SlideShare une entreprise Scribd logo
1  sur  30
Télécharger pour lire hors ligne
Beyond the low hanging fruit !



             Chris Oakley
        www.crowddynamics.com
Wide Spectrum of streets and junctions




                        2
Whats the problem ?


• Many streets will remain heavily trafficked

• Can these be enhanced to

       -   Reduce emissions
       -   Improve priority for pedestrians, cycles and buses
       -   Improve safety
       -   Improve their attractiveness/vitality

• Whilst maintaining traffic capacity
Evolution of design process



• Shared Space - lightly trafficked streets
                 - moderately trafficked streets
                            - Schwarzenburgstrasse Berne
                            - Ashford
                            - Poynton Phase 1
Evolution of design process
Poynton Phase 2 –


Shared Space Heavily trafficked




                                  6
Poynton Phase 2 –




                    7
Evolution of design proces
Alternatives to Traffic Signals
- Switch Off




                         9
Traffic Signal Switch Off




                            10
Analysis – Fountains Place Junction
Traffic Signal Switch off – Queue lengths
Traffic Signal Switch Off- Analysis




                 UAF Simulation
                        12
Example junction5 : Ruthin road/ Bradley Road
Wrexham




                       13
Alternative junction configurations
    Comparison of alternatives


• Pedestrian Amenity

• Pedestrian Delay

• Traffic Delay and junction Capacity

• Emissions

• Impact on bus operations

• Impact on Cyclists

• Safety.

• Cost
Alternative junction configurations


•Option 1 - Traffic signals with pedestrian stage

•Option 2 - Mini Roundabout with puffin crossings on all arms

•Option 3 - Traffic signals with pedestrian stage + scatter crossings

•Option 4 – Mini Roundabout with zebra crossings on all arms
           (a) At 5m distance from roundabout
           (b) At 10m
           (c) At 20m

•Option 5 – Shared Space concept
Alternative junction configurations




   Shared space          Roundabout with zebras 5m back from stop lines   Roundabout with zebras /puffins 20m back from
                                                                          stop lines




Signals option with no            Signals option with conventional                 Signals option with ‘all ways’
pedestrian crossings                   pedestrian crossings                           pedestrian crossings
Alternative junction configurations
    Comparison of alternatives- Quantification


• Pedestrian Amenity

• Pedestrian Delay

• Traffic Delay and junction Capacity

• Emissions

• Impact on bus operations

• Impact on Cyclists

• Safety.

• Cost
Pedestrian and traffic simulation




                                    UAF
Pedestrian/Traffic Interaction at Junction




                         19
                                             UAF
Alternative junction configurations
Pedestrian Travel time Analysis
Alternative junction configurations
Emissions Analysis
Comparison of Options



Ranking of Options in terms of Pedestrian priority        Ranking of Options in terms of Traffic
                                                          Efficiency


               Amenity         Delay          Overall
                                                                                  Overall
               Option 4       Option 5
                                            Option 4/5                            Existing

               Option 5       Option 4
                              Existing                                           Option 4
               Option 3       Option2        Option 2

               Option 1                      Option 3                            Option 2
                                             Option 1                            Option 5
                                             Existing
               Existing
               Option 2      Option 1/3                                          Option 1
                                                                                 Option 3




                                                     22
Comparison of options - Safety
      Ranking of options in terms of safety


                                      Pedestrian

             Site Review               Research                 Overall

                                      & Statistics



                                     Traffic signals
                                  Mini Roundabout with
            Traffic Signals                                  Traffic Signals
                                         puffins


                                  Mini Roundabout with
                                         zebras
          Signals with scatter                            Mini roundabout with
               crossings                                    zebra or puffins

         Mini Roundabout with      Signals with scatter   Traffic Signals with
                zebras                  crossings          Scatter crossings

                Existing                 Existing               Existing
         Mini Roundabout with
                                     Shared Space            Shared Space
                Puffins
               Option 5
Ruthin Road – Bradley Road
Recent Junction Improvement

