Road Subgrade Design – Sustainable ecologically
friendly road construction
Middle East concrete Seminar - Big 5 Dubai
18 Nov 2014
Abdullah Bdeir
Director ATCCo – Chairman Jordan GBC
• Non-toxic clay-based soil stabilizer
• 100% Biodegradable
• Reduced road maintenance costs
• Increased and lasting compaction
2
Benefits:
•100% environmentally friendly
•Reduces maintenance requirements and costs
•Reduces reliance on costly aggregates and gravel
•Allows for use of high clay content soils
•Reduces the permeability of a treated soil
•Increases the density of treated soils
•Increases the CBR (California Bearing Ratio)
or strength of treated soils
3
EarthZyme’s application will result in higher CBR values (a measure of soil strength)
and will allow for the use of marginal soil materials therefore reducing the
standard reliance on expensive aggregates and gravels.
4
5
0
50
100
150
200
250
300
CBRValue
A B C B E F
No EZ CBR 43 12 37 55 69 14
EZ CBR 196 37 135 102 296 41
Increase in CBR Values
6
7
8
9
Before EarthZyme After EarthZyme
EarthZyme is 100% biodegradable and works on the clay-based fraction of the soil.
After EarthZyme’s application, the clay particles in the soil are no longer attracted
to water, allowing for any water present in the soil to drain away freely resulting
in the clay/soil particles settling closer together and producing lasting soil
stabilization.
10
EarthZyme reacts permanently with clay in the soil to produce long-term stabilization.
Other products glue the clay particles together.
Once the glue is gone... so are the results of the stabilization process.
Because EarthZyme uses the
clay as the glue, which
remains in the soil indefinitely,
it produces the long term
effects that are desired.
11
12
13
14
The EarthZyme stabilized soil
will have a lower permeability
due to increased soil density
resulting in a harder, more
durable road in both dry and
wet weather.
15
16
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
VerticalSwell(mm)
Caupicho Quito Ecuador
Hainan Province Transport
Construction Quality Control
Department (2007)
Hainan Province Transport
Construction Quality Control
Department (2005)
Metropolitan District of Quito
Ecuador
EarthZyme 0.3 0.08 0.06 0.01
Untreated 0.81 0.26 0.28 0.32
Reduction in Swell
Once applied, EarthZyme will reduce the tendency for
a road to exhibit common maintenance problems such
as wash-boarding, rutting, heaving, potholing and dust.
T 17
EarthZyme has also resulted in reduced
rolling resistance and racking events on
heavy haul trucks. Extending the
economic life of haul trucks.
18
19
A B C B E F
353%
208%
265%
85%
328%
192%
CBR Avg. Percent Change
A B C B E F
Naco Golf
Country
Club
Consorcio
San Ignacio
Argentina
Huiyang
District
Pontifical
Catholic
University
of Peru
Ghana
Highway
Authority
University
of Piura
EarthZyme is supplied in liquid form and is
applied using standard equipment and techniques.
20
EarthZyme is super-concentrated, therefore making the product’s cost negligible
per kilometer or mile of road treated compared to alternative products or standard
maintenance costs of non-stabilized, unpaved roads.
21
Verification of Soil Compatibility:
Prior to any EarthZyme application,
a soil analysis must be conducted to
verify compatibility with EarthZyme.
Tests Needed:
A) Dry Density/Moisture Content Relation Proctor Test ASTM_D698
B) Liquid Limit, Plastic Limit and Plastic Index Test (Atterberg Limits) ASTM D4318-10
C) Particle Size Analysis ASTM D422
D) Hydrometer Analysis ASTM D1140
22
23
25
Application: STEP 1
Scarify or till the soil to the required depth (50 cm’s minimum for haul
roads).
26
Application: STEP 2
Spray the EarthZyme and water mixture onto the soil.
27
Application: STEP 3 (Example)
Road Length = 1000 m (1 km)
Road Width = 40 m
Depth = 0.50 m (50 cm)
 Volume Soil = 20,000 m3 (compacted)
 Amount of EarthZyme
 (EarthZyme is applied on average 1 liter / 33 m3 of compacted soil)
= 20,000 m3 divided by 33 m3
= 629 liters of EarthZyme
*An optional slurry application of EarthZyme may be recommended, see step 7
28
Application: STEP 3 Cont’d… (Optimal Moisture)
Say the current moisture content is 7 %,
The optimum moisture content is 11 % and the soil has a density of 2.2 tons/m3
 Required moisture to be added: = (11 % - 7 %) x 2.2 x 20,000 m3 (compacted
soil)
= 1,760,000 liters of water
29
Application: STEP 3 Cont’d… (Optimal Moisture)
Say the current moisture content is 7 %,
The optimum moisture content is 11 % and the soil has a density of 2.2 tons/m3
 Required moisture to be added: = (11 % - 7 %) x 2.2 x 20,000 m3 (compacted
soil)
= 1,760,000 liters of water
At 2% below OMC
= 800,000 liters of water
30
Application: STEP 3 Cont’d… (Optimal Moisture)
Bring the soil up to OMC (optimum moisture content)
by adding more water during the mixing process.
31
Application: STEP 4:
Mix the soil, EarthZyme and water to
the desired consistency.
32
Application: STEP 4 (Optional Equipment)
If a reclaimer is not available a grader can be used to mix the water and
EarthZyme into the soil.
33
Application: STEP 5:
Shape the road as per the engineer’s specifications.
34
Application: STEP 6:
Compact to reach MDD or higher for maximum CBR value.
35
Application: STEP 7 7:
Apply a slurry of EarthZyme and water to help seal the road.
36
Application: STEP 8:
Continue compacting after the slurry application has been applied.
37
Application: STEP 9:
Always make sure that there is proper drainage on the road.
38
Application: STEP 10:
Once compaction is complete, the road is ready to be opened to traffic.
39
Applications:
• Primary roads
• Secondary Roads
• Municipal Roads
• Forest roads
• Construction in progress
• Parking
• Container Terminals
• Trails
• Runways
• Levees
40
Works carried out ... Romania
Before After
Chip Seal Surface
EarthZyme
41
Texas, USA
At Mexico Border
42
Romania
43
Dominican Republic
44
Columbia
45
South Africa
46
Mongolia
…Several Months Later
47
China
Shenzhen - Container Storage Yard Shenzhen - EarthZyme Compaction Shenzhen - Two Years Later
Guangzhou - Before Guangzhou - After EarthZyme Application Guangzhou - With Chip Seal 48
China continued…
Huiyan - Before Huiyan - EarthZyme application Huiyan - Paved Surface
Fushan - Before Fushan - EarthZyme with Gravel Wearcoat Fushan - After numerous monsoons
49
Required Equipment:
•Pulverizing Mixer/Reclaimer
•Haul Truck
• Water Truck
•Grader
• Steel Drum Roller/Vibrator
50
Pneumatic Roller
Sheeps Foot Roller
Optional Equipment Needed:
51
Reference letters and lab reports pertaining to successful past EarthZyme
projects are available upon request.
52

