SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Issued: April 29, 2015
Expired: On release of next revision
Lawrence Corcuera
Has gained the necessary knowledges related to the Gamesa Risk Assessment
Course Duration: - 8 hours
Risk Assessment, G4X,G5X,G9X, Rev06, for
Maintenance and Construction activities
OFFICIAL GAMESA CERTIFICATION
CERTIFICATION BST TRAINING | PROVIDED BY GAMESA FACULTY
Gamesa Corporación Tecnológica through Gamesa Faculty, certificate that
Provider:
OFFICIAL GAMESA CERTIFICATION
ART/PS MM.1 GENERAL ACTIVITIES
• Travelling to and wintin a wind farm
• Accessing the wind turbine
• Stopping the Wind Turbine
• Disconnecting Remote Control Communication
• Accessing the Nacelle
• Accessing the Transformer
• Accessing the outside of the nacelle safely
• Accessing the inside of the rotor safely
• Anchor devices on the wind turbine
• Working inside the wind turbine
• Procedure on an operating turbine
• Placement of signs indicating the presence of personnel working on the turbine
• Using the safety harness in the nacelle
• Locking mechanical components that could cause entrapment
• Locking and labeling of electrical equipment
• Marking off work areas
• Load hoisting methods
• Using the Auxiliary Power Unit
• Depressurising the Hydraulic Unit of the Nacelle
• Weather conditions
• Working with the Risk of Thermal Stress
• Night work
• Working in the presence of ice and snow
• Working in confined spaces
• Need for a preventive resource
• Evacuation of wind turbine in event of emergency
• Evacuation in the event of Fire
• Use of the Emergency Descent Device
• Handling chemical products
• Use of PPE
ART/PS MM 2. ROAD SAFETY, TRANSPORTING AND
MOVING MATERIAL.
ART/PS MM 3. WORKING WITH BASKETS
ART/PS MM 4. ENERGISATION/DISCHARGE OF WTG
ART/PS MM 5. VERTICAL WORK
ART/PS MM 6. LIFTS AND HELPERS
ART/PS MM 7. SUSPENDED LIFTING PLATAFORMS
ART/PS MM 8. COMMISSIONING
ART/PS MM 9. UNLOADING, ASSEMBLING AND HOISTING
MATERIAL

Contenu connexe

Similaire à L-Corcuera-Rev06-Risk-Assessment-GEN-PART

An Update on A400M Testing, May 2013
An Update on A400M Testing, May 2013An Update on A400M Testing, May 2013
An Update on A400M Testing, May 2013ICSA, LLC
 
Drone delivery project proposal
Drone delivery project proposalDrone delivery project proposal
Drone delivery project proposalYogesh Dhandharia
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearMarty Stevenson
 

Similaire à L-Corcuera-Rev06-Risk-Assessment-GEN-PART (8)

An Update on A400M Testing, May 2013
An Update on A400M Testing, May 2013An Update on A400M Testing, May 2013
An Update on A400M Testing, May 2013
 
Drone delivery project proposal
Drone delivery project proposalDrone delivery project proposal
Drone delivery project proposal
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
New cv rohit
New cv rohitNew cv rohit
New cv rohit
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
jayakumarcv
jayakumarcvjayakumarcv
jayakumarcv
 

L-Corcuera-Rev06-Risk-Assessment-GEN-PART

  • 1. Issued: April 29, 2015 Expired: On release of next revision Lawrence Corcuera Has gained the necessary knowledges related to the Gamesa Risk Assessment Course Duration: - 8 hours Risk Assessment, G4X,G5X,G9X, Rev06, for Maintenance and Construction activities OFFICIAL GAMESA CERTIFICATION CERTIFICATION BST TRAINING | PROVIDED BY GAMESA FACULTY Gamesa Corporación Tecnológica through Gamesa Faculty, certificate that Provider:
  • 2. OFFICIAL GAMESA CERTIFICATION ART/PS MM.1 GENERAL ACTIVITIES • Travelling to and wintin a wind farm • Accessing the wind turbine • Stopping the Wind Turbine • Disconnecting Remote Control Communication • Accessing the Nacelle • Accessing the Transformer • Accessing the outside of the nacelle safely • Accessing the inside of the rotor safely • Anchor devices on the wind turbine • Working inside the wind turbine • Procedure on an operating turbine • Placement of signs indicating the presence of personnel working on the turbine • Using the safety harness in the nacelle • Locking mechanical components that could cause entrapment • Locking and labeling of electrical equipment • Marking off work areas • Load hoisting methods • Using the Auxiliary Power Unit • Depressurising the Hydraulic Unit of the Nacelle • Weather conditions • Working with the Risk of Thermal Stress • Night work • Working in the presence of ice and snow • Working in confined spaces • Need for a preventive resource • Evacuation of wind turbine in event of emergency • Evacuation in the event of Fire • Use of the Emergency Descent Device • Handling chemical products • Use of PPE ART/PS MM 2. ROAD SAFETY, TRANSPORTING AND MOVING MATERIAL. ART/PS MM 3. WORKING WITH BASKETS ART/PS MM 4. ENERGISATION/DISCHARGE OF WTG ART/PS MM 5. VERTICAL WORK ART/PS MM 6. LIFTS AND HELPERS ART/PS MM 7. SUSPENDED LIFTING PLATAFORMS ART/PS MM 8. COMMISSIONING ART/PS MM 9. UNLOADING, ASSEMBLING AND HOISTING MATERIAL