Hop Lun Ltd 1
• Case Study
• Strategy
• Offsets
General Info
o Sewing Line: A2
o Buyer: Debenhams
o Style: 087-H-00255
o First M/C previous style finished time : 3.30pm, 16-March-13
o Previous style last output time : 3.10pm, 18-March-13
o New Style start time : 8.45am, 18-March-13
o New style first output time : 2.00pm, 20-March-13
CASE-01
Hop Lun Ltd 2
Feeding Analysis-01
ITEM : MOULD PADDED BRA
Date
TIME Elapsed time
REMARKS Root Causes
Expected
Standard Time
SL#
Operations/Activities Type of
M/c or
equipment
Job responsibility START END Minutes
Name Repeatability
1 Open electrical line Do Electrician 18-Mar-13 8.45am,4/16 9.00am 15
Ok
15
2 M/C arrangement ( first 10 m/c) Do Mechanic 18-Mar-13 9.00Aam 11.00 am 60
inventory status is not accurate
30
3 Waiting for electrician Do Electrician 18-Mar-13 10.30am 11.00am 30
delay to come
4 Attach electrical line ( first 10 m/c) Do Electrician 18-Mar-13 11.00am 11.30am 30
change plug/new plug setup
20
5 Line feeding meeting Do Management 18-Mar-13 11.20am 11.45am 25
Delay of meeting
15
6 S/n l/s attach water-proof fabric on foam (for light color) Do 1/N Technician & QC 18-Mar-13 11.15am 1.30pm 75 Lunch 1 hr
(12.15 am-1.15
pm)
Gathering learning curve, need training of process control
15
7
Cut excess water-proof fabric seam allowance with knife
machine (for light color)
Do O/L Technician & QC 18-Mar-13 1.20pm 2.00pm 40
Gathering learning curve, need training of process control
10
8 S/n l/s join cup shell and mould cup on frt neckline Do 1/N Technician & QC 18-Mar-13 1.45pm 2.40pm 55
Gathering learning curve, need training of process control
25
9 3th o/l neaten upper foam edge
Do
O/L
Mechanic 18-Mar-13 2.30pm 2.45pm 15
ok
10
Do Technician & QC 19-Mar-13 2.45pm 7.40am 115
Gathering learning curve, need training of process control
20
10 S/n l/s baste cup shell on mould cup Do 1/N Technician & QC 19-Mar-13 7.30am 8.30am 60
Gathering learning curve, need training of process control
20
11 Extra shell fabric cut by knife machine on cup btm Do E/C Technician & QC 19-Mar-13 8.20am 8.40pm 20
ok
10
12 S/n l/s join cups with wings and cradle and gore Do 1/N Technician & QC 19-Mar-13 8.30am 9.20am 50
Gathering learning curve, need training of process control
10
13 3/16d/n l/s sew wire casing on cup bottom Do 2/N Technician & QC 19-Mar-13 9.00 am 10.15am 75
Gathering learning curve, need training of process control
30
14 S/n l/s baste double layer thread on wing Do 1/N Technician & QC 19-Mar-13 10.00am 10.30am 30
Gathering learning curve, need training of process control
10
15 S/n l/s join wings with cups Do 1/N Technician & QC 19-Mar-13 10.20am 10.40am 20
Gathering learning curve, need training of process control
10
16 5/16d/n l/s attach binding to side seam Do 2/N Technician & QC 19-Mar-13 10.40am 11.00am 20
Gathering learning curve, need training of process control
20
17 Bt lock side binding end *4 Do B/T Technician & QC 19-Mar-13 10.50am 11.15am 25
Gathering learning curve, need training of process control
15
18 Shoulder strap wrong supply Do Material 19-Mar-13 11.00am 1.30pm 90 Lunch 1 hr
(12.15 am-1.15
pm)
Gathering learning curve, need training of process control
0
19 S/n l/s fix shoulder strap at back wing Do 1/N Technician & QC 19-Mar-13 1.30pm 2.30pm 60
Gathering learning curve, need training of process control
15
20 C/s sew under bust Do F/L Technician & QC 19-Mar-13 2.20pm 8.20am 120
Gathering learning curve, need training of process control
40
21 S/n l/s fix fixed net in front shoulder strap Do 1/N Technician & QC 20-Mar-13 3.40pm 8.30am 50
Gathering learning curve, need training of process control
15
22 C/s wrap upper wing through underarm to front shoulder strap Do F/L Technician & QC 20-Mar-13 8.15am 9.15am 60
Gathering learning curve, need training of process control
15
23 ZZ l/s lock H&E(with compensating foot) Do 1/ZZ Technician & QC 20-Mar-13 9.10am 9.50am 40
Gathering learning curve, need training of process control
15
24
S/n l/s fold sew front shoulder strap with ring inserted and
fix back shoulder strap
Do 1/N Technician & QC 20-Mar-13 9.20am 10.00am 40
Gathering learning curve, need training of process control
15
25
Bt lock frt shoulder strap end and be shoulder strap *4,
armhole end *2
Do B/T Technician & QC 20-Mar-13 9.50am 10.10am 20
Lunch 1 hr.
(12.15am-1.15pm
Ok
20
26 M/c arrangement & adjustment (B/A) Do Mechanic 20-Mar-13 10.00am 1.15am 135
inventory status is not accurate
10
27 Attach 1 bow, 1 button and 1 tag Do B/A Technician & QC 20-Mar-13 1.15am 1.40am 25
OK
30
Hop Lun Ltd 3
Summary -01
Activities
Actual Expected
Minutes
Percentag
e Minutes Percentage
Technician & QC 1000 72% 350 74%
Mechanic 210 15% 70 15%
Electrician 60 4% 35 7%
Material 90 6% 0 0%
Management 25 2% 15 3%
Total 1385 100% 470 100%
Total Operations/Process 20 20
Hop Lun Ltd 4
Summary-01
1000
210
60 90
25
72%
15%
4% 6%
2%
0 1 2 3 4 5 6
0%
10%
20%
30%
40%
50%
60%
70%
80%
0
200
400
600
800
1000
1200
Technician &
QC
Mechanic Electrician Material Management
Minutes Percentage
360
50
35
0
15
78%
11% 8%
0% 3%
0 1 2 3 4 5 6
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0
50
100
150
200
250
300
350
400
Technician &
QC
Mechanic Electrician Material Management
Minutes Percentage
Actual
Expected
Hop Lun Ltd 5
Comparison
1000
210
60
90
25
350
70
35
0 150
200
400
600
800
1000
1200
