PCB manufacturing and assembly is a crucial stage that stands between the
design of every technology device and the finished product. Critical business
metrics - cost, quality, delivery, etc. - are directly affected by the quality of the
manufacturing process. Today, PCB manufacturing performance and
productivity are under threat as customers’ delivery requirements become more
volatile and pressure on both the engineering and materials infrastructures
continues to grow.
In this dynamic environment, successful PCB manufacturing must follow eight
steps. This is the first in a two-part series and we will look at four of those steps
in each. Here is the initial quartet:
1. Know your product
2. Do only what needs to be done - and only when it needs to be done
3. Be ready to make anything in any quantity at anytime
4. Know exactly what you are doing at each stage in the process
The second set of steps, covered here in Part Two, is:
1. Stay on top of materials
2. Develop efficient exception management
3. Ensure assurance, conformance, and compliance
4. Deploy seamless operational management
For now, however, I’ll explore each of those first four concepts in more detail.
The manufacturing product model is one of the most significant uncontrolled
variables. The late-stage cost of re-spinning a design or implementing
countermeasures due to production issues can be several orders of magnitude
greater than that if a problem is resolved earlier. Moreover, a delay to new
product introduction (NPI) can result in major lost business opportunities if you
fail to reach customers on time.
You must accurately and thoroughly understand the PCB and its requirements.
The manufacturing processes need to match the product’s requirements in a way
that is efficient and that ensures quality. Designs should be checked against
manufacturing standards as they arrive for fabrication and before the
manufacturing engineering processes begin.
Industry-leading PCB design for manufacturing (DFM) tools mitigate risk and
promote product quality. The most advanced DFM tools are based on rules
derived from actual process capabilities and configurations. They analyze
designs in seconds and then highlight opportunities for cost improvements in
manufacture, yield, quality, and testability. Hundreds of tests for PCB fabrication
and assembly can be performed that provide clear recommendations to improve a
layout improvements, yet without the layout design engineer needing any
manufacturing expertise.
Advanced DFM tools use data formats such as ODB++ to represent the complete
and accurate manufacturing product model, without that model being weighed
down by supporting documentation. Manufacturing receives all the necessary
information needed to fabricate the PCB itself and assemble the final product as
the designer intends, without the need for data reconstruction.
Traditionally, the first step taken when a new product is introduced to PCB
assembly manufacturing is to prepare the design and related data for a specified
set of processes. From the production point of view however, rather than an
assumed and therefore fixed manufacturing configuration, the manufacturer
really needs to prepare several production configurations from which to choose
that which best meets the requirements of the customer at a given time.
Shopfloor planning needs to determine production times, rates, and quantities for
each product, based on this choice of capable production processes that meet
delivery requirements. As the number of concurrent discrete products increases
and tolerance for finished goods stock decreases — whether in the factory
warehouse or a shrinking supply chain — lot sizes have to become smaller and
this requires a much higher degree of production interleave than before.
Enterprise resource planning (ERP), manufacturing execution systems, and
generic shopfloor optimization software are not that good at finding efficient
ways to manage mixed production strategies. They force an unavoidable tradeoff
between the flexibility of a higher mix of products against productivity. Planning
systems must quickly analyze a project’s shopfloor status, consider changing
delivery requirements, and understand PCB process optimization opportunities.
That last step requires an ability to survey the project at a high level and simulate
material setups, product groupings, within the context of machine and line
optimization. The inherent complexity of surface mount technology (SMT)
process makes it extremely difficult to achieve these goals.
The inherent complexity of surface-mount technology raises many challenges (Source: Peripitus)
The most common tool used for this process is Microsoft Excel, which can
hardly be expected to be able to find the most optimum production plans for
SMT. Fortunately, SMT-orientated Production Plan logic is now available that
