SlideShare une entreprise Scribd logo
1  sur  4
LAMBERT ARADA IGNACIO
Permanent Address: Block21, Lot 48 Laguna BuenavistaSubdivision,Brgy.Barandal
CalambaCityLaguna.
Mobile Number: (0917) 5686788
E-mail Address: laignacio1004@gmail.com
Work Background:
ASURION/TECHLOG CENTER PHILS. (FEB2011 - PRESENT)
PROJECT MANAGER/New Product Introduction SR.ENGINEER ( NPI ENGINEERING )
Routinelymonitorsindividual projecttaskcompletion
Provide New ProductIntroduction reportontaskand eachprojectstatus
Track projectcritical paths andresolve problemsencounteredtokeepwithschedule
Intimatelyworkwithsuppliers/internalfactories tounderstandprojectroadblocksandactively
participate inresolvingthem
Deepdive ondetailsof the projectspecifictaskownersandancillarytaskandowners(phone
calls,emails,follow ups)
Constantlyupdate checklist/tasklistandowners
Have weeklymeetingwithsuppliersforprojectstatus
Reportprojecthighlightsandlowlights(escalations)
Reportfor ManagementincludingLessonsLearned,StrategyChange Proposals,approvalsetc.
SpotOpportunitiesforNPIprocessimprovement
Technical SupervisionforInnovationsandProductivityenhancement.
Determinesthe solutionstokeyissuesonaweeklybasisbythe use of the Breakthrough
Strategy.
Usingthe Breakthroughmethods,measuresandanalyzesaproblem.
o PDCA method
o Statistical ProcessControl
o Designof Experiment
Improve existinganddesignnew productandservicestoSix Sigmalevel andeffectivelylead
teamsto improve the process.
Work withandadvice managementonthe identificationandsubsequentimplementationof
processimprovementplan.
Assistinpreparationof StandardOperatingProcedures
OTHER JOB RESPONSIBILITIES :
Responsible inacquiringNewModels RequirementsforbothTCPand Suppliers.
Responsible forAdhesivemanagementforNew andCurrentModels.
Responsible forNewModel HandOvertoOperations.
Responsible forSKUcreation,retirementandcontrol forNew andCurrentModels.
Responsible forBOMacquisition,review andupdates.
Functional Masterof NPIDepartment(ISO).
Model Qualificationforassignedmodel.
SAMSUNG ELECTRONICS PHILS. (JAN2008–FEB2011)
SECTION HEAD/ASST. MANAGER ( PROCESS/EQUIPMENT ENGINEERING)
HandlesTechniciansand Engineers
Technical SupervisionforInnovationsandProductivityenhancement
Prepare reportsforSectionsPerformance Index
Engage in the Maintenance of operationinproductionlineusingTPMsystem.
Responsible forimprovementstominimize machine test time andoperationdowntime.
SR. ENGINEER: EQUIPMENT ENGINEERING (2002-2008)
Maintenance andRepairof all deck assemblylinetestequipment,suchascomputerbased
testing,PLCtype conveyorsandpneumatictestjigs.
Responsible forproductionline innovation
Responsible forthe Preventive Maintenance of ProductionLine Equipment
Equipmentset-upandqualification
Spare parts control,managementandprocurement
TDK PHILIPPINES CORPORATION ( April 10, 2000 - February 23, 2002)
PROJECT ENGINEER (HGAENGINEERING/SLIDER(WAFERFABRICATION) ENGINEERING)
PerformsEngineeringevaluation/failure analysisonlots/waferfromlow yieldandhighpercent
defective aswellasmid-processingandprocessdeviations
Works/coordinateswithSeniorEngineerinpromulgatingandimplementingProjectEngineering
plansof activitiesbasedonformulatedobjectivesandreviewingthe resultsperiodically
In-charge of New Project Qualifications –gatheringandpreparingof data forcustomer;review
and analysisof qualificationdatabasedonexpectedresults;and,monitoringandfollow-upof
qualificationresultsfromcustomer)
Performsmanpowertraining/brush-upof trainors/productionoperators/QAregarding
maintenance of qualitystandardsanduniformity of establishspecification.
Accomplishments
Reduce TAT of NPI Product Launch from 45days to 25 days (TCP)
Qualified#’sof New Phone Models(Asurion/TCP)
Lead 1st
and2nd
VSM for NPIProcess and TAT improvement (TCP)
QualifiedmodelsfromProduct Launchto ProductionSafe Launch.(TCP)
TPM Launching Success for SEPHIL Mainline. First Time in Samsung Electronics (2008)
Equipment Improvement for Capacity Increase from 8K per shift to 9K per Shift. (2007)
Reduction of Spare Parts Stock Amount and incurred company Cost savings up to 30%
(2008)
Set-upof Machine Shopfor In-house FabricationPurposesandincurred Average Savings of
2000USD per month (2007)
Various Design of Work Area improvement resulting to increase line LOB and Operator
Work Efficiency. (2006 to 2008)
Educational Background
Technological Institute of the Philippines
(Center for Continuing Education)
Diploma in Project Management
Sept. 2011 – July 2012
AMA Computer College (Makati, City)
B.S. Electronics and Communications Engineering
1995-1999
Seminars and Trainings Attended
ManufacturingTechnology(3months:Suwon,SouthKorea)
LeadershipTraining
Six SigmaGreenBelt(certified)
Industrial EngineeringForLeaders
ISO9002/14001
CoachingTechniques
Global FieldLeadershipCourse
Team Leadership
People andCommunicationsManagement
StrategicBusinessApproachtoProjectManagement
Implementing,ControllingandClosingthe Project
PlanningandManagingthe ProjectTriple Constraints
Total QualityControl
Statistical ProcessControl
PERSONAL INFORMATIONS
Sex: Male Date of Birth: October 04, 1976
Age: 39 Birth Place: Binangonan, Rizal
Civil Status: Married Nationality: Filipino