Technician & QC Mechanic Electrician Material Management
Series1 Series2
Actual
Expected
Hop Lun Ltd 6
Root Causes-01
Root Causes
Consum
ed Time Percentage
LC & T 935 72%
M/c Inventory
check 195
15%
Change/Replace 30 2%
Waiting 30 2%
Material 90 7%
MD 25 2%
Total 1305 100%
Note:
LC & T – Gather Knowledge through Trial & Error and build upward
learning curve thus needs proper training of process control
MD – Management Decision
Material - shortage/wrong LC&T
M/cInventorycheck
Change/Replace
Waiting
Material
MD
0%
20%
40%
60%
80%
100%
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Pareto Analysis 01 - Root Cause
Time Cumulative % Cut off %
Hop Lun Ltd 7
Root Causes-01
Root Causes
Consum
ed Time Percentage
LC & T 935 72%
M/c Inventory
check 195
15%
Change/Replace 30 2%
Waiting 30 2%
Material 90 7%
MD 25 2%
Total 1305 100%
Note:
LC & T – Gather Knowledge through Trial & Error and build upward
learning curve thus needs proper training of process control
MD – Management Decision
Material - shortage/wrong LC&T
M/cInventorycheck
Change/Replace
Waiting
Material
MD
0%
20%
40%
60%
80%
100%
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Pareto Analysis 01 - Root Cause
Time Cumulative % Cut off %
Hop Lun Ltd 8
General Info
o Sewing Line: A22
o Buyer: George
o Style: 018-k-00653
o First M/C previous style finished time : 10.00 am, 30-March-13
o Previous style last output time : 3.20 pm, 01-April-13
o New Style start time : 8.50 am, 01-April-13
o New style first output time : 12.55 pm 4-April-13
CASE-02
Hop Lun Ltd 9
Feeding Analysis-02
ITEM : MOULD PADDED BRA
Date
TIME Elapsed time
REMARKS Root Causes
Expected
Standard Time
SL#
Operations/Activities Type of
M/c or
Equipme
nt
Job
responsibility
START END Minutes
Name Repeatability
1 Open electrical line Do Electrician 1-Apr-13 8.50am 9:10am 20 15
2 M/C arrangement Do Mechanic 1-Apr-13 9:15am 9:55am 40 delay to check inventory status 30
3 Attach electrical line Do Electrician 1-Apr-13 9:50am 10:10am 20 20
4 Waiting & for PP meeting Quality 1-Apr-13 10:10am 11:00am 50 Busy with other management activities 15
5 Bring accessories Do Line feeder 1-Apr-13 10:30am 11:00am 30 Material has not brought at due time 0
6 Baste lining net at r/l lower cup Do 1/N Technician & QC 1-Apr-13 11:00am 11:25am 25 15
7 Baste lining net at top cup Do 1/N Technician & QC 1-Apr-13 11:30am 1:30pm 60
Lunch 1 Hr.
(11:45am-12:45pm)
trial & error>gather Learning Curve> need Proper technical Training 15
8 Join lower cup seam
Do
1/N
Mechanic 1-Apr-13 1:00pm 2:10pm 70 Simultaneous
Activities
alignment & adjustment problem> variability of materials
usage>unavailability of SOP
5
Do Technician & QC 1-Apr-13 2:10pm 8:20am 130 trial & error>gather Learning Curve> need Proper technical Training 10
9 Topstitch open and sew lower cup seam
Do
2/N
Mechanic 1-Apr-13 9:00am 11:30am 90
alignment & adjustment problem> variability of materials
usage>unavailability of SOP
10
Do Technician & QC 1-Apr-13 3:00pm 8:50am 110 trial & error>gather Learning Curve> need Proper technical Training 20
10 Join top gore and turn over to baste r/l sides Do 1/N Technician & QC 1-Apr-13 3:10pm 9:20am 130
Simultaneous
Activities
trial & error>gather Learning Curve> need Proper technical Training 10
11 Side wing baste and join with back wing Do 1/N Technician & QC 1-Apr-13 3:40pm 9:40am 120
Simultaneous
Activities
trial & error>gather Learning Curve> need Proper technical Training 15
12 Attach elastic ton front neckline Do 1/ZZ Technician & QC 2-Apr-13 8:25am 11:35am 190
Technical took longer time for adjustment> Gather learning Curve > need
proper training of process control
40
13 Join cup seam Do 1/N Technician & QC 2-Apr-13 11:30am 1:30pm 60
Lunch 1 Hr.
(11:45am-12:45pm)
trial & error>gather Learning Curve> need Proper technical Training 20
14 Topstitch cup seam and fold Do 2/N Technician & QC 2-Apr-13 1:00pm 2:15pm 75 trial & error>gather Learning Curve> need Proper technical Training 30
15 Attach fixed net to cup bottom and armhole Do 1/N Technician & QC 2-Apr-13 2:00pm 3:00pm 60 trial & error>gather Learning Curve> need Proper technical Training 15
16 Attach elastic to underbast
Do
3/ZZ
Mechanic 2-Apr-13 9:30am 2:30pm 240 alignment & adjustment problem of feed dog > Change m/c> Decision 20
Do Technician & QC 2-Apr-13 2:30pm 3:50pm 80 trial & error>gather Learning Curve> need Proper technical Training 25
17 join cup with wings and gore and cradle together Do 1/N Technician & QC 2-Apr-13 3:50pm 8:15am 85
Simultaneous
Activities
trial & error>gather Learning Curve> need Proper technical Training 20
18 Attach elastic to top wing through armhole Do 3/ZZ Technician & QC 2-Apr-13 4:10pm 8:50am 100 trial & error>gather Learning Curve> need Proper technical Training 45
19 Attach wire casing on side seam Do 2/N Technician & QC 2-Apr-13 4:20pm 9:15am 115 trial & error>gather Learning Curve> need Proper technical Training 30
20 Sew wire casing on cup bottom Do 2/N Technician & QC 2-Apr-13 4:40pm 9:30am 110 trial & error>gather Learning Curve> need Proper technical Training 40
21 Attach elastic to back scoop Do 1/ZZ Technician & QC 2-Apr-13 4:50pm 9:40am 110 trial & error>gather Learning Curve> need Proper technical Training 20
22 Lock hook and eye Do 1/ZZ Technician & QC 3-Apr-13 8:20am 10:00am 100 trial & error>gather Learning Curve> need Proper technical Training 15
