CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
Preface
The Code is designed to assist:
.1 shipowners, operating companies and ship’s staff;
.2 port industries, shippers and pre-packaging organizations, which are involved in
preparation, loading, and stowing of timber deck cargoes; and
.3 Administrations, manufacturers and designers of the ship and equipment
associated with the carriage of timber deck cargoes and those developing cargo
securing manuals,

Purpose of the code
The purpose of the Code is to ensure that timber deck cargoes are so loaded, stowed and
secured as to prevent as far as practicable, damage or hazard to the ship
and persons on board as well as loss of cargo overboard.
The Code provides:
.1 practices for safe transportation;
.2 methodologies for safe stowage and securing;
.3 design principles for securing systems;
.4 procedures and instructions to be included in ships’ cargo securing manuals on
safe stowage and securing; and
.5 sample checklists for safe stowage and securing.

Application
The requirements of this Code apply to all ships of 24 metres or more in length, carrying
a timber deck cargo.
Timber load line means a special load line assigned to ships complying with
certain conditions set out in the International Convention on Load Lines and used
when the cargo complies with the stowage and securing conditions of this Code.
Weather deck means the uppermost complete deck exposed to weather and sea.
Stowage Factor (SF) means the volume occupied by one tonne of a cargo when
stowed and separated in the accepted manner.

1
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
QUESTION: YOU ARE A CHIEF MATE / MASTER ON A VESSEL TO CARRY
TIMBER?
I shall refer to the CODE OF SAFE PRACTICE FOR SHIPS CARRYING TIMBER
DECK CARGOES which will give me the following information
General Recommendations on Stowage and Securing of Timber Deck Cargoes
Pre-loading operation
Permitted Loading Weights on decks and hatch covers
Stability
Load line
Timber freeboard
Visibility
Work Safety and Work Environment Aspects
Stowage
Post-loading operation.
Voyage planning
Cargo Securing Manual
The code also has 5 annexes
ANNEX 1 – Sample Checklists
ANNEX 2 – Visibility
ANNEX 3 – Physical Properties of Timber Cargoes
ANNEX 4 – Denotations Used in Design Criteria
ANNEX 5 – Samples of Stowage and Securing Methods

3.4 Safety Factors
3.4.1 Safety factors are to be used when:
.1 calculating the Maximum Securing Load (MSL) of the lashings from the
Minimum Breaking Load (MBL);
.2 calculating the maximum allowed Calculated Strength (CS) in the lashings as
function of MSL.
3.4.2 MSL as function of the MBL should be taken according to annex 13 of the CSS Code.
3.4.3 The maximum allowed Calculated Strength (CS) in lashings

3.6 Documentation
3.6.1 Each cargo securing arrangement for timber deck cargoes should be documented in the
ships Cargo Securing Manual in accordance with the instructions in MSC/Circ.745.
3.6.2 In the Cargo Securing Manual each stowage and securing arrangements should
additionally be documented by a Lashing Plan showing at least the following:
.1 Maximum cargo weight for which the arrangement is designed,
.2 Maximum stowage height,
.3 Required number and strength of blocking devices and lashings as applicable,

Preparations before Loading of Timber Deck Cargoes
General preparations
The following cargo information as applicable is collected:
• Total weight of cargo booked as deck cargo
• Typical dimensions of the cargo
• Density of the cargo
• Stowage factor of the cargo
2
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
1.A pre-loading plan according to the vessel’s Trim and Stability
 Stowage height
 Weight per m2
 Required amount of water ballast
 Displacement, draft, trim and stability at departure and arrival.
2.During stability calculations, variation in displacement, centre of gravity and free surface
moments due to the following factors are considered:
 Absorption of water in dried or seasoned timber carried as timber deck cargo
 Ice accretion, if applicable
 Loss of weight due to drying
 Variations in consumables
 Ballast water exchange operations.
3.A pre-lashing plan according to the vessel’s Cargo Securing Manual (CSM) is done
4.The certificates for the lashing equipment are available in the vessel’s Cargo Securing Manual.
5.When stability calculations and lashing plan have been satisfactorily carried out, the maximum
cargo intake is confirmed.
6.Pre-load loading and pre-lashing plans are distributed to all involved parties (i.e. supercargo,
stevedores, agent, etc.).
7.Weather report for loading period and forecasted weather for the sea voyage is checked.
Vessel readiness
1.All ballast tanks required for the voyage and included in the stability calculations are filled
before commencing loading on deck and it is ensured that tanks are completely full or empty
to minimize the amount of free surfaces.
2.Hatch covers and other openings to spaces below deck are closed, secured and battened down.
3.Air pipes, ventilators and check-valves are protected and examined to ascertain their
effectiveness against entry of water.
4.Objects which might obstruct cargo stowage on deck are removed and secured safely in places
appropriate for storage.
5.Accumulations of ice and snow on loading area are removed.
6.All sounding pipes on the deck are reviewed and necessary precautions are taken that safe
access to these remains, and that they are not over stowed.
7.It is controlled that illumination on deck is working and ready for use.
Ship-to-shore communication
1.Radio channels to be used during cargo operations are assigned and tested.
2.It is confirmed that crane drivers and loading stevedores/crew understands signals to be used
during cargo operations.
3.A plan is worked out for possible ceasing of the loading operations due to deteriorating
weather.