simultaneously optimizes the selection and sequencing of products according to
delivery schedules, whilst simultaneously grouping products and feeders
throughout the SMT processes.
This approach reduces SMT changeover time and optimizes machine utilization
and efficiency. It also creates a production schedule that accurately reflects the
needs of the customer, and minimizes stock dormancy in the warehouse and
beyond.
The top-level plan is derived from standard ERP tools together with the
requirements for each product, which are then broken down for each line and
machine. The Production Plan logic is capable of optimization based on real-time
customer requirements, the current production status, and the inventory of
available materials. Such tools can manage thousands of products over a period
of time and perform optimization for the whole shopfloor, applying a flexible set
of rules that determines planning policy and priorities.
The result is an immediate increase in operational productivity, with high-mix
PCB production achieving levels of efficiency approaching those for
high-volume. The ability to respond rapidly and precisely to demand changes
means that the factory can be flexible without having to resort to accumulating
stock of each of the products or sacrificing performance.
SMT engineers generate production-ready machine programs, test and inspection
data, and visual documentation by converting the manufacturing product model
data and a local bill of materials (BOM). That BOM usually comes from the ERP
system.
This is the first step taken at electronic manufacturing service (EMS) companies,
where an understanding of the cost of PCB production is required, along with
any specific physical project requirements (e.g., safety-critical requirements for
automotive applications).
Carrying out complex process preparation can be very difficult. It starts with the
product data qualification and merger of the local BOM data. This step often
encounters discrepancies that must be resolved before other processes can start. It
is important to get a full understanding any new materials that are being used
(e.g., how they are supplied and what sizes and shapes are available, etc.).
Then the SMT assembly work has to be split across different machines in any
specified configuration. These machines may run on different software platforms
or come from different equipment vendors. SMT-related processes (e.g., screen
printers, reflow ovens) also need to be set up.
A similar process flow has to be created for each of the test and inspection
processes, whether these are manual, automated or a combination of both.
Finally, comes the operator documentation.
Performing all this for each PCB product often consumes the available
engineering resources, particularly in a time when the number of products and
the product mix is increasing. As a result, defacto assumptions are inevitable, and
these typically lead to restrictions that limit each product to a specific line
configuration. Therefore, there are effectively very few, if any choices, about
which SMT line is assigned to any product.
Frequently to make life easier, many manufacturing lines will have the same
configuration, eliminating any choices in the production rates that can be
achieved. This leads to a situation where some lines frequently build to stock not
required for delivery, while other lines stand idle. Delivery targets for some
products become unachievable.
This is changing thanks to advanced Process Preparation tools. They take the
design data and merge the BOM within a graphical interface, allowing
discrepancies to be quickly identified and resolved to create a single product
dataset.
These tools can generate optimized SMT program sets, test programs, inspection
data and more. They can identify all the necessary PCB manufacturing
engineering process steps across equipment from multiple vendors. Direct
outputs to SMT machines, testers, and inspection machines can be sent without
manual data manipulation, using sophisticated automated native program and
library generation tools.
All engineering processes share a common-parts-shape data source, linked with
the ODB++ product model data and the web-based shape library. Simulation of
the SMT machine operation is performed in software to correct placement
rotation and offset errors, removing the need for physical product qualification,
and thus avoiding line downtime for NPI qualification.
The SMT programming team can now respond to the needs of planning and
provide multiple line configurations for each product. That means that PCB
production flows can now easily be matched to delivery timetables because
alternate configurations can be prepared in just a couple of minutes
The results include reduced NPI lead-time, increased asset utilization, the
elimination of line down-time for product qualification, and a reduction in the
