Chapter 9:
Project Human Resource
Management
1
303KM Project Management
2
303KM Project Management
Learning Objectives
1. Explain the importance of good human resource
management on projects.
2. Define project human resource management and
understand its processes.
3. Summarize key concepts for managing people by
understanding the theories of Abraham Maslow,
Frederick Herzberg, David McClelland, and Douglas
McGregor on motivation.
3
303KM Project Management
Learning Objectives
4. Discuss human resource planning and be able to create a
project organizational chart, responsibility assignment
matrix, and resource histogram.
5. Understand important issues involved in project staff
acquisition and explain the concepts of resource
assignments, resource loading, and resource leveling.
6. Assist in team development with training, team-building
activities, and reward systems.
7. Explain and apply several tools and techniques to help
manage a project team and summarize general advice on
managing teams.
4
303KM Project Management
1 Importance of good human resource management
on projects
 U.S. productivity is No. 1 in the world when productivity is
measured as gross domestic product per worker, but our lead
vanishes when productivity is measured as GDP per hour
worked…Europeans take an average of six to seven weeks of
paid annual leave, compared with just 12 days in the United
States. Twice as many American as European workers put in
more than 48 hours per week.”*
 Sociologists have shown that many Americans, especially men,
would like to have more family or leisure time. Recent surveys
show that many Americans are willing to sacrifice up to a
quarter of their salaries in return for more time off!
*Williams, Joan and Ariane Hegewisch, “Confusing productivity with long work
week,” Minneapolis Star Tribune (September 6, 2004) (www.startribune.com).
5
303KM Project Management
2. What is Project Human Resource
Management?
 Making the most effective use of the people involved with a
project.
 Processes include:
 Human resource planning: Identifying and documenting project
roles, responsibilities, and reporting relationships.
 Acquiring the project team: Getting the needed personnel
assigned to and working on the project.
 Developing the project team: Building individual and group
skills to enhance project performance.
 Managing the project team: Tracking team member
performance, motivating team members, providing timely
feedback, resolving issues and conflicts, and coordinating changes
to help enhance project performance.
6
303KM Project Management
3. Keys to Managing People
 Psychologists and management theorists have devoted
much research and thought to the field of managing
people at work.
 Important areas related to project management include:
 Motivation theories
 Influence and power
 Effectiveness
7
303KM Project Management
Intrinsic and Extrinsic Motivation
 Intrinsic motivation causes people to participate in an
activity for their own enjoyment.
 Extrinsic motivation causes people to do something
for a reward or to avoid a penalty.
 For example, some children take piano lessons for
intrinsic motivation (they enjoy it) while others take
them for extrinsic motivation (to get a reward or avoid
punishment).
8
303KM Project Management
Maslow’s Hierarchy of Needs
 Abraham Maslow argued that human beings possess
unique qualities that enable them to make independent
choices, thus giving them control of their destiny.
 Maslow developed a hierarchy of needs, which states
that people’s behaviors are guided or motivated by a
sequence of needs.
9
303KM Project Management
Figure 9-1. Maslow’s Hierarchy
of Needs
10
303KM Project Management
Herzberg’s Motivational and Hygiene
Factors
 Frederick Herzberg wrote several famous books and
articles about worker motivation. He distinguished
between:
 Motivational factors: Achievement, recognition, the
work itself, responsibility, advancement, and growth.
These factors produce job satisfaction.
 Hygiene factors: Larger salaries, more supervision, and
a more attractive work environment. These factors cause
dissatisfaction if not present, but do not motivate
workers to do more.
11
303KM Project Management
McClelland’s Acquired-Needs Theory
 Specific needs are acquired or learned over time and are shaped
by life experiences. The following are the main categories of
acquired needs:
 Achievement (nAch): People with a high need for achievement
like challenging projects with attainable goals and lots of feedback.
 Affiliation (nAff): People with high need for affiliation desire
harmonious relationships and need to feel accepted by others, so
managers should try to create a cooperative work environment for
them.
 Power (nPow): People with a need for power desire either
personal power (not good) or institutional power (good for the
organization). Provide institutional power seekers with
management opportunities.
12
303KM Project Management
McGregor’s Theory X and Y
 Douglas McGregor popularized the human relations approach to
management in the 1960s.
 Theory X: Assumes workers dislike and avoid work, so
managers must use coercion, threats, and various control
schemes to get workers to meet objectives.
 Theory Y: Assumes individuals consider work as natural as play
or rest and enjoy the satisfaction of esteem and self-actualization
needs.
 Theory Z: Introduced in 1981 by William Ouchi and is based on
the Japanese approach to motivating workers, which emphasizes
trust, quality, collective decision making, and cultural values.
13
303KM Project Management
4. Organizational Planning
 Involves identifying and documenting project
roles, responsibilities, and reporting
relationships.
 Outputs include:
 Project organizational charts
 Staffing management plans
 Responsibility assignment matrixes
 Resource histograms
14
303KM Project Management