Contenu connexe

Tendances

Tendances (20)

Field compaction methods
Field compaction methodsField compaction methods
Field compaction methods
 
DEVELOPMENT OF A TRANSPARENT MATERIAL TO MODEL THE GEOTECHNICAL PROPERTIES OF...
DEVELOPMENT OF A TRANSPARENT MATERIAL TO MODEL THE GEOTECHNICAL PROPERTIES OF...DEVELOPMENT OF A TRANSPARENT MATERIAL TO MODEL THE GEOTECHNICAL PROPERTIES OF...
DEVELOPMENT OF A TRANSPARENT MATERIAL TO MODEL THE GEOTECHNICAL PROPERTIES OF...
 
Chapter 3 soil compaction and field density
Chapter 3 soil compaction and field densityChapter 3 soil compaction and field density
Chapter 3 soil compaction and field density
 
Ib2514451452
Ib2514451452Ib2514451452
Ib2514451452
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and Surveys
 
Stabilisation of clayey soil using silica fume and cement
Stabilisation of clayey soil using silica fume and cementStabilisation of clayey soil using silica fume and cement
Stabilisation of clayey soil using silica fume and cement
 
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
 
Recycle and reuse of Demolished concrete
Recycle and reuse of Demolished concreteRecycle and reuse of Demolished concrete
Recycle and reuse of Demolished concrete
 
Design flexible and rigid pavements
Design flexible and rigid pavementsDesign flexible and rigid pavements
Design flexible and rigid pavements
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
 
Design of pavement on subgrade soil by stabilization
Design of pavement on subgrade soil by stabilizationDesign of pavement on subgrade soil by stabilization
Design of pavement on subgrade soil by stabilization
 
Soil stabilization by using ggbs
Soil stabilization by using ggbsSoil stabilization by using ggbs
Soil stabilization by using ggbs
 
Design of pavement on subgrade soil by stabilization detailed report
Design of pavement on subgrade soil by stabilization detailed reportDesign of pavement on subgrade soil by stabilization detailed report
Design of pavement on subgrade soil by stabilization detailed report
 
Pavement Engineering Materials_4
Pavement Engineering Materials_4Pavement Engineering Materials_4
Pavement Engineering Materials_4
 
Subgrade
SubgradeSubgrade
Subgrade
 
Design and construction of highway (flexible pavement
Design and construction of highway (flexible pavementDesign and construction of highway (flexible pavement
Design and construction of highway (flexible pavement
 
Pavement materials in Road Construction
Pavement materials in Road ConstructionPavement materials in Road Construction
Pavement materials in Road Construction
 
Compaction of soil
Compaction of soilCompaction of soil
Compaction of soil
 
Compaction and Drainability 01
Compaction and Drainability 01Compaction and Drainability 01
Compaction and Drainability 01
 
IRJET- A Study on Reclaimed Asphalt Pavement (RAP)Material using Sub-Grade La...
IRJET- A Study on Reclaimed Asphalt Pavement (RAP)Material using Sub-Grade La...IRJET- A Study on Reclaimed Asphalt Pavement (RAP)Material using Sub-Grade La...
IRJET- A Study on Reclaimed Asphalt Pavement (RAP)Material using Sub-Grade La...
 

Similaire à Road Subgrade Design- Sustainable ecologically friendly road construction

FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
DolanGhosh4
 

Similaire à Road Subgrade Design- Sustainable ecologically friendly road construction (20)

EarthZyme 2013; SMART
EarthZyme 2013; SMARTEarthZyme 2013; SMART
EarthZyme 2013; SMART
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
1 (1)
1 (1)1 (1)
1 (1)
 
Project presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash GargProject presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash Garg
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigid
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 
INTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdfINTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdf
 
Settlement of flexible pavement of Sangli-Islampur road- A case study
Settlement of flexible pavement of Sangli-Islampur road- A case studySettlement of flexible pavement of Sangli-Islampur road- A case study
Settlement of flexible pavement of Sangli-Islampur road- A case study
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
 
road construction
road constructionroad construction
road construction
 
Polymer road technology
Polymer road technologyPolymer road technology
Polymer road technology
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
Shamsudin masoud PPT (Principle of Soil and Soil Compaction.ppt
Shamsudin masoud PPT (Principle of Soil  and Soil Compaction.pptShamsudin masoud PPT (Principle of Soil  and Soil Compaction.ppt
Shamsudin masoud PPT (Principle of Soil and Soil Compaction.ppt
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Compaction of soils
Compaction of soilsCompaction of soils
Compaction of soils
 
Geotechnical Engineering-I [Lec #13: Soil Compaction]
Geotechnical Engineering-I [Lec #13: Soil Compaction]Geotechnical Engineering-I [Lec #13: Soil Compaction]
Geotechnical Engineering-I [Lec #13: Soil Compaction]
 