23
Overlap and sew shoulder strap and fold & fix elastic end at
be scoop with ring inserted
Do O/L Technician & QC 3-Apr-13 8:55am 10:30am 95 trial & error>gather Learning Curve> need Proper technical Training 15
24
Bt lock shoulder strap opening*4, elastic end at be scoop *2,
lock wire & side seam end*8
Do B/T Technician & QC 3-Apr-13 9:40am 11:00am 80 trial & error>gather Learning Curve> need Proper technical Training 20
25 Attach Bow *3 Do B/A Technician & QC 3-Apr-13 9:55am 11:20am 85 trial & error>gather Learning Curve> need Proper technical Training 30
Hop Lun Ltd 10
Summary-02
Activities
Actual Expected
Minutes Percentage Minutes Percentage
Technician & QC 1920 78% 450 80%
Mechanic 440 18% 65 12%
Electrician 20 1% 35 6%
Quality 50 2% 15 3%
Line feeder 30 1% 0 0%
Total 2460 100% 565 100%
Total Operations/Process 20 20
Hop Lun Ltd 11
Summary-02
Actual
Expected
1920
440
20 50 30
78%
18%
1% 2% 1% 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0 1 2 3 4 5 6
0
500
1000
1500
2000
2500
Technician &
QC
Mechanic Electrician Quality Line feeder
Minutes Percentage
450
65
35
15 0
80%
12%
6%
3% 0% 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0 1 2 3 4 5 6
0
50
100
150
200
250
300
350
400
450
500
Technician &
QC
Mechanic Electrician Quality Line feeder
Minutes Percentage
Hop Lun Ltd 12
Comparison-02
Actual
Expected
1920
440
20 50 30
450
65 35 15 00
500
1000
1500
2000
2500
Technician & QC Mechanic Electrician Quality Line feeder
Series1 Series2
Hop Lun Ltd 13
Root Causes-02
Note:
LC & T - Gather Knowledge through Trial & Error and build upward
learning curve thus needs proper training of process control
M-MD - Maintenance of Management Decision
Material - shortage/wrong
U-SOP – Unavailability of SOP
Root Causes
Consumed
Time
Percentage
LC & T 1895 78%
M/c Inventory
check
40 2%
U-SOP 160 7%
Waiting 50 2%
Material 30 1%
M-MD 240 10%
Total 2415 100%
LC&T
M/cInventorycheck
Change/Replace
Waiting
Material
MD
0%
20%
40%
60%
80%
100%
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Pareto Analysis 02 - Root Cause
Time Cumulative % Cut off %
Hop Lun Ltd 14
General Info
o Sewing Line: A22
o Buyer: Debenhams
o Style: 087-G-00636
o First M/C previous style finished time : 5.00 pm, 16-Sep
o Previous style last output time : 4:45:00 PM,17 Sep
o New Style start time : 11:20:00 AM,17 Sep
o New style first output time : 3:20:00 PM,18 Sep
CASE-03
Hop Lun Ltd 15
Feeding Analysis-03
ITEM : MOULD PADDED BRA
Date
TIME Elapsed time
Root Causes
Expected
Standard TimeSL#
Operations/Activities Type of M/c or
equipment
Job responsibility START END Minutes
Name Repeatability
1 Attach water-proof fabric on foam Do 1/N
Mechanic
17-Sep-12 11.20 11.35
5 ok 5
Technician & QC 10 ok 10
2 Cut excess water-proof fabric seam allowance Do E/C Technician & QC 17-Sep-12 11.35 11.40 5 ok 5
3 attach lace at upper cup Do 1/ZZ Technician & QC 17-Sep-12 11.40 12.50 10 ok 15
4 Check swatch card Do Technician & QC 17-Sep-12 12.50 1.16 36 wrong Sample given>Sample Dept. given wrong sample 10
5 3th o/l neaten cup edge, cup btm, armhole foam edge Do O/L
Mechanic
17-Sep-12 1.17 1.30
6 ok 5
Technician & QC 7 ok 10
6 Give above operation standard Do Technician & QC 17-Sep-12 1.30 2.10 40 ok 10
7 Correction lay-out paper Do IE 17-Sep-12 2.10 2.45 35 lay-out paper need correction>Job Description 0
8 wrap upper cup foam edge Do 1/N
Mechanic
17-Sep-12 2.45 3.25
10 ok 10
Technician & QC 20 Trial & Error> Gather Learning Curve>need training 10
9 attach cup shell on foam Do 1/N Technician & QC 17-Sep-12 3.25 3.35 10 ok 10
10 join top gore and gore bottom then turn over to sew both sides Do 1/N Technician & QC 17-Sep-12 3.35 3.45 10 ok 10
11 attach net to side wing Do 1/N Technician & QC 17-Sep-12 3.45 3.50 5 ok 10
12 Align M/C according to lay-out paper & Add electric power Do
Mechanic
17-Sep-12 3.50 4.30
30
No available space to keep M/C which manage from another line &
communication gap> M/c inventory status check
10
Electrician 10 20
13 join side wings with cups Do 1/N Technician & QC 17-Sep-12 4.30 4.35 5 ok 10
14 attach elastic to lower wing Do 1/ZZ
Mechanic
17-Sep-12 4.35 5.00
15 ok 10
Technician & QC 10 ok 10
15 topstitch elastic on lower wing Do 1/ZZ
Mechanic
18-Sep-12 8.05 9.00
20 Adjustment & Alignment Problem>Unviability of SOP 10
Technician & QC 35 Trial & Error> Gather Learning Curve>need training 25
16 Waiting for Technician Do Technician & QC 18-Sep-12 9.00 9.30 30 Technician engage in meeting>job Description 0
17 insert cup Do 1/N Technician & QC 18-Sep-12 9.30 10.10 40 operator engage in another sewing line> incorrect Man-Hour planning 15
18 attach elastic to upper wing through underarm Do 3/ZZ
Mechanic
18-Sep-12 10.10 11.05
10 ok 10
Technician & QC 45 previous style accessories shortage & recut problem> Replenishment problem 25
19 attach binding to side seam Do 2/N
Mechanic
18-Sep-12 11.05 11.30
10 ok 5
Technician & QC 15 ok 15
20 sew wire casing on cup bottom Do 2/N
Mechanic
18-Sep-12 11.30 1.10
18 ok 10
Technician & QC 22 Trial & Error> Gather Learning Curve>need training 15
21 attach elastic to be scoop Do 1/ZZ
Mechanic
18-Sep-12 1.10 1.45
10 ok 10
Technician & QC 25 ok 20
22 lock H&E Do 1/ZZ Technician & QC 18-Sep-12 1.45 2.15 30 Trial & Error> Gather Learning Curve>need training 20
23 overlap&sew shoulder strap with slider Do 1/N