engineering effort to duplicate data maintenance across different systems.
Overall, there are general increases in machine optimization, line balance, test
coverage, reliability and yield, and assembly operation.
SMT machines are now very fast, and SMT materials have become very small. It
is impossible to follow the operation of SMT machines with the naked eye.
Multiply the inherent challenge here by the number of machines across all the
lines on the shopfloor. Now ask yourself how can even the most experienced
industrial engineer be expected to diagnose and explain sudden drops in
performance or find the causes of unexpected quality issues using traditional
inspection techniques.
This affects both the reliability of on-time delivery of products, and stresses the
associated production resources and materials supply chains because they cannot
be synchronized effectively to requirements. Planning changes required to meet
changing demands can be very risky to execute because of all the unknowns that
need to be assessed. Materials will have been physically committed to production
in terms of kit preparation; work-orders may be partially completed with
associated part-built work-in-progress at several locations.
The true utilization rate of equipment is also often unknown: State-of-the-art
machines incorporate multiple heads, multiple conveyors, and multiple modular
stages, and this combination can hide significant avoidable idle time. Also, the
timing of changeovers between products cannot be predicted accurately which
creates bottlenecks. These percolate right through to issues such as which
operator performs which task. Reports created using data extracted from
individual machines have little meaning because they do not consider the full
context of events, specifically the effects of external causes of stoppages.
The situation is so dismal, that manual data collection or simple PCB counting is
still often the norm. Data from the SMT production process generally has
minimal value. It is inaccurate, incomplete, unqualified, and arrives too late to be
acted upon. All this creates a huge limitation for successful productivity
improvement initiatives, planning optimization, material delivery, and resource
management.
Here again, the introduction of advanced capabilities is providing new
approaches that can collect and process data in real-time no matter what type or
vendor of SMT machine or related process, including manual operations. Events
and supporting data are read and normalized, eliminating differences in the data
format and meaning, and harmonized for a single common language. Data
collected is automatically qualified.
For example, when a machine stops, the production line can be analyzed to see
why the flow of PCBs has stopped, or why the output conveyor is blocked. So,
the occurrence and cost of any event during production can be accurately
attributed. Information about complex SMT processes (e.g., under-utilization of
modules or heads) is recorded and this exposes opportunities to improve
productivity. Event data collected even includes the precise usage and spoilage of
materials so that accurate material consumption can be reported.
As the data is collected and processed live in real-time, it can be utilized by many
of the key operational and control functions. Use cases include the data’s
exploitation by asset management to increase productivity, by material
management for JIT delivery of materials to the line, and by production planning
to implement changes that are exactly based on the current production
commitment. This leads to an increase in productivity, improved reliability for
on-time delivery, reduced on-site finished goods storage, and better planning
change execution that follows customer requirements.
This brings us to the end of our review of the first four necessary steps for
cost-effective, high quality PCB manufacturing and assembly. Now read on to
the second part of this overview, where we take a detailed look at the next four
steps:
1. Stay on top of materials
2. Exercise exception management
3. Enforce assurance, conformance, and compliance
4. Employ seamless operational management
Michael Ford is Senior Marketing Development Manager in the Valor Division
of Mentor Graphics.
Having majored in Electronics, Michael started his career with Sony, gaining a
combination of hardware, software, system architecture and manufacturing skills,
leading to the creation and management of Sony’s global Lean Manufacturing
solutions in Japan.
Since joining Mentor Graphics in 2008, Michael has become a key contributor to
thought leadership in the industry, predicting trends and bringing insights on
opportunities that can be gained by customers, driving the evolution of
manufacturing execution technologies to deliver direct business benefits.

