Presentation on Best Practice for
Electrical Equipment Installation and Safety
of Product(Earthing & Protection)
We Commit to Safe India Lifes
and Assests from Lightning
Hame Jina hey Hame Jine Doo
Lightning
Safety of the structure / human/ equipments
India Lost Due to Lightning
We all may be danger if not Protected
Hamen Babaji Nahi Science Chahiye
Horrifying Losses Due To Devil Lightning
Safe India from Lightning
Make in India Follow NBC2016(Electrical Safety)
Topics of Presentation
• Latest National Building Code 2016
• Maintenance Free Earthing Arrangement as per UL 467, IEC 62561-2
• Earth Enhancing Compound as per IEC 62561-7
• Exothermic Weld(Fail Proof Joints) as per IEEE 837
• Copper Clad Steel Replacement of GI Flat Strips as per IEEE & IEC
• Surge Protection for Power and Communication Port (Suitable Integration is
also available)
• Lightning Protection IS/IEC 62305 Part 1-4
• NFC 17-102/UNE 211186 is in Process Incorporation in National Electric
Code Under Final Revision
Our Solutions for Best Practice
(Earthing & Protection)
• Electrical Power Generation ,Transmission & Distribution
• Backup Power(DG and UPS now Solar PV Power)
• Communication Equipment (Fixed or Wireless)
• Telecommunication Exchange
• Security Surveillance (CCTV/Access Controls/Networking)
• Building and Infra Solutions
• Rail Transportation (DMRC/Bullet Train/DFCC)
• Airport Infrastructure
• Smart City Programme
• AMRUT Project Programme
• Digital India Programme
• Energy Efficiency (Street Light)
• Sagarmala Project
Surge Protection use Recommendation
We always think about Safety of Each Life
Everybody Monitor for Human Safety
We are offering
Surge Protection Devices as IS/IEC 62305-4
Sikhana to Padega Hi Follow NBC2016
Best Earthing Practice to perform equipment well &
protects from shock (As per Latest NBC-2016)
1. Equipment Earthing
 CI/GI/ Copper Plate earthing with maintenance
material
 Copper/ Copper Bonded Steel Rod with
maintenance free earthing system
2. GRID Earthing
Copper Bonded Steel Rod- Best Earthing Material /
Superior in Quality / Recommended by IEEE 80, UL 467,
IEC 62561-2, IS 3043
• Low carbon solid steel rod with minimum 250 micron pure
copper coating as per UL 467
• Offers 4 to 5 times more working life than GI electrode
• Excellent fault current carrying capacity
• Exhibits same corrosion resistant property as copper
• High strength of steel
• A cost effective solution
• Theft proof solution
Complete Earthing Arrangement
The use of Earth Enhancing Compound
complying to …IEC - ……..pla s a i porta t i
making grounding system much more effective.
- It retain moisture thus provide smooth path for current to flow
faster.
- Si e it has oisture rete tio properties it does ’t de a d
regular watering that makes the grounding system low
maintenance.
- The continuous presence of moisture provides stable Ohmic
value.
- It does ’t ot ashes a a ith ti e.
- It does not demand continuous presence of water to maintain
its conductivity.
Fire Accident due to electrical joint failure in
Lightning Protection & Earthing
An Arcing Fault is the flow of
current through the air between
phase conductors or phase
conductors and neutral or ground.
Concentrated radiant energy is
released at the point of arcing an a
small amount of time resulting in
Extremely High Temperature.
Earthing Connections & Joint Practices
For making earthing connections &
electrical jointing, mechanical joints are
still prevails.
Nut & Bolt, welding, clamping,
brazing
Contact areas of connections have voids
and gaps which cause corrosion, rust
and oxide results in early deterioration
Resistance of mechanical connections
increases with time and this alters the
conductive properties of connections
Only give 8-20% contact surface area
Gets corroded over the period of time
due to atmospheric corrosion
Main earthing wire connections shall be:
• Be mechanically & electrically sound;
• Be protected against damage, corrosion and vibration;
• 100% contact surface area is must;
• Be secured at the earth electrode;
EXOTHERMIC WELDING- For all buried & permanent
connections as per IEEE 837 / NBC 2017
EXOTHERMIC WELDING-
Permanent Jointing solution
These cavity can be designed on
customize basis as per the type of joint
is required.
Also the dimension of the conductors
which needs to be joint in a kind of
jointing.
We are the manufacturer and can offer
any kind of joint type as mentioned
below:
Most Efficient Joint Process
It is efficient and superior to all existing surface –to-surface
mechanical retention connectors.
Copper Clad Steel Solid ROD and Conductor
Surge in Systems and Result
Surge in DC Application
External/Internal Surge Source
LIGHTNING FORMATION
Safety Main It Should be Remain
(Protect your Equipment for Internal & External Surges)
The 100% of lightning energy breaks down as follows:
a) 50% of the lightning current will flow through
the ground
b) 50% of the lightning current will flow over the
connected metal parts out of the building:
• about 10% to the water pipe (metal)
• about 10% to the gas pipe (metal)
• about 10% to the oil pipe (metal tank)
• about 10% to the sewage pipe
• a out % to the power supplier’s i o i g feed
• max. 5% or 5 kA shared across all data lines
Facts about Lightning
• A strike can average 100 million volts of electricity
• Current of up to 200,000 amperes
• Can generate 54,000 oF
• 10/350MicroSec/50KA Fault Current/Discharge in
Nano Sec
Protection
Earthing Design100KA Fault Current/Joints Exothermic
/Flexible Down Conductor with Shortest Route &
Less Corner
• Lightning Protection Standard use in India
