Export Promotion Strategy for the
        Macedonian Software and IT Services
                      Industry
            - the role of MASIT in it’s
                 implementation
                         Predrag Radojičić
                 MASIT, SW&IT Services Committee
                            Chairman

8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Brief description of history of the project (1/2)
  -    Started second half 2008 as idea from MASIT and supported by
       GTZ
  -    Successfully lobbying to government/educational institution to take
       part in working group:
        – Ministry od Economy
        – Ministry of Information sociaty
        – Ministry of transport and telecomunication
        – Ministry of education and science
        – Agency for Promotion of Entrepreneurship of Macedonia
        – Agency for Foreign Investments of Macedonia
        – Faculty of Electrical Engineering and Information Technologies,
          University "St. Ciryl and Methodius" – Skopje
        – Faculty of Natural Science and Mathematics, University "St. Cyril and
          Methodius" - Skopje
        – Institute of Economy, University "St. Ciryl and Methodius" – Skopje

8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Brief description of history of the project (2/2)

  -    Other stakeholder which take part in working group:
        – Member of MASIT
        – USAID
        – SIPPO
        – MBPR (Macedonian Bank for Development Promotion)
           Starting /launching project in march 2009 with first workshop
  -    Held five more workshops till end of the year when first draft of the
       Strategy was presented in front of the working group
  -    Finalizing strategy in January 2010 (with operational plan)
  -    Starting to promote the strategy in front of all stakeholders




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Curent situation

 • Strategy was distributed and presented to all major stakeholders from
   government bodies:
    – Ministry od Economy
    – Cabinet of Vice Priminister for economic issues
    – Ministry of Information sociaty
    – Ministry of transport and telecomunication
    – Ministry of education and science
    – Ministry of foreign affairs
    – Ministry of finance
    …. WAITING FOR ADOPTION AS GOVERNMENT STRATEGY




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
MEANWHILE, ….WHAT WE DONE

 • Strategy was adopted by MASIT
   Management board
 • Proceed successfully cooperation with
   GTZ now in implementation of the strategy
   itself (budget is allocated)
 • GTZ organize workshop presenting the
   next steps and dedication of implementing
   part of the operational plan for 2010 - 2012


8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Project Management & Organization

  Success factors for implementing a collaborative strategy:

  •    Close coordination
  •    Regular communication
  •    Exchange of information
  •    Clearly defined responsibilities
  •    Clearly defined processes
  •    Accurate reporting and documentation
  •    Learning consistently
  •    Cross-functional teams

8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org                       6
Key Instrument for Strategy Implementation:
                       Operational Plan

Measure



                                                                              Activity




    Task




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org                       7
Key Instrument for Strategy Implementation:
                     Operational Plan
Operational Plan: Task
Description

•   Task
•   Expected results
•   Result indicators
•   Timing
•   Responsibilities
•   Budget
•   Activities
•   Deliverables
•   Timetable (Gantt chart)
•   Milestones
   Timeline: 3 years

8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org                       8
Organizational Structure
                               Assembly

 Advisory
  Board
                                Board
                                   of
                               Directors

                                                                                              Tasks
                                                                        Steering
                                                                       Committee              - implementation
                            Managing Office                                                   - coordination
                                                                    Export Promotion
                                                                        Strategy              - monitoring & evaluation



     Committee for           Software&IT
      domestic IT              Services               ICT Experts
       business               Committee                 Council




                                Task Force:    Task Force:                                                                Task Force:
            Task Force:                                                Task Force:            Task Force:
                                Branding &      Cluster &                                                                  Investment
            Export Policy                                           Export Capabilities   Excallence & Quality
                                Positioning   Collaboration                                                                Promotion




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org                                                                              9
10



                             Organizational Structure

    No.             Unit                       Staffing                            Tasks

      1     Board of Directors • MASIT representatives                • Approval of the
                                                                        organizational structure

      2         Steering     • Selected members of the                •   Coordination
            Committee Export   working group                          •   Approval of tasks
               Promotion     • Board members of                       •   Reporting & comunication
                Strategy       MASIT                                  •   Control
                                                                      •   Monitoring & evaluation
      3        Task Forces         • Task force manager (SC)          • Implementation of
                  (1-6)            • Members of the working             measures and
                                     group                              corresponding tasks
                                   • Stakeholder reps.                • Reporting to Steering
                                   • MASIT member                       Committee (SC)
                                     companies
                                   • Consultants (GTZ)

