slabs
Column strip = Short span (c/c)/4 = 32/4 = 8 , Middle strip = 16 8 = 8 (i.e., 2.5 pans per strip)
Slab (S1)
Slab size (= 32 32 c/c) = 31 31
M0 = wL2Ln
2
/8 = 0.202 16.5 312
/8 = 399.48 k
Support (c) MExt = 0.26 M0 = 103.87 k , M+
= 0.52 M0 = 207.73 k , MInt = 0.70 M0 = 279.64 k
L2/L1 = 32/32 = 1.0, 1L2/L1 = 0
Total column strip moments are
MCExt = 1.00 MExt = 103.87 k ; i.e., 103.87 k /8 = 12.98 k / ; AsCExt = 12.98/24.04 = 0.54 in2
/
MC
+
= 0.60 M+
= 124.64 k ; i.e., 124.64 k /2.5 rib = 49.86 k / ; ACExt
+
= 49.86/24.04 = 2.07 in2
/rib
MCInt = 0.75 MInt = 209.73 k ; 209.73 k /8 = 26.22 k / ; AsCInt = 26.22/24.04 = 1.09 in2
/
Total middle strip moments are
MMExt = 103.87 103.87 = 0 k ; i.e., 0 k /8 = 0 k / ; AsMExt = 0/24.04 = 0.0 in2
/
MM
+
= 207.73 124.64 = 83.09 k ; i.e., 83.09 k /2.5 rib = 33.24 k /rib; AM
+
= 33.24/24.04 = 1.38 in2
/rib
MMInt = 279.64 209.73 = 69.91 k ; i.e., 69.91 k /8 = 8.74 k / ; AMInt
+
= 8.74/24.04 = 0.36 in2
/
Slab (S2)
Slab size (= 32 32 c/c) = 31 31
M0 = wL2Ln
2
/8 = 0.202 16.5 312
/8 = 399.48 k
Interior Support MInt = 0.65 M0 = 259.67 k , M+
= 0.35 M0 = 139.82 k , MInt = 0.65 M0 = 259.67 k
L2/L1 = 32/32 = 1.0, 1L2/L1 = 0
Total column strip moments are
MCInt = 0.75 MExt = 194.75 k ; i.e., 194.75 k /8 = 24.34 k / ; AsCInt = 24.34/24.04 = 1.01 in2
/
MC
+
= 0.60 M+
= 83.89 k ; i.e., 83.89 k /2.5 rib = 33.56 k /rib; AsM
+
= 33.56/24.04 = 1.40 in2
/rib
MCInt = 0.75 MInt = 194.75 k ; i.e., 194.75 k /8 = 24.34 k / ; AsCInt = 24.34/24.04 = 1.01 in2
/
Total middle strip moments are
MMInt = 259.67 194.75 = 64.92 k ; i.e., 64.92 k /8 = 8.11 k / ; AsMInt = 8.11/24.04 = 0.34 in2
/
MM
+
= 139.82 83.89 = 55.93 k ; i.e., 55.93 k /2.5 rib = 22.37 k /rib; AsM
+
= 22.37/24.04 = 0.93 in2
/rib
MMInt = 259.67 194.75 = 64.92 k ; i.e., 64.92 k /8 = 8.11 k / ; AsMInt = 8.11/24.04 = 0.34 in2
/
Denoting slab reinforcement by in2
/ ( ve) and rib reinforcement by in2
/rib (+ve highlighted)
Ribs within Column Strip
Ribs within Middle Strip
0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54
0.00 1.38 0.36 0.34 0.93 0.34 0.36 1.38 0.00
0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54
0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54
0.00 1.38 0.36 0.34 0.93 0.34 0.36 1.38 0.00
0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54
0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54
0.00 1.38 0.36 0.34 0.93 0.34 0.36 1.38 0.00
0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54
1 #4 extra top between
alternate #4 bars
2 #9 through
#4 @ 4.5 c/c within slab
2 #8 through
#4 @ 7.5 c/c
A
A
Section A-A
3.2
2 #9
#4@ 4.5 c/c
B
B
Section B-B
3.2
2 #9
#4@ 4.5 c/c
+ extra top

Contenu connexe

Tendances

Pedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedungPedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedung
infosanitasi
 