3
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
PP equipments
1.It is made sure that personnel involved in the loading process are aware of all requirements
regarding protective clothing,

Safety during Loading and Securing of Timber Deck Cargoes
1.If applicable, uprights are mounted before loading on deck is commenced.
2.Cargo securing equipment has been examined in preparation for use in securing of timber deck
cargoes and any defective equipment found has been removed from service, tagged for
repair and replaced.
Vessel’s safety
1.All loading operations are planned to immediately cease if a list develops for which there is no
satisfactory explanation
2.In the event that the vessel takes up an unexplained list, then no further work to be undertaken
until all ship’s tanks are sounded and assessment made of the ship’s stability condition.
3.The loading operations are ceased if the weather condition deteriorating significantly.
4.Draft surveys are regularly carried out during the course of loading and the ship’s displacement
is calculated to ensure that the ship is not over loaded.
5.Permitted loading weights on deck and hatches are not exceeded.
6.The stability of the vessel is at all times positive and in compliance with the vessels intact
stability requirements.
7. Emergency escape routes are free and ready for use.
8.Any obstruction such as lashings or securing points in the access way of escape routes and
spaces essential to operation of the vessel, such as machinery spaces and crew’s quarters, as
well as obstructions to safety equipment, fire fighting equipment and sounding pipes are kept
to minimum
Stowage
1.The stow of the deck cargo is as solid and compact as practicable and the cargo is tightly
stowed. This is as far as practicable obtained within the stow to minimize the risk of cargo
shifting during the sea voyage.
2.Cargo is not stowed overhanging the ship’s side
Work safety
1.Personnel involved in the loading process are equipped with protective clothing, i.e. hardhats,
proper footwear, gloves etc
2.Personnel working on cargo stowed at heights 2 metres and above are protected from falls with
fall restraint equipment such as a safety harness or other approved fall restraining devices.
3.All possible actions are taken to minimize the risk of slipping on the cargo (i.e. when plastic
wrapping or tarpaulins are used as covers).
4.Illumination is working when required during the cargo operation.

4
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
Securing of Timber Deck Cargoes
1.The stevedoring company and the crew are informed about the requirements on the securing
arrangements.
2.If required, extra lashing points are welded to the vessel with strength according to the vessel’s
Cargo Securing Manual.
3.Only undamaged cargo securing equipment is used for the securing of the timber deck cargoes.
4.If any damage is noted on the fixed lashing equipment this is immediately repaired.
5.If any damage is noted on the portable lashing equipment this is immediately repaired or the
equipment is exchanged by new certified equipment.
6.All lashings are thoroughly tightened and all bolts and screws on shackles and turnbuckles are
tightly fastened.Turnbuckles have sufficient threads remaining to permit lashings to be
tightened during the voyage if needed.
IMPORTANT:
 The timber deck cargo is secured according to the vessel’s Cargo Securing
Manual and the manual is approved by the Administration.
 Number and strength of uprights and lashing equipment used for the securing of the
timber deck cargo is in accordance with the vessel’s Cargo Securing Manual
approved by the Administration.
 Certificates for the lashing equipment used are enclosed with the vessel’s Cargo
Securing Manual.

Actions to be Taken during the Voyage
1.Before the vessel proceeds to sea, the following are verified:
• The ship is upright
• The ship has an adequate metacentric height
• The ship meets the required stability criteria
• The cargo is properly secured.
2.Soundings of tanks are continuously carried out throughout the voyage.
3.In cases where severe weather and sea conditions are unavoidable, the Master should be
conscious of the need to reduce speed and/or alter course at an early stage in order to minimize
damage to cargo and lashing
4.If deviation from the intended voyage plan is considered during the voyage, a new plan should
be made.
Cargo Safety Inspections during Sea Voyages
Cargo Safety Inspections, in accordance with the items below, are continuously checked
throughout the voyage.
Prior to any inspections being commenced on deck, the Master has taken appropriate
actions to reduce the motions of thevessel during such operations.
No movement of the cargo which would threaten the safety of the vessel has occurred.
All lashing equipment are visually examined for any abnormal wear or tear or other
damages.

