SlideShare une entreprise Scribd logo
1  sur  31
CONSTRUCTION MANAGEMENT 
BCM 544 
(CONSTRUCTION TECHNOLOGY IV) 
AP246 5P(PLK) 
PREPARED FOR: 
EN. MUHAMMAD KAMAL BIN AHMAD 
Prepared by: 
MUHAMMAD SADDAM BIN HUSSIN 2013187865 
EZMEEL ASRIL BIN KAMARULZAMAN 2013513717 
MOHD IZWAN FAZLY BIN ISMAIL 
2013795881 
AHMAD KHAIR BIN YAHAYA 2013109191
1.1 OBJECTIVE OF STUDY 
The purpose we do this assignment and case study is to achieve this following objective: 
1 To study the types of intelligent building dimension used at the building 
2 To study the intelligent building system operation and process 
1.2 MATHOD OF STUDY 
1.2.1 Primary Data 
i. Observation 
Observation that carried out of those building which is used system of the intelligent building 
ii. Case study 
To obtain a simple explanation by using a case from studies, to be acquired. Case study carried out in those building and also from 
contractors who managed the facilities by gathering all information through observation and interview. 
iii. Interview 
With interview skilled and experienced individual on report subject. 
1.2.2 Secondary Data 
a. Reading source 
Reading resources from book or article that have relevance in intelligent building system 
b. Electronic media 
Obtain information through internet from related website. , this method use to obtain information particularly on theoretical 
part.
Kompleks Kerja Raya (KKR 2) 
Kompleks Kerja Raya 2 (KKR2) is a 6-block office complex master plan on 
an existing 1 million sq ft site, strategically located at Jalan Sultan Salahuddin, 
Kuala Lumpur. 
KKR Tower provides 37-levels of accommodation for Jabatan Kerja Raya 
(JKR). The tower creates a centralized location for JKR’s growing workforce 
while uplifting JKR’s image. The ‘diamond’ facade concept represents 
Kompleks Kerja Raya’s role as ‘a diamond in the crown of the Malaysian 
construction industry’ by being a ‘Diamond in KL City’.
Summary of Project
Location of Construction Building
Design Principles and Characteristic
Design Parameters 
The ‘diamond’ façade concept represents Kompleks Kerja raya’s role as ‘diamond in th 
crown of the Malaysian construction industry’. KKR2 tower comprises three facades. ‘A’ & 
‘B’ are mirrored with ‘C’ at rear.
Design & Construction Consideration 
Orientation sun 
These rectangular frames are also split diagonally 
resulting in upper and lower triangular glass components 
6284 numbers including upper level roof angled pieces. 
Tilting these triangles inwards within frame allows an 
incremental response to the shifting geometry, level 
by level to create a curve facade. These triangular 
insulated glazing units comprise 3 pieces of glass at top 
and bottom. 
East west glazing orientation, facade A&B enables 
this play to façade design allowing natural sun shading by 
glazing detail and the external mounted ‘fin’ elements 
1600 unique numbers 6.4 km long. Each fin acts as both 
shading and design feature expressing curvature and 
verticality.
Design Elements Of KKR 2 Building 
Terraced roof garden 
Two building components create the ‘roof’ a terraced roof garden 
between level 32 & 35 and independent canopy above. Respectively 
they are key factors within the GBI initiative. The green roof, 
accessible at each level, enjoys fantastic views while sun shading is 
provided by louvered canopy above both canopy and 50% open 
glazing at front facades A&B allows both airflow and weather protection 
for visitors to arguable Kuala Lumpur highest garden.
Crane for maintenance 
Mean while at level 37 a centrally located building 
maintenance unit crane has a telescopic reach of 32 
meters one of the longest in Asia.
Front columns A1 &B1 are the straightest whereas 
A11 & B11 are the most angled to meet this 
curvature facade ‘C’ design curve facade C design 
curves in two planes a parabolic geometry. That 
structural design evolved from original structural 
design concept where columns were square, 
enabling a smooth currying geometry. A slip form 
reinforced structural core construction remains 
constant while the adjoining finger beams to 
slating columns shifts at every level, a further 
outer ring beam near slab edge, connects columns. 
A minimum of 600mm glazing zone between 
column and slab edge receives the 450mm depth 
glazing units. 
Columns of building
Design Process And Tools 
The Kompleks Kerja Raya 2 (KKR 2) building used a 
skeleton frame because the system is commonly used in 
Malaysia and it is more suitable for a tall building. Even 
the skeleton frame is difficult to construct due to many 
structures members but the construction process is 
more faster because the project is used a formwork 
systems. The installation of formwork systems is easy to 
dismantle and used back for a next floor level with a 
short time period. Therefore, this site used 2 unit of 
supported static tower crane to make sure the material 
and tool easy to lifted. Besides that, during construction, 
concrete pump also have used to pump the concrete to 
above level with fast.
Design Elements Of KKR 2 Tall Building 
Each level is unique as unique as 
incrementally the geometry 
shifts upward the triangular 
footprint tapers upward into 
‘leaf shaped upper levels. There 
are 10 circular columns slating in 
two directions, mirrored at each 
side A&B of tower ranging from 
a 1400mm diameter at low levels 
to 800mm at highest.
Key Component Of The Structure
Rigid Frame and Core at Kompleks Kerja Raya 2 (KKR 2) 
Rigid frame system as to achieving lateral 
stability in areas of low seismic activities, 
or somewhat less in height in areas of 
greater seismic activity Rigid frame 
structures may be less attractive option 
due to greater difficulty of their 
fabrication because of many 
structures member and the increased size 
of the beams and columns required. It 
combines with core structures to increase 
the lateral resistance. Core structures are 
the most commonly used system to 
stabilize tall buildings
Foundation structure 
Bored pile and pile cap 
Kompleks Kerja Raya 2 (KKR 2) used bored piles as a 
foundation for the building. The construction for bored 
pile work took 6 months. There are two elements for 
bored piles which pile cap and the pile. Bored piles can 
be constructed using a number of methods. The 
simplest method is using an auger to remove the soil 
and replace it with concrete and reinforcement.
Vertical and Horizontal Loading Systems 
Skeleton Frame System- Reinforced concrete 
One of the great technological changes of the 
nineteenth century was the introduction of skeleton 
framing as the common method of supporting large 
buildings. Skeleton frames, which use a system of 
columns and beams to support a building’s interior 
floors and exterior walls. Skeleton frame system is 
commonly used in Malaysia. The Kompleks Kerja 
Raya 2 (KKR 2) building used a skeleton frame because 
the system is commonly used in Malaysia and it is more 
suitable for a tall building. Even the skeleton frame is 
difficult to construct due to many structures members 
but the construction process is more faster because the 
project is used a formwork systems
Roof Steel structures 
The structure component used roof at Kompleks Kerja 
Raya (KKR 2) is steel structure. The members of steel 
structure are made of steel and are joined by welding, 
riveting and bolting. Because of the high strength of 
steel, these structures are reliable and require less 
material than other types of structures. Fabrication and 
installation of steel structures are realized through 
industrial methods.
Façade of the Building
Main Materials And Finishes
Planning And Controlling
kkr 2
kkr 2
kkr 2
kkr 2
kkr 2