(IS2309 Now IEC 62305-5)NBC2016
Working Principle Angular No Compromise with Design
Max Protection 30Mtrs from One
No Product warranty from Manufacturer
High Maintenance Require
Earthing below 10.00 Ohm
Lightning Risk Assessment Study is actually the
measure of risk of a lightning strike and probability of
damages. As Per IEC62305-2.
All these calculations are based on:
Lightning strike density in that particular area(provided byOMV i.e.Ng = 8),
Danger for people,
Occupation coefficient of structure,
Relative location of site,
Fire Risk,
Associated services,
Electrical Lines,
Lightning Protection Level,
Surge Arrestor and
Dimensions of installation.
Risk Assessment Calculator as per IS/IEC 62305
Air- Termination System
1. Vertical Rods- simple
shaped buildings
2. Catenary wires-
suitable for all cases
3. Meshed/ Grid
Conductors- best for
where plane/ pitch
roof surfaces
Air- Termination System Design
Protection Angle method
Mesh/ Faraday Cage Method
Rolling Sphere Method
Lightning Protection As Per NF C 17 102/UNE 211186
The ESE air terminal is a terminal which enables to generate artificially an upward leader earlier than a simple rod, with an
ionization system, in order to establish a special impact on its point. The capture of the lightning strike being faster than a
simple rod, this technology enables to benefit from larger protection areas, ensuring protection for large dimensions structures.
The generated protection radius depends on the early streamer emission value of the air terminal (Δt in µs), its height, and the
efficiency of the protection. The protection radius ensured by this type of air terminal is 120 m (Protection level IV, height = 60
m , early streamer emission time 60µs).
The NFC 17-102/UNE 211186 standard describes the installation procedure for this type of air terminal.
The installation of this type of air terminal is easy and cheaper than other technologies.
It can protect whole buildings with one E.S.E. air terminal. It enables the protection of a structure and its environment, the
protection of opened areas and well integrate in the architecture of a structure without aesthetic alteration.
1 ESE, 2 down conductors and 2 earthing systems are necessary to ensure the protection.
Early Streamer Emission Air Terminal
•An active and advance technology device based on the principle of
Corona effect.
•Internationally accepted technology complying standard NFC 17-102.
•Active Protection not only protects the structure also protect
surroundings & open areas.
•Made up of stainless steel SS-316L hence highly corrosion resistant
and long lasting.
•More life due to corrosion resistant material is used.
•Single installation offering maximum radius of protection of 109
meters which is very large in comparison to conventional lightning
system.
•ESE air terminal is very quick in response.
•Excellent, no electronic device.
•Economical solution.
•Easy to Install.
IEC Declaration by CENELEC for
NFC17-102
BT has confirmed that ESE National Standards would remain valid and thus BT recognized
there ould e o e ide e of o fli t et ee NF C ‐ a d IEC EN ‐ sta dards a d
consequently there is no reason, technical or otherwise, for the withdrawal of the respective
national standard.BT has requested that this standard be modified in order to cancel all
refere e to the IEC EN ‐ series, allowing the NF C ‐ sta dard to e ist, ith the
proposal of possible future migration to international level (lEC). Accordingly, it was established
that European ESE standards (France, Spain, Portugal, Slovaquia, etc.) will not
conflict with other European standards and will remain valid.
• GIMELEC would draw your attention to the fact that
the ter s of refere e of NF C ‐ a d
• other standards, addressing alternative terminals (NF
C ‐ , PR EN ‐ ‐ ) ere fro the
• outset, er differe t. It is a fa t that NF C ‐ ,
whilst referring to ESE Technology also
• comments on other standards for lightning protection
systems, particularly incorporating
• faraday cage, franklin rod and catenary wire systems.
the 'camouflaging' of NF C ‐102 by IEC EN
• ‐ and its proponents, that FRENCH STANDARD
NF C ‐ is still in full force.
ESE Installation Guidance
ESE AT with radius protection form 32 mtr to 107 mtr.
DMC Insulator .
GI/FRP Mast .
Down Conductor Copper / Copper Cadmium
Cable 70 sq. mm
Copper Bonded Ground Earthing
Safety Main It Should be Remain
(Protect your Equipment for Internal & External Surges)
The 100% of lightning energy breaks down as follows:
a) 50% of the lightning current will flow through
the ground
b) 50% of the lightning current will flow over the
connected metal parts out of the building:
• about 10% to the water pipe (metal)
• about 10% to the gas pipe (metal)
• about 10% to the oil pipe (metal tank)
• about 10% to the sewage pipe
• a out % to the power supplier’s i o i g feed
• max. 5% or 5 kA shared across all data lines
Step – 1
Step – 2
Step – 3
Joint all phase wire/ cable with the help of
crimping tools and lugs
Fixed the separation sheet between all wires/
cables
Close the filled Silicon enclosure from top and
bottom , complete installation is done.
Thimble
Separation Sheet
Gel / Silicon
Gel Based Cable Jointing Kit
JMV Products for Earthing & Protection
Contact Professionals for Advise
We Protect You
Use Well Engineered Electrical Safety
Solutions With Us
Contact Our Team JMV INDIA
Leader and Inspiration behind Mr. Neeraj Saini neeraj@jmv.co.in
Mr. Mahesh Chandra Manav Brand JMV HOD manav@jmv.co.in
www.jmv.co.in
Mobile -919910398999 Landline -01204590000
JMV’s Clients