Contenu connexe

En vedette

Beyond 0402 m-placement-5
Beyond 0402 m-placement-5Beyond 0402 m-placement-5
Beyond 0402 m-placement-5Lemon Lee
 
Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...
Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...
Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...UCAR - Atmospheric & Earth System Science
 
Drilling rig components
Drilling rig componentsDrilling rig components
Drilling rig components美英 田
 
Dv na ne - ZG - LUDGI 04
Dv na ne - ZG - LUDGI 04Dv na ne - ZG - LUDGI 04
Dv na ne - ZG - LUDGI 04Stripovi Klub
 
12 gamification principles to increase sales productivity and engagement 96dpi
12 gamification principles to increase sales productivity and engagement 96dpi12 gamification principles to increase sales productivity and engagement 96dpi
12 gamification principles to increase sales productivity and engagement 96dpiInsideSales.com
 
LEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BAS
LEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BASLEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BAS
LEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BASInsideSales.com
 

En vedette (6)

Beyond 0402 m-placement-5
Beyond 0402 m-placement-5Beyond 0402 m-placement-5
Beyond 0402 m-placement-5
 
Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...
Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...
Forecasting Changing Sea Ice Conditions, Months to Years in Advance - State o...
 
Drilling rig components
Drilling rig componentsDrilling rig components
Drilling rig components
 
Dv na ne - ZG - LUDGI 04
Dv na ne - ZG - LUDGI 04Dv na ne - ZG - LUDGI 04
Dv na ne - ZG - LUDGI 04
 
12 gamification principles to increase sales productivity and engagement 96dpi
12 gamification principles to increase sales productivity and engagement 96dpi12 gamification principles to increase sales productivity and engagement 96dpi
12 gamification principles to increase sales productivity and engagement 96dpi
 
LEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BAS
LEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BASLEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BAS
LEVERAGING ACCOUNT-BASED MARKETING AND ACCOUNT-BAS
 

Plus de Lemon Lee

Step stencils-laserjob
Step stencils-laserjobStep stencils-laserjob
Step stencils-laserjobLemon Lee
 
Solder joint-fatigue-dfr
Solder joint-fatigue-dfrSolder joint-fatigue-dfr
Solder joint-fatigue-dfrLemon Lee
 
Pcb surface-finishes-general-review
Pcb surface-finishes-general-reviewPcb surface-finishes-general-review
Pcb surface-finishes-general-reviewLemon Lee
 
Henny youngman’s-advice-to-pcb-designers
Henny youngman’s-advice-to-pcb-designersHenny youngman’s-advice-to-pcb-designers
Henny youngman’s-advice-to-pcb-designersLemon Lee
 
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Lemon Lee
 
Cleaning pc bs-ultrasonic
Cleaning pc bs-ultrasonicCleaning pc bs-ultrasonic
Cleaning pc bs-ultrasonicLemon Lee
 

Plus de Lemon Lee (6)

Step stencils-laserjob
Step stencils-laserjobStep stencils-laserjob
Step stencils-laserjob
 
Solder joint-fatigue-dfr
Solder joint-fatigue-dfrSolder joint-fatigue-dfr
Solder joint-fatigue-dfr
 
Pcb surface-finishes-general-review
Pcb surface-finishes-general-reviewPcb surface-finishes-general-review
Pcb surface-finishes-general-review
 
Henny youngman’s-advice-to-pcb-designers
Henny youngman’s-advice-to-pcb-designersHenny youngman’s-advice-to-pcb-designers
Henny youngman’s-advice-to-pcb-designers
 
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
 
Cleaning pc bs-ultrasonic
Cleaning pc bs-ultrasonicCleaning pc bs-ultrasonic
Cleaning pc bs-ultrasonic
 

Dernier

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 

Dernier (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Eight steps-for-efficient-pcb-manufacturing-and-assemblypart13