6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut
6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut
6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut
nefertitieanggen
 
Konsep rancangan struktur & konstruksi
Konsep rancangan struktur & konstruksiKonsep rancangan struktur & konstruksi
Konsep rancangan struktur & konstruksi
Nana Roy
 

Tendances (20)

Pondasi Foot plan
Pondasi Foot planPondasi Foot plan
Pondasi Foot plan
 
Pedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedungPedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedung
 
Pelat Lantai
Pelat LantaiPelat Lantai
Pelat Lantai
 
PELAKSANAAN PEMBESIAN PELAT LANTAI
PELAKSANAAN PEMBESIAN PELAT LANTAI PELAKSANAAN PEMBESIAN PELAT LANTAI
PELAKSANAAN PEMBESIAN PELAT LANTAI
 
Plafond
PlafondPlafond
Plafond
 
Modul dpib pb 5
Modul dpib pb 5Modul dpib pb 5
Modul dpib pb 5
 
MODUL TKP M5KB4 - GAMBAR UTILITAS BANGUNAN
MODUL TKP M5KB4 - GAMBAR UTILITAS BANGUNANMODUL TKP M5KB4 - GAMBAR UTILITAS BANGUNAN
MODUL TKP M5KB4 - GAMBAR UTILITAS BANGUNAN
 
6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut
6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut
6 pelaksanaan-pondasi-cerucuk-kayu-diatas-tanah-lembek-dan-tanah-gambut
 
123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung
 
utilitas gedung
utilitas gedungutilitas gedung
utilitas gedung
 
Konsep rancangan struktur & konstruksi
Konsep rancangan struktur & konstruksiKonsep rancangan struktur & konstruksi
Konsep rancangan struktur & konstruksi
 
Sistem tabung
Sistem tabungSistem tabung
Sistem tabung
 
Analisis arah angin
Analisis arah anginAnalisis arah angin
Analisis arah angin
 
Pranata Pembangunan Pertemuan 1
Pranata Pembangunan Pertemuan 1Pranata Pembangunan Pertemuan 1
Pranata Pembangunan Pertemuan 1
 
Bagian bagian jembatan bentang panjang
Bagian bagian jembatan bentang panjangBagian bagian jembatan bentang panjang
Bagian bagian jembatan bentang panjang
 
Makalah metode pelaksanaan_konstruksi
Makalah metode pelaksanaan_konstruksiMakalah metode pelaksanaan_konstruksi
Makalah metode pelaksanaan_konstruksi
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
 
Core dan Shaft
Core dan ShaftCore dan Shaft
Core dan Shaft
 
Sistem rangka pemikul momen
Sistem rangka pemikul momenSistem rangka pemikul momen
Sistem rangka pemikul momen
 
Proporsi dalam arsitektur
Proporsi dalam arsitekturProporsi dalam arsitektur
Proporsi dalam arsitektur
 

Similaire à perhitungan waffle slab

Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
carlos
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
Luan Truong Van
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
luantvconst
 
IDP PROJECT column.pptxvjfhhfudyytststrrsrsr
IDP PROJECT column.pptxvjfhhfudyytststrrsrsrIDP PROJECT column.pptxvjfhhfudyytststrrsrsr
IDP PROJECT column.pptxvjfhhfudyytststrrsrsr
ct571999
 

Similaire à perhitungan waffle slab (20)

Design of rc building
Design of rc buildingDesign of rc building
Design of rc building
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
2 compression
2  compression2  compression
2 compression
 
1 perhitungan-balok
1 perhitungan-balok1 perhitungan-balok
1 perhitungan-balok
 
Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)
 
Design of stairs
Design of stairsDesign of stairs
Design of stairs
 
RCC BMD
RCC BMDRCC BMD
RCC BMD
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
 
Muro contension raul1
Muro contension raul1Muro contension raul1
Muro contension raul1
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigas
 
Shi20396 ch08
Shi20396 ch08Shi20396 ch08
Shi20396 ch08
 
H c verma part 1 solution
H c verma part 1 solutionH c verma part 1 solution
H c verma part 1 solution
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical liner
 
Capítulo 08 parafusos
Capítulo 08   parafusosCapítulo 08   parafusos
Capítulo 08 parafusos
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Shi20396 ch17
Shi20396 ch17Shi20396 ch17
Shi20396 ch17
 