Contenu connexe

Tendances

Petronas twin tower
Petronas twin towerPetronas twin tower
Petronas twin towerSomya Gupta
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysialimziahuei
 
Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report hongbinng
 
presentation on petronas twin tower
 presentation on petronas twin tower presentation on petronas twin tower
presentation on petronas twin towerKaish Pasha
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
 
Building Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- TowerBuilding Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- Towerhiewyennee
 
Green Building Index
Green Building IndexGreen Building Index
Green Building IndexBC Chew
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Adila Zaas
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
Lantern Hotel Analysis - Part 1B
Lantern Hotel Analysis - Part 1BLantern Hotel Analysis - Part 1B
Lantern Hotel Analysis - Part 1BSoule Teh
 
Building services group report
Building services group report Building services group report
Building services group report XingYue0907
 
Culture History Report
Culture History ReportCulture History Report
Culture History ReportYung Kai
 
Long span structures
Long span structures  Long span structures
Long span structures Aroh Thombre
 
Building Service Chapter 6
Building Service Chapter 6Building Service Chapter 6
Building Service Chapter 6Izam Lukman
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 

Tendances (20)

Petronas twin tower
Petronas twin towerPetronas twin tower
Petronas twin tower
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
 
klcc
klccklcc
klcc
 
Petronas Towers
Petronas TowersPetronas Towers
Petronas Towers
 
Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Petronas tower
Petronas towerPetronas tower
Petronas tower
 
presentation on petronas twin tower
 presentation on petronas twin tower presentation on petronas twin tower
presentation on petronas twin tower
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
Building Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- TowerBuilding Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- Tower
 
Green Building Index
Green Building IndexGreen Building Index
Green Building Index
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Lantern Hotel Analysis - Part 1B
Lantern Hotel Analysis - Part 1BLantern Hotel Analysis - Part 1B
Lantern Hotel Analysis - Part 1B
 