5
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
List during voyage
1.If a list occurs that is not caused by normal use of consumables, it is immediately determined if
such list can be attributed to one of the three causes, or possibly a combination of same:
• Cargo shift
• Water ingresses
• The angle of loll (poor stability).
2.The possibility of water ingress is determined by sounding throughout the vessel. In the event
that unexplained water is detected, all available pumps are used to bring the situation under
control.
3.If the list is corrected by ballasting and deballasting operations, the order in which tanks are
filled and emptied is decided with consideration to the following factors:
If ballast have been shifted to counteract a cargo shift or water ingress, a far greater list
may rapidly develop to the opposite side
If the list is due to the ship lolling, and if empty divided double bottom space is
available, the tank on the lower side should be ballasted first in order to immediately
provide additional metacentric height – after which the tank on the high side should also
be ballasted
Free surface moments should be kept at a minimum by operating only one tank at a time.
If the list is corrected by jettisoning deck cargo, the following aspects are noted:
Jettisoning is unlikely to improve the situation as the whole stack would probably not
fall at once
Severe damage may be sustained by the propeller if it isstill turning when the timber is
jettisoned.
If the whole or partial timber deck load is either jettisoned or accidentally lost overboard, the
information on a direct danger to navigation is communicated by the master by all means at
his disposal to the following parties:
Ships in the vicinity
Competent authorities
Such information is to include the following:
The kind of danger
The position of the danger when last observed
The time and date (coordinated universal time) when the danger was last observed.

6
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
Safety during Discharge of Timber Deck Cargoes
Cargo Securing Equipment
1.The cargo securing equipment is collected and examined and damaged equipment is either
repaired or scrapped.
2.Uprights, when used, are well fastened to the deck or hatch coamings of the vessel and
protected from falling inwards during discharging operations.
Vessel’s Safety
1.All loading operations to immediately cease if a list develops for which there is no satisfactory
explanation.
2.The stability of the vessel is at all times positive and in compliance with the vessels intact
stability requirements.
3.Emergency escape routes are free and ready for use.
Work Safety
1.Personnel involved in the loading process are dressed with protective clothing, i.e. hardhats,
proper footwear, gloves, etc.,
2 While working on the cargo there are possibilities for safety wires and the use of safety harness
if applicable.
3.Correct signals are used with crane operator(s).
4.Safe access is available to the top of, and across, the cargo stow.
5.Illumination is used when required during the cargo operation.

ANNEX 2 – Visibility
1 According to SOLAS chapter V, the view of the sea surface from the conning position
should not be obscured by more than two ship lengths, or 500 m, whichever is the less, forward
of the bow to 10° on either side under all conditions of draught, trim and deck cargo. National
deviations may exist and should be taken into consideration as required dependent on the
intended voyage.
2 No blind sector, caused by cargo, cargo gear or other obstructions outside of the
wheelhouse forward of the beam which obstructs the view of the sea surface as seen from the
conning position, should exceed 10°. The total arc of blind sectors should not exceed 20°. The
clear sectors between blind sectors should be at least 5°.

Package Weight Marking
All packages over 1 metric ton should be clearly marked with the weight of the package.
The marking should be clearly visible on the top of the package as well as both long
sides.

Water Absorption
Sea spray may increase the weight of the timber deck cargo and thus influence on the
stability.The value of increased weight of timber deck cargo due to water absorption should be
taken according to the Intact Stability Code.

Weight of Ice
During cold weather conditions ice may form from sea spray and the stability may be
affected as the ice can add weight rapidly. Increasing of the weight due to icing should be taken
according to the Intact Stability Code.
7
CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES
NOTE 1: when can a vessel load to her timber marks?
 When a ship is assigned a timber load line, in order to load to those marks the
vessel must be loaded with a timberdeck cargo which is correctly stowed in
accordance with the deck cargo regulations and the IMO Code of Safe Practice
for Ships Carrying Timber Deck Cargoes, 1991.
 These regulations require that the timber be stowed as solidly as possible to at
least the standard height of the superstructure. For instance, in ships of 125m or
more in length, this equates to a uniform height of not less than 2.3m. In ships
under 125m in length, the stow should reach a uniform height of not less than the
height of the break of the forecastle head.
 If the timber is stowed to a lesser height than indicated above or is not correctly
stowed in any other way, i.e., not the full length of the well or not from side to
side, then the ship is not permitted to load to the timber line.
 When timber is correctly stowed on deck as referred to above, the ship may load
to the timber load line irrespective of the quantity or type of cargo stowed below
decks. The reduction in freeboard enjoyed by a ship which is assigned timber
load lines, is permitted because of the buoyancy contribution of the timber deck
cargo to the ship’s stability characteristics
NOTE 2: When can a vessel be assigned a timber load line?
 In order to be assigned a timber load line along with the usual cargo ship load
lines the vessel must comply with the following construction requirements.
Vessel to have adequate strength at deeper draught
A raised forecastle atleast to the standard height of the superstructure and
extending for atleast 7% of the vessels length. If the vessel is under 100mtrs in
length, there must also be a superstructure aft of atleast standard height
Double bottom tanks,where fitted within the midship half length,must be
subdivided in order to minimise the free surface effects
The ship must be fitted with the permanent bulwarks atleast 1m in height and
suitably stiffened and fitted with freeing ports
NOTE 3: intact stability requirements
 Stability calculations to assess the vessels compliance with minimum stability
criteria should include 15% increase in weight of the timber deck cargo due to
water absorption
 Alternate KN tables taking into account the increase in freeboard due to timber
deck cargo to be used. Such tables must assume reserve buoyancy of 75% of
the total deck timber
 Initial GM not less than 0.05m (SOLAS gives GM not less than 0.10m)
 Max GZ not less than 0.2m and angle of max Gz not less than 30 degrees
 Area under curve upto 30 degrees not less than 0.055mr
 Area under curve upto 40 degrees not less than 0.09mr
 Area between 30 and 40 degrees not less than 0.03mr