Contenu connexe

Tendances

Cable Tray Installation 211215
Cable Tray Installation 211215Cable Tray Installation 211215
Cable Tray Installation 211215
MUHAMMAD MAJID
 

Tendances (20)

Microstrip patch-antenna
Microstrip patch-antennaMicrostrip patch-antenna
Microstrip patch-antenna
 
Economic Loading of Distribution Transformer PPT
Economic Loading of Distribution Transformer PPTEconomic Loading of Distribution Transformer PPT
Economic Loading of Distribution Transformer PPT
 
Study and realization of dc micro-grid for remote areas.
Study and realization of dc micro-grid for remote areas.Study and realization of dc micro-grid for remote areas.
Study and realization of dc micro-grid for remote areas.
 
What is pcf
What is  pcfWhat is  pcf
What is pcf
 
Lumerical Software: DEVICE
Lumerical Software: DEVICELumerical Software: DEVICE
Lumerical Software: DEVICE
 
Power cables
Power cablesPower cables
Power cables
 
Types of Cables.pdf
Types of Cables.pdfTypes of Cables.pdf
Types of Cables.pdf
 
NFPA 780 detailed Risk assessment
NFPA 780 detailed Risk assessmentNFPA 780 detailed Risk assessment
NFPA 780 detailed Risk assessment
 
Lightning Protection System.pptx
Lightning Protection System.pptxLightning Protection System.pptx
Lightning Protection System.pptx
 
Substation grounding
Substation grounding Substation grounding
Substation grounding
 
Erico Eritech Lightning Protection - IEC62305 Earthing Design Guide
Erico Eritech Lightning Protection - IEC62305 Earthing Design GuideErico Eritech Lightning Protection - IEC62305 Earthing Design Guide
Erico Eritech Lightning Protection - IEC62305 Earthing Design Guide
 
Cable Tray Installation 211215
Cable Tray Installation 211215Cable Tray Installation 211215
Cable Tray Installation 211215
 
E bomb
E bombE bomb
E bomb
 
Solar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptxSolar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptx
 