  • 1. Eight steps for efficient PCB manufacturing and assembly(part 1) PCB manufacturing and assembly is a crucial stage that stands between the design of every technology device and the finished product. Critical business metrics - cost, quality, delivery, etc. - are directly affected by the quality of the manufacturing process. Today, PCB manufacturing performance and productivity are under threat as customers’ delivery requirements become more volatile and pressure on both the engineering and materials infrastructures continues to grow. In this dynamic environment, successful PCB manufacturing must follow eight steps. This is the first in a two-part series and we will look at four of those steps in each. Here is the initial quartet: 1. Know your product 2. Do only what needs to be done - and only when it needs to be done 3. Be ready to make anything in any quantity at anytime 4. Know exactly what you are doing at each stage in the process The second set of steps, covered here in Part Two, is: 1. Stay on top of materials 2. Develop efficient exception management 3. Ensure assurance, conformance, and compliance 4. Deploy seamless operational management For now, however, I’ll explore each of those first four concepts in more detail. The manufacturing product model is one of the most significant uncontrolled variables. The late-stage cost of re-spinning a design or implementing countermeasures due to production issues can be several orders of magnitude greater than that if a problem is resolved earlier. Moreover, a delay to new product introduction (NPI) can result in major lost business opportunities if you fail to reach customers on time. You must accurately and thoroughly understand the PCB and its requirements. The manufacturing processes need to match the product’s requirements in a way that is efficient and that ensures quality. Designs should be checked against manufacturing standards as they arrive for fabrication and before the manufacturing engineering processes begin. Industry-leading PCB design for manufacturing (DFM) tools mitigate risk and promote product quality. The most advanced DFM tools are based on rules derived from actual process capabilities and configurations. They analyze designs in seconds and then highlight opportunities for cost improvements in manufacture, yield, quality, and testability. Hundreds of tests for PCB fabrication and assembly can be performed that provide clear recommendations to improve a layout improvements, yet without the layout design engineer needing any manufacturing expertise.
  • 2. Advanced DFM tools use data formats such as ODB++ to represent the complete and accurate manufacturing product model, without that model being weighed down by supporting documentation. Manufacturing receives all the necessary information needed to fabricate the PCB itself and assemble the final product as the designer intends, without the need for data reconstruction. Traditionally, the first step taken when a new product is introduced to PCB assembly manufacturing is to prepare the design and related data for a specified set of processes. From the production point of view however, rather than an assumed and therefore fixed manufacturing configuration, the manufacturer really needs to prepare several production configurations from which to choose that which best meets the requirements of the customer at a given time. Shopfloor planning needs to determine production times, rates, and quantities for each product, based on this choice of capable production processes that meet delivery requirements. As the number of concurrent discrete products increases and tolerance for finished goods stock decreases — whether in the factory warehouse or a shrinking supply chain — lot sizes have to become smaller and this requires a much higher degree of production interleave than before. Enterprise resource planning (ERP), manufacturing execution systems, and generic shopfloor optimization software are not that good at finding efficient ways to manage mixed production strategies. They force an unavoidable tradeoff between the flexibility of a higher mix of products against productivity. Planning systems must quickly analyze a project’s shopfloor status, consider changing delivery requirements, and understand PCB process optimization opportunities. That last step requires an ability to survey the project at a high level and simulate material setups, product groupings, within the context of machine and line optimization. The inherent complexity of surface mount technology (SMT) process makes it extremely difficult to achieve these goals.
  • 3. The inherent complexity of surface-mount technology raises many challenges (Source: Peripitus) The most common tool used for this process is Microsoft Excel, which can hardly be expected to be able to find the most optimum production plans for SMT. Fortunately, SMT-orientated Production Plan logic is now available that simultaneously optimizes the selection and sequencing of products according to delivery schedules, whilst simultaneously grouping products and feeders throughout the SMT processes. This approach reduces SMT changeover time and optimizes machine utilization and efficiency. It also creates a production schedule that accurately reflects the needs of the customer, and minimizes stock dormancy in the warehouse and beyond. The top-level plan is derived from standard ERP tools together with the requirements for each product, which are then broken down for each line and machine. The Production Plan logic is capable of optimization based on real-time customer requirements, the current production status, and the inventory of available materials. Such tools can manage thousands of products over a period of time and perform optimization for the whole shopfloor, applying a flexible set of rules that determines planning policy and priorities. The result is an immediate increase in operational productivity, with high-mix PCB production achieving levels of efficiency approaching those for
  • 4. high-volume. The ability to respond rapidly and precisely to demand changes means that the factory can be flexible without having to resort to accumulating stock of each of the products or sacrificing performance. SMT engineers generate production-ready machine programs, test and inspection data, and visual documentation by converting the manufacturing product model data and a local bill of materials (BOM). That BOM usually comes from the ERP system. This is the first step taken at electronic manufacturing service (EMS) companies, where an understanding of the cost of PCB production is required, along with any specific physical project requirements (e.g., safety-critical requirements for automotive applications). Carrying out complex process preparation can be very difficult. It starts with the product data qualification and merger of the local BOM data. This step often encounters discrepancies that must be resolved before other processes can start. It is important to get a full understanding any new materials that are being used (e.g., how they are supplied and what sizes and shapes are available, etc.). Then the SMT assembly work has to be split across different machines in any specified configuration. These machines may run on different software platforms or come from different