Responsibility Assignment Matrixes
 A responsibility assignment matrix (RAM) is a
matrix that maps the work of the project, as described
in the WBS, to the people responsible for performing
the work, as described in the OBS.
 Can be created in different ways to meet unique project
needs.
15
303KM Project Management
Figure 9-4. Sample Responsibility
Assignment Matrix (RAM)
16
303KM Project Management
Figure 9-5. RAM Showing
Stakeholder Roles
17
303KM Project Management
Table 9-1. Sample RACI Chart
R = Responsibility, only one R per task
A = Accountability
C = Consultation
I = Informed
18
303KM Project Management
Staffing Management Plans and Resource
Histograms
 A staffing management plan describes when and how
people will be added to and taken off the project team.
 A resource histogram is a column chart that shows the
number of resources assigned to a project over time.
19
303KM Project Management
Figure 9-6. Sample Resource Histogram
20
303KM Project Management
5. Acquiring the Project Team
 Acquiring qualified people for teams is crucial.
 The project manager who is the smartest person on the
team has done a poor job of recruiting!
 Staffing plans and good hiring procedures are
important, as are incentives for recruiting and retention.
 Some companies give their employees one dollar for
every hour that a new person who they helped hire
works.
 Some organizations allow people to work from home as
an incentive.
21
303KM Project Management
Resource Loading
 Resource loading refers to the amount of individual
resources an existing schedule requires during specific
time periods.
 Helps project managers develop a general
understanding of the demands a project will make on
the organization’s resources and individual people’s
schedules.
 Overallocation means more resources than are
available are assigned to perform work at a given time.
22
303KM Project Management
Figure 9-7. Sample Histogram Showing an
Overallocated Individual
What’s wrong with this picture? Assume 100 percent means Joe is
working eight hours per day.
23
303KM Project Management
Resource Leveling
 Resource leveling is a technique for resolving resource
conflicts by delaying tasks.
 The main purpose of resource leveling is to create a
smoother distribution of resource use and reduce
overallocation.
24
303KM Project Management
Figure 9-8. Resource Leveling Example
25
303KM Project Management
Benefits of Resource Leveling
 When resources are used on a more constant basis, they
require less management.
 It may enable project managers to use a just-in-time
inventory type of policy for using subcontractors or
other expensive resources.
 It results in fewer problems for project personnel and
the accounting department.
 It often improves morale.
26
303KM Project Management
6. Developing the Project Team
 The main goal of team development is to help people
work together more effectively to improve project
performance.
 It takes teamwork to successfully complete most
projects.
27
303KM Project Management
Training
 Training can help people understand themselves and
each other, and understand how to work better in
teams.
 Team building activities include:
 Physical challenges
 Psychological preference indicator tools
28
303KM Project Management
Myers-Briggs Type Indicator (MBTI)
 MBTI is a popular tool for determining personality
preferences and helping teammates understand each
other.
 Four dimensions include:
 Extrovert/Introvert (E/I)
 Sensation/Intuition (S/N)
 Thinking/Feeling (T/F)
 Judgment/Perception (J/P)
 NTs, or rationals, are attracted to technology fields.
 IT people vary most from the general population in
their tendency to not be extroverted or sensing.
29
303KM Project Management
Wideman and Shenhar’s Views on MBTI
and Project Management*
 Most suited for project leadership:
 100 percent: INTJ, ENTJ, ISTJ, ESTJ
 50 percent: INTP, ENTP, ENFP, ENFJ
 Best suited as followers:
 100 percent: INFJ, ISFJ
 50 percent: INTP, ENTP, ENFP, ENFJ, ESFJ
 Not suited for project work:
 100 percent: INFP, ISFP, ESFP, ISTP
 50 percent: ENFP, ESTP
*Wideman, R. Max and Aaron J. Shenhar, “Professional and Personal Development: A Practical
Approach to Education and Training,” Project Management for Business Professionals, edited by Joan
Knutson, 2001, p. 375.
30
303KM Project Management
MBTI and Suitability to Project Work*
*Wideman, R. Max. “Project Teamwork, Personality Profiles and the Population at Large: Do we
have enough of the right kind of people?” (http://www.maxwideman.com/papers/profiles/profiles.pdf ).
What do
you think
about
these
views?
31
303KM Project Management
Social Styles Profile
 People are perceived as behaving primarily in one of
four zones, based on their assertiveness and
responsiveness:
 Drivers
 Expressives
 Analyticals
 Amiables
 People on opposite corners (drivers and amiables,
analyticals and expressives) may have difficulty getting
along.
32
303KM Project Management
Figure 9-9. Social Styles
33
303KM Project Management
Reward and Recognition Systems
 Team-based reward and recognition systems can
promote teamwork.
 Focus on rewarding teams for achieving specific goals.
 Allow time for team members to mentor and help each
other to meet project goals and develop human
resources.
34
303KM Project Management
7. Managing the Project Team
 Project managers must lead their teams in performing
various project activities.
 After assessing team performance and related
information, the project manager must decide:
 If changes should be requested to the project.
 If corrective or preventive actions should be
recommended.
 If updates are needed to the project management plan or
organizational process assets.
35
303KM Project Management
Tools and Techniques for Managing
Project Teams
 Observation and conversation
 Project performance appraisals
 Conflict management
 Issue logs