Mechanic
18-Sep-12 2.15 2.30
5 ok 5
Technician & QC 10 ok 10
24 bt lock shoulder strap Do B/T
Mechanic
18-Sep-12 2.30 2.40
5 ok 5
Technician & QC 5 ok 10
25 attach 1 bow and 1 gore tag Do 1/ZZ
Mechanic
18-Sep-12 2.40 3.20
10 ok 10
Technician & QC 30 Trial & Error> Gather Learning Curve>need training 20
Hop Lun Ltd 16
Summary-03
Activities
Actual Expected
Minutes Percentage Minutes Percentage
Technician & QC
455 70% 295 70%
Mechanic
154 24% 105 25%
Electrician
10 2% 20 5%
IE
35 5% 0 0%
Total 654 100% 420 100%
Total Operations/Process
20 20
Hop Lun Ltd 17
Graph-03
Actual
Expected
455
154
10 35
70%
24%
2% 5%
0%
10%
20%
30%
40%
50%
60%
70%
80%
0 1 2 3 4 5
0
50
100
150
200
250
300
350
400
450
500
Minutes Percentage
295
105
20 0
70%
25%
5% 0% 0%
10%
20%
30%
40%
50%
60%
70%
80%
0 1 2 3 4 5
0
50
100
150
200
250
300
350
Minutes Percentage
Hop Lun Ltd 18
Actual vs. Expected-03 Actual
Expected
455
154
10
35
295
105
20
00
50
100
150
200
250
300
350
400
450
500
Technician & QC Mechanic Electrician IE
Series1 Series2
Hop Lun Ltd 19
Root Causes-03
Note:
LC & T - Gather Knowledge through Trial & Error and build upward
learning curve thus needs proper training of process control
M-MD - Maintenance of Management Decision
Material - shortage/wrong
U-SOP – Unavailability of SOP
Root Causes Consumed Time
Percenta
ge
LC & T 137 44%
M/c
Inventory
check
10 3%
JD 65 21%
SOP 36 12%
U-SOP 20 6%
Replenish 45 14%
Total 313 100%
LC&T
JD
Replenish
SOP
U-SOP
M/cInventoryCheck
0%
20%
40%
60%
80%
100%
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
Pareto Analysis 03 - Root Cause
Time Cumulative % Cut off %
Hop Lun Ltd 20
Consolidation
Hop Lun Ltd 21
Root Causes -1
LC & T
M/c Inventory check
Change/Replace
Waiting
Material
MD
Root Causes - 2
LC & T
M-MD
U-SOP
Waiting
M/c Inventory Check
Material
Root Causes - 3
LC & T
JD
Replenish
SOP
U-SOP
M/c Inventory Check
LC & T
M/c Inventory check
Material
MD
M-MD
U-SOP
JD
Waiting
Replenish
SOP
Consolidation
Hop Lun Ltd 22
LC&T
M/cInventorycheck
M-MD
U-SOP
Material
Waiting
JD
Replenish
SOP
Change/Replace
MD
0%
20%
40%
60%
80%
100%
0
500
1000
1500
2000
2500
3000
Axis Title
80/20 Analysis
Time Cum % Cut Off
73%
6%
6%
4%
3%
2% 2% 1% 1%
1% 1%
Pie Chart- Proportion of
Causes
LC & T
M/c Inventory check
M-MD
U-SOP
Material
Waiting
JD
20 % Root
Causes
consume 80%
time
Goal(s)
Hop Lun Ltd 23
By making setup times/Change over times quicker
and simpler to enables Hoplun produces smaller
lots with higher flexibility. This means company can
meet their customers’ needs for high quality, low
cost products that are delivered quickly and
without the expense of excess inventory.
Objective(s)
Hop Lun Ltd 24
1. The setup time for every operation
should be made or ready for bulk
production in less than 10 minutes.
2. There will be no interruption in hourly
production during change over
Hop Lun Ltd 25
Strategy
Hop Lun Ltd 26
Strategy
Hop Lun Ltd 27
Splitting…
Hop Lun Ltd 28
Internal
Activities
Hop Lun Ltd 29
Correlation Between Internal Activities & Root Causes
• M/C
Inventory
MACHINE SEARCHING/MACHINE
READYNESS AS PER LAY OUT
•Change/Repl
aceATTACHMENT OF GUIDES & FOLDERS
•MD, JDFEEDING MEETING
•M/C
InventoryMACHINE SETUP AS PER LAYOUT
• U-SOPLINE FEEDING & STITCHING STANDARD
FIX
•U-SOP,
M-MD
GUIDE & FOLDERS ADJUSTMENT AS PER
STANDARD
•LC & TENSURE BUYER MEASUREMENT
STANDARD & GET UP
Possible to make
external Activities
Trial & tune it as
external activities
Possible to make
external Activities
Perform Parallel as
internal activities
Perform Parallel as
internal activities
Perform Parallel as
internal activities
Perform Parallel as
internal activities
Hop Lun Ltd 30
Corrective Action Plan
Root Causes
Short Term Plan Mid Term Plan Long Term Plan
Code Elaboration
LC & T
Gather Knowledge through Trial & Error and
build upward learning curve thus needs
proper training of process control
1. Standardize HC of QC
& Technician.
2. Ensure attendance of
Tec & QC
Standardize the process
wise setup time
1. Ensure proper training
of process control to
Technician & QC
personnel.
2. Ensure proper training
to operator to know how
to fix required SPI.
M/c Inventory
check
No visual inventory system & current
Inventory status is not updated continuously
Visualize & Update
Inventory & Define Roles
Display Inventory at
Floor, Retrieval system
Implement TPM
Material Shortage or send wrong material
Visualize the material
replenishment
Practice the Kaizen
Board to visualize the
problem
Need to develop mistake
proofing techniques at
cutting & W/H
MD Management Decision
Practice Kaizen board to
visualize problem
Perform weekly kaizen meeting & take corrective
action on weekly basis
M-MD Maintenance -Management Decision
Review the job reporting
system during
changeover
Standardize time limit to
maintenance/solve a job
Train and Visualize the
next level decision to
solve a problem
U-SOP Unavailability of SOP
List down and review
SOP of machine
maintenance
Standardize SOP Sustain SOP
JD Job Description Review Job description
Standardize Job
description
Sustain JD
Replenish Input material not receive at due time
Standardize
Replenishment SOP
Standardize the place & visualize inventory
SOP SOP not followed
Review operating
Procedure
Standardize the operating procedure
Change Over Off Sets
Hop Lun Ltd 31
Need Discussion, Grooming &
Then……..
Hop Lun Ltd 32