Building services group report
Building services group report Building services group report
Building services group report
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Culture History Report
Culture History ReportCulture History Report
Culture History Report
 
Long span structures
Long span structures  Long span structures
Long span structures
 
Building Service Chapter 6
Building Service Chapter 6Building Service Chapter 6
Building Service Chapter 6
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 

Similaire à kkr 2

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...IRJET Journal
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingAnupama Krishnan
 
munjushreeshindepapaer.doc
munjushreeshindepapaer.docmunjushreeshindepapaer.doc
munjushreeshindepapaer.docff2403522
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniquekvijay31
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....MSulmanSarwar
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeSmee Kaem Chann
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down methodDarshan Parakhiya
 
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...IRJET Journal
 
B tech project 2
B tech project 2B tech project 2
B tech project 2Pei Di
 

Similaire à kkr 2 (20)

Internship report
Internship reportInternship report
Internship report
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Btech
BtechBtech
Btech
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal Building
 
munjushreeshindepapaer.doc
munjushreeshindepapaer.docmunjushreeshindepapaer.doc
munjushreeshindepapaer.doc
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquake
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 

Dernier

Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...poojakaurpk09
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...nirzagarg
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
WhatsApp Chat: 📞 8617697112 Call Girl Baran is experienced
WhatsApp Chat: 📞 8617697112 Call Girl Baran is experiencedWhatsApp Chat: 📞 8617697112 Call Girl Baran is experienced
WhatsApp Chat: 📞 8617697112 Call Girl Baran is experiencedNitya salvi
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Real service provider college girl Mira Road 8976425520
Real service provider college girl Mira Road 8976425520Real service provider college girl Mira Road 8976425520
Real service provider college girl Mira Road 8976425520modelanjalisharma4
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...amitlee9823
 

Dernier (20)

Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
WhatsApp Chat: 📞 8617697112 Call Girl Baran is experienced
WhatsApp Chat: 📞 8617697112 Call Girl Baran is experiencedWhatsApp Chat: 📞 8617697112 Call Girl Baran is experienced
WhatsApp Chat: 📞 8617697112 Call Girl Baran is experienced
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Real service provider college girl Mira Road 8976425520
Real service provider college girl Mira Road 8976425520Real service provider college girl Mira Road 8976425520
Real service provider college girl Mira Road 8976425520
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
 