EarthZyme - Paving a New Way For Haul Road Construction
EarthZyme - Paving a New Way For Haul Road Construction EarthZyme - Paving a New Way For Haul Road Construction
EarthZyme - Paving a New Way For Haul Road Construction
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
 

Plus de MECandPMV

Plus de MECandPMV (20)

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structures
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutants
 
Standards for mobile towers
Standards for mobile towersStandards for mobile towers
Standards for mobile towers
 
Risk management
Risk managementRisk management
Risk management
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificates
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & priorities
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at height
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential development
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniques
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet management
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & Applications
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & cost
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructure
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistance
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to service
 

Dernier

young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
rajputriyana310
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Basel Ahmed
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 

Road Subgrade Design- Sustainable ecologically friendly road construction

  • 1. Road Subgrade Design – Sustainable ecologically friendly road construction Middle East concrete Seminar - Big 5 Dubai 18 Nov 2014 Abdullah Bdeir Director ATCCo – Chairman Jordan GBC
  • 2. • Non-toxic clay-based soil stabilizer • 100% Biodegradable • Reduced road maintenance costs • Increased and lasting compaction 2
  • 3. Benefits: •100% environmentally friendly •Reduces maintenance requirements and costs •Reduces reliance on costly aggregates and gravel •Allows for use of high clay content soils •Reduces the permeability of a treated soil •Increases the density of treated soils •Increases the CBR (California Bearing Ratio) or strength of treated soils 3
  • 4. EarthZyme’s application will result in higher CBR values (a measure of soil strength) and will allow for the use of marginal soil materials therefore reducing the standard reliance on expensive aggregates and gravels. 4
  • 5. 5 0 50 100 150 200 250 300 CBRValue A B C B E F No EZ CBR 43 12 37 55 69 14 EZ CBR 196 37 135 102 296 41 Increase in CBR Values
  • 6. 6
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. Before EarthZyme After EarthZyme EarthZyme is 100% biodegradable and works on the clay-based fraction of the soil. After EarthZyme’s application, the clay particles in the soil are no longer attracted to water, allowing for any water present in the soil to drain away freely resulting in the clay/soil particles settling closer together and producing lasting soil stabilization. 10
  • 11. EarthZyme reacts permanently with clay in the soil to produce long-term stabilization. Other products glue the clay particles together. Once the glue is gone... so are the results of the stabilization process. Because EarthZyme uses the clay as the glue, which remains in the soil indefinitely, it produces the long term effects that are desired. 11
  • 12. 12
  • 13. 13
  • 14. 14
  • 15. The EarthZyme stabilized soil will have a lower permeability due to increased soil density resulting in a harder, more durable road in both dry and wet weather. 15
  • 16. 16 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 VerticalSwell(mm) Caupicho Quito Ecuador Hainan Province Transport Construction Quality Control Department (2007) Hainan Province Transport Construction Quality Control Department (2005) Metropolitan District of Quito Ecuador EarthZyme 0.3 0.08 0.06 0.01 Untreated 0.81 0.26 0.28 0.32 Reduction in Swell
  • 17. Once applied, EarthZyme will reduce the tendency for a road to exhibit common maintenance problems such as wash-boarding, rutting, heaving, potholing and dust. T 17