8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Implementation Process
Proposed Process:

1. Formation of Steering Committee
2. Steering Committee establishes Task Forces (1-6) and appoints Task Force Managers
3. Steering Committee approves tasks and corresponding budgets (based on Operational
    Plan)
4. Task Forces start implementation of tasks according to prioritization (1-3) and timetable
5. Task forces conduct internal team-meetings on a monthly basis (self-managing teams)
6. Steering Committee conducts coordination meeting with task force managers every two
    months (reporting & task implementation review based on deliverables and indicators)
7. Steering Committee and Task Forces review and update OP (every 6 months)
8. Steering Committee defines completion of measures and activities based on
    deliverables and indicators
9. Completion of implementation
10. Monitoring & evaluation
11. Restart strategy development cycle



8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org                            11
Information & Knowledge Management

 Goals of our Export Knowledge Management System
 (SharePoint)

 • Providing companies and stakeholders with export-relevant
   information (market surveys, training materials, business leads, etc.)
 • Creating a “collaborative learning system” (organizational learning)
 • Organizational knowledge: transfer of individual stakeholder’s
   knowledge to collective knowledge
 • Supporting communication, information and cooperation among the
   steering committee, members of the task forces and companies
 • Adaptation and continuous improvement of the export strategy
 • Creating a basis for new, innovative strategic measures


8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org                       12
MEANWHILE, ….WHAT WE DONE 2

 • SW&IT Servicies committee apointed
   responsible person from the members for
   each Task force (for each strategic
   measures)
 • work on refining activity plan in line with
   interest of members




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Task forces – strategic measures

 1. Export promotion policy – Predrag Radojičić – SIMT
 2. Int. Branding&Positioning – Vladimir Matevski-SEAVUS
 3. Claster collaboration – Nadezda Dimitrovska and Toni
    Petreski – INET
 4. Export capability&knowladge – Slavčo Bujarovski –
    SIGMA SB and Behar Hadzihamza - EUDSOFT
 5. Quality&company excelence – Jasmina Trajkovski –
    expert council
 6. Export oriented investment – Petar Indovski - GORD



8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
WHAT WAS DONE BY GTZ

 • MASIT Training Academy start working – first training
   was performed for Performance and HR Management
 • Preparation of questionary for Industry barometar are in
   final phase
 • Colaboration platform was promoted and traning for the
   executive office was held
 • Preparing two additional training are in finall phase
       – PMP training
       – Training for European tenders




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
IMPELEMENTATION – CRITICAL FACTORS

 Critical factor for to succesfully implementation                       of the
strategy are:
    - Serious involment of government bodies with
    concrete budget for part of the activity plan
    - serius involment of all other donor comunity again
    with dedicated budget for activity which is in line with
    SW /export strategy acivity plan,
    - serious involvement of financial institution , banks,
    venture capital, supporting financially export activity
    of ours company

8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org
Thank you for your attention
                                       Contact information:

                                     Predrag Radojičić
                                E-mail: radojicic@simt.com.mk

                                    MASIT, Executive Office
                                      www.masit.org.mk

                                   Tel. + 389 2 32 38 601
                                E-mail: contact@masit.org.mk




8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference
14-15 October 2010, Ohrid            www.seeita.org

Contenu connexe

Similaire à Macedonian Software Export Strategy Implementation

What you should know about project management
What you should know about project managementWhat you should know about project management
What you should know about project managementRistyawan Fauzi Mubarok
 
Final report 2007 to 2012
Final report 2007 to 2012Final report 2007 to 2012
Final report 2007 to 2012linioti
 
EOSCSecretariat.eu: Engagement opportunities for EOSC stakeholders
EOSCSecretariat.eu: Engagement opportunities for EOSC stakeholdersEOSCSecretariat.eu: Engagement opportunities for EOSC stakeholders
EOSCSecretariat.eu: Engagement opportunities for EOSC stakeholdersEOSC Secretariat
 
CG and CSR Accomplishments and Awards INet–Skopje
CG and CSR Accomplishments and Awards INet–SkopjeCG and CSR Accomplishments and Awards INet–Skopje
CG and CSR Accomplishments and Awards INet–SkopjeMASIT MACEDONIA
 
Cg and csr accomplishments and awards
Cg and csr accomplishments and awardsCg and csr accomplishments and awards
Cg and csr accomplishments and awardsMASIT MACEDONIA
 