Contenu connexe

Similaire à HOP Yick BD Ltd SMED

CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
peter mcelwee
 
REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2 REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2
Chandra sekhar sahoo
 
WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25
Tofik Nazirov, B.Sc., PhD
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
Thomas Ingrey
 
Rice Co-Op Presentation
Rice Co-Op PresentationRice Co-Op Presentation
Rice Co-Op Presentation
Scott Rice
 
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)  WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
Ali Yousef
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
Issa Alshaikh
 

Similaire à HOP Yick BD Ltd SMED (20)

porject summary
porject summaryporject summary
porject summary
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
Ihf,ihf(d) fsb, fsb(d)
Ihf,ihf(d) fsb, fsb(d)Ihf,ihf(d) fsb, fsb(d)
Ihf,ihf(d) fsb, fsb(d)
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2 REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2
 
WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25
 
Catalog cs contactor d range
Catalog cs contactor d rangeCatalog cs contactor d range
Catalog cs contactor d range
 
Catalog cs contactor d range-dienhathe.vn
Catalog cs contactor d range-dienhathe.vnCatalog cs contactor d range-dienhathe.vn
Catalog cs contactor d range-dienhathe.vn
 
Catalog cs contactor d range
Catalog cs contactor d rangeCatalog cs contactor d range
Catalog cs contactor d range
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
 
Rice Co-Op Presentation
Rice Co-Op PresentationRice Co-Op Presentation
Rice Co-Op Presentation
 
PJMcManus
PJMcManusPJMcManus
PJMcManus
 
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)  WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
Jan 2017
Jan 2017Jan 2017
Jan 2017
 
DPMT.pdf
DPMT.pdfDPMT.pdf
DPMT.pdf
 
sealing open project
sealing open projectsealing open project
sealing open project
 
Company Profile Wooil 2014
Company Profile Wooil 2014Company Profile Wooil 2014
Company Profile Wooil 2014
 