Transmission Tower Design Flow Chart
Transmission Tower Design Flow ChartTransmission Tower Design Flow Chart
Transmission Tower Design Flow Chart
 
NFPA 780 simplified risk assessment
NFPA 780 simplified risk assessmentNFPA 780 simplified risk assessment
NFPA 780 simplified risk assessment
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 
Earthing System in Building services
Earthing System in Building servicesEarthing System in Building services
Earthing System in Building services
 
Earthing
EarthingEarthing
Earthing
 
electrical lighting calculation
electrical lighting calculationelectrical lighting calculation
electrical lighting calculation
 

Similaire à Presentation lightning protection system by jmv lps

Similaire à Presentation lightning protection system by jmv lps (20)

Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lps
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
 
Jmv presentation smart power transmission projects cea
Jmv  presentation  smart power transmission projects  ceaJmv  presentation  smart power transmission projects  cea
Jmv presentation smart power transmission projects cea
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1
 
Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1Presentation ese type lightning protecton year 2017 1
Presentation ese type lightning protecton year 2017 1
 
Lightning protection as per iec62035
Lightning protection as per iec62035Lightning protection as per iec62035
Lightning protection as per iec62035
 
Jmv presentation smart process plant (fertilizer)
Jmv  presentation  smart process  plant (fertilizer)Jmv  presentation  smart process  plant (fertilizer)
Jmv presentation smart process plant (fertilizer)
 
Jmv presentation smart process plant -hurl 2017
Jmv  presentation  smart process plant -hurl 2017Jmv  presentation  smart process plant -hurl 2017
Jmv presentation smart process plant -hurl 2017
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
Presentation indian railway electrical and s&t by jmv
Presentation indian railway electrical and s&t by jmvPresentation indian railway electrical and s&t by jmv
Presentation indian railway electrical and s&t by jmv
 
Presentation water way journey by jmv lps
Presentation water way journey by jmv lpsPresentation water way journey by jmv lps
Presentation water way journey by jmv lps
 

Plus de Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
Mahesh Chandra Manav
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
Mahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
Mahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
Mahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
Mahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
Mahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
Mahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
Mahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
Mahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
Mahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
Mahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
Mahesh Chandra Manav
 

Plus de Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Dernier

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Dernier (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Presentation lightning protection system by jmv lps