Contenu connexe

Tendances

Project time management
Project time managementProject time management
Project time managementImran Jamil
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and ProcessMuhammad Rehman
 
Project human resources management
Project human resources managementProject human resources management
Project human resources managementFirmansyah Ashari
 
Project management
Project managementProject management
Project managementJay Raval
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementAnand Bobade
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementJahangeer Shams
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Jeremy Jay Lim
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CycleAnand Bobade
 
PRINCE2 - Presentation
PRINCE2 - PresentationPRINCE2 - Presentation
PRINCE2 - PresentationMatt Trigg
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Agus Suhanto
 

Tendances (20)

Project time management
Project time managementProject time management
Project time management
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
 
Project human resources management
Project human resources managementProject human resources management
Project human resources management
 
Project time management
Project time managementProject time management
Project time management
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Evolution of project management
Evolution of project managementEvolution of project management
Evolution of project management
 
Project management
Project managementProject management
Project management
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
PRINCE2 - Presentation
PRINCE2 - PresentationPRINCE2 - Presentation
PRINCE2 - Presentation
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 

Similaire à Project Human Resources Management.ppt

HRM in PM (1).pptx
HRM in PM (1).pptxHRM in PM (1).pptx
HRM in PM (1).pptxumairshams6
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10Muzette Charles, PMP
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1reddvise
 
The Project Management Process - Week 7 Managing Teams
The Project Management Process - Week 7   Managing TeamsThe Project Management Process - Week 7   Managing Teams
The Project Management Process - Week 7 Managing TeamsCraig Brown
 
Solutions Manual for Managing Human Resources 16th Edition by Snell
Solutions Manual for Managing Human Resources 16th Edition by SnellSolutions Manual for Managing Human Resources 16th Edition by Snell
Solutions Manual for Managing Human Resources 16th Edition by Snellriven013
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
People management.pptx
People management.pptxPeople management.pptx
People management.pptxNANCY ALSEBAIY
 
Pm0013 summer-2016
Pm0013 summer-2016Pm0013 summer-2016
Pm0013 summer-2016smumbahelp
 
Human resource managment.pptx
Human resource managment.pptxHuman resource managment.pptx
Human resource managment.pptxBetshaTizazu1
 
project human resources management
project human resources managementproject human resources management
project human resources managementMohamed , PMP
 
Hotel administration
Hotel administrationHotel administration
Hotel administrationConfidential
 

Similaire à Project Human Resources Management.ppt (20)

HRM in PM (1).pptx
HRM in PM (1).pptxHRM in PM (1).pptx
HRM in PM (1).pptx
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
 
The Project Management Process - Week 7 Managing Teams
The Project Management Process - Week 7   Managing TeamsThe Project Management Process - Week 7   Managing Teams
The Project Management Process - Week 7 Managing Teams
 
Ch09
Ch09Ch09
Ch09
 
Pom
PomPom
Pom
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
 
Solutions Manual for Managing Human Resources 16th Edition by Snell
Solutions Manual for Managing Human Resources 16th Edition by SnellSolutions Manual for Managing Human Resources 16th Edition by Snell
Solutions Manual for Managing Human Resources 16th Edition by Snell
 