  Photios




                      24
Alternative Junction Configurations-
  Initial findings


• Shared Space – Heavily trafficked
                  – Await opening at Poynton with considerable interest
Alternative Junction Configurations-
  Initial findings


• Shared Space - Heavily trafficked
                  - Await opening with considerable interest
• Traffic signal switch offs
                  - Can significantly reduce delay.
                  - Issue of pedestrian amenity , but not delay
Alternative Junction Configurations-
   Initial findings


• Shared Space - Heavily trafficked
                   - Await opening with considerable interest
• Traffic signal switch offs
                   - Can significantly reduce delay.
                   - Issue of pedestrian amenity , but not delay
• Alternatives to signals –
                   -Typically more efficient in terms of traffic movement
                   -Reduce emissions.
                   -Pedestrian delay typically reduced.
                   -Safety ?
Conclusions


• Innovative and efficient design solutions are deliverable


•Doesn’t have to be shared space, Cheaper more conventional solutions
possible.


• Emissions can be reduced


• Comparative analysis of wide range options now possible


• Modelling has vital role in refining/optimising schemes


• Need further study and demonstration projects
Finally




• Reappraise our approach to street and junction design


• Never a perfect design


• Always requires compromise from the different users of the street

Contenu connexe

En vedette

Transport Problems And Solutions!
Transport  Problems And  Solutions!Transport  Problems And  Solutions!
Transport Problems And Solutions!
adtastic2001
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
Md Tanvir Alam
 

En vedette (18)

Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation  by ahmed ferdous - 1004137-buetTraffic volume study-opresentation  by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
 
Type of Junctions
Type of JunctionsType of Junctions
Type of Junctions
 
Traffic at urban road junctions
Traffic at urban road junctionsTraffic at urban road junctions
Traffic at urban road junctions
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
 
Chapter 3 junction design
Chapter 3 junction designChapter 3 junction design
Chapter 3 junction design
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 
Highway And traffic Engineering
Highway And traffic EngineeringHighway And traffic Engineering
Highway And traffic Engineering
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
 
Transport Problems And Solutions!
Transport  Problems And  Solutions!Transport  Problems And  Solutions!
Transport Problems And Solutions!
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Traffic volume-study
Traffic volume-studyTraffic volume-study
Traffic volume-study
 
Roadway condition survey & Traffic Volume Study
Roadway condition survey & Traffic Volume StudyRoadway condition survey & Traffic Volume Study
Roadway condition survey & Traffic Volume Study
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 

Plus de LandorLINKS

Paul O’Day, Part 3: Vision for Highways Maintenance and Management in Birmingham
Paul O’Day, Part 3: Vision for Highways Maintenance and Management in BirminghamPaul O’Day, Part 3: Vision for Highways Maintenance and Management in Birmingham
Paul O’Day, Part 3: Vision for Highways Maintenance and Management in Birmingham
LandorLINKS
 
Neil Gibson, Part 1: The Need for Change; how service delivery transformation...
Neil Gibson, Part 1: The Need for Change; how service delivery transformation...Neil Gibson, Part 1: The Need for Change; how service delivery transformation...
Neil Gibson, Part 1: The Need for Change; how service delivery transformation...
LandorLINKS
 

Plus de LandorLINKS (16)

Dana Skelley, Why Change
Dana Skelley, Why ChangeDana Skelley, Why Change
Dana Skelley, Why Change
 
Zerrin Lovett, Use of e-auctions
Zerrin Lovett, Use of e-auctionsZerrin Lovett, Use of e-auctions
Zerrin Lovett, Use of e-auctions
 
Philip Snowling, Highways Supplier Relationship Development
Philip Snowling, Highways Supplier Relationship DevelopmentPhilip Snowling, Highways Supplier Relationship Development
Philip Snowling, Highways Supplier Relationship Development
 
John Dales, Director, Urban Movement @ Urban Initiatives: The state of the na...
John Dales, Director, Urban Movement @ Urban Initiatives: The state of the na...John Dales, Director, Urban Movement @ Urban Initiatives: The state of the na...
John Dales, Director, Urban Movement @ Urban Initiatives: The state of the na...
 
