Planning Engineer
Resume : Malayarasan.M
Date of Birth : 06.12.1989
Nationality : Indian
Qualification : Electronics & Instrumentation Engineering
Experience : 3+ Years
CAREER SUMMARY:
 Working knowledge in Planning Tools
o Primavera – P6
o MS Project
 Experience in Electrical Substation Project (132 & 66 kV)
PROJECTS WORKED:
 Qatar General Electricity & Water Corporation Project
(KAHRAMAA/WSP) - NATIONAL CONTRACTING COMPANY
(NCC) QATAR
 Qatar Aluminium Limited (QATALUM) – CONSTRUCTION
DEVELOPMENT COMPANY (CDC) QATAR
 ALJABER @ RLIC – CONSTRUCTION DEVELOPMENT COMPANY
(CDC) QATAR
PLANNING ENGINEER RESPONSIBILITIES AND ROLES
 To Create the Schedule Based on the scope of Work (Duration of the
Project)
 To allocate the Man Power in the Primavera Program based on the
Final Letter of Award (FLOA) Price
 Based on the FLOA Price & Scope, to finalize the Price Schedule &
Enterprise Resource Procedure (ERP)
 To Finalize the Weightage for each line item Based on the Approved
Price Schedule
 To Create the Critical Path Activity of the Milestone for Project
Monitoring Purpose & to avoid any Delay
 To Create S Curve for the Overall Project & Individual Categories like
Engineering, Procurement, Construction, Installation & Testing
Commissioning
 To Create Cash Flow for the Individual Projects for Monitoring
Purpose & To Annalise Cash inflow & Outflow of the Projects (Plan Vs
Actual)
 For Primavera Updating Purpose Create registers like Engineering &
2 of 3
procurement based on the Approved Price Schedule
 To Create Daily Progress Report (DPR), Weekly Progress Report
(WPR), Monthly Progress Report (MPR) for Monitoring Purpose
 At the Project Ending stage, Once the program getting the Status on
“B” We can Eligible for Applying Extension of Time request (EOT) for
the Project.
PREVIOUS PROJECTS WORKED:
 Construction Development Company, Qatar
1. GALFAR @ HALUL
2. L & T @ RLIC
 National Drilling Company, Abu Dhabi
 Vijaj Steel, Mumbai
 Chemtrols Industries limited, Goa
SAP CMMS ENGINEER RESPONSIBILITIES AND ROLES
 Analysis from the given source and create noun &modifier
 Create template for the noun modifier (attributes)
 Collect the product mandatory details from the warehouse or else from
the internet
 Create Unit of measurement (UOM) & update the Physical Verification
Details
 Date Cleansing, Data Enrichment, Noun Modifier Creation as Per
MESC
 Preparation of short & long Description
 Create Document Master from the given P&ID, SLD, layout,
Specification sheet, etc. from the Document master create bill of
material (BOM)
 Reviewing and Creating SPARE PARTS INTERCHANGEABILITY
RECORD (SPIR) as per End user requirement creation of Hierarchy
Structure for the Plant
 Creation of Hierarchy Structure for the Plant Equipment
PERSONAL DETAILS
 Passport Number : K8987956
 Date of Expiry : 21.01.2023
 Mobile no : +974 50108496 (Qatar), +91 9944404891 (India)
3 of 3
*********

Contenu connexe

Tendances

Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14
Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14
Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14p6academy
 
Technip case study
Technip case studyTechnip case study
Technip case studyignitetribes
 
Improving Productivity Using FME Workbench
Improving Productivity Using FME WorkbenchImproving Productivity Using FME Workbench
Improving Productivity Using FME WorkbenchSafe Software
 
TILOS: Brochure
TILOS: BrochureTILOS: Brochure
TILOS: BrochureCisco
 

Tendances (6)

Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14
Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14
Integrating cost and schedule in p6 - Oracle Primavera P6 Collaborate 14
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
Technip case study
Technip case studyTechnip case study
Technip case study
 
Improving Productivity Using FME Workbench
Improving Productivity Using FME WorkbenchImproving Productivity Using FME Workbench
Improving Productivity Using FME Workbench
 
DPS - Copy
DPS - CopyDPS - Copy
DPS - Copy
 
TILOS: Brochure
TILOS: BrochureTILOS: Brochure
TILOS: Brochure
 

En vedette

Cifosis para defender
Cifosis para defenderCifosis para defender
Cifosis para defenderUPTAEB
 
Analysis of results media
Analysis of results mediaAnalysis of results media
Analysis of results mediamillieiron
 