Pmp hr chapter 9
Pmp hr chapter 9Pmp hr chapter 9
Pmp hr chapter 9
 
9 human resource PMBOK
9 human resource PMBOK9 human resource PMBOK
9 human resource PMBOK
 
Project Management Managing Teams
Project Management Managing TeamsProject Management Managing Teams
Project Management Managing Teams
 
Chap09 project human resource management
Chap09 project human resource managementChap09 project human resource management
Chap09 project human resource management
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
People management.pptx
People management.pptxPeople management.pptx
People management.pptx
 
Pm0013 summer-2016
Pm0013 summer-2016Pm0013 summer-2016
Pm0013 summer-2016
 
Human resource managment.pptx
Human resource managment.pptxHuman resource managment.pptx
Human resource managment.pptx
 
Ch09
Ch09Ch09
Ch09
 
project human resources management
project human resources managementproject human resources management
project human resources management
 
I, manager
I, manager I, manager
I, manager
 
Hotel administration
Hotel administrationHotel administration
Hotel administration
 

Plus de MUST

Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.pptLecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.pptMUST
 
NYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdfNYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdfMUST
 
ME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdfME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdfMUST
 
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdfLECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdfMUST
 
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdfStability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdfMUST
 
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptxLECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptxMUST
 
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...MUST
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.pptMUST
 
ON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptMUST
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfMUST
 
L4_Cost Management.ppt
L4_Cost Management.pptL4_Cost Management.ppt
L4_Cost Management.pptMUST
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptMUST
 
Project procurement Management.ppt
Project procurement Management.pptProject procurement Management.ppt
Project procurement Management.pptMUST
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfMUST
 
pmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfpmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfMUST
 
2nd_order.pdf
2nd_order.pdf2nd_order.pdf
2nd_order.pdfMUST
 
History of Robotics.ppt
History of Robotics.pptHistory of Robotics.ppt
History of Robotics.pptMUST
 
Machine Vision Systems.pptx
Machine Vision Systems.pptxMachine Vision Systems.pptx
Machine Vision Systems.pptxMUST
 
Robot actuation and feedback components.pptx
Robot actuation and feedback components.pptxRobot actuation and feedback components.pptx
Robot actuation and feedback components.pptxMUST
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.pptMUST
 

Plus de MUST (20)

Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.pptLecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
 
NYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdfNYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdf
 
ME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdfME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdf
 
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdfLECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
 
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdfStability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
 
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptxLECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
 
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt
 
ON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).ppt
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 
L4_Cost Management.ppt
L4_Cost Management.pptL4_Cost Management.ppt
L4_Cost Management.ppt
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.ppt
 
Project procurement Management.ppt
Project procurement Management.pptProject procurement Management.ppt
Project procurement Management.ppt
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdf
 
pmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfpmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdf
 
2nd_order.pdf
2nd_order.pdf2nd_order.pdf
2nd_order.pdf
 
History of Robotics.ppt
History of Robotics.pptHistory of Robotics.ppt
History of Robotics.ppt
 
Machine Vision Systems.pptx
Machine Vision Systems.pptxMachine Vision Systems.pptx
Machine Vision Systems.pptx
 
Robot actuation and feedback components.pptx
Robot actuation and feedback components.pptxRobot actuation and feedback components.pptx
Robot actuation and feedback components.pptx
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 

Dernier

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 

Dernier (20)