Phil Jones, Managing Director, Phil Jones Associates: Local Transport Note on...
Phil Jones, Managing Director, Phil Jones Associates: Local Transport Note on...Phil Jones, Managing Director, Phil Jones Associates: Local Transport Note on...
Phil Jones, Managing Director, Phil Jones Associates: Local Transport Note on...
 
David Ubaka, Transport for London: How important are good looks when money's ...
David Ubaka, Transport for London: How important are good looks when money's ...David Ubaka, Transport for London: How important are good looks when money's ...
David Ubaka, Transport for London: How important are good looks when money's ...
 
Paul O’Day, Part 1: Vision for Highways Maintenance and Management in Birmingham
Paul O’Day, Part 1: Vision for Highways Maintenance and Management in BirminghamPaul O’Day, Part 1: Vision for Highways Maintenance and Management in Birmingham
Paul O’Day, Part 1: Vision for Highways Maintenance and Management in Birmingham
 
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
 
Paul O’Day, Part 3: Vision for Highways Maintenance and Management in Birmingham
Paul O’Day, Part 3: Vision for Highways Maintenance and Management in BirminghamPaul O’Day, Part 3: Vision for Highways Maintenance and Management in Birmingham
Paul O’Day, Part 3: Vision for Highways Maintenance and Management in Birmingham
 
Allison Page, Taking Forward Successful Elements of PFI Contracts in the Future
Allison Page, Taking Forward Successful Elements of PFI Contracts in the FutureAllison Page, Taking Forward Successful Elements of PFI Contracts in the Future
Allison Page, Taking Forward Successful Elements of PFI Contracts in the Future
 
Neil Gibson, Part 1: The Need for Change; how service delivery transformation...
Neil Gibson, Part 1: The Need for Change; how service delivery transformation...Neil Gibson, Part 1: The Need for Change; how service delivery transformation...
Neil Gibson, Part 1: The Need for Change; how service delivery transformation...
 
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
 
Jason Russell, The opportunity for efficiency savings: Highways Maintenance E...
Jason Russell, The opportunity for efficiency savings: Highways Maintenance E...Jason Russell, The opportunity for efficiency savings: Highways Maintenance E...
Jason Russell, The opportunity for efficiency savings: Highways Maintenance E...
 
Mark Widdup, It worked for us: how moving to a joint venture has delivered sa...
Mark Widdup, It worked for us: how moving to a joint venture has delivered sa...Mark Widdup, It worked for us: how moving to a joint venture has delivered sa...
Mark Widdup, It worked for us: how moving to a joint venture has delivered sa...
 
Matthew Lugg, Never waste a good crisis: the opportunity to make efficiencies...
Matthew Lugg, Never waste a good crisis: the opportunity to make efficiencies...Matthew Lugg, Never waste a good crisis: the opportunity to make efficiencies...
Matthew Lugg, Never waste a good crisis: the opportunity to make efficiencies...
 
John Lamb, Solace chairman (North West branch)
John Lamb, Solace chairman (North West branch)John Lamb, Solace chairman (North West branch)
John Lamb, Solace chairman (North West branch)
 

Dernier

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Dernier (20)

Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 

Chris Oakley, Director, Transport Planning & Strategy, Crowd Dynamics: Beyond the low-hanging fruit

