Contenu connexe Similaire à Mepl presentation (20) Mepl presentation2. SCOPE OF ENGINEERING
JOB OPPORTUNITIESAFTER ENGINEERING
I. Research & Development
II. EPCM Sector
III. In-Plant
MECCI Engineers © copy right
3. Research & Development
Scope For Below Engineering Branches:
i. Electrical Engineers
ii. Mechanical Engineers
iii. Instrumentation Engineers
iv. Civil Engineers
v. Chemical Engineers
vi. Computer Science Engineers
vii. InformationTechnology
MECCI Engineers © copy right
4. EPCM Sector
The Sector which having group of contractor companies and is a
prominent form of contracting agreement in the construction industry.
The engineering and construction contractor will carry out the
detailed engineering design of the project, procure all the equipment
and materials necessary, and then construct to deliver a functioning
facility or asset to their clients. Companies that deliver EPC Projects are
commonly referred to as EPCM Contractors.
“ENGINEERING PROCUREMENT CONSTRUCTION & MANAGEMENT COMPANIES”
Opportunities In EPC Sector
Professionals having opportunity at different level:
Feasibility Study
FEED
DESIGN Engineering
Procurement
Construction/ Commissioning
MECCI Engineers © copy right
5. Clients In EPC Sector
On-Shore Off-Shore Sub-Sea
Refineries Process Head
Platforms
Pipeline Projects
Power Plants Flare Head
Platforms
FPSO Supporting
Accessories
Cement Plants LNG Units
Fertilizers FLNG Units
Pharmaceuticals FPSO & Etc.
Hydrogen Units
Ethylene Units
& Etc.
MECCI Engineers © copy right
6. Few Major Indian Client
Companies
ONGC
IOCL
HPCL
BHART OMAN GAS
Reliance Power Ltd.
NTPC
Jindal Power/ Steels
SAIL
GAIL
Jaypee Cements/ Power & ETC.
MECCI Engineers © copy right
7. Few EPC Sector Companies
Samsung Engineering
Lahmeyer international Pvt. Ltd.
Indian Oil Tanking Design
Degremont Ltd.
Nuberg Engineering
Lurgi India
Flour Daniel
L&T Ltd.
Petrofac
Valdel Engineering
SMS SIEMAG
DESEIN Private limited
Denso India ltd
Conceptia software solutions
Bechtel
KSJ Technocrat
Wood Group
KSJ Engineering services
Sterling and Wilson
Multitax filteration
Technofab
Multimax
Global Economic Advantage
Vertex gp of companies
Cheema boilers ltd
Esteem Projects Pvt Ltd
S k Engineering
Mellcon Engineers
Ultima Switch Gear
Chemline India Ltd
Jakson Ltd.
S. S. Gas Lab Asia Pvt. Ltd
Membrane Engineering Pvt Ltd
Aravali Infrapower ltd
Creative Oz Air
Tecpro Systems Ltd
Deeya Energy India Pvt. Ltd
Accurate transformers
Peekay Farm Equipments I P Ltd
Mtekpro
Taneja Vidyut Control Private Limited
Brisanzia Technologies Pvt Ltd
Hitech Bulk handling systems Pvt ltd
Sombansi enviro
Azure power India pvt ltd
Ecotherm Engineers Pvt Ltd
Zeus group
Bhaskar Power Projects Pvt Ltd
ACSION CHEMICALS & SYSTEMS PVT.LTD
Ns Terbo Pvt LtdMECCI Engineers © copy right
9. Other Related Sectors:
PMC- “Project Management Consultancy”
PMC stands for Project Management Consultant or Project
Management Contract. Under a project management contract an
engineering contractor will overlook the EPC Contractors work to
ensure compliance with client scope of works.
Other terms for these type of services include Project
Management Services (PMS) and Project Management Services
Contracts (PMSC).
MECCI Engineers © copy right
10. “Licensor Company”
The Company who is responsible for defining the
technology for Process Plant Engineering
MECCI Engineers © copy right
11. EPCM
EPCM (engineering, procurement, and construction management) is a
common form of contracting arrangement for very large projects within
the infrastructure, mining, resources and energy industries. In an EPCM
arrangement, the client selects a head contractor who manages the whole
project on behalf of the client.The EPCM contractor coordinates all design,
procurement and construction work and ensures that the whole project is
completed as required and in time.The EPCM contractor may or may not
undertake actual site work.
An EPCM contract is a natural progression for an EPC contractor as, if one is able
to do an EPC of a project, then getting a bigger EPCM job is advantageous. It
helps to tap the already present competencies while ensuring better control over
the project. Also, the value of the project managed through an EPCM contract is
far greater than the individual EPC contracts.
Normally, an EPCM contractor completes the basic work such as site surveys,
getting clearances from authorities, doing the basic engineering and preparing
the site for the subcontractors. Subcontractors are chosen by the EPCM
company, but they have an agreement directly with the final customer
(investor).
MECCI Engineers © copy right
12. EPIC “Engineering Procurement
Installation Commissioning”
EPIC stands for Engineering Procurement Installation
Commissioning is typically a Lump SumTurn Key (LSTK) type
Contract integrating the responsibility going from the
conception to the final acceptance of one or more elements of
a production system. It can be awarded for all, or part, of a
field development.
LSTK “LumpsumTurnkey”
LSTK stands for Lump SumTurn Key.This is a contractual
agreement in which a fixed price is agreed for the execution of
a project or part of a project. Once the final development is
completed a finished functioning asset is handed over to the
client, hence the term "Turn Key" which effectively means
ready to operate.