Contenu connexe

Tendances

Tendances (17)

DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Bruce_Clark_Honeywell_Resume_r1_08-2015
Bruce_Clark_Honeywell_Resume_r1_08-2015Bruce_Clark_Honeywell_Resume_r1_08-2015
Bruce_Clark_Honeywell_Resume_r1_08-2015
 
UMAR IQBAL QC.CV
UMAR IQBAL QC.CVUMAR IQBAL QC.CV
UMAR IQBAL QC.CV
 
Resume2015
Resume2015Resume2015
Resume2015
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
 
Karthik Updated (1)
Karthik Updated (1)Karthik Updated (1)
Karthik Updated (1)
 
RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
Vijeesh resume dec 2016
Vijeesh resume dec 2016Vijeesh resume dec 2016
Vijeesh resume dec 2016
 
Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22
 
Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016
 
CURICULUM VITAE ( Sree ) latest
CURICULUM VITAE ( Sree ) latestCURICULUM VITAE ( Sree ) latest
CURICULUM VITAE ( Sree ) latest
 
Arame Vartani - Resume 3
Arame Vartani - Resume 3Arame Vartani - Resume 3
Arame Vartani - Resume 3
 
resume-april-2016
resume-april-2016resume-april-2016
resume-april-2016
 

Similaire à LAMBERT ARADA IGNACIO

Similaire à LAMBERT ARADA IGNACIO (20)

Melvin L. Pedido III_CV url
Melvin L. Pedido III_CV urlMelvin L. Pedido III_CV url
Melvin L. Pedido III_CV url
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015
 
edenobrero(resume)
edenobrero(resume) edenobrero(resume)
edenobrero(resume)
 
Thoreson, Scott Resume
Thoreson, Scott ResumeThoreson, Scott Resume
Thoreson, Scott Resume
 
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
 
Jose Mangual (Micron) VCR
Jose Mangual (Micron) VCRJose Mangual (Micron) VCR
Jose Mangual (Micron) VCR
 
KY Fung Resume_me
KY Fung Resume_meKY Fung Resume_me
KY Fung Resume_me
 
Sundra resume.1
Sundra resume.1Sundra resume.1
Sundra resume.1
 
Maria Hygine M Micosa
Maria Hygine M MicosaMaria Hygine M Micosa
Maria Hygine M Micosa
 
Manish Gujarathi - Copy
Manish Gujarathi  - CopyManish Gujarathi  - Copy
Manish Gujarathi - Copy
 
SRN_11
SRN_11SRN_11
SRN_11
 
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
 
LGD (new)
LGD (new)LGD (new)
LGD (new)
 
BIJIT_CV
BIJIT_CVBIJIT_CV
BIJIT_CV
 
Resume
ResumeResume
Resume
 
Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014
 
Vijeesh resume dec 2016
Vijeesh resume dec 2016Vijeesh resume dec 2016
Vijeesh resume dec 2016
 