IDP PROJECT column.pptxvjfhhfudyytststrrsrsr
IDP PROJECT column.pptxvjfhhfudyytststrrsrsrIDP PROJECT column.pptxvjfhhfudyytststrrsrsr
IDP PROJECT column.pptxvjfhhfudyytststrrsrsr
 

Dernier

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Dernier (20)

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

perhitungan waffle slab

  • 1. Design of Waffle Slab (without beams) by Direct Design Method 32 32 32 C1 C2 C3 C4 32 C5 C6 C7 C8 32 C9 C10 C11 C12 32 C13 C14 C15 C16 Building Plan Assume S = (32 + x/2) , Building spans = (S, S, S) by (S, S, S) Building Height = 4@10 = 40 Loads: LL = 40 psf, FF = 20 psf, RW = 20 psf [i.e., (40 + x/2), (20 + x/4), (20 + x/4) psf] Material Properties: f c = 3 ksi, fs = 20 ksi [i.e., f c = (3 + x/20) ksi, fs = (20 + x/4) ksi (S1) (S1) (S1) (S1) (S2) (S2) 16.5 16 16 16.5 B1 B3 B4 B5 B6 B7 B8 B9 B10 B12 16.5 16 16 16.5 16 16 16 16 (S3) (S2) (S2) B2 B11
  • 2. Design of Slabs and Ribs Slabs Assuming 10 square pans per slab; i.e., (3.2 3.2 ) c/c and (2.7 2.7 ) clear spans (with 6 ribs) Slab thickness = 2.5 Self weight = 2.5 150/12 = 31.25 psf Total load on slab, w = 31.25 + 20 + 20 + 40 = 111.25 psf = 0.111 ksf Maximum Moment for an edge-supported (2.7 2.7 ) slab with Support condition Case 2 M( ) max = 0.045 wL2 = 0.045 0.111 (2.7)2 = 0.0365 k / Modulus of rupture = 5 fc = 5 (3/1000) = 0.274 ksi; i.e., Allowable tensile stress = 0.274/2 = 0.137 ksi Ssect = bh2 /6 0.0365 = h2 /6 0.137 hreq = (0.0365 6/0.137) = 1.26 Slab thickness, h = 2.5 is OK; i.e. d = 2 As(Temp) = 0.0025 bh = 0.0025 12 2.5 = 0.075 in2 /ft Use appropriate wire mesh to provide the required As(Temp); i.e., 1/8 -wire diameter (2 2 ) mesh Ribs Maximum clear span = 31 ; Slab without edge beam and fy = 40 ksi Slab thickness = Ln(0.8 + fy/200)/33 = 31 (0.8 + 40/200) 12/33 = 11.27 Assume 18 thickness; i.e., 13.5 below slab, with bw = 6 Average thickness without column head = 18 {(2.7 2.7) 15.5}/(3.2 3.2) = 6.97 If column head covers (5 5 = 25) square pans, average thickness of slab = 6.97 + {25 (2.7 2.7) 15.5}/(32 32) = 9.72 Assuming the entire slab thickness to be = 9.72 Self weight = 9.72 150/12 = 121.5 psf Total load on slab = 121.5 + 20 + 20 + 40 201.5 psf = 0.202 ksf For design, n = 9, k = 0.378, j = 0.874, R = 0.223 ksi d = 18 1.5 = 16.5 ; As = M/fsjd = M 12/(20 0.874 16.5) = M/24.04 Moment capacity Mc(max) = Rbd2 = 0.223 1 16.52 = 60.70 k / , or 30.35 k /rib Also, As(Temp) = 0.0025 bt = 0.0025 12 18 = 0.54 in2 / ; or 0.27 in2 /rib Punching shear force in slab 0.202 {322 (16 + 2/12)2 } = 153.71 k and in column head 0.202 {322 (12/12 + 16.5/12)2 } = 205.25 k Stresses are = 153.71/(4(16 12 + 2) 2) = 0.099 ksi and = 205.25/(4(12 + 16.5) 16.5) = 0.109 ksi Allowable punching shear stress, punch = 2 fc = 2 (3/1000) = 0.110 ksi OK for punching shear