MECCI Engineers © copy right
13. An owner decides for an EPC
contract for reasons that include:
Reduced stress for owner
easy work and growth of the company.
Single point of contact for owner simplifies communications.
Ready availability of post-commissioning services
Ensures quality and reduces practical issues faced in other ways
Owner protected against changing prices for materials, labour, etc.
Cost is known at the start of the project
Besides the plant sitting, in an EPC contract the owner defines:
Scope and the specifications of the plant
Quality
Project duration
Cost
The cost (the price to be paid to the EPCC) is negotiated and finalised and paid in
mutually agreed instalments.
MECCI Engineers © copy right
14. EPC Top Management
CEO
ADMINISTRATION
HUMAN RESOURCE
PLANNING/ ESTIMATION
ENGINEERING MGMT.
QHSE
PROCESS ENGINEERING
ENGINEERING
CIVIL ENGINEERING
MECHANICAL ENGINEERING
I. MECHANICAL EQUIPMENT DESIGN
II. PIPING DESIGN
III. HVAC
ELECTRICAL ENGINEERING
INSTRUMENTATION ENGINEERING
MECCI Engineers © copy right
15. Functions In Detailed Engineering
•Engineering Functions
•Initiation
•Implementation
•Planning & Programming
•Estimating -> Request for Quote
•Valuation
•Design
Procurement Functions
•Purchasing
•Expediting
•Receiving
•Invoicing
•Reconciliation
Construction Functions
•Construction Schedule
•On-site Material Handling
•Construction Activities
•On-site Client Communications
•Valuation & Cash flow
•Closing
MECCI Engineers © copy right
16. LEVEL OF DESIGNATION IN ENGINEERING DEPT.
LEVEL MIN. QUALIFICATION
HOD “HEAD OFTHE DEPT.” B.Tech/B.E. or Above
Principal Engineer B.Tech/B.E.
Sr. ENGINEER B.Tech/B.E.
ENGINEER/ DESIGNER B.Tech/B.E.
MODELLER DIPLOMA
DRAFTMAN ITI
MECCI Engineers © copy right
17. SCOPE IN DESIGNATION RELATED BRANCH
PROCESS DEPT. PROCESS DESIGN
ENGINEER
CHEMICAL ENGINEERING
CIVIL DEPT. CIVIL & STRUCTURAL
ENGINEER
CIVIL ENGINEERING
PIPING/STRESS DEPT. PIPING STRESS
ENGINEER
MECHANICAL
ENGINEERING
MECHANICAL
EQUIPMENT
MECH. EQUIPMENT
ENGINEER
MECHANICAL
ENGINEERING
HVAC HVAC ENGINEER MECHANICAL
ENGINEERING
ELECTRICAL DEPT. ELECTRICAL DESIGN
ENGINEER
ELECTRICAL
ENGINEERING
INSTRUMENTATION
DEPT.
INST. DESIGN ENGINEER INSTRUMENTATION /
ELECTRONICS
ENGINEERING
MECCI Engineers © copy right
18. WORK FLOW
INVOLVEMENT
CLIENT MGMT. CLIENT
DFR EPC
FEED EPC
PROPOSAL EPC
DETAILED ENGINEERING EPC
PROCUREMENT EPC
INSTALLATION/COMMISSIONING EPC
MECCI Engineers © copy right
19. DEFINATIONS
DFR “DETAILED FEASIBILITY REPORT”
The Feasibility Report constitutes one of the most important steps in the decision-
making process involved with embarking on a project. Approvals from financial
institutions and Clients' Managements are based on the viability of the project, and a
proper Feasibility Report / Study provides an unbiased and authentic evaluation of
this viability.
Essential features of a bankable Report include proper technical basis, accurate cost
estimates with back-up quotations fromVendors, appropriate market surveys and
realistic financial analyses
FEED “FRONT END ENGINEERING DESIGN”
FEED stands for Front End Engineering Design.The FEED is basic engineering
which comes after the Conceptual design or Feasibility study.The FEED design
focuses the technical requirements as well as rough investment cost for the
project.The FEED can be divided into separate packages covering different
portions of the project.The FEED package is used as the basis for bidding the
Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis.
Cont….
MECCI Engineers © copy right
20. A good FEED will reflect all the clients project specific requirements and avoid
significant changes during the execution phase. FEED Contracts usually take around
1 year to complete for larger sized projects. During the FEED phase there is close
communication between Project Owners and Operators and the Engineering
Contractor to work up the project specific requirements.
MECCI Engineers © copy right
21. PROPOSAL
This is the type of quotation which prepared by
EPC Companies. It defines process involve to
complete the requirement of Client with
involving the factors like Quality/Standards, Cost
& Estimation,Total Duration of Project & etc.
Finally client will decide a L1 (Lower One)
Company after a bid/tender.Who is responsible
for Detailed Engineering.
MECCI Engineers © copy right
22. Detailed Engineering
Detail Engineering Design (DED) is the essential bridge between the basic
engineering design and construction phase of a project in order to convert
the ideas into reality.
DED involves close coordination and synchronization among various
disciplines of engineering, all in house resources for interactive and
progressive manner. With having the DED, is vital to the owner flexibility
time to execute the project.
A dedicated team of reliable and knowledgeable managers, engineers and
designers who are able to provide the complete detail engineering design
solution.
Computer aided design techniques are extensively used as design aids to
help develop optimum layout & design to assure maximum construction,
operational & maintenance convenience, and detailed construction
drawings with bill of materials are extracted automatically from the system,
ensuring highest degree of accuracy and error-free drawings.
MECCI Engineers © copy right