  • 1. Presentation on Best Practice for Electrical Equipment Installation and Safety of Product(Earthing & Protection) We Commit to Safe India Lifes and Assests from Lightning
  • 2. Hame Jina hey Hame Jine Doo
  • 3. Lightning Safety of the structure / human/ equipments
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. India Lost Due to Lightning
  • 11. We all may be danger if not Protected
  • 12. Hamen Babaji Nahi Science Chahiye
  • 13. Horrifying Losses Due To Devil Lightning
  • 14. Safe India from Lightning Make in India Follow NBC2016(Electrical Safety)
  • 15. Topics of Presentation • Latest National Building Code 2016 • Maintenance Free Earthing Arrangement as per UL 467, IEC 62561-2 • Earth Enhancing Compound as per IEC 62561-7 • Exothermic Weld(Fail Proof Joints) as per IEEE 837 • Copper Clad Steel Replacement of GI Flat Strips as per IEEE & IEC • Surge Protection for Power and Communication Port (Suitable Integration is also available) • Lightning Protection IS/IEC 62305 Part 1-4 • NFC 17-102/UNE 211186 is in Process Incorporation in National Electric Code Under Final Revision
  • 16. Our Solutions for Best Practice (Earthing & Protection) • Electrical Power Generation ,Transmission & Distribution • Backup Power(DG and UPS now Solar PV Power) • Communication Equipment (Fixed or Wireless) • Telecommunication Exchange • Security Surveillance (CCTV/Access Controls/Networking) • Building and Infra Solutions • Rail Transportation (DMRC/Bullet Train/DFCC) • Airport Infrastructure • Smart City Programme • AMRUT Project Programme • Digital India Programme • Energy Efficiency (Street Light) • Sagarmala Project
  • 17. Surge Protection use Recommendation
  • 18. We always think about Safety of Each Life
  • 19. Everybody Monitor for Human Safety
  • 20. We are offering Surge Protection Devices as IS/IEC 62305-4
  • 21. Sikhana to Padega Hi Follow NBC2016
  • 22. Best Earthing Practice to perform equipment well & protects from shock (As per Latest NBC-2016) 1. Equipment Earthing  CI/GI/ Copper Plate earthing with maintenance material  Copper/ Copper Bonded Steel Rod with maintenance free earthing system 2. GRID Earthing
  • 23. Copper Bonded Steel Rod- Best Earthing Material / Superior in Quality / Recommended by IEEE 80, UL 467, IEC 62561-2, IS 3043 • Low carbon solid steel rod with minimum 250 micron pure copper coating as per UL 467 • Offers 4 to 5 times more working life than GI electrode • Excellent fault current carrying capacity • Exhibits same corrosion resistant property as copper • High strength of steel • A cost effective solution • Theft proof solution
  • 24. Complete Earthing Arrangement The use of Earth Enhancing Compound complying to …IEC - ……..pla s a i porta t i making grounding system much more effective. - It retain moisture thus provide smooth path for current to flow faster. - Si e it has oisture rete tio properties it does ’t de a d regular watering that makes the grounding system low maintenance. - The continuous presence of moisture provides stable Ohmic value. - It does ’t ot ashes a a ith ti e. - It does not demand continuous presence of water to maintain its conductivity.
  • 25. Fire Accident due to electrical joint failure in Lightning Protection & Earthing
  • 26. An Arcing Fault is the flow of current through the air between phase conductors or phase conductors and neutral or ground. Concentrated radiant energy is released at the point of arcing an a small amount of time resulting in Extremely High Temperature.
  • 27. Earthing Connections & Joint Practices For making earthing connections & electrical jointing, mechanical joints are still prevails. Nut & Bolt, welding, clamping, brazing Contact areas of connections have voids and gaps which cause corrosion, rust and oxide results in early deterioration Resistance of mechanical connections increases with time and this alters the conductive properties of connections Only give 8-20% contact surface area Gets corroded over the period of time due to atmospheric corrosion
  • 28. Main earthing wire connections shall be: • Be mechanically & electrically sound; • Be protected against damage, corrosion and vibration; • 100% contact surface area is must; • Be secured at the earth electrode; EXOTHERMIC WELDING- For all buried & permanent connections as per IEEE 837 / NBC 2017
  • 29. EXOTHERMIC WELDING- Permanent Jointing solution These cavity can be designed on customize basis as per the type of joint is required. Also the dimension of the conductors which needs to be joint in a kind of jointing. We are the manufacturer and can offer any kind of joint type as mentioned below:
  • 30. Most Efficient Joint Process It is efficient and superior to all existing surface –to-surface mechanical retention connectors.
  • 31. Copper Clad Steel Solid ROD and Conductor
  • 32.
  • 33.
  • 34. Surge in Systems and Result
  • 35. Surge in DC Application
  • 37.
  • 39. Safety Main It Should be Remain (Protect your Equipment for Internal & External Surges) The 100% of lightning energy breaks down as follows: a) 50% of the lightning current will flow through the ground b) 50% of the lightning current will flow over the connected metal parts out of the building: • about 10% to the water pipe (metal) • about 10% to the gas pipe (metal) • about 10% to the oil pipe (metal tank) • about 10% to the sewage pipe • a out % to the power supplier’s i o i g feed • max. 5% or 5 kA shared across all data lines
  • 40. Facts about Lightning • A strike can average 100 million volts of electricity • Current of up to 200,000 amperes • Can generate 54,000 oF • 10/350MicroSec/50KA Fault Current/Discharge in Nano Sec Protection Earthing Design100KA Fault Current/Joints Exothermic /Flexible Down Conductor with Shortest Route & Less Corner