  • 3. Panels in the Long and Short Direction Panel 1 (and all other panels) Width of Panel = 16.5 No edge beam along panel length; 1 = 0, for all slabs Also no transverse beam t = 0, for all slabs Column strip = Short span (c/c)/4 = 32/4 = 8 , Middle strip = 16 8 = 8 (i.e., 2.5 pans per strip) Slab (S1) Slab size (= 32 32 c/c) = 31 31 M0 = wL2Ln 2 /8 = 0.202 16.5 312 /8 = 399.48 k Support (c) MExt = 0.26 M0 = 103.87 k , M+ = 0.52 M0 = 207.73 k , MInt = 0.70 M0 = 279.64 k L2/L1 = 32/32 = 1.0, 1L2/L1 = 0 Total column strip moments are MCExt = 1.00 MExt = 103.87 k ; i.e., 103.87 k /8 = 12.98 k / ; AsCExt = 12.98/24.04 = 0.54 in2 / MC + = 0.60 M+ = 124.64 k ; i.e., 124.64 k /2.5 rib = 49.86 k / ; ACExt + = 49.86/24.04 = 2.07 in2 /rib MCInt = 0.75 MInt = 209.73 k ; 209.73 k /8 = 26.22 k / ; AsCInt = 26.22/24.04 = 1.09 in2 / Total middle strip moments are MMExt = 103.87 103.87 = 0 k ; i.e., 0 k /8 = 0 k / ; AsMExt = 0/24.04 = 0.0 in2 / MM + = 207.73 124.64 = 83.09 k ; i.e., 83.09 k /2.5 rib = 33.24 k /rib; AM + = 33.24/24.04 = 1.38 in2 /rib MMInt = 279.64 209.73 = 69.91 k ; i.e., 69.91 k /8 = 8.74 k / ; AMInt + = 8.74/24.04 = 0.36 in2 / Slab (S2) Slab size (= 32 32 c/c) = 31 31 M0 = wL2Ln 2 /8 = 0.202 16.5 312 /8 = 399.48 k Interior Support MInt = 0.65 M0 = 259.67 k , M+ = 0.35 M0 = 139.82 k , MInt = 0.65 M0 = 259.67 k L2/L1 = 32/32 = 1.0, 1L2/L1 = 0 Total column strip moments are MCInt = 0.75 MExt = 194.75 k ; i.e., 194.75 k /8 = 24.34 k / ; AsCInt = 24.34/24.04 = 1.01 in2 / MC + = 0.60 M+ = 83.89 k ; i.e., 83.89 k /2.5 rib = 33.56 k /rib; AsM + = 33.56/24.04 = 1.40 in2 /rib MCInt = 0.75 MInt = 194.75 k ; i.e., 194.75 k /8 = 24.34 k / ; AsCInt = 24.34/24.04 = 1.01 in2 / Total middle strip moments are MMInt = 259.67 194.75 = 64.92 k ; i.e., 64.92 k /8 = 8.11 k / ; AsMInt = 8.11/24.04 = 0.34 in2 / MM + = 139.82 83.89 = 55.93 k ; i.e., 55.93 k /2.5 rib = 22.37 k /rib; AsM + = 22.37/24.04 = 0.93 in2 /rib MMInt = 259.67 194.75 = 64.92 k ; i.e., 64.92 k /8 = 8.11 k / ; AsMInt = 8.11/24.04 = 0.34 in2 /
  • 4. Denoting slab reinforcement by in2 / ( ve) and rib reinforcement by in2 /rib (+ve highlighted) Ribs within Column Strip Ribs within Middle Strip 0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54 0.00 1.38 0.36 0.34 0.93 0.34 0.36 1.38 0.00 0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54 0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54 0.00 1.38 0.36 0.34 0.93 0.34 0.36 1.38 0.00 0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54 0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54 0.00 1.38 0.36 0.34 0.93 0.34 0.36 1.38 0.00 0.54 2.07 1.09 1.01 1.40 1.01 1.09 2.07 0.54 1 #4 extra top between alternate #4 bars 2 #9 through #4 @ 4.5 c/c within slab 2 #8 through #4 @ 7.5 c/c A A Section A-A 3.2 2 #9 #4@ 4.5 c/c B B Section B-B 3.2 2 #9 #4@ 4.5 c/c + extra top