8

Contenu connexe

Tendances

Tendances (20)

Cargo lashing
Cargo lashingCargo lashing
Cargo lashing
 
Ports&harbor, some of its parts and modern facilities
Ports&harbor, some of its parts and modern facilitiesPorts&harbor, some of its parts and modern facilities
Ports&harbor, some of its parts and modern facilities
 
İMDG CODES
İMDG CODESİMDG CODES
İMDG CODES
 
Ism cbt
Ism cbtIsm cbt
Ism cbt
 
Ecdis
EcdisEcdis
Ecdis
 
Ship handling
Ship handlingShip handling
Ship handling
 
Bridge resources management lrg
Bridge resources management lrgBridge resources management lrg
Bridge resources management lrg
 
Mlc 2006
Mlc 2006Mlc 2006
Mlc 2006
 
Ship stresses
Ship stresses Ship stresses
Ship stresses
 
Cargo Securing Manual
Cargo Securing ManualCargo Securing Manual
Cargo Securing Manual
 
Bridge Navigational Watch Alarm System
Bridge Navigational Watch Alarm SystemBridge Navigational Watch Alarm System
Bridge Navigational Watch Alarm System
 
Imsbc code pocket guide
Imsbc code pocket guideImsbc code pocket guide
Imsbc code pocket guide
 
MANEUVERING & COLLISION AVOIDANCE
MANEUVERING & COLLISION AVOIDANCEMANEUVERING & COLLISION AVOIDANCE
MANEUVERING & COLLISION AVOIDANCE
 
Personal safety on deck
Personal safety on deckPersonal safety on deck
Personal safety on deck
 
Solas Presentation
Solas PresentationSolas Presentation
Solas Presentation
 
Ships structure-safety
Ships structure-safetyShips structure-safety
Ships structure-safety
 
Ship's Transverse Stability
Ship's Transverse StabilityShip's Transverse Stability
Ship's Transverse Stability
 
Ship Security Training Manual (Sample)
Ship Security Training Manual (Sample)Ship Security Training Manual (Sample)
Ship Security Training Manual (Sample)
 
Berthing and Anchoring
Berthing and AnchoringBerthing and Anchoring
Berthing and Anchoring
 
Rudders and propellers
Rudders and propellersRudders and propellers
Rudders and propellers
 

En vedette

En vedette (20)

Cargo liquefaction
Cargo liquefaction Cargo liquefaction
Cargo liquefaction
 
RESUME - Wayne
RESUME - WayneRESUME - Wayne
RESUME - Wayne
 
Engine speed governors
Engine speed governorsEngine speed governors
Engine speed governors
 
Lesson 24 buoyancy & stability
Lesson 24   buoyancy & stabilityLesson 24   buoyancy & stability
Lesson 24 buoyancy & stability
 
generators
generatorsgenerators
generators
 
Signode Stteel Band operation_manual
Signode Stteel Band operation_manualSignode Stteel Band operation_manual
Signode Stteel Band operation_manual
 
Ac generator
Ac generatorAc generator
Ac generator
 
Naval arch incline test
Naval arch incline testNaval arch incline test
Naval arch incline test
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)
 
Governor
GovernorGovernor
Governor
 
Bulk carrier
Bulk carrierBulk carrier
Bulk carrier
 
Powerpoint spread the load original
Powerpoint spread the load originalPowerpoint spread the load original
Powerpoint spread the load original
 
Governor
GovernorGovernor
Governor
 
Watt Governors
Watt GovernorsWatt Governors
Watt Governors
 
Railwayloco 140218012723-phpapp02
Railwayloco 140218012723-phpapp02Railwayloco 140218012723-phpapp02
Railwayloco 140218012723-phpapp02
 
Governor
GovernorGovernor
Governor
 
Important terminology in governors
Important terminology in governorsImportant terminology in governors
Important terminology in governors
 
Electronic governor
Electronic governorElectronic governor
Electronic governor
 
Governors
GovernorsGovernors
Governors
 
Governor used in vehicles
Governor used in vehiclesGovernor used in vehicles
Governor used in vehicles
 

Similaire à Timber deck code

003_CARGO_SECURING_MANUAL.pdf
003_CARGO_SECURING_MANUAL.pdf003_CARGO_SECURING_MANUAL.pdf
003_CARGO_SECURING_MANUAL.pdfMaanMrabet1
 
D1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlineD1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlinejabbar2002pk200
 
Imo entry into enclosed space permit
Imo entry into enclosed space permitImo entry into enclosed space permit
Imo entry into enclosed space permitPrince Mathew
 