  • 18. EarthZyme has also resulted in reduced rolling resistance and racking events on heavy haul trucks. Extending the economic life of haul trucks. 18
  • 19. 19 A B C B E F 353% 208% 265% 85% 328% 192% CBR Avg. Percent Change A B C B E F Naco Golf Country Club Consorcio San Ignacio Argentina Huiyang District Pontifical Catholic University of Peru Ghana Highway Authority University of Piura
  • 20. EarthZyme is supplied in liquid form and is applied using standard equipment and techniques. 20
  • 21. EarthZyme is super-concentrated, therefore making the product’s cost negligible per kilometer or mile of road treated compared to alternative products or standard maintenance costs of non-stabilized, unpaved roads. 21
  • 22. Verification of Soil Compatibility: Prior to any EarthZyme application, a soil analysis must be conducted to verify compatibility with EarthZyme. Tests Needed: A) Dry Density/Moisture Content Relation Proctor Test ASTM_D698 B) Liquid Limit, Plastic Limit and Plastic Index Test (Atterberg Limits) ASTM D4318-10 C) Particle Size Analysis ASTM D422 D) Hydrometer Analysis ASTM D1140 22
  • 23. 23
  • 24. 25
  • 25. Application: STEP 1 Scarify or till the soil to the required depth (50 cm’s minimum for haul roads). 26
  • 26. Application: STEP 2 Spray the EarthZyme and water mixture onto the soil. 27
  • 27. Application: STEP 3 (Example) Road Length = 1000 m (1 km) Road Width = 40 m Depth = 0.50 m (50 cm)  Volume Soil = 20,000 m3 (compacted)  Amount of EarthZyme  (EarthZyme is applied on average 1 liter / 33 m3 of compacted soil) = 20,000 m3 divided by 33 m3 = 629 liters of EarthZyme *An optional slurry application of EarthZyme may be recommended, see step 7 28
  • 28. Application: STEP 3 Cont’d… (Optimal Moisture) Say the current moisture content is 7 %, The optimum moisture content is 11 % and the soil has a density of 2.2 tons/m3  Required moisture to be added: = (11 % - 7 %) x 2.2 x 20,000 m3 (compacted soil) = 1,760,000 liters of water 29
  • 29. Application: STEP 3 Cont’d… (Optimal Moisture) Say the current moisture content is 7 %, The optimum moisture content is 11 % and the soil has a density of 2.2 tons/m3  Required moisture to be added: = (11 % - 7 %) x 2.2 x 20,000 m3 (compacted soil) = 1,760,000 liters of water At 2% below OMC = 800,000 liters of water 30
  • 30. Application: STEP 3 Cont’d… (Optimal Moisture) Bring the soil up to OMC (optimum moisture content) by adding more water during the mixing process. 31
  • 31. Application: STEP 4: Mix the soil, EarthZyme and water to the desired consistency. 32
  • 32. Application: STEP 4 (Optional Equipment) If a reclaimer is not available a grader can be used to mix the water and EarthZyme into the soil. 33
  • 33. Application: STEP 5: Shape the road as per the engineer’s specifications. 34
  • 34. Application: STEP 6: Compact to reach MDD or higher for maximum CBR value. 35
  • 35. Application: STEP 7 7: Apply a slurry of EarthZyme and water to help seal the road. 36
  • 36. Application: STEP 8: Continue compacting after the slurry application has been applied. 37
  • 37. Application: STEP 9: Always make sure that there is proper drainage on the road. 38
  • 38. Application: STEP 10: Once compaction is complete, the road is ready to be opened to traffic. 39
  • 39. Applications: • Primary roads • Secondary Roads • Municipal Roads • Forest roads • Construction in progress • Parking • Container Terminals • Trails • Runways • Levees 40
  • 40. Works carried out ... Romania Before After Chip Seal Surface EarthZyme 41
  • 41. Texas, USA At Mexico Border 42
  • 47. China Shenzhen - Container Storage Yard Shenzhen - EarthZyme Compaction Shenzhen - Two Years Later Guangzhou - Before Guangzhou - After EarthZyme Application Guangzhou - With Chip Seal 48
  • 48. China continued… Huiyan - Before Huiyan - EarthZyme application Huiyan - Paved Surface Fushan - Before Fushan - EarthZyme with Gravel Wearcoat Fushan - After numerous monsoons 49
  • 49. Required Equipment: •Pulverizing Mixer/Reclaimer •Haul Truck • Water Truck •Grader • Steel Drum Roller/Vibrator 50
  • 50. Pneumatic Roller Sheeps Foot Roller Optional Equipment Needed: 51
  • 51. Reference letters and lab reports pertaining to successful past EarthZyme projects are available upon request. 52