kkr 2

  • 1. CONSTRUCTION MANAGEMENT BCM 544 (CONSTRUCTION TECHNOLOGY IV) AP246 5P(PLK) PREPARED FOR: EN. MUHAMMAD KAMAL BIN AHMAD Prepared by: MUHAMMAD SADDAM BIN HUSSIN 2013187865 EZMEEL ASRIL BIN KAMARULZAMAN 2013513717 MOHD IZWAN FAZLY BIN ISMAIL 2013795881 AHMAD KHAIR BIN YAHAYA 2013109191
  • 2. 1.1 OBJECTIVE OF STUDY The purpose we do this assignment and case study is to achieve this following objective: 1 To study the types of intelligent building dimension used at the building 2 To study the intelligent building system operation and process 1.2 MATHOD OF STUDY 1.2.1 Primary Data i. Observation Observation that carried out of those building which is used system of the intelligent building ii. Case study To obtain a simple explanation by using a case from studies, to be acquired. Case study carried out in those building and also from contractors who managed the facilities by gathering all information through observation and interview. iii. Interview With interview skilled and experienced individual on report subject. 1.2.2 Secondary Data a. Reading source Reading resources from book or article that have relevance in intelligent building system b. Electronic media Obtain information through internet from related website. , this method use to obtain information particularly on theoretical part.
  • 3. Kompleks Kerja Raya (KKR 2) Kompleks Kerja Raya 2 (KKR2) is a 6-block office complex master plan on an existing 1 million sq ft site, strategically located at Jalan Sultan Salahuddin, Kuala Lumpur. KKR Tower provides 37-levels of accommodation for Jabatan Kerja Raya (JKR). The tower creates a centralized location for JKR’s growing workforce while uplifting JKR’s image. The ‘diamond’ facade concept represents Kompleks Kerja Raya’s role as ‘a diamond in the crown of the Malaysian construction industry’ by being a ‘Diamond in KL City’.
  • 6. Design Principles and Characteristic
  • 7. Design Parameters The ‘diamond’ façade concept represents Kompleks Kerja raya’s role as ‘diamond in th crown of the Malaysian construction industry’. KKR2 tower comprises three facades. ‘A’ & ‘B’ are mirrored with ‘C’ at rear.
  • 8. Design & Construction Consideration Orientation sun These rectangular frames are also split diagonally resulting in upper and lower triangular glass components 6284 numbers including upper level roof angled pieces. Tilting these triangles inwards within frame allows an incremental response to the shifting geometry, level by level to create a curve facade. These triangular insulated glazing units comprise 3 pieces of glass at top and bottom. East west glazing orientation, facade A&B enables this play to façade design allowing natural sun shading by glazing detail and the external mounted ‘fin’ elements 1600 unique numbers 6.4 km long. Each fin acts as both shading and design feature expressing curvature and verticality.
  • 9. Design Elements Of KKR 2 Building Terraced roof garden Two building components create the ‘roof’ a terraced roof garden between level 32 & 35 and independent canopy above. Respectively they are key factors within the GBI initiative. The green roof, accessible at each level, enjoys fantastic views while sun shading is provided by louvered canopy above both canopy and 50% open glazing at front facades A&B allows both airflow and weather protection for visitors to arguable Kuala Lumpur highest garden.
  • 10. Crane for maintenance Mean while at level 37 a centrally located building maintenance unit crane has a telescopic reach of 32 meters one of the longest in Asia.
  • 11. Front columns A1 &B1 are the straightest whereas A11 & B11 are the most angled to meet this curvature facade ‘C’ design curve facade C design curves in two planes a parabolic geometry. That structural design evolved from original structural design concept where columns were square, enabling a smooth currying geometry. A slip form reinforced structural core construction remains constant while the adjoining finger beams to slating columns shifts at every level, a further outer ring beam near slab edge, connects columns. A minimum of 600mm glazing zone between column and slab edge receives the 450mm depth glazing units. Columns of building
  • 12. Design Process And Tools The Kompleks Kerja Raya 2 (KKR 2) building used a skeleton frame because the system is commonly used in Malaysia and it is more suitable for a tall building. Even the skeleton frame is difficult to construct due to many structures members but the construction process is more faster because the project is used a formwork systems. The installation of formwork systems is easy to dismantle and used back for a next floor level with a short time period. Therefore, this site used 2 unit of supported static tower crane to make sure the material and tool easy to lifted. Besides that, during construction, concrete pump also have used to pump the concrete to above level with fast.
  • 13. Design Elements Of KKR 2 Tall Building Each level is unique as unique as incrementally the geometry shifts upward the triangular footprint tapers upward into ‘leaf shaped upper levels. There are 10 circular columns slating in two directions, mirrored at each side A&B of tower ranging from a 1400mm diameter at low levels to 800mm at highest.
  • 14. Key Component Of The Structure
  • 15. Rigid Frame and Core at Kompleks Kerja Raya 2 (KKR 2) Rigid frame system as to achieving lateral stability in areas of low seismic activities, or somewhat less in height in areas of greater seismic activity Rigid frame structures may be less attractive option due to greater difficulty of their fabrication because of many structures member and the increased size of the beams and columns required. It combines with core structures to increase the lateral resistance. Core structures are the most commonly used system to stabilize tall buildings
  • 16. Foundation structure Bored pile and pile cap Kompleks Kerja Raya 2 (KKR 2) used bored piles as a foundation for the building. The construction for bored pile work took 6 months. There are two elements for bored piles which pile cap and the pile. Bored piles can be constructed using a number of methods. The simplest method is using an auger to remove the soil and replace it with concrete and reinforcement.
  • 17. Vertical and Horizontal Loading Systems Skeleton Frame System- Reinforced concrete One of the great technological changes of the nineteenth century was the introduction of skeleton framing as the common method of supporting large buildings. Skeleton frames, which use a system of columns and beams to support a building’s interior floors and exterior walls. Skeleton frame system is commonly used in Malaysia. The Kompleks Kerja Raya 2 (KKR 2) building used a skeleton frame because the system is commonly used in Malaysia and it is more suitable for a tall building. Even the skeleton frame is difficult to construct due to many structures members but the construction process is more faster because the project is used a formwork systems
  • 18. Roof Steel structures The structure component used roof at Kompleks Kerja Raya (KKR 2) is steel structure. The members of steel structure are made of steel and are joined by welding, riveting and bolting. Because of the high strength of steel, these structures are reliable and require less material than other types of structures. Fabrication and installation of steel structures are realized through industrial methods.
  • 19. Façade of the Building
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Main Materials And Finishes