  • 1.
  • 2. Beyond the low hanging fruit ! Chris Oakley www.crowddynamics.com
  • 3. Wide Spectrum of streets and junctions 2
  • 4. Whats the problem ? • Many streets will remain heavily trafficked • Can these be enhanced to - Reduce emissions - Improve priority for pedestrians, cycles and buses - Improve safety - Improve their attractiveness/vitality • Whilst maintaining traffic capacity
  • 5. Evolution of design process • Shared Space - lightly trafficked streets - moderately trafficked streets - Schwarzenburgstrasse Berne - Ashford - Poynton Phase 1
  • 7. Poynton Phase 2 – Shared Space Heavily trafficked 6
  • 10. Alternatives to Traffic Signals - Switch Off 9
  • 12. Analysis – Fountains Place Junction Traffic Signal Switch off – Queue lengths
  • 13. Traffic Signal Switch Off- Analysis UAF Simulation 12
  • 14. Example junction5 : Ruthin road/ Bradley Road Wrexham 13
  • 15. Alternative junction configurations Comparison of alternatives • Pedestrian Amenity • Pedestrian Delay • Traffic Delay and junction Capacity • Emissions • Impact on bus operations • Impact on Cyclists • Safety. • Cost
  • 16. Alternative junction configurations •Option 1 - Traffic signals with pedestrian stage •Option 2 - Mini Roundabout with puffin crossings on all arms •Option 3 - Traffic signals with pedestrian stage + scatter crossings •Option 4 – Mini Roundabout with zebra crossings on all arms (a) At 5m distance from roundabout (b) At 10m (c) At 20m •Option 5 – Shared Space concept
  • 17. Alternative junction configurations Shared space Roundabout with zebras 5m back from stop lines Roundabout with zebras /puffins 20m back from stop lines Signals option with no Signals option with conventional Signals option with ‘all ways’ pedestrian crossings pedestrian crossings pedestrian crossings
  • 18. Alternative junction configurations Comparison of alternatives- Quantification • Pedestrian Amenity • Pedestrian Delay • Traffic Delay and junction Capacity • Emissions • Impact on bus operations • Impact on Cyclists • Safety. • Cost
  • 19. Pedestrian and traffic simulation UAF
  • 23. Comparison of Options Ranking of Options in terms of Pedestrian priority Ranking of Options in terms of Traffic Efficiency Amenity Delay Overall Overall Option 4 Option 5 Option 4/5 Existing Option 5 Option 4 Existing Option 4 Option 3 Option2 Option 2 Option 1 Option 3 Option 2 Option 1 Option 5 Existing Existing Option 2 Option 1/3 Option 1 Option 3 22
  • 24. Comparison of options - Safety Ranking of options in terms of safety Pedestrian Site Review Research Overall & Statistics Traffic signals Mini Roundabout with Traffic Signals Traffic Signals puffins Mini Roundabout with zebras Signals with scatter Mini roundabout with crossings zebra or puffins Mini Roundabout with Signals with scatter Traffic Signals with zebras crossings Scatter crossings Existing Existing Existing Mini Roundabout with Shared Space Shared Space Puffins Option 5
  • 25. Ruthin Road – Bradley Road Recent Junction Improvement Photios 24
  • 26. Alternative Junction Configurations- Initial findings • Shared Space – Heavily trafficked – Await opening at Poynton with considerable interest
  • 27. Alternative Junction Configurations- Initial findings • Shared Space - Heavily trafficked - Await opening with considerable interest • Traffic signal switch offs - Can significantly reduce delay. - Issue of pedestrian amenity , but not delay
  • 28. Alternative Junction Configurations- Initial findings • Shared Space - Heavily trafficked - Await opening with considerable interest • Traffic signal switch offs - Can significantly reduce delay. - Issue of pedestrian amenity , but not delay • Alternatives to signals – -Typically more efficient in terms of traffic movement -Reduce emissions. -Pedestrian delay typically reduced. -Safety ?
  • 29. Conclusions • Innovative and efficient design solutions are deliverable •Doesn’t have to be shared space, Cheaper more conventional solutions possible. • Emissions can be reduced • Comparative analysis of wide range options now possible • Modelling has vital role in refining/optimising schemes • Need further study and demonstration projects
  • 30. Finally • Reappraise our approach to street and junction design • Never a perfect design • Always requires compromise from the different users of the street