HOP Yick BD Ltd SMED

  • 1. HOP Yick BD Ltd Hop Lun Ltd 1 • Case Study • Strategy • Offsets
  • 2. General Info o Sewing Line: A2 o Buyer: Debenhams o Style: 087-H-00255 o First M/C previous style finished time : 3.30pm, 16-March-13 o Previous style last output time : 3.10pm, 18-March-13 o New Style start time : 8.45am, 18-March-13 o New style first output time : 2.00pm, 20-March-13 CASE-01 Hop Lun Ltd 2
  • 3. Feeding Analysis-01 ITEM : MOULD PADDED BRA Date TIME Elapsed time REMARKS Root Causes Expected Standard Time SL# Operations/Activities Type of M/c or equipment Job responsibility START END Minutes Name Repeatability 1 Open electrical line Do Electrician 18-Mar-13 8.45am,4/16 9.00am 15 Ok 15 2 M/C arrangement ( first 10 m/c) Do Mechanic 18-Mar-13 9.00Aam 11.00 am 60 inventory status is not accurate 30 3 Waiting for electrician Do Electrician 18-Mar-13 10.30am 11.00am 30 delay to come 4 Attach electrical line ( first 10 m/c) Do Electrician 18-Mar-13 11.00am 11.30am 30 change plug/new plug setup 20 5 Line feeding meeting Do Management 18-Mar-13 11.20am 11.45am 25 Delay of meeting 15 6 S/n l/s attach water-proof fabric on foam (for light color) Do 1/N Technician & QC 18-Mar-13 11.15am 1.30pm 75 Lunch 1 hr (12.15 am-1.15 pm) Gathering learning curve, need training of process control 15 7 Cut excess water-proof fabric seam allowance with knife machine (for light color) Do O/L Technician & QC 18-Mar-13 1.20pm 2.00pm 40 Gathering learning curve, need training of process control 10 8 S/n l/s join cup shell and mould cup on frt neckline Do 1/N Technician & QC 18-Mar-13 1.45pm 2.40pm 55 Gathering learning curve, need training of process control 25 9 3th o/l neaten upper foam edge Do O/L Mechanic 18-Mar-13 2.30pm 2.45pm 15 ok 10 Do Technician & QC 19-Mar-13 2.45pm 7.40am 115 Gathering learning curve, need training of process control 20 10 S/n l/s baste cup shell on mould cup Do 1/N Technician & QC 19-Mar-13 7.30am 8.30am 60 Gathering learning curve, need training of process control 20 11 Extra shell fabric cut by knife machine on cup btm Do E/C Technician & QC 19-Mar-13 8.20am 8.40pm 20 ok 10 12 S/n l/s join cups with wings and cradle and gore Do 1/N Technician & QC 19-Mar-13 8.30am 9.20am 50 Gathering learning curve, need training of process control 10 13 3/16d/n l/s sew wire casing on cup bottom Do 2/N Technician & QC 19-Mar-13 9.00 am 10.15am 75 Gathering learning curve, need training of process control 30 14 S/n l/s baste double layer thread on wing Do 1/N Technician & QC 19-Mar-13 10.00am 10.30am 30 Gathering learning curve, need training of process control 10 15 S/n l/s join wings with cups Do 1/N Technician & QC 19-Mar-13 10.20am 10.40am 20 Gathering learning curve, need training of process control 10 16 5/16d/n l/s attach binding to side seam Do 2/N Technician & QC 19-Mar-13 10.40am 11.00am 20 Gathering learning curve, need training of process control 20 17 Bt lock side binding end *4 Do B/T Technician & QC 19-Mar-13 10.50am 11.15am 25 Gathering learning curve, need training of process control 15 18 Shoulder strap wrong supply Do Material 19-Mar-13 11.00am 1.30pm 90 Lunch 1 hr (12.15 am-1.15 pm) Gathering learning curve, need training of process control 0 19 S/n l/s fix shoulder strap at back wing Do 1/N Technician & QC 19-Mar-13 1.30pm 2.30pm 60 Gathering learning curve, need training of process control 15 20 C/s sew under bust Do F/L Technician & QC 19-Mar-13 2.20pm 8.20am 120 Gathering learning curve, need training of process control 40 21 S/n l/s fix fixed net in front shoulder strap Do 1/N Technician & QC 20-Mar-13 3.40pm 8.30am 50 Gathering learning curve, need training of process control 15 22 C/s wrap upper wing through underarm to front shoulder strap Do F/L Technician & QC 20-Mar-13 8.15am 9.15am 60 Gathering learning curve, need training of process control 15 23 ZZ l/s lock H&E(with compensating foot) Do 1/ZZ Technician & QC 20-Mar-13 9.10am 9.50am 40 Gathering learning curve, need training of process control 15 24 S/n l/s fold sew front shoulder strap with ring inserted and fix back shoulder strap Do 1/N Technician & QC 20-Mar-13 9.20am 10.00am 40 Gathering learning curve, need training of process control 15 25 Bt lock frt shoulder strap end and be shoulder strap *4, armhole end *2 Do B/T Technician & QC 20-Mar-13 9.50am 10.10am 20 Lunch 1 hr. (12.15am-1.15pm Ok 20 26 M/c arrangement & adjustment (B/A) Do Mechanic 20-Mar-13 10.00am 1.15am 135 inventory status is not accurate 10 27 Attach 1 bow, 1 button and 1 tag Do B/A Technician & QC 20-Mar-13 1.15am 1.40am 25 OK 30 Hop Lun Ltd 3
  • 4. Summary -01 Activities Actual Expected Minutes Percentag e Minutes Percentage Technician & QC 1000 72% 350 74% Mechanic 210 15% 70 15% Electrician 60 4% 35 7% Material 90 6% 0 0% Management 25 2% 15 3% Total 1385 100% 470 100% Total Operations/Process 20 20 Hop Lun Ltd 4
  • 5. Summary-01 1000 210 60 90 25 72% 15% 4% 6% 2% 0 1 2 3 4 5 6 0% 10% 20% 30% 40% 50% 60% 70% 80% 0 200 400 600 800 1000 1200 Technician & QC Mechanic Electrician Material Management Minutes Percentage 360 50 35 0 15 78% 11% 8% 0% 3% 0 1 2 3 4 5 6 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 0 50 100 150 200 250 300 350 400 Technician & QC Mechanic Electrician Material Management Minutes Percentage Actual Expected Hop Lun Ltd 5
  • 6. Comparison 1000 210 60 90 25 350 70 35 0 150 200 400 600 800 1000 1200 Technician & QC Mechanic Electrician Material Management Series1 Series2 Actual Expected Hop Lun Ltd 6
  • 7. Root Causes-01 Root Causes Consum ed Time Percentage LC & T 935 72% M/c Inventory check 195 15% Change/Replace 30 2% Waiting 30 2% Material 90 7% MD 25 2% Total 1305 100% Note: LC & T – Gather Knowledge through Trial & Error and build upward learning curve thus needs proper training of process control MD – Management Decision Material - shortage/wrong LC&T M/cInventorycheck Change/Replace Waiting Material MD 0% 20% 40% 60% 80% 100% 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Pareto Analysis 01 - Root Cause Time Cumulative % Cut off % Hop Lun Ltd 7
  • 8. Root Causes-01 Root Causes Consum ed Time Percentage LC & T 935 72% M/c Inventory check 195 15% Change/Replace 30 2% Waiting 30 2% Material 90 7% MD 25 2% Total 1305 100% Note: LC & T – Gather Knowledge through Trial & Error and build upward learning curve thus needs proper training of process control MD – Management Decision Material - shortage/wrong LC&T M/cInventorycheck Change/Replace Waiting Material MD 0% 20% 40% 60% 80% 100% 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Pareto Analysis 01 - Root Cause Time Cumulative % Cut off % Hop Lun Ltd 8
  • 9. General Info o Sewing Line: A22 o Buyer: George o Style: 018-k-00653 o First M/C previous style finished time : 10.00 am, 30-March-13 o Previous style last output time : 3.20 pm, 01-April-13 o New Style start time : 8.50 am, 01-April-13 o New style first output time : 12.55 pm 4-April-13 CASE-02 Hop Lun Ltd 9