Resume_0724
Resume_0724Resume_0724
Resume_0724
 
Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014
 

LAMBERT ARADA IGNACIO

  • 1. LAMBERT ARADA IGNACIO Permanent Address: Block21, Lot 48 Laguna BuenavistaSubdivision,Brgy.Barandal CalambaCityLaguna. Mobile Number: (0917) 5686788 E-mail Address: laignacio1004@gmail.com Work Background: ASURION/TECHLOG CENTER PHILS. (FEB2011 - PRESENT) PROJECT MANAGER/New Product Introduction SR.ENGINEER ( NPI ENGINEERING ) Routinelymonitorsindividual projecttaskcompletion Provide New ProductIntroduction reportontaskand eachprojectstatus Track projectcritical paths andresolve problemsencounteredtokeepwithschedule Intimatelyworkwithsuppliers/internalfactories tounderstandprojectroadblocksandactively participate inresolvingthem Deepdive ondetailsof the projectspecifictaskownersandancillarytaskandowners(phone calls,emails,follow ups) Constantlyupdate checklist/tasklistandowners Have weeklymeetingwithsuppliersforprojectstatus Reportprojecthighlightsandlowlights(escalations) Reportfor ManagementincludingLessonsLearned,StrategyChange Proposals,approvalsetc. SpotOpportunitiesforNPIprocessimprovement Technical SupervisionforInnovationsandProductivityenhancement. Determinesthe solutionstokeyissuesonaweeklybasisbythe use of the Breakthrough Strategy. Usingthe Breakthroughmethods,measuresandanalyzesaproblem. o PDCA method o Statistical ProcessControl o Designof Experiment Improve existinganddesignnew productandservicestoSix Sigmalevel andeffectivelylead teamsto improve the process. Work withandadvice managementonthe identificationandsubsequentimplementationof processimprovementplan. Assistinpreparationof StandardOperatingProcedures OTHER JOB RESPONSIBILITIES : Responsible inacquiringNewModels RequirementsforbothTCPand Suppliers. Responsible forAdhesivemanagementforNew andCurrentModels. Responsible forNewModel HandOvertoOperations. Responsible forSKUcreation,retirementandcontrol forNew andCurrentModels. Responsible forBOMacquisition,review andupdates. Functional Masterof NPIDepartment(ISO). Model Qualificationforassignedmodel.
  • 2. SAMSUNG ELECTRONICS PHILS. (JAN2008–FEB2011) SECTION HEAD/ASST. MANAGER ( PROCESS/EQUIPMENT ENGINEERING) HandlesTechniciansand Engineers Technical SupervisionforInnovationsandProductivityenhancement Prepare reportsforSectionsPerformance Index Engage in the Maintenance of operationinproductionlineusingTPMsystem. Responsible forimprovementstominimize machine test time andoperationdowntime. SR. ENGINEER: EQUIPMENT ENGINEERING (2002-2008) Maintenance andRepairof all deck assemblylinetestequipment,suchascomputerbased testing,PLCtype conveyorsandpneumatictestjigs. Responsible forproductionline innovation Responsible forthe Preventive Maintenance of ProductionLine Equipment Equipmentset-upandqualification Spare parts control,managementandprocurement TDK PHILIPPINES CORPORATION ( April 10, 2000 - February 23, 2002) PROJECT ENGINEER (HGAENGINEERING/SLIDER(WAFERFABRICATION) ENGINEERING) PerformsEngineeringevaluation/failure analysisonlots/waferfromlow yieldandhighpercent defective aswellasmid-processingandprocessdeviations Works/coordinateswithSeniorEngineerinpromulgatingandimplementingProjectEngineering plansof activitiesbasedonformulatedobjectivesandreviewingthe resultsperiodically In-charge of New Project Qualifications –gatheringandpreparingof data forcustomer;review and analysisof qualificationdatabasedonexpectedresults;and,monitoringandfollow-upof qualificationresultsfromcustomer) Performsmanpowertraining/brush-upof trainors/productionoperators/QAregarding maintenance of qualitystandardsanduniformity of establishspecification.
  • 3. Accomplishments Reduce TAT of NPI Product Launch from 45days to 25 days (TCP) Qualified#’sof New Phone Models(Asurion/TCP) Lead 1st and2nd VSM for NPIProcess and TAT improvement (TCP) QualifiedmodelsfromProduct Launchto ProductionSafe Launch.(TCP) TPM Launching Success for SEPHIL Mainline. First Time in Samsung Electronics (2008) Equipment Improvement for Capacity Increase from 8K per shift to 9K per Shift. (2007) Reduction of Spare Parts Stock Amount and incurred company Cost savings up to 30% (2008) Set-upof Machine Shopfor In-house FabricationPurposesandincurred Average Savings of 2000USD per month (2007) Various Design of Work Area improvement resulting to increase line LOB and Operator Work Efficiency. (2006 to 2008) Educational Background Technological Institute of the Philippines (Center for Continuing Education) Diploma in Project Management Sept. 2011 – July 2012 AMA Computer College (Makati, City) B.S. Electronics and Communications Engineering 1995-1999 Seminars and Trainings Attended ManufacturingTechnology(3months:Suwon,SouthKorea) LeadershipTraining Six SigmaGreenBelt(certified) Industrial EngineeringForLeaders ISO9002/14001 CoachingTechniques Global FieldLeadershipCourse Team Leadership People andCommunicationsManagement StrategicBusinessApproachtoProjectManagement Implementing,ControllingandClosingthe Project PlanningandManagingthe ProjectTriple Constraints Total QualityControl Statistical ProcessControl
  • 4. PERSONAL INFORMATIONS Sex: Male Date of Birth: October 04, 1976 Age: 39 Birth Place: Binangonan, Rizal Civil Status: Married Nationality: Filipino