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...SpagoWorld
 
Corporate Governance of ICT in the Public Sector
Corporate Governance of ICT in the Public SectorCorporate Governance of ICT in the Public Sector
Corporate Governance of ICT in the Public SectorThe Open Group SA
 
Integrated Management System
  Integrated Management System  Integrated Management System
Integrated Management SystemMASIT MACEDONIA
 
Cobit as IT Management Best Practice Framework
Cobit as IT Management Best Practice FrameworkCobit as IT Management Best Practice Framework
Cobit as IT Management Best Practice Frameworkjg20001234
 
Ratification
RatificationRatification
Ratificationmogs22
 
GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)
GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)
GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)IGN Vorstand
 
The OECD Standard Codes for Agricultural and Forestry Tractors
The OECD Standard Codes for Agricultural and Forestry TractorsThe OECD Standard Codes for Agricultural and Forestry Tractors
The OECD Standard Codes for Agricultural and Forestry TractorsGAS Forum
 
Time Machine CSA Final Conference Session 3 TMO GA
Time Machine CSA Final Conference Session 3 TMO GATime Machine CSA Final Conference Session 3 TMO GA
Time Machine CSA Final Conference Session 3 TMO GATime Machine Organisation
 

Similaire à Macedonian Software Export Strategy Implementation (20)

ISRM
ISRMISRM
ISRM
 
KKORM
KKORMKKORM
KKORM
 
What you should know about project management
What you should know about project managementWhat you should know about project management
What you should know about project management
 
Final report 2007 to 2012
Final report 2007 to 2012Final report 2007 to 2012
Final report 2007 to 2012
 
EOSCSecretariat.eu: Engagement opportunities for EOSC stakeholders
EOSCSecretariat.eu: Engagement opportunities for EOSC stakeholdersEOSCSecretariat.eu: Engagement opportunities for EOSC stakeholders
EOSCSecretariat.eu: Engagement opportunities for EOSC stakeholders
 
CG and CSR Accomplishments and Awards INet–Skopje
CG and CSR Accomplishments and Awards INet–SkopjeCG and CSR Accomplishments and Awards INet–Skopje
CG and CSR Accomplishments and Awards INet–Skopje
 
Cg and csr accomplishments and awards
Cg and csr accomplishments and awardsCg and csr accomplishments and awards
Cg and csr accomplishments and awards
 
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
 
Corporate Governance of ICT in the Public Sector
Corporate Governance of ICT in the Public SectorCorporate Governance of ICT in the Public Sector
Corporate Governance of ICT in the Public Sector
 
Integrated Management System
  Integrated Management System  Integrated Management System
Integrated Management System
 
Cobit as IT Management Best Practice Framework
Cobit as IT Management Best Practice FrameworkCobit as IT Management Best Practice Framework
Cobit as IT Management Best Practice Framework
 
Ratification
RatificationRatification
Ratification
 
3 Questions PM needs to ask for Stakeholder Management
3 Questions PM needs to ask for Stakeholder Management3 Questions PM needs to ask for Stakeholder Management
3 Questions PM needs to ask for Stakeholder Management
 
Eii 2007-val it-evatik
Eii 2007-val it-evatikEii 2007-val it-evatik
Eii 2007-val it-evatik
 
GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)
GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)
GI2010 symposium-ws1.1 sdi-readiness-checklist (longhorn 14+15-may2010)
 
Pamela Mühlmann: The European Partnership for Integrated Sustainability Manag...
Pamela Mühlmann: The European Partnership for Integrated Sustainability Manag...Pamela Mühlmann: The European Partnership for Integrated Sustainability Manag...
Pamela Mühlmann: The European Partnership for Integrated Sustainability Manag...
 
The OECD Standard Codes for Agricultural and Forestry Tractors
The OECD Standard Codes for Agricultural and Forestry TractorsThe OECD Standard Codes for Agricultural and Forestry Tractors
The OECD Standard Codes for Agricultural and Forestry Tractors
 
Time Machine CSA Final Conference Session 3 TMO GA
Time Machine CSA Final Conference Session 3 TMO GATime Machine CSA Final Conference Session 3 TMO GA
Time Machine CSA Final Conference Session 3 TMO GA
 
Ahmed Resume
Ahmed ResumeAhmed Resume
Ahmed Resume
 
Cro.ict@secep 210610s
Cro.ict@secep 210610sCro.ict@secep 210610s
Cro.ict@secep 210610s
 