Msf safety-flash-13.09
Msf safety-flash-13.09Msf safety-flash-13.09
Msf safety-flash-13.09Jossian Brito
 
Personal Survival Techniques(PST)
Personal Survival Techniques(PST)Personal Survival Techniques(PST)
Personal Survival Techniques(PST)nmahi96
 
_______ uk-masters-orals
  _______ uk-masters-orals  _______ uk-masters-orals
_______ uk-masters-oralsRabah HELAL
 
Management of shipping (1)
Management of shipping (1)Management of shipping (1)
Management of shipping (1)Fredrick Olali
 
The standard container securing
The standard container securingThe standard container securing
The standard container securingLuis Vitiritti
 
Shipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangementsShipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangementsblacks0u1
 
Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015James Gardiner
 
Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015James Gardiner
 
Effective Management on Safety, Security and Environmental Protection at Sea
Effective Management on Safety, Security and Environmental Protection at SeaEffective Management on Safety, Security and Environmental Protection at Sea
Effective Management on Safety, Security and Environmental Protection at Seasuperman19921992
 
SOLAS Presentation
SOLAS PresentationSOLAS Presentation
SOLAS Presentationrezvi san
 

Similaire à Timber deck code (20)

Masters Guide to Container Securing
 Masters Guide to Container Securing Masters Guide to Container Securing
Masters Guide to Container Securing
 
On board safety
   On board safety    On board safety
On board safety
 
Imsbc
ImsbcImsbc
Imsbc
 
003_CARGO_SECURING_MANUAL.pdf
003_CARGO_SECURING_MANUAL.pdf003_CARGO_SECURING_MANUAL.pdf
003_CARGO_SECURING_MANUAL.pdf
 
D1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlineD1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadline
 
Imo entry into enclosed space permit
Imo entry into enclosed space permitImo entry into enclosed space permit
Imo entry into enclosed space permit
 
Msf safety-flash-13.09
Msf safety-flash-13.09Msf safety-flash-13.09
Msf safety-flash-13.09
 
unit 4.pptx
unit 4.pptxunit 4.pptx
unit 4.pptx
 
Personal Survival Techniques(PST)
Personal Survival Techniques(PST)Personal Survival Techniques(PST)
Personal Survival Techniques(PST)
 
Safety in mooring Operations
Safety in mooring OperationsSafety in mooring Operations
Safety in mooring Operations
 
_______ uk-masters-orals
  _______ uk-masters-orals  _______ uk-masters-orals
_______ uk-masters-orals
 
Management of shipping (1)
Management of shipping (1)Management of shipping (1)
Management of shipping (1)
 
The standard container securing
The standard container securingThe standard container securing
The standard container securing
 
Isps code
Isps codeIsps code
Isps code
 
Shipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangementsShipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangements
 
Packing Cargo Handling Factsheet
Packing Cargo Handling FactsheetPacking Cargo Handling Factsheet
Packing Cargo Handling Factsheet
 
Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015
 
Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015Container Seminar Flyer Singapore 2015
Container Seminar Flyer Singapore 2015
 
Effective Management on Safety, Security and Environmental Protection at Sea
Effective Management on Safety, Security and Environmental Protection at SeaEffective Management on Safety, Security and Environmental Protection at Sea
Effective Management on Safety, Security and Environmental Protection at Sea
 
SOLAS Presentation
SOLAS PresentationSOLAS Presentation
SOLAS Presentation
 

Plus de Maanas Gopinath (17)

Work n rest hours & olb
Work n rest hours  & olbWork n rest hours  & olb
Work n rest hours & olb
 
Solas ffa
Solas ffaSolas ffa
Solas ffa
 
Set 2 gmdss
Set 2  gmdssSet 2  gmdss
Set 2 gmdss
 
Set 1 certificates and survey
Set 1 certificates and surveySet 1 certificates and survey
Set 1 certificates and survey
 
Mgn 71 muster and drills
Mgn 71 muster and drillsMgn 71 muster and drills
Mgn 71 muster and drills
 
Marpol
MarpolMarpol
Marpol
 
Maib
MaibMaib
Maib
 
Isps
IspsIsps
Isps
 
Isps (1)
Isps (1)Isps (1)
Isps (1)
 
Imdg. code
Imdg. codeImdg. code
Imdg. code
 
Health and safety reg
Health and safety regHealth and safety reg
Health and safety reg
 
Emergency response
Emergency responseEmergency response
Emergency response
 
Drills
DrillsDrills
Drills
 
Code of conduct alc & mlc
Code of conduct  alc & mlcCode of conduct  alc & mlc
Code of conduct alc & mlc
 
Certificate list dry
Certificate list   dryCertificate list   dry
Certificate list dry
 
Bridge equipments
Bridge equipmentsBridge equipments
Bridge equipments
 
Ballast water management
Ballast water managementBallast water management
Ballast water management
 

Dernier

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 

Dernier (20)