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 

Project Human Resources Management.ppt

  • 1. Chapter 9: Project Human Resource Management 1 303KM Project Management
  • 2. 2 303KM Project Management Learning Objectives 1. Explain the importance of good human resource management on projects. 2. Define project human resource management and understand its processes. 3. Summarize key concepts for managing people by understanding the theories of Abraham Maslow, Frederick Herzberg, David McClelland, and Douglas McGregor on motivation.
  • 3. 3 303KM Project Management Learning Objectives 4. Discuss human resource planning and be able to create a project organizational chart, responsibility assignment matrix, and resource histogram. 5. Understand important issues involved in project staff acquisition and explain the concepts of resource assignments, resource loading, and resource leveling. 6. Assist in team development with training, team-building activities, and reward systems. 7. Explain and apply several tools and techniques to help manage a project team and summarize general advice on managing teams.
  • 4. 4 303KM Project Management 1 Importance of good human resource management on projects  U.S. productivity is No. 1 in the world when productivity is measured as gross domestic product per worker, but our lead vanishes when productivity is measured as GDP per hour worked…Europeans take an average of six to seven weeks of paid annual leave, compared with just 12 days in the United States. Twice as many American as European workers put in more than 48 hours per week.”*  Sociologists have shown that many Americans, especially men, would like to have more family or leisure time. Recent surveys show that many Americans are willing to sacrifice up to a quarter of their salaries in return for more time off! *Williams, Joan and Ariane Hegewisch, “Confusing productivity with long work week,” Minneapolis Star Tribune (September 6, 2004) (www.startribune.com).
  • 5. 5 303KM Project Management 2. What is Project Human Resource Management?  Making the most effective use of the people involved with a project.  Processes include:  Human resource planning: Identifying and documenting project roles, responsibilities, and reporting relationships.  Acquiring the project team: Getting the needed personnel assigned to and working on the project.  Developing the project team: Building individual and group skills to enhance project performance.  Managing the project team: Tracking team member performance, motivating team members, providing timely feedback, resolving issues and conflicts, and coordinating changes to help enhance project performance.
  • 6. 6 303KM Project Management 3. Keys to Managing People  Psychologists and management theorists have devoted much research and thought to the field of managing people at work.  Important areas related to project management include:  Motivation theories  Influence and power  Effectiveness
  • 7. 7 303KM Project Management Intrinsic and Extrinsic Motivation  Intrinsic motivation causes people to participate in an activity for their own enjoyment.  Extrinsic motivation causes people to do something for a reward or to avoid a penalty.  For example, some children take piano lessons for intrinsic motivation (they enjoy it) while others take them for extrinsic motivation (to get a reward or avoid punishment).
  • 8. 8 303KM Project Management Maslow’s Hierarchy of Needs  Abraham Maslow argued that human beings possess unique qualities that enable them to make independent choices, thus giving them control of their destiny.  Maslow developed a hierarchy of needs, which states that people’s behaviors are guided or motivated by a sequence of needs.
  • 9. 9 303KM Project Management Figure 9-1. Maslow’s Hierarchy of Needs
  • 10. 10 303KM Project Management Herzberg’s Motivational and Hygiene Factors  Frederick Herzberg wrote several famous books and articles about worker motivation. He distinguished between:  Motivational factors: Achievement, recognition, the work itself, responsibility, advancement, and growth. These factors produce job satisfaction.  Hygiene factors: Larger salaries, more supervision, and a more attractive work environment. These factors cause dissatisfaction if not present, but do not motivate workers to do more.
  • 11. 11 303KM Project Management McClelland’s Acquired-Needs Theory  Specific needs are acquired or learned over time and are shaped by life experiences. The following are the main categories of acquired needs:  Achievement (nAch): People with a high need for achievement like challenging projects with attainable goals and lots of feedback.  Affiliation (nAff): People with high need for affiliation desire harmonious relationships and need to feel accepted by others, so managers should try to create a cooperative work environment for them.  Power (nPow): People with a need for power desire either personal power (not good) or institutional power (good for the organization). Provide institutional power seekers with management opportunities.
  • 12. 12 303KM Project Management McGregor’s Theory X and Y  Douglas McGregor popularized the human relations approach to management in the 1960s.  Theory X: Assumes workers dislike and avoid work, so managers must use coercion, threats, and various control schemes to get workers to meet objectives.  Theory Y: Assumes individuals consider work as natural as play or rest and enjoy the satisfaction of esteem and self-actualization needs.  Theory Z: Introduced in 1981 by William Ouchi and is based on the Japanese approach to motivating workers, which emphasizes trust, quality, collective decision making, and cultural values.
  • 13. 13 303KM Project Management 4. Organizational Planning  Involves identifying and documenting project roles, responsibilities, and reporting relationships.  Outputs include:  Project organizational charts  Staffing management plans  Responsibility assignment matrixes  Resource histograms