Linkedin personal resume 20150128
Linkedin personal resume 20150128Linkedin personal resume 20150128
Linkedin personal resume 20150128Edward Chao
 
Dr. Chao profile in Linkedin (May-2016)
Dr. Chao profile in Linkedin (May-2016)Dr. Chao profile in Linkedin (May-2016)
Dr. Chao profile in Linkedin (May-2016)Edward Chao
 
Creating healthy effective and resilient organisations - HERO's
Creating healthy effective and resilient organisations - HERO'sCreating healthy effective and resilient organisations - HERO's
Creating healthy effective and resilient organisations - HERO'sSelina Monk Simson MSc MBPs FLPI
 
Location of our film
Location of our filmLocation of our film
Location of our filmmillieiron
 
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХКлуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХPavel Gamolskiy
 
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mbDubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mbMohammed Hajjar
 
RESUME OF SANDIP S GANGULY
RESUME OF SANDIP S GANGULYRESUME OF SANDIP S GANGULY
RESUME OF SANDIP S GANGULYSANDIP GANGULY
 
Спортивные сборы в Красной Поляне
Спортивные сборы в Красной ПолянеСпортивные сборы в Красной Поляне
Спортивные сборы в Красной ПолянеKupola
 
Latino initiative powepoint 1 25-14
Latino initiative powepoint 1 25-14Latino initiative powepoint 1 25-14
Latino initiative powepoint 1 25-14youthdiscovery
 
Suresh_ System administrator.doc
Suresh_ System administrator.docSuresh_ System administrator.doc
Suresh_ System administrator.docSuresh Annadurai
 
Inspiration and moodboard
Inspiration and moodboardInspiration and moodboard
Inspiration and moodboardmillieiron
 
E-Brochure Noida World One (1)
E-Brochure Noida World One (1)E-Brochure Noida World One (1)
E-Brochure Noida World One (1)saurabh manchanda
 

En vedette (19)

Production processes
Production processesProduction processes
Production processes
 
Cifosis para defender
Cifosis para defenderCifosis para defender
Cifosis para defender
 
Analysis of results media
Analysis of results mediaAnalysis of results media
Analysis of results media
 
Linkedin personal resume 20150128
Linkedin personal resume 20150128Linkedin personal resume 20150128
Linkedin personal resume 20150128
 
Dr. Chao profile in Linkedin (May-2016)
Dr. Chao profile in Linkedin (May-2016)Dr. Chao profile in Linkedin (May-2016)
Dr. Chao profile in Linkedin (May-2016)
 
Creating healthy effective and resilient organisations - HERO's
Creating healthy effective and resilient organisations - HERO'sCreating healthy effective and resilient organisations - HERO's
Creating healthy effective and resilient organisations - HERO's
 
Location of our film
Location of our filmLocation of our film
Location of our film
 
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХКлуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
 
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mbDubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
 
RESUME OF SANDIP S GANGULY
RESUME OF SANDIP S GANGULYRESUME OF SANDIP S GANGULY
RESUME OF SANDIP S GANGULY
 
Jonathan Mulosa ET'Al
Jonathan Mulosa ET'AlJonathan Mulosa ET'Al
Jonathan Mulosa ET'Al
 
Спортивные сборы в Красной Поляне
Спортивные сборы в Красной ПолянеСпортивные сборы в Красной Поляне
Спортивные сборы в Красной Поляне
 
Latino initiative powepoint 1 25-14
Latino initiative powepoint 1 25-14Latino initiative powepoint 1 25-14
Latino initiative powepoint 1 25-14
 
Suresh_ System administrator.doc
Suresh_ System administrator.docSuresh_ System administrator.doc
Suresh_ System administrator.doc
 
Inspiration and moodboard
Inspiration and moodboardInspiration and moodboard
Inspiration and moodboard
 
Yader
YaderYader
Yader
 
Dr. Moscato
Dr. MoscatoDr. Moscato
Dr. Moscato
 
Haiti Gonna Hate
Haiti Gonna HateHaiti Gonna Hate
Haiti Gonna Hate
 
E-Brochure Noida World One (1)
E-Brochure Noida World One (1)E-Brochure Noida World One (1)
E-Brochure Noida World One (1)
 

Similaire à Planning Engineer Resume: Malayarasan.M

Similaire à Planning Engineer Resume: Malayarasan.M (20)

Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
spi 3+ years resume
spi 3+ years resumespi 3+ years resume
spi 3+ years resume
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
 