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 

Timber deck code

  • 1. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES Preface The Code is designed to assist: .1 shipowners, operating companies and ship’s staff; .2 port industries, shippers and pre-packaging organizations, which are involved in preparation, loading, and stowing of timber deck cargoes; and .3 Administrations, manufacturers and designers of the ship and equipment associated with the carriage of timber deck cargoes and those developing cargo securing manuals, Purpose of the code The purpose of the Code is to ensure that timber deck cargoes are so loaded, stowed and secured as to prevent as far as practicable, damage or hazard to the ship and persons on board as well as loss of cargo overboard. The Code provides: .1 practices for safe transportation; .2 methodologies for safe stowage and securing; .3 design principles for securing systems; .4 procedures and instructions to be included in ships’ cargo securing manuals on safe stowage and securing; and .5 sample checklists for safe stowage and securing. Application The requirements of this Code apply to all ships of 24 metres or more in length, carrying a timber deck cargo. Timber load line means a special load line assigned to ships complying with certain conditions set out in the International Convention on Load Lines and used when the cargo complies with the stowage and securing conditions of this Code. Weather deck means the uppermost complete deck exposed to weather and sea. Stowage Factor (SF) means the volume occupied by one tonne of a cargo when stowed and separated in the accepted manner. 1
  • 2. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES QUESTION: YOU ARE A CHIEF MATE / MASTER ON A VESSEL TO CARRY TIMBER? I shall refer to the CODE OF SAFE PRACTICE FOR SHIPS CARRYING TIMBER DECK CARGOES which will give me the following information General Recommendations on Stowage and Securing of Timber Deck Cargoes Pre-loading operation Permitted Loading Weights on decks and hatch covers Stability Load line Timber freeboard Visibility Work Safety and Work Environment Aspects Stowage Post-loading operation. Voyage planning Cargo Securing Manual The code also has 5 annexes ANNEX 1 – Sample Checklists ANNEX 2 – Visibility ANNEX 3 – Physical Properties of Timber Cargoes ANNEX 4 – Denotations Used in Design Criteria ANNEX 5 – Samples of Stowage and Securing Methods 3.4 Safety Factors 3.4.1 Safety factors are to be used when: .1 calculating the Maximum Securing Load (MSL) of the lashings from the Minimum Breaking Load (MBL); .2 calculating the maximum allowed Calculated Strength (CS) in the lashings as function of MSL. 3.4.2 MSL as function of the MBL should be taken according to annex 13 of the CSS Code. 3.4.3 The maximum allowed Calculated Strength (CS) in lashings 3.6 Documentation 3.6.1 Each cargo securing arrangement for timber deck cargoes should be documented in the ships Cargo Securing Manual in accordance with the instructions in MSC/Circ.745. 3.6.2 In the Cargo Securing Manual each stowage and securing arrangements should additionally be documented by a Lashing Plan showing at least the following: .1 Maximum cargo weight for which the arrangement is designed, .2 Maximum stowage height, .3 Required number and strength of blocking devices and lashings as applicable, Preparations before Loading of Timber Deck Cargoes General preparations The following cargo information as applicable is collected: • Total weight of cargo booked as deck cargo • Typical dimensions of the cargo • Density of the cargo • Stowage factor of the cargo 2
  • 3. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES 1.A pre-loading plan according to the vessel’s Trim and Stability  Stowage height  Weight per m2  Required amount of water ballast  Displacement, draft, trim and stability at departure and arrival. 2.During stability calculations, variation in displacement, centre of gravity and free surface moments due to the following factors are considered:  Absorption of water in dried or seasoned timber carried as timber deck cargo  Ice accretion, if applicable  Loss of weight due to drying  Variations in consumables  Ballast water exchange operations. 3.A pre-lashing plan according to the vessel’s Cargo Securing Manual (CSM) is done 4.The certificates for the lashing equipment are available in the vessel’s Cargo Securing Manual. 5.When stability calculations and lashing plan have been satisfactorily carried out, the maximum cargo intake is confirmed. 6.Pre-load loading and pre-lashing plans are distributed to all involved parties (i.e. supercargo, stevedores, agent, etc.). 7.Weather report for loading period and forecasted weather for the sea voyage is checked. Vessel readiness 1.All ballast tanks required for the voyage and included in the stability calculations are filled before commencing loading on deck and it is ensured that tanks are completely full or empty to minimize the amount of free surfaces. 2.Hatch covers and other openings to spaces below deck are closed, secured and battened down. 3.Air pipes, ventilators and check-valves are protected and examined to ascertain their effectiveness against entry of water. 4.Objects which might obstruct cargo stowage on deck are removed and secured safely in places appropriate for storage. 5.Accumulations of ice and snow on loading area are removed. 6.All sounding pipes on the deck are reviewed and necessary precautions are taken that safe access to these remains, and that they are not over stowed. 7.It is controlled that illumination on deck is working and ready for use. Ship-to-shore communication 1.Radio channels to be used during cargo operations are assigned and tested. 2.It is confirmed that crane drivers and loading stevedores/crew understands signals to be used during cargo operations. 3.A plan is worked out for possible ceasing of the loading operations due to deteriorating weather. 3