  • 41. • Lightning Protection Standard use in India (IS2309 Now IEC 62305-5)NBC2016 Working Principle Angular No Compromise with Design Max Protection 30Mtrs from One No Product warranty from Manufacturer High Maintenance Require Earthing below 10.00 Ohm
  • 42. Lightning Risk Assessment Study is actually the measure of risk of a lightning strike and probability of damages. As Per IEC62305-2. All these calculations are based on: Lightning strike density in that particular area(provided byOMV i.e.Ng = 8), Danger for people, Occupation coefficient of structure, Relative location of site, Fire Risk, Associated services, Electrical Lines, Lightning Protection Level, Surge Arrestor and Dimensions of installation.
  • 43. Risk Assessment Calculator as per IS/IEC 62305
  • 44. Air- Termination System 1. Vertical Rods- simple shaped buildings 2. Catenary wires- suitable for all cases 3. Meshed/ Grid Conductors- best for where plane/ pitch roof surfaces
  • 49. Lightning Protection As Per NF C 17 102/UNE 211186 The ESE air terminal is a terminal which enables to generate artificially an upward leader earlier than a simple rod, with an ionization system, in order to establish a special impact on its point. The capture of the lightning strike being faster than a simple rod, this technology enables to benefit from larger protection areas, ensuring protection for large dimensions structures. The generated protection radius depends on the early streamer emission value of the air terminal (Δt in µs), its height, and the efficiency of the protection. The protection radius ensured by this type of air terminal is 120 m (Protection level IV, height = 60 m , early streamer emission time 60µs). The NFC 17-102/UNE 211186 standard describes the installation procedure for this type of air terminal. The installation of this type of air terminal is easy and cheaper than other technologies. It can protect whole buildings with one E.S.E. air terminal. It enables the protection of a structure and its environment, the protection of opened areas and well integrate in the architecture of a structure without aesthetic alteration. 1 ESE, 2 down conductors and 2 earthing systems are necessary to ensure the protection.
  • 50. Early Streamer Emission Air Terminal
  • 51. •An active and advance technology device based on the principle of Corona effect. •Internationally accepted technology complying standard NFC 17-102. •Active Protection not only protects the structure also protect surroundings & open areas. •Made up of stainless steel SS-316L hence highly corrosion resistant and long lasting. •More life due to corrosion resistant material is used. •Single installation offering maximum radius of protection of 109 meters which is very large in comparison to conventional lightning system. •ESE air terminal is very quick in response. •Excellent, no electronic device. •Economical solution. •Easy to Install.
  • 52.
  • 53. IEC Declaration by CENELEC for NFC17-102
  • 54. BT has confirmed that ESE National Standards would remain valid and thus BT recognized there ould e o e ide e of o fli t et ee NF C ‐ a d IEC EN ‐ sta dards a d consequently there is no reason, technical or otherwise, for the withdrawal of the respective national standard.BT has requested that this standard be modified in order to cancel all refere e to the IEC EN ‐ series, allowing the NF C ‐ sta dard to e ist, ith the proposal of possible future migration to international level (lEC). Accordingly, it was established that European ESE standards (France, Spain, Portugal, Slovaquia, etc.) will not conflict with other European standards and will remain valid. • GIMELEC would draw your attention to the fact that the ter s of refere e of NF C ‐ a d • other standards, addressing alternative terminals (NF C ‐ , PR EN ‐ ‐ ) ere fro the • outset, er differe t. It is a fa t that NF C ‐ , whilst referring to ESE Technology also • comments on other standards for lightning protection systems, particularly incorporating • faraday cage, franklin rod and catenary wire systems. the 'camouflaging' of NF C ‐102 by IEC EN • ‐ and its proponents, that FRENCH STANDARD NF C ‐ is still in full force.
  • 55. ESE Installation Guidance ESE AT with radius protection form 32 mtr to 107 mtr. DMC Insulator . GI/FRP Mast . Down Conductor Copper / Copper Cadmium Cable 70 sq. mm Copper Bonded Ground Earthing
  • 56. Safety Main It Should be Remain (Protect your Equipment for Internal & External Surges) The 100% of lightning energy breaks down as follows: a) 50% of the lightning current will flow through the ground b) 50% of the lightning current will flow over the connected metal parts out of the building: • about 10% to the water pipe (metal) • about 10% to the gas pipe (metal) • about 10% to the oil pipe (metal tank) • about 10% to the sewage pipe • a out % to the power supplier’s i o i g feed • max. 5% or 5 kA shared across all data lines
  • 57. Step – 1 Step – 2 Step – 3 Joint all phase wire/ cable with the help of crimping tools and lugs Fixed the separation sheet between all wires/ cables Close the filled Silicon enclosure from top and bottom , complete installation is done. Thimble Separation Sheet Gel / Silicon Gel Based Cable Jointing Kit
  • 58. JMV Products for Earthing & Protection
  • 60. We Protect You Use Well Engineered Electrical Safety Solutions With Us
  • 61. Contact Our Team JMV INDIA Leader and Inspiration behind Mr. Neeraj Saini neeraj@jmv.co.in Mr. Mahesh Chandra Manav Brand JMV HOD manav@jmv.co.in www.jmv.co.in Mobile -919910398999 Landline -01204590000