RESUME_Sumeet
RESUME_SumeetRESUME_Sumeet
RESUME_Sumeet
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
Shahzad Sikandaruk
Shahzad SikandarukShahzad Sikandaruk
Shahzad Sikandaruk
 
Rohan_Resume (1)
Rohan_Resume (1)Rohan_Resume (1)
Rohan_Resume (1)
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
C.V of Prasanta
C.V of PrasantaC.V of Prasanta
C.V of Prasanta
 
CV_RuchiraDas
CV_RuchiraDasCV_RuchiraDas
CV_RuchiraDas
 
CV_Puran Kumar_Latest
CV_Puran Kumar_LatestCV_Puran Kumar_Latest
CV_Puran Kumar_Latest
 
Vinoth_Resume_EXP-15 years
Vinoth_Resume_EXP-15 yearsVinoth_Resume_EXP-15 years
Vinoth_Resume_EXP-15 years
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
PALLAMI resume
PALLAMI resumePALLAMI resume
PALLAMI resume
 
Sankar_Electrical Design & Est. Engineer
Sankar_Electrical Design & Est. EngineerSankar_Electrical Design & Est. Engineer
Sankar_Electrical Design & Est. Engineer
 
AbdulKalamAzad - CAD Designer
AbdulKalamAzad - CAD DesignerAbdulKalamAzad - CAD Designer
AbdulKalamAzad - CAD Designer
 

Planning Engineer Resume: Malayarasan.M

  • 1. Planning Engineer Resume : Malayarasan.M Date of Birth : 06.12.1989 Nationality : Indian Qualification : Electronics & Instrumentation Engineering Experience : 3+ Years CAREER SUMMARY:  Working knowledge in Planning Tools o Primavera – P6 o MS Project  Experience in Electrical Substation Project (132 & 66 kV) PROJECTS WORKED:  Qatar General Electricity & Water Corporation Project (KAHRAMAA/WSP) - NATIONAL CONTRACTING COMPANY (NCC) QATAR  Qatar Aluminium Limited (QATALUM) – CONSTRUCTION DEVELOPMENT COMPANY (CDC) QATAR  ALJABER @ RLIC – CONSTRUCTION DEVELOPMENT COMPANY (CDC) QATAR PLANNING ENGINEER RESPONSIBILITIES AND ROLES  To Create the Schedule Based on the scope of Work (Duration of the Project)  To allocate the Man Power in the Primavera Program based on the Final Letter of Award (FLOA) Price  Based on the FLOA Price & Scope, to finalize the Price Schedule & Enterprise Resource Procedure (ERP)  To Finalize the Weightage for each line item Based on the Approved Price Schedule  To Create the Critical Path Activity of the Milestone for Project Monitoring Purpose & to avoid any Delay  To Create S Curve for the Overall Project & Individual Categories like Engineering, Procurement, Construction, Installation & Testing Commissioning  To Create Cash Flow for the Individual Projects for Monitoring Purpose & To Annalise Cash inflow & Outflow of the Projects (Plan Vs Actual)  For Primavera Updating Purpose Create registers like Engineering &
  • 2. 2 of 3 procurement based on the Approved Price Schedule  To Create Daily Progress Report (DPR), Weekly Progress Report (WPR), Monthly Progress Report (MPR) for Monitoring Purpose  At the Project Ending stage, Once the program getting the Status on “B” We can Eligible for Applying Extension of Time request (EOT) for the Project. PREVIOUS PROJECTS WORKED:  Construction Development Company, Qatar 1. GALFAR @ HALUL 2. L & T @ RLIC  National Drilling Company, Abu Dhabi  Vijaj Steel, Mumbai  Chemtrols Industries limited, Goa SAP CMMS ENGINEER RESPONSIBILITIES AND ROLES  Analysis from the given source and create noun &modifier  Create template for the noun modifier (attributes)  Collect the product mandatory details from the warehouse or else from the internet  Create Unit of measurement (UOM) & update the Physical Verification Details  Date Cleansing, Data Enrichment, Noun Modifier Creation as Per MESC  Preparation of short & long Description  Create Document Master from the given P&ID, SLD, layout, Specification sheet, etc. from the Document master create bill of material (BOM)  Reviewing and Creating SPARE PARTS INTERCHANGEABILITY RECORD (SPIR) as per End user requirement creation of Hierarchy Structure for the Plant  Creation of Hierarchy Structure for the Plant Equipment PERSONAL DETAILS  Passport Number : K8987956  Date of Expiry : 21.01.2023  Mobile no : +974 50108496 (Qatar), +91 9944404891 (India)