  • 14. 14 303KM Project Management Responsibility Assignment Matrixes  A responsibility assignment matrix (RAM) is a matrix that maps the work of the project, as described in the WBS, to the people responsible for performing the work, as described in the OBS.  Can be created in different ways to meet unique project needs.
  • 15. 15 303KM Project Management Figure 9-4. Sample Responsibility Assignment Matrix (RAM)
  • 16. 16 303KM Project Management Figure 9-5. RAM Showing Stakeholder Roles
  • 17. 17 303KM Project Management Table 9-1. Sample RACI Chart R = Responsibility, only one R per task A = Accountability C = Consultation I = Informed
  • 18. 18 303KM Project Management Staffing Management Plans and Resource Histograms  A staffing management plan describes when and how people will be added to and taken off the project team.  A resource histogram is a column chart that shows the number of resources assigned to a project over time.
  • 19. 19 303KM Project Management Figure 9-6. Sample Resource Histogram
  • 20. 20 303KM Project Management 5. Acquiring the Project Team  Acquiring qualified people for teams is crucial.  The project manager who is the smartest person on the team has done a poor job of recruiting!  Staffing plans and good hiring procedures are important, as are incentives for recruiting and retention.  Some companies give their employees one dollar for every hour that a new person who they helped hire works.  Some organizations allow people to work from home as an incentive.
  • 21. 21 303KM Project Management Resource Loading  Resource loading refers to the amount of individual resources an existing schedule requires during specific time periods.  Helps project managers develop a general understanding of the demands a project will make on the organization’s resources and individual people’s schedules.  Overallocation means more resources than are available are assigned to perform work at a given time.
  • 22. 22 303KM Project Management Figure 9-7. Sample Histogram Showing an Overallocated Individual What’s wrong with this picture? Assume 100 percent means Joe is working eight hours per day.
  • 23. 23 303KM Project Management Resource Leveling  Resource leveling is a technique for resolving resource conflicts by delaying tasks.  The main purpose of resource leveling is to create a smoother distribution of resource use and reduce overallocation.
  • 24. 24 303KM Project Management Figure 9-8. Resource Leveling Example
  • 25. 25 303KM Project Management Benefits of Resource Leveling  When resources are used on a more constant basis, they require less management.  It may enable project managers to use a just-in-time inventory type of policy for using subcontractors or other expensive resources.  It results in fewer problems for project personnel and the accounting department.  It often improves morale.
  • 26. 26 303KM Project Management 6. Developing the Project Team  The main goal of team development is to help people work together more effectively to improve project performance.  It takes teamwork to successfully complete most projects.
  • 27. 27 303KM Project Management Training  Training can help people understand themselves and each other, and understand how to work better in teams.  Team building activities include:  Physical challenges  Psychological preference indicator tools
  • 28. 28 303KM Project Management Myers-Briggs Type Indicator (MBTI)  MBTI is a popular tool for determining personality preferences and helping teammates understand each other.  Four dimensions include:  Extrovert/Introvert (E/I)  Sensation/Intuition (S/N)  Thinking/Feeling (T/F)  Judgment/Perception (J/P)  NTs, or rationals, are attracted to technology fields.  IT people vary most from the general population in their tendency to not be extroverted or sensing.
  • 29. 29 303KM Project Management Wideman and Shenhar’s Views on MBTI and Project Management*  Most suited for project leadership:  100 percent: INTJ, ENTJ, ISTJ, ESTJ  50 percent: INTP, ENTP, ENFP, ENFJ  Best suited as followers:  100 percent: INFJ, ISFJ  50 percent: INTP, ENTP, ENFP, ENFJ, ESFJ  Not suited for project work:  100 percent: INFP, ISFP, ESFP, ISTP  50 percent: ENFP, ESTP *Wideman, R. Max and Aaron J. Shenhar, “Professional and Personal Development: A Practical Approach to Education and Training,” Project Management for Business Professionals, edited by Joan Knutson, 2001, p. 375.
  • 30. 30 303KM Project Management MBTI and Suitability to Project Work* *Wideman, R. Max. “Project Teamwork, Personality Profiles and the Population at Large: Do we have enough of the right kind of people?” (http://www.maxwideman.com/papers/profiles/profiles.pdf ). What do you think about these views?
  • 31. 31 303KM Project Management Social Styles Profile  People are perceived as behaving primarily in one of four zones, based on their assertiveness and responsiveness:  Drivers  Expressives  Analyticals  Amiables  People on opposite corners (drivers and amiables, analyticals and expressives) may have difficulty getting along.
  • 33. 33 303KM Project Management Reward and Recognition Systems  Team-based reward and recognition systems can promote teamwork.  Focus on rewarding teams for achieving specific goals.  Allow time for team members to mentor and help each other to meet project goals and develop human resources.
  • 34. 34 303KM Project Management 7. Managing the Project Team  Project managers must lead their teams in performing various project activities.  After assessing team performance and related information, the project manager must decide:  If changes should be requested to the project.  If corrective or preventive actions should be recommended.  If updates are needed to the project management plan or organizational process assets.
  • 35. 35 303KM Project Management Tools and Techniques for Managing Project Teams  Observation and conversation  Project performance appraisals  Conflict management  Issue logs