Plus de MASIT MACEDONIA

Plus de MASIT MACEDONIA (20)

Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
CSR
CSRCSR
CSR
 
ICT Call 7
ICT Call 7ICT Call 7
ICT Call 7
 
Work programme WINS ICT
Work programme WINS ICTWork programme WINS ICT
Work programme WINS ICT
 
Why should SME’s participate in FP 7
Why should SME’s participate in FP 7Why should SME’s participate in FP 7
Why should SME’s participate in FP 7
 
ReDeSign – FP7 Project for Cable Industry
ReDeSign – FP7 Project for Cable IndustryReDeSign – FP7 Project for Cable Industry
ReDeSign – FP7 Project for Cable Industry
 
WINS-ICT project overview
WINS-ICT project overviewWINS-ICT project overview
WINS-ICT project overview
 
Opportunities for Macedonian SME's in FP7
Opportunities for Macedonian SME's in FP7Opportunities for Macedonian SME's in FP7
Opportunities for Macedonian SME's in FP7
 
Registry integration and dynamics
Registry integration and dynamicsRegistry integration and dynamics
Registry integration and dynamics
 
E-municipality
E-municipalityE-municipality
E-municipality
 
E-gov project
E-gov projectE-gov project
E-gov project
 
Vision of registry infrastructure for progressive societies
Vision of registry infrastructure for progressive societiesVision of registry infrastructure for progressive societies
Vision of registry infrastructure for progressive societies
 
One stop shop
One stop shopOne stop shop
One stop shop
 
Functional e-municipality
Functional e-municipalityFunctional e-municipality
Functional e-municipality
 
ICT Impact in Republic of Kosova
ICT Impact in Republic of KosovaICT Impact in Republic of Kosova
ICT Impact in Republic of Kosova
 
AITA
AITAAITA
AITA
 
Inevitable synergy
 Inevitable synergy Inevitable synergy
Inevitable synergy
 
MCP Project
MCP ProjectMCP Project
MCP Project
 
Forefront Identity Manager
Forefront Identity ManagerForefront Identity Manager
Forefront Identity Manager
 