equipment vendors. SMT-related processes (e.g., screen printers, reflow ovens) also need to be set up. A similar process flow has to be created for each of the test and inspection processes, whether these are manual, automated or a combination of both. Finally, comes the operator documentation. Performing all this for each PCB product often consumes the available engineering resources, particularly in a time when the number of products and the product mix is increasing. As a result, defacto assumptions are inevitable, and these typically lead to restrictions that limit each product to a specific line configuration. Therefore, there are effectively very few, if any choices, about which SMT line is assigned to any product. Frequently to make life easier, many manufacturing lines will have the same configuration, eliminating any choices in the production rates that can be achieved. This leads to a situation where some lines frequently build to stock not required for delivery, while other lines stand idle. Delivery targets for some products become unachievable. This is changing thanks to advanced Process Preparation tools. They take the design data and merge the BOM within a graphical interface, allowing discrepancies to be quickly identified and resolved to create a single product dataset. These tools can generate optimized SMT program sets, test programs, inspection data and more. They can identify all the necessary PCB manufacturing engineering process steps across equipment from multiple vendors. Direct outputs to SMT machines, testers, and inspection machines can be sent without
  • 5. manual data manipulation, using sophisticated automated native program and library generation tools. All engineering processes share a common-parts-shape data source, linked with the ODB++ product model data and the web-based shape library. Simulation of the SMT machine operation is performed in software to correct placement rotation and offset errors, removing the need for physical product qualification, and thus avoiding line downtime for NPI qualification. The SMT programming team can now respond to the needs of planning and provide multiple line configurations for each product. That means that PCB production flows can now easily be matched to delivery timetables because alternate configurations can be prepared in just a couple of minutes The results include reduced NPI lead-time, increased asset utilization, the elimination of line down-time for product qualification, and a reduction in the engineering effort to duplicate data maintenance across different systems. Overall, there are general increases in machine optimization, line balance, test coverage, reliability and yield, and assembly operation. SMT machines are now very fast, and SMT materials have become very small. It is impossible to follow the operation of SMT machines with the naked eye. Multiply the inherent challenge here by the number of machines across all the lines on the shopfloor. Now ask yourself how can even the most experienced industrial engineer be expected to diagnose and explain sudden drops in performance or find the causes of unexpected quality issues using traditional inspection techniques. This affects both the reliability of on-time delivery of products, and stresses the associated production resources and materials supply chains because they cannot be synchronized effectively to requirements. Planning changes required to meet changing demands can be very risky to execute because of all the unknowns that need to be assessed. Materials will have been physically committed to production in terms of kit preparation; work-orders may be partially completed with associated part-built work-in-progress at several locations. The true utilization rate of equipment is also often unknown: State-of-the-art machines incorporate multiple heads, multiple conveyors, and multiple modular stages, and this combination can hide significant avoidable idle time. Also, the timing of changeovers between products cannot be predicted accurately which creates bottlenecks. These percolate right through to issues such as which operator performs which task. Reports created using data extracted from individual machines have little meaning because they do not consider the full context of events, specifically the effects of external causes of stoppages. The situation is so dismal, that manual data collection or simple PCB counting is still often the norm. Data from the SMT production process generally has minimal value. It is inaccurate, incomplete, unqualified, and arrives too late to be acted upon. All this creates a huge limitation for successful productivity
  • 6. improvement initiatives, planning optimization, material delivery, and resource management. Here again, the introduction of advanced capabilities is providing new approaches that can collect and process data in real-time no matter what type or vendor of SMT machine or related process, including manual operations. Events and supporting data are read and normalized, eliminating differences in the data format and meaning, and harmonized for a single common language. Data collected is automatically qualified. For example, when a machine stops, the production line can be analyzed to see why the flow of PCBs has stopped, or why the output conveyor is blocked. So, the occurrence and cost of any event during production can be accurately attributed. Information about complex SMT processes (e.g., under-utilization of modules or heads) is recorded and this exposes opportunities to improve productivity. Event data collected even includes the precise usage and spoilage of materials so that accurate material consumption can be reported. As the data is collected and processed live in real-time, it can be utilized by many of the key operational and control functions. Use cases include the data’s exploitation by asset management to increase productivity, by material management for JIT delivery of materials to the line, and by production planning to implement changes that are exactly based on the current production commitment. This leads to an increase in productivity, improved reliability for on-time delivery, reduced on-site finished goods storage, and better planning change execution that follows customer requirements. This brings us to the end of our review of the first four necessary steps for cost-effective, high quality PCB manufacturing and assembly. Now read on to the second part of this overview, where we take a detailed look at the next four steps: 1. Stay on top of materials 2. Exercise exception management 3. Enforce assurance, conformance, and compliance 4. Employ seamless operational management Michael Ford is Senior Marketing Development Manager in the Valor Division of Mentor Graphics. Having majored in Electronics, Michael started his career with Sony, gaining a combination of hardware, software, system architecture and manufacturing skills, leading to the creation and management of Sony’s global Lean Manufacturing solutions in Japan. Since joining Mentor Graphics in 2008, Michael has become a key contributor to thought leadership in the industry, predicting trends and bringing insights on opportunities that can be gained by customers, driving the evolution of manufacturing execution technologies to deliver direct business benefits.