ThyssenKrupp CSA Companhia Siderúrgica
DATE: 10-01-2011 Jumatatu
AREA: C56-FGD-PIPING
DIRECT MANPOWER: 35
REPORTED BY: Manuel Bartilotti
Pict.#1
Pict.#2
Pict.#3
Fabric Filter Bag Cleaning, been lifted to the
Platform EL+32.000, where is gone be Installed
and Connected with Rubber Hoses to the
Fabric Filters Bag Cleaning.
Picture#1, Shows the Air Pressure Pipes For
Both Ends Already Welded, who comes from
Daily Report
BOILER, FGD and PIPING
COSTRUCTION HIGHTLIGHTS: PICTURES
Product Silo, in the West Side of the Battery-B.
Placed on the Top of the Plates who Covering
the Fabric Filter Hoppers.
Picture#2, Shows The Air Pressure Pipes
Ash Conveying Blow Tanks to feed into the
Picture#3, Shows the one of Gummed
Bends Inwardly Lined with Porcelaine with the
A
ThyssenKrup
p
Steel
Company
ThyssenKrupp CSA Companhia Siderúrgica
DATE: 10-01-2011 Jumatatu
AREA: C56-FGD-PIPING
DIRECT MANPOWER: 35
REPORTED BY: Manuel Bartilotti
Pict.#4
Pict.#5
Pict.#6
Daily Report
BOILER, FGD and PIPING
AREAS of CONCERN: PICTURES
Concerning with not yet Installed Equipments
at "FGD-BATTERY-B", I still continue to inform
You the Missing Equipments, With his TAG.
NUMBERS, at the EL+0.000: Water Pumps:
(PP-13-61A) & (PP-13-61B).
Water for the Bearings of the Primary Fans and
the other is (OT02014-40) who is the Outlet
Water from the Bearings.
Picture#5, Shows the Electric Heater which
TAG: Nº is (AH-13-81A) already Fixed on their
Product Silo, in the East Side of the Battery-B.
Both Ends Already Welded, who comes from
Bends Inwardly Lined with Porcelaine with the
Supports. Now I can Start Connecting the Pipe
Work.
ones are (RW02006-40) who refill the Cooling
Picture#4, Shows the 1-1/2" Pipes which
Ash Conveying Blow Tanks to feed into the
Picture#6, Shows the other Gummed
A
ThyssenKrup
p
Steel
Company
A
ThyssenKrup
p
Steel
Company
A
ThyssenKrup
p
Steel
Company

Contenu connexe

Plus de Manuel Bartilotti

PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
Manuel Bartilotti
 
OSSA Regional Orientation Program
OSSA Regional Orientation ProgramOSSA Regional Orientation Program
OSSA Regional Orientation Program
Manuel Bartilotti
 
Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.
Manuel Bartilotti
 
RECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BVRECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BV
Manuel Bartilotti
 
Recommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.LdaRecommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.Lda
Manuel Bartilotti
 
Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.
Manuel Bartilotti
 
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORSRecommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Manuel Bartilotti
 
WELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATEWELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATE
Manuel Bartilotti
 
Recommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren MadagascarRecommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren Madagascar
Manuel Bartilotti
 
ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.
Manuel Bartilotti
 
RECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALYRECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALY
Manuel Bartilotti
 
RECOMMENDATION LETTER FROM THYSSENKRUPP-CSA
RECOMMENDATION LETTER FROM THYSSENKRUPP-CSARECOMMENDATION LETTER FROM THYSSENKRUPP-CSA
RECOMMENDATION LETTER FROM THYSSENKRUPP-CSA
Manuel Bartilotti
 
My J.C.I. Saref Project Card
My J.C.I. Saref Project CardMy J.C.I. Saref Project Card
My J.C.I. Saref Project Card
Manuel Bartilotti
 
Recommendation Letter from STORK INDUSTRY SERVICES B.V.
Recommendation Letter from STORK INDUSTRY SERVICES B.V.Recommendation Letter from STORK INDUSTRY SERVICES B.V.
Recommendation Letter from STORK INDUSTRY SERVICES B.V.
Manuel Bartilotti
 
Recommendation Letter from FABRICOM-GTI-SUEZ
Recommendation Letter from FABRICOM-GTI-SUEZRecommendation Letter from FABRICOM-GTI-SUEZ
Recommendation Letter from FABRICOM-GTI-SUEZ
Manuel Bartilotti
 
RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.
RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.
RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.
Manuel Bartilotti
 
FKI-Recommendation Letter from Babcock Engineer Contractors (Pty) Limited
FKI-Recommendation Letter from Babcock Engineer Contractors (Pty) LimitedFKI-Recommendation Letter from Babcock Engineer Contractors (Pty) Limited
FKI-Recommendation Letter from Babcock Engineer Contractors (Pty) Limited
Manuel Bartilotti
 

Plus de Manuel Bartilotti (20)

MY VCA-1
MY VCA-1MY VCA-1
MY VCA-1
 
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
 
RBCS Alberta BC Safety
RBCS Alberta BC SafetyRBCS Alberta BC Safety
RBCS Alberta BC Safety
 
OSSA Regional Orientation Program
OSSA Regional Orientation ProgramOSSA Regional Orientation Program
OSSA Regional Orientation Program
 
Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.
 
RECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BVRECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BV
 
Recommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.LdaRecommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.Lda
 
Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.
 
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORSRecommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
 
WELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATEWELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATE
 
Recommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren MadagascarRecommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren Madagascar
 
ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.
 
RECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALYRECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALY
 
RECOMMENDATION LETTER FROM THYSSENKRUPP-CSA
RECOMMENDATION LETTER FROM THYSSENKRUPP-CSARECOMMENDATION LETTER FROM THYSSENKRUPP-CSA
RECOMMENDATION LETTER FROM THYSSENKRUPP-CSA
 
My J.C.I. Saref Project Card
My J.C.I. Saref Project CardMy J.C.I. Saref Project Card
My J.C.I. Saref Project Card
 
Recommendation Letter from STORK INDUSTRY SERVICES B.V.
Recommendation Letter from STORK INDUSTRY SERVICES B.V.Recommendation Letter from STORK INDUSTRY SERVICES B.V.
Recommendation Letter from STORK INDUSTRY SERVICES B.V.
 
Recommendation Letter from FABRICOM-GTI-SUEZ
Recommendation Letter from FABRICOM-GTI-SUEZRecommendation Letter from FABRICOM-GTI-SUEZ
Recommendation Letter from FABRICOM-GTI-SUEZ
 
RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.
RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.
RECOMMENDATION LETTER FROM ALLSEAS ENGINEERING B.V.
 
FKI-Recommendation Letter from Babcock Engineer Contractors (Pty) Limited
FKI-Recommendation Letter from Babcock Engineer Contractors (Pty) LimitedFKI-Recommendation Letter from Babcock Engineer Contractors (Pty) Limited
FKI-Recommendation Letter from Babcock Engineer Contractors (Pty) Limited
 
My Q.C.S. Card
My Q.C.S. CardMy Q.C.S. Card
My Q.C.S. Card
 

Piping Daily Report_FGD_10-01-2011

  • 1. ThyssenKrupp CSA Companhia Siderúrgica DATE: 10-01-2011 Jumatatu AREA: C56-FGD-PIPING DIRECT MANPOWER: 35 REPORTED BY: Manuel Bartilotti Pict.#1 Pict.#2 Pict.#3 Fabric Filter Bag Cleaning, been lifted to the Platform EL+32.000, where is gone be Installed and Connected with Rubber Hoses to the Fabric Filters Bag Cleaning. Picture#1, Shows the Air Pressure Pipes For Both Ends Already Welded, who comes from Daily Report BOILER, FGD and PIPING COSTRUCTION HIGHTLIGHTS: PICTURES Product Silo, in the West Side of the Battery-B. Placed on the Top of the Plates who Covering the Fabric Filter Hoppers. Picture#2, Shows The Air Pressure Pipes Ash Conveying Blow Tanks to feed into the Picture#3, Shows the one of Gummed Bends Inwardly Lined with Porcelaine with the A ThyssenKrup p Steel Company
  • 2. ThyssenKrupp CSA Companhia Siderúrgica DATE: 10-01-2011 Jumatatu AREA: C56-FGD-PIPING DIRECT MANPOWER: 35 REPORTED BY: Manuel Bartilotti Pict.#4 Pict.#5 Pict.#6 Daily Report BOILER, FGD and PIPING AREAS of CONCERN: PICTURES Concerning with not yet Installed Equipments at "FGD-BATTERY-B", I still continue to inform You the Missing Equipments, With his TAG. NUMBERS, at the EL+0.000: Water Pumps: (PP-13-61A) & (PP-13-61B). Water for the Bearings of the Primary Fans and the other is (OT02014-40) who is the Outlet Water from the Bearings. Picture#5, Shows the Electric Heater which TAG: Nº is (AH-13-81A) already Fixed on their Product Silo, in the East Side of the Battery-B. Both Ends Already Welded, who comes from Bends Inwardly Lined with Porcelaine with the Supports. Now I can Start Connecting the Pipe Work. ones are (RW02006-40) who refill the Cooling Picture#4, Shows the 1-1/2" Pipes which Ash Conveying Blow Tanks to feed into the Picture#6, Shows the other Gummed A ThyssenKrup p Steel Company A ThyssenKrup p Steel Company A ThyssenKrup p Steel Company