Grid computing
Grid computingGrid computing
Grid computing
 

Macedonian Software Export Strategy Implementation

  • 1. Export Promotion Strategy for the Macedonian Software and IT Services Industry - the role of MASIT in it’s implementation Predrag Radojičić MASIT, SW&IT Services Committee Chairman 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 2. Brief description of history of the project (1/2) - Started second half 2008 as idea from MASIT and supported by GTZ - Successfully lobbying to government/educational institution to take part in working group: – Ministry od Economy – Ministry of Information sociaty – Ministry of transport and telecomunication – Ministry of education and science – Agency for Promotion of Entrepreneurship of Macedonia – Agency for Foreign Investments of Macedonia – Faculty of Electrical Engineering and Information Technologies, University "St. Ciryl and Methodius" – Skopje – Faculty of Natural Science and Mathematics, University "St. Cyril and Methodius" - Skopje – Institute of Economy, University "St. Ciryl and Methodius" – Skopje 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 3. Brief description of history of the project (2/2) - Other stakeholder which take part in working group: – Member of MASIT – USAID – SIPPO – MBPR (Macedonian Bank for Development Promotion) Starting /launching project in march 2009 with first workshop - Held five more workshops till end of the year when first draft of the Strategy was presented in front of the working group - Finalizing strategy in January 2010 (with operational plan) - Starting to promote the strategy in front of all stakeholders 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 4. Curent situation • Strategy was distributed and presented to all major stakeholders from government bodies: – Ministry od Economy – Cabinet of Vice Priminister for economic issues – Ministry of Information sociaty – Ministry of transport and telecomunication – Ministry of education and science – Ministry of foreign affairs – Ministry of finance …. WAITING FOR ADOPTION AS GOVERNMENT STRATEGY 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 5. MEANWHILE, ….WHAT WE DONE • Strategy was adopted by MASIT Management board • Proceed successfully cooperation with GTZ now in implementation of the strategy itself (budget is allocated) • GTZ organize workshop presenting the next steps and dedication of implementing part of the operational plan for 2010 - 2012 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 6. Project Management & Organization Success factors for implementing a collaborative strategy: • Close coordination • Regular communication • Exchange of information • Clearly defined responsibilities • Clearly defined processes • Accurate reporting and documentation • Learning consistently • Cross-functional teams 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org 6
  • 7. Key Instrument for Strategy Implementation: Operational Plan Measure Activity Task 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org 7
  • 8. Key Instrument for Strategy Implementation: Operational Plan Operational Plan: Task Description • Task • Expected results • Result indicators • Timing • Responsibilities • Budget • Activities • Deliverables • Timetable (Gantt chart) • Milestones  Timeline: 3 years 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org 8
  • 9. Organizational Structure Assembly Advisory Board Board of Directors Tasks Steering Committee - implementation Managing Office - coordination Export Promotion Strategy - monitoring & evaluation Committee for Software&IT domestic IT Services ICT Experts business Committee Council Task Force: Task Force: Task Force: Task Force: Task Force: Task Force: Branding & Cluster & Investment Export Policy Export Capabilities Excallence & Quality Positioning Collaboration Promotion 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org 9
  • 10. 10 Organizational Structure No. Unit Staffing Tasks 1 Board of Directors • MASIT representatives • Approval of the organizational structure 2 Steering • Selected members of the • Coordination Committee Export working group • Approval of tasks Promotion • Board members of • Reporting & comunication Strategy MASIT • Control • Monitoring & evaluation 3 Task Forces • Task force manager (SC) • Implementation of (1-6) • Members of the working measures and group corresponding tasks • Stakeholder reps. • Reporting to Steering • MASIT member Committee (SC) companies • Consultants (GTZ) 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 11. Implementation Process Proposed Process: 1. Formation of Steering Committee 2. Steering Committee establishes Task Forces (1-6) and appoints Task Force Managers 3. Steering Committee approves tasks and corresponding budgets (based on Operational Plan) 4. Task Forces start implementation of tasks according to prioritization (1-3) and timetable 5. Task forces conduct internal team-meetings on a monthly basis (self-managing teams) 6. Steering Committee conducts coordination meeting with task force managers every two months (reporting & task implementation review based on deliverables and indicators) 7. Steering Committee and Task Forces review and update OP (every 6 months) 8. Steering Committee defines completion of measures and activities based on deliverables and indicators 9. Completion of implementation 10. Monitoring & evaluation 11. Restart strategy development cycle 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org 11
  • 12. Information & Knowledge Management Goals of our Export Knowledge Management System (SharePoint) • Providing companies and stakeholders with export-relevant information (market surveys, training materials, business leads, etc.) • Creating a “collaborative learning system” (organizational learning) • Organizational knowledge: transfer of individual stakeholder’s knowledge to collective knowledge • Supporting communication, information and cooperation among the steering committee, members of the task forces and companies • Adaptation and continuous improvement of the export strategy • Creating a basis for new, innovative strategic measures 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org 12
  • 13. MEANWHILE, ….WHAT WE DONE 2 • SW&IT Servicies committee apointed responsible person from the members for each Task force (for each strategic measures) • work on refining activity plan in line with interest of members 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 14. Task forces – strategic measures 1. Export promotion policy – Predrag Radojičić – SIMT 2. Int. Branding&Positioning – Vladimir Matevski-SEAVUS 3. Claster collaboration – Nadezda Dimitrovska and Toni Petreski – INET 4. Export capability&knowladge – Slavčo Bujarovski – SIGMA SB and Behar Hadzihamza - EUDSOFT 5. Quality&company excelence – Jasmina Trajkovski – expert council 6. Export oriented investment – Petar Indovski - GORD 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 15. WHAT WAS DONE BY GTZ • MASIT Training Academy start working – first training was performed for Performance and HR Management • Preparation of questionary for Industry barometar are in final phase • Colaboration platform was promoted and traning for the executive office was held • Preparing two additional training are in finall phase – PMP training – Training for European tenders 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 16. IMPELEMENTATION – CRITICAL FACTORS  Critical factor for to succesfully implementation of the strategy are: - Serious involment of government bodies with concrete budget for part of the activity plan - serius involment of all other donor comunity again with dedicated budget for activity which is in line with SW /export strategy acivity plan, - serious involvement of financial institution , banks, venture capital, supporting financially export activity of ours company 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org
  • 17. Thank you for your attention Contact information: Predrag Radojičić E-mail: radojicic@simt.com.mk MASIT, Executive Office www.masit.org.mk Tel. + 389 2 32 38 601 E-mail: contact@masit.org.mk 8th SEEITA – 7th SEE ICT Forum Meeting & 7th MASIT Open Days Conference 14-15 October 2010, Ohrid www.seeita.org