  • 10. Feeding Analysis-02 ITEM : MOULD PADDED BRA Date TIME Elapsed time REMARKS Root Causes Expected Standard Time SL# Operations/Activities Type of M/c or Equipme nt Job responsibility START END Minutes Name Repeatability 1 Open electrical line Do Electrician 1-Apr-13 8.50am 9:10am 20 15 2 M/C arrangement Do Mechanic 1-Apr-13 9:15am 9:55am 40 delay to check inventory status 30 3 Attach electrical line Do Electrician 1-Apr-13 9:50am 10:10am 20 20 4 Waiting & for PP meeting Quality 1-Apr-13 10:10am 11:00am 50 Busy with other management activities 15 5 Bring accessories Do Line feeder 1-Apr-13 10:30am 11:00am 30 Material has not brought at due time 0 6 Baste lining net at r/l lower cup Do 1/N Technician & QC 1-Apr-13 11:00am 11:25am 25 15 7 Baste lining net at top cup Do 1/N Technician & QC 1-Apr-13 11:30am 1:30pm 60 Lunch 1 Hr. (11:45am-12:45pm) trial & error>gather Learning Curve> need Proper technical Training 15 8 Join lower cup seam Do 1/N Mechanic 1-Apr-13 1:00pm 2:10pm 70 Simultaneous Activities alignment & adjustment problem> variability of materials usage>unavailability of SOP 5 Do Technician & QC 1-Apr-13 2:10pm 8:20am 130 trial & error>gather Learning Curve> need Proper technical Training 10 9 Topstitch open and sew lower cup seam Do 2/N Mechanic 1-Apr-13 9:00am 11:30am 90 alignment & adjustment problem> variability of materials usage>unavailability of SOP 10 Do Technician & QC 1-Apr-13 3:00pm 8:50am 110 trial & error>gather Learning Curve> need Proper technical Training 20 10 Join top gore and turn over to baste r/l sides Do 1/N Technician & QC 1-Apr-13 3:10pm 9:20am 130 Simultaneous Activities trial & error>gather Learning Curve> need Proper technical Training 10 11 Side wing baste and join with back wing Do 1/N Technician & QC 1-Apr-13 3:40pm 9:40am 120 Simultaneous Activities trial & error>gather Learning Curve> need Proper technical Training 15 12 Attach elastic ton front neckline Do 1/ZZ Technician & QC 2-Apr-13 8:25am 11:35am 190 Technical took longer time for adjustment> Gather learning Curve > need proper training of process control 40 13 Join cup seam Do 1/N Technician & QC 2-Apr-13 11:30am 1:30pm 60 Lunch 1 Hr. (11:45am-12:45pm) trial & error>gather Learning Curve> need Proper technical Training 20 14 Topstitch cup seam and fold Do 2/N Technician & QC 2-Apr-13 1:00pm 2:15pm 75 trial & error>gather Learning Curve> need Proper technical Training 30 15 Attach fixed net to cup bottom and armhole Do 1/N Technician & QC 2-Apr-13 2:00pm 3:00pm 60 trial & error>gather Learning Curve> need Proper technical Training 15 16 Attach elastic to underbast Do 3/ZZ Mechanic 2-Apr-13 9:30am 2:30pm 240 alignment & adjustment problem of feed dog > Change m/c> Decision 20 Do Technician & QC 2-Apr-13 2:30pm 3:50pm 80 trial & error>gather Learning Curve> need Proper technical Training 25 17 join cup with wings and gore and cradle together Do 1/N Technician & QC 2-Apr-13 3:50pm 8:15am 85 Simultaneous Activities trial & error>gather Learning Curve> need Proper technical Training 20 18 Attach elastic to top wing through armhole Do 3/ZZ Technician & QC 2-Apr-13 4:10pm 8:50am 100 trial & error>gather Learning Curve> need Proper technical Training 45 19 Attach wire casing on side seam Do 2/N Technician & QC 2-Apr-13 4:20pm 9:15am 115 trial & error>gather Learning Curve> need Proper technical Training 30 20 Sew wire casing on cup bottom Do 2/N Technician & QC 2-Apr-13 4:40pm 9:30am 110 trial & error>gather Learning Curve> need Proper technical Training 40 21 Attach elastic to back scoop Do 1/ZZ Technician & QC 2-Apr-13 4:50pm 9:40am 110 trial & error>gather Learning Curve> need Proper technical Training 20 22 Lock hook and eye Do 1/ZZ Technician & QC 3-Apr-13 8:20am 10:00am 100 trial & error>gather Learning Curve> need Proper technical Training 15 23 Overlap and sew shoulder strap and fold & fix elastic end at be scoop with ring inserted Do O/L Technician & QC 3-Apr-13 8:55am 10:30am 95 trial & error>gather Learning Curve> need Proper technical Training 15 24 Bt lock shoulder strap opening*4, elastic end at be scoop *2, lock wire & side seam end*8 Do B/T Technician & QC 3-Apr-13 9:40am 11:00am 80 trial & error>gather Learning Curve> need Proper technical Training 20 25 Attach Bow *3 Do B/A Technician & QC 3-Apr-13 9:55am 11:20am 85 trial & error>gather Learning Curve> need Proper technical Training 30 Hop Lun Ltd 10
  • 11. Summary-02 Activities Actual Expected Minutes Percentage Minutes Percentage Technician & QC 1920 78% 450 80% Mechanic 440 18% 65 12% Electrician 20 1% 35 6% Quality 50 2% 15 3% Line feeder 30 1% 0 0% Total 2460 100% 565 100% Total Operations/Process 20 20 Hop Lun Ltd 11
  • 12. Summary-02 Actual Expected 1920 440 20 50 30 78% 18% 1% 2% 1% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 0 1 2 3 4 5 6 0 500 1000 1500 2000 2500 Technician & QC Mechanic Electrician Quality Line feeder Minutes Percentage 450 65 35 15 0 80% 12% 6% 3% 0% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 0 1 2 3 4 5 6 0 50 100 150 200 250 300 350 400 450 500 Technician & QC Mechanic Electrician Quality Line feeder Minutes Percentage Hop Lun Ltd 12
  • 13. Comparison-02 Actual Expected 1920 440 20 50 30 450 65 35 15 00 500 1000 1500 2000 2500 Technician & QC Mechanic Electrician Quality Line feeder Series1 Series2 Hop Lun Ltd 13
  • 14. Root Causes-02 Note: LC & T - Gather Knowledge through Trial & Error and build upward learning curve thus needs proper training of process control M-MD - Maintenance of Management Decision Material - shortage/wrong U-SOP – Unavailability of SOP Root Causes Consumed Time Percentage LC & T 1895 78% M/c Inventory check 40 2% U-SOP 160 7% Waiting 50 2% Material 30 1% M-MD 240 10% Total 2415 100% LC&T M/cInventorycheck Change/Replace Waiting Material MD 0% 20% 40% 60% 80% 100% 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Pareto Analysis 02 - Root Cause Time Cumulative % Cut off % Hop Lun Ltd 14
  • 15. General Info o Sewing Line: A22 o Buyer: Debenhams o Style: 087-G-00636 o First M/C previous style finished time : 5.00 pm, 16-Sep o Previous style last output time : 4:45:00 PM,17 Sep o New Style start time : 11:20:00 AM,17 Sep o New style first output time : 3:20:00 PM,18 Sep CASE-03 Hop Lun Ltd 15
  • 16. Feeding Analysis-03 ITEM : MOULD PADDED BRA Date TIME Elapsed time Root Causes Expected Standard TimeSL# Operations/Activities Type of M/c or equipment Job responsibility START END Minutes Name Repeatability 1 Attach water-proof fabric on foam Do 1/N Mechanic 17-Sep-12 11.20 11.35 5 ok 5 Technician & QC 10 ok 10 2 Cut excess water-proof fabric seam allowance Do E/C Technician & QC 17-Sep-12 11.35 11.40 5 ok 5 3 attach lace at upper cup Do 1/ZZ Technician & QC 17-Sep-12 11.40 12.50 10 ok 15 4 Check swatch card Do Technician & QC 17-Sep-12 12.50 1.16 36 wrong Sample given>Sample Dept. given wrong sample 10 5 3th o/l neaten cup edge, cup btm, armhole foam edge Do O/L Mechanic 17-Sep-12 1.17 1.30 6 ok 5 Technician & QC 7 ok 10 6 Give above operation standard Do Technician & QC 17-Sep-12 1.30 2.10 40 ok 10 7 Correction lay-out paper Do IE 17-Sep-12 2.10 2.45 35 lay-out paper need correction>Job Description 0 8 wrap upper cup foam edge Do 1/N Mechanic 17-Sep-12 2.45 3.25 10 ok 10 Technician & QC 20 Trial & Error> Gather Learning Curve>need training 10 9 attach cup shell on foam Do 1/N Technician & QC 17-Sep-12 3.25 3.35 10 ok 10 10 join