  • 4. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES PP equipments 1.It is made sure that personnel involved in the loading process are aware of all requirements regarding protective clothing, Safety during Loading and Securing of Timber Deck Cargoes 1.If applicable, uprights are mounted before loading on deck is commenced. 2.Cargo securing equipment has been examined in preparation for use in securing of timber deck cargoes and any defective equipment found has been removed from service, tagged for repair and replaced. Vessel’s safety 1.All loading operations are planned to immediately cease if a list develops for which there is no satisfactory explanation 2.In the event that the vessel takes up an unexplained list, then no further work to be undertaken until all ship’s tanks are sounded and assessment made of the ship’s stability condition. 3.The loading operations are ceased if the weather condition deteriorating significantly. 4.Draft surveys are regularly carried out during the course of loading and the ship’s displacement is calculated to ensure that the ship is not over loaded. 5.Permitted loading weights on deck and hatches are not exceeded. 6.The stability of the vessel is at all times positive and in compliance with the vessels intact stability requirements. 7. Emergency escape routes are free and ready for use. 8.Any obstruction such as lashings or securing points in the access way of escape routes and spaces essential to operation of the vessel, such as machinery spaces and crew’s quarters, as well as obstructions to safety equipment, fire fighting equipment and sounding pipes are kept to minimum Stowage 1.The stow of the deck cargo is as solid and compact as practicable and the cargo is tightly stowed. This is as far as practicable obtained within the stow to minimize the risk of cargo shifting during the sea voyage. 2.Cargo is not stowed overhanging the ship’s side Work safety 1.Personnel involved in the loading process are equipped with protective clothing, i.e. hardhats, proper footwear, gloves etc 2.Personnel working on cargo stowed at heights 2 metres and above are protected from falls with fall restraint equipment such as a safety harness or other approved fall restraining devices. 3.All possible actions are taken to minimize the risk of slipping on the cargo (i.e. when plastic wrapping or tarpaulins are used as covers). 4.Illumination is working when required during the cargo operation. 4
  • 5. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES Securing of Timber Deck Cargoes 1.The stevedoring company and the crew are informed about the requirements on the securing arrangements. 2.If required, extra lashing points are welded to the vessel with strength according to the vessel’s Cargo Securing Manual. 3.Only undamaged cargo securing equipment is used for the securing of the timber deck cargoes. 4.If any damage is noted on the fixed lashing equipment this is immediately repaired. 5.If any damage is noted on the portable lashing equipment this is immediately repaired or the equipment is exchanged by new certified equipment. 6.All lashings are thoroughly tightened and all bolts and screws on shackles and turnbuckles are tightly fastened.Turnbuckles have sufficient threads remaining to permit lashings to be tightened during the voyage if needed. IMPORTANT:  The timber deck cargo is secured according to the vessel’s Cargo Securing Manual and the manual is approved by the Administration.  Number and strength of uprights and lashing equipment used for the securing of the timber deck cargo is in accordance with the vessel’s Cargo Securing Manual approved by the Administration.  Certificates for the lashing equipment used are enclosed with the vessel’s Cargo Securing Manual. Actions to be Taken during the Voyage 1.Before the vessel proceeds to sea, the following are verified: • The ship is upright • The ship has an adequate metacentric height • The ship meets the required stability criteria • The cargo is properly secured. 2.Soundings of tanks are continuously carried out throughout the voyage. 3.In cases where severe weather and sea conditions are unavoidable, the Master should be conscious of the need to reduce speed and/or alter course at an early stage in order to minimize damage to cargo and lashing 4.If deviation from the intended voyage plan is considered during the voyage, a new plan should be made. Cargo Safety Inspections during Sea Voyages Cargo Safety Inspections, in accordance with the items below, are continuously checked throughout the voyage. Prior to any inspections being commenced on deck, the Master has taken appropriate actions to reduce the motions of thevessel during such operations. No movement of the cargo which would threaten the safety of the vessel has occurred. All lashing equipment are visually examined for any abnormal wear or tear or other damages. 5
  • 6. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES List during voyage 1.If a list occurs that is not caused by normal use of consumables, it is immediately determined if such list can be attributed to one of the three causes, or possibly a combination of same: • Cargo shift • Water ingresses • The angle of loll (poor stability). 2.The possibility of water ingress is determined by sounding throughout the vessel. In the event that unexplained water is detected, all available pumps are used to bring the situation under control. 3.If the list is corrected by ballasting and deballasting operations, the order in which tanks are filled and emptied is decided with consideration to the following factors: If ballast have been shifted to counteract a cargo shift or water ingress, a far greater list may rapidly develop to the opposite side If the list is due to the ship lolling, and if empty divided double bottom space is available, the tank on the lower side should be ballasted first in order to immediately provide additional metacentric height – after which the tank on the high side should also be ballasted Free surface moments should be kept at a minimum by operating only one tank at a time. If the list is corrected by jettisoning deck cargo, the following aspects are noted: Jettisoning is unlikely to improve the situation as the whole stack would probably not fall at once Severe damage may be sustained by the propeller if it isstill turning when the timber is jettisoned. If the whole or partial timber deck load is either jettisoned or accidentally lost overboard, the information on a direct danger to navigation is communicated by the master by all means at his disposal to the following parties: Ships in the vicinity Competent authorities Such information is to include the following: The kind of danger The position of the danger when last observed The time and date (coordinated universal time) when the danger was last observed. 6