top gore and gore bottom then turn over to sew both sides Do 1/N Technician & QC 17-Sep-12 3.35 3.45 10 ok 10 11 attach net to side wing Do 1/N Technician & QC 17-Sep-12 3.45 3.50 5 ok 10 12 Align M/C according to lay-out paper & Add electric power Do Mechanic 17-Sep-12 3.50 4.30 30 No available space to keep M/C which manage from another line & communication gap> M/c inventory status check 10 Electrician 10 20 13 join side wings with cups Do 1/N Technician & QC 17-Sep-12 4.30 4.35 5 ok 10 14 attach elastic to lower wing Do 1/ZZ Mechanic 17-Sep-12 4.35 5.00 15 ok 10 Technician & QC 10 ok 10 15 topstitch elastic on lower wing Do 1/ZZ Mechanic 18-Sep-12 8.05 9.00 20 Adjustment & Alignment Problem>Unviability of SOP 10 Technician & QC 35 Trial & Error> Gather Learning Curve>need training 25 16 Waiting for Technician Do Technician & QC 18-Sep-12 9.00 9.30 30 Technician engage in meeting>job Description 0 17 insert cup Do 1/N Technician & QC 18-Sep-12 9.30 10.10 40 operator engage in another sewing line> incorrect Man-Hour planning 15 18 attach elastic to upper wing through underarm Do 3/ZZ Mechanic 18-Sep-12 10.10 11.05 10 ok 10 Technician & QC 45 previous style accessories shortage & recut problem> Replenishment problem 25 19 attach binding to side seam Do 2/N Mechanic 18-Sep-12 11.05 11.30 10 ok 5 Technician & QC 15 ok 15 20 sew wire casing on cup bottom Do 2/N Mechanic 18-Sep-12 11.30 1.10 18 ok 10 Technician & QC 22 Trial & Error> Gather Learning Curve>need training 15 21 attach elastic to be scoop Do 1/ZZ Mechanic 18-Sep-12 1.10 1.45 10 ok 10 Technician & QC 25 ok 20 22 lock H&E Do 1/ZZ Technician & QC 18-Sep-12 1.45 2.15 30 Trial & Error> Gather Learning Curve>need training 20 23 overlap&sew shoulder strap with slider Do 1/N Mechanic 18-Sep-12 2.15 2.30 5 ok 5 Technician & QC 10 ok 10 24 bt lock shoulder strap Do B/T Mechanic 18-Sep-12 2.30 2.40 5 ok 5 Technician & QC 5 ok 10 25 attach 1 bow and 1 gore tag Do 1/ZZ Mechanic 18-Sep-12 2.40 3.20 10 ok 10 Technician & QC 30 Trial & Error> Gather Learning Curve>need training 20 Hop Lun Ltd 16
  • 17. Summary-03 Activities Actual Expected Minutes Percentage Minutes Percentage Technician & QC 455 70% 295 70% Mechanic 154 24% 105 25% Electrician 10 2% 20 5% IE 35 5% 0 0% Total 654 100% 420 100% Total Operations/Process 20 20 Hop Lun Ltd 17
  • 18. Graph-03 Actual Expected 455 154 10 35 70% 24% 2% 5% 0% 10% 20% 30% 40% 50% 60% 70% 80% 0 1 2 3 4 5 0 50 100 150 200 250 300 350 400 450 500 Minutes Percentage 295 105 20 0 70% 25% 5% 0% 0% 10% 20% 30% 40% 50% 60% 70% 80% 0 1 2 3 4 5 0 50 100 150 200 250 300 350 Minutes Percentage Hop Lun Ltd 18
  • 19. Actual vs. Expected-03 Actual Expected 455 154 10 35 295 105 20 00 50 100 150 200 250 300 350 400 450 500 Technician & QC Mechanic Electrician IE Series1 Series2 Hop Lun Ltd 19
  • 20. Root Causes-03 Note: LC & T - Gather Knowledge through Trial & Error and build upward learning curve thus needs proper training of process control M-MD - Maintenance of Management Decision Material - shortage/wrong U-SOP – Unavailability of SOP Root Causes Consumed Time Percenta ge LC & T 137 44% M/c Inventory check 10 3% JD 65 21% SOP 36 12% U-SOP 20 6% Replenish 45 14% Total 313 100% LC&T JD Replenish SOP U-SOP M/cInventoryCheck 0% 20% 40% 60% 80% 100% 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 Pareto Analysis 03 - Root Cause Time Cumulative % Cut off % Hop Lun Ltd 20
  • 21. Consolidation Hop Lun Ltd 21 Root Causes -1 LC & T M/c Inventory check Change/Replace Waiting Material MD Root Causes - 2 LC & T M-MD U-SOP Waiting M/c Inventory Check Material Root Causes - 3 LC & T JD Replenish SOP U-SOP M/c Inventory Check LC & T M/c Inventory check Material MD M-MD U-SOP JD Waiting Replenish SOP
  • 22. Consolidation Hop Lun Ltd 22 LC&T M/cInventorycheck M-MD U-SOP Material Waiting JD Replenish SOP Change/Replace MD 0% 20% 40% 60% 80% 100% 0 500 1000 1500 2000 2500 3000 Axis Title 80/20 Analysis Time Cum % Cut Off 73% 6% 6% 4% 3% 2% 2% 1% 1% 1% 1% Pie Chart- Proportion of Causes LC & T M/c Inventory check M-MD U-SOP Material Waiting JD 20 % Root Causes consume 80% time
  • 23. Goal(s) Hop Lun Ltd 23 By making setup times/Change over times quicker and simpler to enables Hoplun produces smaller lots with higher flexibility. This means company can meet their customers’ needs for high quality, low cost products that are delivered quickly and without the expense of excess inventory.
  • 24. Objective(s) Hop Lun Ltd 24 1. The setup time for every operation should be made or ready for bulk production in less than 10 minutes. 2. There will be no interruption in hourly production during change over
  • 25. Hop Lun Ltd 25 Strategy
  • 26. Hop Lun Ltd 26 Strategy
  • 27. Hop Lun Ltd 27 Splitting…
  • 28. Hop Lun Ltd 28 Internal Activities
  • 29. Hop Lun Ltd 29 Correlation Between Internal Activities & Root Causes • M/C Inventory MACHINE SEARCHING/MACHINE READYNESS AS PER LAY OUT •Change/Repl aceATTACHMENT OF GUIDES & FOLDERS •MD, JDFEEDING MEETING •M/C InventoryMACHINE SETUP AS PER LAYOUT • U-SOPLINE FEEDING & STITCHING STANDARD FIX •U-SOP, M-MD GUIDE & FOLDERS ADJUSTMENT AS PER STANDARD •LC & TENSURE BUYER MEASUREMENT STANDARD & GET UP Possible to make external Activities Trial & tune it as external activities Possible to make external Activities Perform Parallel as internal activities Perform Parallel as internal activities Perform Parallel as internal activities Perform Parallel as internal activities
  • 30. Hop Lun Ltd 30 Corrective Action Plan Root Causes Short Term Plan Mid Term Plan Long Term Plan Code Elaboration LC & T Gather Knowledge through Trial & Error and build upward learning curve thus needs proper training of process control 1. Standardize HC of QC & Technician. 2. Ensure attendance of Tec & QC Standardize the process wise setup time 1. Ensure proper training of process control to Technician & QC personnel. 2. Ensure proper training to operator to know how to fix required SPI. M/c Inventory check No visual inventory system & current Inventory status is not updated continuously Visualize & Update Inventory & Define Roles Display Inventory at Floor, Retrieval system Implement TPM Material Shortage or send wrong material Visualize the material replenishment Practice the Kaizen Board to visualize the problem Need to develop mistake proofing techniques at cutting & W/H MD Management Decision Practice Kaizen board to visualize problem Perform weekly kaizen meeting & take corrective action on weekly basis M-MD Maintenance -Management Decision Review the job reporting system during changeover Standardize time limit to maintenance/solve a job Train and Visualize the next level decision to solve a problem U-SOP Unavailability of SOP List down and review SOP of machine maintenance Standardize SOP Sustain SOP JD Job Description Review Job description Standardize Job description Sustain JD Replenish Input material not receive at due time Standardize Replenishment SOP Standardize the place & visualize inventory SOP SOP not followed Review operating Procedure Standardize the operating procedure
  • 31. Change Over Off Sets Hop Lun Ltd 31 Need Discussion, Grooming & Then……..