  • 7. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES Safety during Discharge of Timber Deck Cargoes Cargo Securing Equipment 1.The cargo securing equipment is collected and examined and damaged equipment is either repaired or scrapped. 2.Uprights, when used, are well fastened to the deck or hatch coamings of the vessel and protected from falling inwards during discharging operations. Vessel’s Safety 1.All loading operations to immediately cease if a list develops for which there is no satisfactory explanation. 2.The stability of the vessel is at all times positive and in compliance with the vessels intact stability requirements. 3.Emergency escape routes are free and ready for use. Work Safety 1.Personnel involved in the loading process are dressed with protective clothing, i.e. hardhats, proper footwear, gloves, etc., 2 While working on the cargo there are possibilities for safety wires and the use of safety harness if applicable. 3.Correct signals are used with crane operator(s). 4.Safe access is available to the top of, and across, the cargo stow. 5.Illumination is used when required during the cargo operation. ANNEX 2 – Visibility 1 According to SOLAS chapter V, the view of the sea surface from the conning position should not be obscured by more than two ship lengths, or 500 m, whichever is the less, forward of the bow to 10° on either side under all conditions of draught, trim and deck cargo. National deviations may exist and should be taken into consideration as required dependent on the intended voyage. 2 No blind sector, caused by cargo, cargo gear or other obstructions outside of the wheelhouse forward of the beam which obstructs the view of the sea surface as seen from the conning position, should exceed 10°. The total arc of blind sectors should not exceed 20°. The clear sectors between blind sectors should be at least 5°. Package Weight Marking All packages over 1 metric ton should be clearly marked with the weight of the package. The marking should be clearly visible on the top of the package as well as both long sides. Water Absorption Sea spray may increase the weight of the timber deck cargo and thus influence on the stability.The value of increased weight of timber deck cargo due to water absorption should be taken according to the Intact Stability Code. Weight of Ice During cold weather conditions ice may form from sea spray and the stability may be affected as the ice can add weight rapidly. Increasing of the weight due to icing should be taken according to the Intact Stability Code. 7
  • 8. CODE OF SAFE PRACTICE FOR CARRYING TIMBER DECK CARGOES NOTE 1: when can a vessel load to her timber marks?  When a ship is assigned a timber load line, in order to load to those marks the vessel must be loaded with a timberdeck cargo which is correctly stowed in accordance with the deck cargo regulations and the IMO Code of Safe Practice for Ships Carrying Timber Deck Cargoes, 1991.  These regulations require that the timber be stowed as solidly as possible to at least the standard height of the superstructure. For instance, in ships of 125m or more in length, this equates to a uniform height of not less than 2.3m. In ships under 125m in length, the stow should reach a uniform height of not less than the height of the break of the forecastle head.  If the timber is stowed to a lesser height than indicated above or is not correctly stowed in any other way, i.e., not the full length of the well or not from side to side, then the ship is not permitted to load to the timber line.  When timber is correctly stowed on deck as referred to above, the ship may load to the timber load line irrespective of the quantity or type of cargo stowed below decks. The reduction in freeboard enjoyed by a ship which is assigned timber load lines, is permitted because of the buoyancy contribution of the timber deck cargo to the ship’s stability characteristics NOTE 2: When can a vessel be assigned a timber load line?  In order to be assigned a timber load line along with the usual cargo ship load lines the vessel must comply with the following construction requirements. Vessel to have adequate strength at deeper draught A raised forecastle atleast to the standard height of the superstructure and extending for atleast 7% of the vessels length. If the vessel is under 100mtrs in length, there must also be a superstructure aft of atleast standard height Double bottom tanks,where fitted within the midship half length,must be subdivided in order to minimise the free surface effects The ship must be fitted with the permanent bulwarks atleast 1m in height and suitably stiffened and fitted with freeing ports NOTE 3: intact stability requirements  Stability calculations to assess the vessels compliance with minimum stability criteria should include 15% increase in weight of the timber deck cargo due to water absorption  Alternate KN tables taking into account the increase in freeboard due to timber deck cargo to be used. Such tables must assume reserve buoyancy of 75% of the total deck timber  Initial GM not less than 0.05m (SOLAS gives GM not less than 0.10m)  Max GZ not less than 0.2m and angle of max Gz not less than 30 degrees  Area under curve upto 30 degrees not less than 0.055mr  Area under curve upto 40 degrees not less than 0.09mr  Area between 30 and 40 degrees not less than 0.03mr 8